        Network scheduling in Glassware Industry
Abstract:
The case study is being carried out from the data made available
by LA OPALA Glassware industry situated at Madhupur in
Deoghar, Jharkhand.
Study is based on the daily production processes taking place in
the industry.
Case study is based on Network scheduling and critical path
method(CPM) technique is used to solve the problem.
It is a step by step process to find out the critical path which
determine the time required to produce glass product.
The main aim is to reduce the production time and gain the
maximum profit to survive competition in modern day scenario.

          Network scheduling in Glassware Industry
Methodology:
Problem statement:
  There are around 15 -20 steps involved in the production of a
  finished glassware product from raw materials.
  Some of the steps are relatively insignificant as compared to
  others.
  The problem is to find out the longest path that includes all
  the necessary processes.
Solution:
  Network scheduling is being used to solve the problem.


             Network scheduling in Glassware Industry
Network design




•The critical path method (CPM) is used to find the
solution of this Network scheduling problem.
•It determines the longest path that includes all the
necessary production processes.
          Network scheduling in Glassware Industry
Results and Discussions:
Result:
  The critical path is found out to be 1-2-4-5-6-7-8-9-10-11-
  12-13-14-15-16-17-18.
  The critical length of duration is: 793 min.
Discussions:
  All the techniques applied in any industry results is based on
  maximum production in minimum time.
  To optimize the model the manufactures need to carry out
  more no. of processes simultaneously.
  Projects having independent activities are better suited to the
  network scheduling technique.
Conclusion:
The case study was carried out keeping in mind the daily
production activities taking place at LA OPALA glassware
industry.
The analysis was carried out using by Network scheduling
using CPM technique.
The case study has enabled me to apply the theoretical
studies in real time industrial scenario.
The study provides an overview of modern day industrial
scenario and how the day to day problems are being tackled
and solutions are brought to application.
THANK YOU

Mais conteúdo relacionado

Mais procurados

A Study on Project Planning Using the Deterministic and Probabilistic Models ...
A Study on Project Planning Using the Deterministic and Probabilistic Models ...A Study on Project Planning Using the Deterministic and Probabilistic Models ...
A Study on Project Planning Using the Deterministic and Probabilistic Models ...IJERA Editor
 
Project management
Project managementProject management
Project managementShankaran Rd
 
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap ReductionESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap ReductionESTIEM
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET Journal
 
PDM - Precedence Diagram Method
PDM - Precedence Diagram MethodPDM - Precedence Diagram Method
PDM - Precedence Diagram Methodphantai24
 
IDEF0 and Software Process Engineering Model
IDEF0 and Software Process Engineering ModelIDEF0 and Software Process Engineering Model
IDEF0 and Software Process Engineering ModelMandar Trivedi
 
Ray stratton aace presentation
Ray stratton aace presentationRay stratton aace presentation
Ray stratton aace presentationDr Ezzat Mansour
 
Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang
 
Comparative characteristics of pert and cpm
Comparative characteristics of pert and cpmComparative characteristics of pert and cpm
Comparative characteristics of pert and cpmKinshook Chaturvedi
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTS.Vijaya Bhaskar
 
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET Journal
 
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...IRJET Journal
 
Process Modeling with IDEF 0
Process Modeling with IDEF 0Process Modeling with IDEF 0
Process Modeling with IDEF 0Mandar Trivedi
 

Mais procurados (19)

Pert & cpm
Pert & cpmPert & cpm
Pert & cpm
 
CPM-Updating
CPM-UpdatingCPM-Updating
CPM-Updating
 
A Study on Project Planning Using the Deterministic and Probabilistic Models ...
A Study on Project Planning Using the Deterministic and Probabilistic Models ...A Study on Project Planning Using the Deterministic and Probabilistic Models ...
A Study on Project Planning Using the Deterministic and Probabilistic Models ...
 
Project management
Project managementProject management
Project management
 
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap ReductionESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
 
Project management cpm-pert
Project management   cpm-pertProject management   cpm-pert
Project management cpm-pert
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
 
PDM - Precedence Diagram Method
PDM - Precedence Diagram MethodPDM - Precedence Diagram Method
PDM - Precedence Diagram Method
 
IDEF0 and Software Process Engineering Model
IDEF0 and Software Process Engineering ModelIDEF0 and Software Process Engineering Model
IDEF0 and Software Process Engineering Model
 
Ray stratton aace presentation
Ray stratton aace presentationRay stratton aace presentation
Ray stratton aace presentation
 
Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)
 
Comparative characteristics of pert and cpm
Comparative characteristics of pert and cpmComparative characteristics of pert and cpm
Comparative characteristics of pert and cpm
 
cpmpertmy (1)
cpmpertmy (1)cpmpertmy (1)
cpmpertmy (1)
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERT
 
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
 
EARNED VALUE MANAGEMENT
EARNED VALUE MANAGEMENTEARNED VALUE MANAGEMENT
EARNED VALUE MANAGEMENT
 
Bballard2000 dissertation
Bballard2000 dissertationBballard2000 dissertation
Bballard2000 dissertation
 
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
 
Process Modeling with IDEF 0
Process Modeling with IDEF 0Process Modeling with IDEF 0
Process Modeling with IDEF 0
 

Destaque

Project network scheduling and S-curve
Project network scheduling and S-curve Project network scheduling and S-curve
Project network scheduling and S-curve Satish Yadavalli
 
Network scheduling with limited_resources- revised1
Network scheduling with limited_resources- revised1Network scheduling with limited_resources- revised1
Network scheduling with limited_resources- revised1Ninoto Zhimomi
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations SchedulingAshish Jain
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Schedulingsenthil.G
 
Network Problem CPM & PERT
Network Problem CPM &  PERTNetwork Problem CPM &  PERT
Network Problem CPM & PERTPulchowk Campus
 
Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )Akaresh Jose Kaviyil JY
 
Operation scheduling
Operation schedulingOperation scheduling
Operation schedulingsai precious
 

Destaque (11)

Project network scheduling and S-curve
Project network scheduling and S-curve Project network scheduling and S-curve
Project network scheduling and S-curve
 
Network scheduling with limited_resources- revised1
Network scheduling with limited_resources- revised1Network scheduling with limited_resources- revised1
Network scheduling with limited_resources- revised1
 
Network scheduling
Network scheduling Network scheduling
Network scheduling
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
 
Ch17 scheduling
Ch17 schedulingCh17 scheduling
Ch17 scheduling
 
Pert & Cpm
Pert & CpmPert & Cpm
Pert & Cpm
 
Network Problem CPM & PERT
Network Problem CPM &  PERTNetwork Problem CPM &  PERT
Network Problem CPM & PERT
 
Project Management PERT and CPM
Project Management PERT and CPMProject Management PERT and CPM
Project Management PERT and CPM
 
Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 

Semelhante a Network scheduling

IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining TimeIRJET Journal
 
Improvement strategy by using ML and TM. A case study for solving cracking i...
Improvement strategy by using ML and TM. A  case study for solving cracking i...Improvement strategy by using ML and TM. A  case study for solving cracking i...
Improvement strategy by using ML and TM. A case study for solving cracking i...q-Maxim
 
Real-time Manufacturing Management for a Hybrid Process
Real-time Manufacturing Management for a Hybrid ProcessReal-time Manufacturing Management for a Hybrid Process
Real-time Manufacturing Management for a Hybrid Processmichaelthonea
 
COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...
COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...
COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...IRJET Journal
 
Nc verification and re processing for collaborative machining
Nc verification and re processing for collaborative machiningNc verification and re processing for collaborative machining
Nc verification and re processing for collaborative machiningLiu PeiLing
 
Process improvement-using-dmaic-approach-case-study-in-downtime-reduction-ije...
Process improvement-using-dmaic-approach-case-study-in-downtime-reduction-ije...Process improvement-using-dmaic-approach-case-study-in-downtime-reduction-ije...
Process improvement-using-dmaic-approach-case-study-in-downtime-reduction-ije...AjitsinghDaud
 
Post Processing
Post Processing Post Processing
Post Processing KTN
 
Optimization of sealing casting by identifying solidification defect and impr...
Optimization of sealing casting by identifying solidification defect and impr...Optimization of sealing casting by identifying solidification defect and impr...
Optimization of sealing casting by identifying solidification defect and impr...IRJET Journal
 
Optimization of sealing casting by identifying solidification defect and impr...
Optimization of sealing casting by identifying solidification defect and impr...Optimization of sealing casting by identifying solidification defect and impr...
Optimization of sealing casting by identifying solidification defect and impr...IRJET Journal
 
Failure of tube reduced in split air conditioner
Failure of tube reduced in split air conditionerFailure of tube reduced in split air conditioner
Failure of tube reduced in split air conditionerprjpublications
 
M.tech (Production and Industrial Engineering) Thesis Presentation
M.tech (Production and Industrial Engineering) Thesis PresentationM.tech (Production and Industrial Engineering) Thesis Presentation
M.tech (Production and Industrial Engineering) Thesis PresentationSanchit Jain
 
VSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTVSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTFASI93
 
AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...
AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...
AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...IAEME Publication
 
Development frameworks and methods
Development frameworks and methodsDevelopment frameworks and methods
Development frameworks and methodsMin Phone Nyunt Win
 
Sunil David Presentation on Traceability-automation expo 22.pptx
Sunil David Presentation on Traceability-automation expo 22.pptxSunil David Presentation on Traceability-automation expo 22.pptx
Sunil David Presentation on Traceability-automation expo 22.pptxMoienMuzaffarBhat
 
Concurrent Engineering- for Environment & Sustainability
Concurrent Engineering- for Environment & SustainabilityConcurrent Engineering- for Environment & Sustainability
Concurrent Engineering- for Environment & SustainabilityIRJET Journal
 
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...IRJET Journal
 

Semelhante a Network scheduling (20)

IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
 
Improvement strategy by using ML and TM. A case study for solving cracking i...
Improvement strategy by using ML and TM. A  case study for solving cracking i...Improvement strategy by using ML and TM. A  case study for solving cracking i...
Improvement strategy by using ML and TM. A case study for solving cracking i...
 
Bryan allcock trl9 ready
Bryan allcock   trl9 readyBryan allcock   trl9 ready
Bryan allcock trl9 ready
 
Real-time Manufacturing Management for a Hybrid Process
Real-time Manufacturing Management for a Hybrid ProcessReal-time Manufacturing Management for a Hybrid Process
Real-time Manufacturing Management for a Hybrid Process
 
COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...
COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...
COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...
 
Nc verification and re processing for collaborative machining
Nc verification and re processing for collaborative machiningNc verification and re processing for collaborative machining
Nc verification and re processing for collaborative machining
 
Krishnan_Resume
Krishnan_ResumeKrishnan_Resume
Krishnan_Resume
 
Process improvement-using-dmaic-approach-case-study-in-downtime-reduction-ije...
Process improvement-using-dmaic-approach-case-study-in-downtime-reduction-ije...Process improvement-using-dmaic-approach-case-study-in-downtime-reduction-ije...
Process improvement-using-dmaic-approach-case-study-in-downtime-reduction-ije...
 
Post Processing
Post Processing Post Processing
Post Processing
 
Optimization of sealing casting by identifying solidification defect and impr...
Optimization of sealing casting by identifying solidification defect and impr...Optimization of sealing casting by identifying solidification defect and impr...
Optimization of sealing casting by identifying solidification defect and impr...
 
Optimization of sealing casting by identifying solidification defect and impr...
Optimization of sealing casting by identifying solidification defect and impr...Optimization of sealing casting by identifying solidification defect and impr...
Optimization of sealing casting by identifying solidification defect and impr...
 
Failure of tube reduced in split air conditioner
Failure of tube reduced in split air conditionerFailure of tube reduced in split air conditioner
Failure of tube reduced in split air conditioner
 
M.tech (Production and Industrial Engineering) Thesis Presentation
M.tech (Production and Industrial Engineering) Thesis PresentationM.tech (Production and Industrial Engineering) Thesis Presentation
M.tech (Production and Industrial Engineering) Thesis Presentation
 
VSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTVSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPT
 
AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...
AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...
AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...
 
Development frameworks and methods
Development frameworks and methodsDevelopment frameworks and methods
Development frameworks and methods
 
Sunil David Presentation on Traceability-automation expo 22.pptx
Sunil David Presentation on Traceability-automation expo 22.pptxSunil David Presentation on Traceability-automation expo 22.pptx
Sunil David Presentation on Traceability-automation expo 22.pptx
 
Concurrent Engineering- for Environment & Sustainability
Concurrent Engineering- for Environment & SustainabilityConcurrent Engineering- for Environment & Sustainability
Concurrent Engineering- for Environment & Sustainability
 
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
 
Ffeb69332c5a484
Ffeb69332c5a484Ffeb69332c5a484
Ffeb69332c5a484
 

Mais de Ravi Shekhar

"Vidura" The ancient Management Guru
"Vidura" The ancient Management Guru"Vidura" The ancient Management Guru
"Vidura" The ancient Management GuruRavi Shekhar
 
Supply chain management
Supply chain managementSupply chain management
Supply chain managementRavi Shekhar
 
Design of half shaft and wheel hub assembly for racing car
Design of half shaft and wheel hub assembly for racing carDesign of half shaft and wheel hub assembly for racing car
Design of half shaft and wheel hub assembly for racing carRavi Shekhar
 
Fea of springback on perforated sheet metal
Fea of springback on perforated sheet metalFea of springback on perforated sheet metal
Fea of springback on perforated sheet metalRavi Shekhar
 
Fabrication of prototype of stirling engine
Fabrication of prototype of stirling engineFabrication of prototype of stirling engine
Fabrication of prototype of stirling engineRavi Shekhar
 
Intro to radiography 1_2(NDT)
Intro to radiography 1_2(NDT)Intro to radiography 1_2(NDT)
Intro to radiography 1_2(NDT)Ravi Shekhar
 

Mais de Ravi Shekhar (6)

"Vidura" The ancient Management Guru
"Vidura" The ancient Management Guru"Vidura" The ancient Management Guru
"Vidura" The ancient Management Guru
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Design of half shaft and wheel hub assembly for racing car
Design of half shaft and wheel hub assembly for racing carDesign of half shaft and wheel hub assembly for racing car
Design of half shaft and wheel hub assembly for racing car
 
Fea of springback on perforated sheet metal
Fea of springback on perforated sheet metalFea of springback on perforated sheet metal
Fea of springback on perforated sheet metal
 
Fabrication of prototype of stirling engine
Fabrication of prototype of stirling engineFabrication of prototype of stirling engine
Fabrication of prototype of stirling engine
 
Intro to radiography 1_2(NDT)
Intro to radiography 1_2(NDT)Intro to radiography 1_2(NDT)
Intro to radiography 1_2(NDT)
 

Último

HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 

Último (20)

HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 

Network scheduling

  • 1. Network scheduling in Glassware industry By Ravi Shekhar 08bme181 B.Tech( Mechanical) Network scheduling in Glassware Industry
  • 2. Abstract: The case study is being carried out from the data made available by LA OPALA Glassware industry situated at Madhupur in Deoghar, Jharkhand. Study is based on the daily production processes taking place in the industry. Case study is based on Network scheduling and critical path method(CPM) technique is used to solve the problem. It is a step by step process to find out the critical path which determine the time required to produce glass product. The main aim is to reduce the production time and gain the maximum profit to survive competition in modern day scenario. Network scheduling in Glassware Industry
  • 3. Methodology: Problem statement: There are around 15 -20 steps involved in the production of a finished glassware product from raw materials. Some of the steps are relatively insignificant as compared to others. The problem is to find out the longest path that includes all the necessary processes. Solution: Network scheduling is being used to solve the problem. Network scheduling in Glassware Industry
  • 4. Network design •The critical path method (CPM) is used to find the solution of this Network scheduling problem. •It determines the longest path that includes all the necessary production processes. Network scheduling in Glassware Industry
  • 5. Results and Discussions: Result: The critical path is found out to be 1-2-4-5-6-7-8-9-10-11- 12-13-14-15-16-17-18. The critical length of duration is: 793 min. Discussions: All the techniques applied in any industry results is based on maximum production in minimum time. To optimize the model the manufactures need to carry out more no. of processes simultaneously. Projects having independent activities are better suited to the network scheduling technique.
  • 6. Conclusion: The case study was carried out keeping in mind the daily production activities taking place at LA OPALA glassware industry. The analysis was carried out using by Network scheduling using CPM technique. The case study has enabled me to apply the theoretical studies in real time industrial scenario. The study provides an overview of modern day industrial scenario and how the day to day problems are being tackled and solutions are brought to application.