CONTENTS
 Company Introduction
 Introduction
 Principle
 Classification of transformer
 Construction
 Construction Process
 Winding Construction
 Core Construction
 Core Coil Assembly (CCA)
 Tank Fabrication
 Paint
 Testing
COMPANY INTRODUCTION
 “Danish Private Limited” is established in 1985 and is today
India’s leading quality manufacturer
 Company Works in the field of Manufacturing and Exporting
of Transformers and Relay Panels.
 Product Generated by Company:
o Distribution Transformer
o Dry type Transformer
o Power Transformer
o CRP and Substation Automation
o Substations Projects
INTRODUCTION
 A transformer is a device that changes ac electric power at one
voltage level to ac electric power at another voltage level
through the action of a magnetic field.
 It can be either to step-up or step down the voltage.
 A transformer is a static device.
 The word ‘transformer’ comes form the word ‘transform’.
PRINCIPLE
 Transformers work on the principle of mutual induction.
“when the two coils are inductively coupled and if the current
in coil change uniformly then the e.m.f. induced in the other
coils. This e.m.f can drive a current when a closed path is
provide to it.”
 “The principle of mutual Induction
states that an e.m.f. is induced in a
coil when current in the neighbouring
coil changes”.
CLASSIFICATION OF TRANSFORMER
Instrument
Transformer
Power
Transformer
Step Up and
Step Down
Transformer
Single Phase and
Three Phase
Distribution
Transformer
Transformer
Current
Transformer
Potential
Transformer
 It consists of an iron core on which two separate coils of insulated
copper wire are wound.
 The function of the core is to transfer the changing magnetic flux
from the primary coil to the secondary coil
 The Secondary Coil has a load resistance connected to safe
transformer from being heating up.
 Construction of a simple transformer
Can be seen in Fig.
CONSTRUCTION
Winding Construction
Core Assembly
Core & Winding(Coil) Assembly
(CCA)
Tapping &Tap Changer
Drying Process
Tank Construction
Tanking & Final Fitting
Fittings & Accessories
Painting
Testing
CONSTRUCTION PROCESS
CONSTRUCTION OF WINDING
 Conducting material is used for construction of winding.
 The coils are used are wound on the limbs and insulated from
each other.
 The two different windings are wounds on two different limbs.
 The leakage flux increases which affects the performance and
efficiency of transformer.
 To reduce the leakage flux it is necessary that the windings
should be very close to each other to have high mutual
induction.
CORE TYPE CONSTRUCTION
 In this one magnetic circuit and cylindrical coils are used.
 Normally L and T shaped laminations are used.
 Commonly primary winding would on one limb while secondary
on the other but performance will be reduce.
 To get high performance it is
necessary that other the two winding
should be very close to each other.
 There are two type of core .
CORE COILASSEMBLY
 In this Process the Winding Coil and Core is Assembled
together .
 Core Coil Assembly defines the insulation scheme, cooling,
dynamic withstand capability, handling.
 Cooling is essential to prevent the thermal degradation of
insulation which enhances a transformer’s life.
 The core assembly is vertically placed with the foot plate
touching the ground. The top yoke of the core is removed.
Tapping & Tap Changer
 Generally Taps are provided on HV Windings for HV Variation
or LV Variation.
 To achieve proper voltage regulation on load tap changer is used
instead of OCTC.
 As it is mainly used for higher capacity transformers i.e. above
5000 KVA ratings, voltage can be supplied with On Load Tap
Changer along with necessary controls.
 After this the CCA is placed in Vacuum Auto Enclave to remove
moisture content at 90°c.
TANK FABRICATION
 Transformer tanks commonly used are of the following types;
1. Plain sheet steel tank.
2. Sheet steel tank with external cooling tubes.
3. Radiator tanks.
4. Tanks with corrugated wall panels.
 The tank is manufactured by forming and welding steel plate
which is used as a container for holding the core and coil
assembly together with insulating oil.
TANK UP PROCESS
 The core-coil assembly is taken out of the oven and the
"Muggers test" is carried out. If the merger value is as per the
specification then it is taken to Tank-up Dept.
 After this test the Core-Coil Assembly is placed into the tank
and locked up, this process is known as “Tank-Up Process”.
 Accessories are Fitted like drain valves, HV & LV Bushings,
conservator, oil level indicator and explosion vent are fitted in
the tanks.
 Pure filtered transformer oil is filled in the tank to immerse the
assembly only.
 After the Tank-up process the Transformer is Brought to the
Paint Department.
 In this process a zinc-32 rich primer is used to paint the
transformer tank for protection from corrosion.
PAINT SHOP
TESTING OF TRANSFORMER
Following test used for the various purposes:-
1. Megger Insulation Test
2. Ratio And Polarity Test
3. High Voltage Test
4. Low Voltage Test
5. D.V.D.F Test
6. Open Circuit Test
7. Short Circuit Test
8. Winding Resistance Test
9. Oil Dielectric Strength Test
10. Vector Group Test
11. Magnetic Balance Test
APPLICATIONAND USES
 The transformer used in television and photocopy Machines.
 The transmission and distribution of alternating power is possible
by transformer.
 Simple camera flash uses fly back transformer.
 Signal and audio transformer are used couple in amplifier.
ADVANTAGES
 Less cost
 Less Weight
 less size
 Less time require to assembling
 Require less space
 Deliver more power
 Higher efficiency
 Easier to install
 Easy transportation and installation
 Easy to repair
 Easy assembling
DISADVANTAGES
 Greater cost of standby Units
 Increased cost and inconvenience of repairs.
 In Single Phase transformer (Three Single Phase
Transformer) failure of one transformer, the other two,
Single Phase Transformer still supply the power, while it is
not possible in case of failing a Transformer.
Transformer ppt

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Transformer
TransformerTransformer
Transformer
 
Current Transformer
Current TransformerCurrent Transformer
Current Transformer
 
Relays
RelaysRelays
Relays
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Relays
RelaysRelays
Relays
 
Transformer basic
Transformer basicTransformer basic
Transformer basic
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1
 
transformer slide prsentation
transformer slide prsentation transformer slide prsentation
transformer slide prsentation
 
Transformer
Transformer Transformer
Transformer
 
Introduction to power transformers
Introduction to power transformersIntroduction to power transformers
Introduction to power transformers
 
Types of relay
Types of relayTypes of relay
Types of relay
 
Motor Protection
Motor ProtectionMotor Protection
Motor Protection
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
Instrument transformer CT & PT
Instrument transformer CT & PTInstrument transformer CT & PT
Instrument transformer CT & PT
 
Current transformer (ct)
Current transformer (ct)Current transformer (ct)
Current transformer (ct)
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
transformer protection
transformer protection transformer protection
transformer protection
 
On load tap changer
On load tap changerOn load tap changer
On load tap changer
 
Protection & switchgear
Protection & switchgear  Protection & switchgear
Protection & switchgear
 
SWITCHGEAR
SWITCHGEARSWITCHGEAR
SWITCHGEAR
 

Semelhante a Transformer ppt

Industrial visit report uttam transformers
Industrial visit report  uttam transformersIndustrial visit report  uttam transformers
Industrial visit report uttam transformersMahipalSoni4
 
Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE] Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE] Nik Sharma
 
Tbea vocatinal training
Tbea vocatinal trainingTbea vocatinal training
Tbea vocatinal trainingDeep Shah
 
transformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationtransformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationFawaz Baik
 
Transformer report-Siemens
Transformer report-SiemensTransformer report-Siemens
Transformer report-SiemensMahmood Ali
 
Industrial training report
Industrial training report Industrial training report
Industrial training report Pritam Samanta
 
Presentation Design of Computer aided design of power transformer
Presentation Design of Computer aided design of power transformerPresentation Design of Computer aided design of power transformer
Presentation Design of Computer aided design of power transformerSMDDTech
 
Kanti Thermal Power Station
Kanti Thermal Power StationKanti Thermal Power Station
Kanti Thermal Power Stationneeraj prasad
 
Wings automobile products pvt
Wings automobile products pvtWings automobile products pvt
Wings automobile products pvtVikram Singh
 
summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...Rahul Akinapelli
 
TRANSFORMER WORKING MANUFACTURINIG
 TRANSFORMER WORKING MANUFACTURINIG TRANSFORMER WORKING MANUFACTURINIG
TRANSFORMER WORKING MANUFACTURINIGSumit Saini
 
Faisal Presentation.pptx
Faisal Presentation.pptxFaisal Presentation.pptx
Faisal Presentation.pptxSalmanTariq93
 
Training report trw
Training report trwTraining report trw
Training report trwChandan Garg
 
Industrial training ppt bhel bhopal
Industrial training ppt bhel bhopalIndustrial training ppt bhel bhopal
Industrial training ppt bhel bhopalPRAVEENKUMARSINGH87
 
Seminar report theory
Seminar report theorySeminar report theory
Seminar report theoryRanjan kumar
 
How to reduced transformer losses report
How to reduced transformer losses reportHow to reduced transformer losses report
How to reduced transformer losses reportkamal soni
 
Transformer protection & maintenance
Transformer protection & maintenanceTransformer protection & maintenance
Transformer protection & maintenancePradeep Avanigadda
 

Semelhante a Transformer ppt (20)

Industrial visit report uttam transformers
Industrial visit report  uttam transformersIndustrial visit report  uttam transformers
Industrial visit report uttam transformers
 
TELK Industrial Visit Report
TELK Industrial Visit ReportTELK Industrial Visit Report
TELK Industrial Visit Report
 
Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE] Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE]
 
Tbea vocatinal training
Tbea vocatinal trainingTbea vocatinal training
Tbea vocatinal training
 
transformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationtransformer Sales, after sales & service presentation
transformer Sales, after sales & service presentation
 
Transformer report-Siemens
Transformer report-SiemensTransformer report-Siemens
Transformer report-Siemens
 
Industrial training report
Industrial training report Industrial training report
Industrial training report
 
Presentation Design of Computer aided design of power transformer
Presentation Design of Computer aided design of power transformerPresentation Design of Computer aided design of power transformer
Presentation Design of Computer aided design of power transformer
 
Kanti Thermal Power Station
Kanti Thermal Power StationKanti Thermal Power Station
Kanti Thermal Power Station
 
Makpower - Furnace Transformer Manufacturer in India
Makpower - Furnace Transformer Manufacturer in IndiaMakpower - Furnace Transformer Manufacturer in India
Makpower - Furnace Transformer Manufacturer in India
 
Wings automobile products pvt
Wings automobile products pvtWings automobile products pvt
Wings automobile products pvt
 
summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...
 
TRANSFORMER WORKING MANUFACTURINIG
 TRANSFORMER WORKING MANUFACTURINIG TRANSFORMER WORKING MANUFACTURINIG
TRANSFORMER WORKING MANUFACTURINIG
 
Faisal Presentation.pptx
Faisal Presentation.pptxFaisal Presentation.pptx
Faisal Presentation.pptx
 
Training report trw
Training report trwTraining report trw
Training report trw
 
Industrial training ppt bhel bhopal
Industrial training ppt bhel bhopalIndustrial training ppt bhel bhopal
Industrial training ppt bhel bhopal
 
Seminar report theory
Seminar report theorySeminar report theory
Seminar report theory
 
Pragati pt cataloge
Pragati pt catalogePragati pt cataloge
Pragati pt cataloge
 
How to reduced transformer losses report
How to reduced transformer losses reportHow to reduced transformer losses report
How to reduced transformer losses report
 
Transformer protection & maintenance
Transformer protection & maintenanceTransformer protection & maintenance
Transformer protection & maintenance
 

Último

Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 

Último (20)

Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 

Transformer ppt

  • 1. A Summer training Presentation on “Transformer” Presented By: Name: Rakesh Gurjar Roll no: 039 Department of Electrical Engineering Poornima Institute of Engineering and Technology ISI-6 RIICO Institutional Area, Jaipur -302022 Submitted To: Rajendra Singh (Ass. Professor ) EE, PIET, Jaipur 2018-2019
  • 2. CONTENTS  Company Introduction  Introduction  Principle  Classification of transformer  Construction  Construction Process  Winding Construction  Core Construction  Core Coil Assembly (CCA)  Tank Fabrication  Paint  Testing
  • 3. COMPANY INTRODUCTION  “Danish Private Limited” is established in 1985 and is today India’s leading quality manufacturer  Company Works in the field of Manufacturing and Exporting of Transformers and Relay Panels.  Product Generated by Company: o Distribution Transformer o Dry type Transformer o Power Transformer o CRP and Substation Automation o Substations Projects
  • 4. INTRODUCTION  A transformer is a device that changes ac electric power at one voltage level to ac electric power at another voltage level through the action of a magnetic field.  It can be either to step-up or step down the voltage.  A transformer is a static device.  The word ‘transformer’ comes form the word ‘transform’.
  • 5. PRINCIPLE  Transformers work on the principle of mutual induction. “when the two coils are inductively coupled and if the current in coil change uniformly then the e.m.f. induced in the other coils. This e.m.f can drive a current when a closed path is provide to it.”  “The principle of mutual Induction states that an e.m.f. is induced in a coil when current in the neighbouring coil changes”.
  • 6. CLASSIFICATION OF TRANSFORMER Instrument Transformer Power Transformer Step Up and Step Down Transformer Single Phase and Three Phase Distribution Transformer Transformer Current Transformer Potential Transformer
  • 7.  It consists of an iron core on which two separate coils of insulated copper wire are wound.  The function of the core is to transfer the changing magnetic flux from the primary coil to the secondary coil  The Secondary Coil has a load resistance connected to safe transformer from being heating up.  Construction of a simple transformer Can be seen in Fig. CONSTRUCTION
  • 8. Winding Construction Core Assembly Core & Winding(Coil) Assembly (CCA) Tapping &Tap Changer Drying Process Tank Construction Tanking & Final Fitting Fittings & Accessories Painting Testing CONSTRUCTION PROCESS
  • 9. CONSTRUCTION OF WINDING  Conducting material is used for construction of winding.  The coils are used are wound on the limbs and insulated from each other.  The two different windings are wounds on two different limbs.  The leakage flux increases which affects the performance and efficiency of transformer.  To reduce the leakage flux it is necessary that the windings should be very close to each other to have high mutual induction.
  • 10.
  • 11. CORE TYPE CONSTRUCTION  In this one magnetic circuit and cylindrical coils are used.  Normally L and T shaped laminations are used.  Commonly primary winding would on one limb while secondary on the other but performance will be reduce.  To get high performance it is necessary that other the two winding should be very close to each other.  There are two type of core .
  • 12.
  • 13. CORE COILASSEMBLY  In this Process the Winding Coil and Core is Assembled together .  Core Coil Assembly defines the insulation scheme, cooling, dynamic withstand capability, handling.  Cooling is essential to prevent the thermal degradation of insulation which enhances a transformer’s life.  The core assembly is vertically placed with the foot plate touching the ground. The top yoke of the core is removed.
  • 14.
  • 15. Tapping & Tap Changer  Generally Taps are provided on HV Windings for HV Variation or LV Variation.  To achieve proper voltage regulation on load tap changer is used instead of OCTC.  As it is mainly used for higher capacity transformers i.e. above 5000 KVA ratings, voltage can be supplied with On Load Tap Changer along with necessary controls.  After this the CCA is placed in Vacuum Auto Enclave to remove moisture content at 90°c.
  • 16. TANK FABRICATION  Transformer tanks commonly used are of the following types; 1. Plain sheet steel tank. 2. Sheet steel tank with external cooling tubes. 3. Radiator tanks. 4. Tanks with corrugated wall panels.  The tank is manufactured by forming and welding steel plate which is used as a container for holding the core and coil assembly together with insulating oil.
  • 17.
  • 18. TANK UP PROCESS  The core-coil assembly is taken out of the oven and the "Muggers test" is carried out. If the merger value is as per the specification then it is taken to Tank-up Dept.  After this test the Core-Coil Assembly is placed into the tank and locked up, this process is known as “Tank-Up Process”.  Accessories are Fitted like drain valves, HV & LV Bushings, conservator, oil level indicator and explosion vent are fitted in the tanks.  Pure filtered transformer oil is filled in the tank to immerse the assembly only.
  • 19.
  • 20.  After the Tank-up process the Transformer is Brought to the Paint Department.  In this process a zinc-32 rich primer is used to paint the transformer tank for protection from corrosion. PAINT SHOP
  • 21. TESTING OF TRANSFORMER Following test used for the various purposes:- 1. Megger Insulation Test 2. Ratio And Polarity Test 3. High Voltage Test 4. Low Voltage Test 5. D.V.D.F Test 6. Open Circuit Test 7. Short Circuit Test 8. Winding Resistance Test 9. Oil Dielectric Strength Test 10. Vector Group Test 11. Magnetic Balance Test
  • 22.
  • 23. APPLICATIONAND USES  The transformer used in television and photocopy Machines.  The transmission and distribution of alternating power is possible by transformer.  Simple camera flash uses fly back transformer.  Signal and audio transformer are used couple in amplifier.
  • 24. ADVANTAGES  Less cost  Less Weight  less size  Less time require to assembling  Require less space  Deliver more power  Higher efficiency  Easier to install  Easy transportation and installation  Easy to repair  Easy assembling
  • 25. DISADVANTAGES  Greater cost of standby Units  Increased cost and inconvenience of repairs.  In Single Phase transformer (Three Single Phase Transformer) failure of one transformer, the other two, Single Phase Transformer still supply the power, while it is not possible in case of failing a Transformer.