Contents

1. ROI
2. NPV
 1.   NPV on “Chapter 17, Exercises and
      Project, No.2”
3. Payback Period




                       2          RAHMAD KURNIAWAN P68500
What is ROI?


ROI can be defined as:
     One of several approaches to building a
      financial business case (Solution Matrix).
     A performance measure used to evaluate
      the efficiency of an investment.
     A performance measure to compare the
      efficiency of different investments.
     ROI is a metric that yields some insights
      into how to improve business results in the
      future (L. Dombrowski)

                       3          RAHMAD KURNIAWAN P68500
Cont...

 Another traditional tool for evalating capital
  investments is return on investment
  (ROI), which measures the effectiveness of
  management in generating profits with its
  available assets. (Turban)
 The ROI measure is a percentage, and the
  higher this percentage return, the better.
 It is calculated essentially by dividing net
  income attributable to a project by the
  average assets invested in the project.




                      4          RAHMAD KURNIAWAN P68500
Simple ROI

The benefit (return) of an investment
 is divided by the cost of the
 investments. The result is expressed
 as a percentage or a ratio. This is
 referred to as “simple ROI”.

    ROI= Gains from investment – Cost of investment
                       Cost of Investment


                 $700,000 - $500,000    = 40%
                      $500,000



                        5             RAHMAD KURNIAWAN P68500
Example of ROI

For example, a $1000 investment that
 earns $50 in interest obviously
 generates more cash than a $100
 investment that earns $20
 interest, but the $100 investment
 earns a higher return.

So...




                 6       RAHMAD KURNIAWAN P68500
Cont...


                 $1050 $1000     $50
ROI   $50 / 1000                      5%
                    $1000       $1000

                  $120 $100    $20
ROI   $20 / 100                         20%
                     $100     $100




                      7              RAHMAD KURNIAWAN P68500
What is NPV?

NPV can be defined as:
     NPV is one of Capital budgeting analysis uses
      standard financial models. (Turban)
     Net present value is the present value of net
      cash inflows generated by a project including
      salvage value, if any, less the initial
      investment on the project.
If NPV > 0, accept
If NPV < 0, reject



                         8           RAHMAD KURNIAWAN P68500
Cont...

Organizations often use net present
 value (NPV) calculations for cost
 benefit analyses.
In an NPV analysis, analysts convert
 future values of benefits to their
 present-value equivalent by
 discounting them at the
 organization’s cost of funds.




                  9       RAHMAD KURNIAWAN P68500
NPV Formula

                      C1             C2           CT
 NPV          C0                              
                    (1 r )1        (1 r ) 2     (1 r ) T

 Where,
     r is the target rate of return per period;
     C0 is the Initial investment.
     C1 is the net cash inflow during the first period;
     C2 is the net cash inflow during the second period;
     C3 is the net cash inflow during the third period, and so
      on ...



                              10              RAHMAD KURNIAWAN P68500
Example of NPV

There is an opportunity to invest in a
 business that will pay $200,000 in
 one year, $400,000 in two
 years, $600,000 in three years and
 $800,000 in four years. It can earn
 12% per year compounded annually
 on a mutual fund that has similar risk.
 If it costs $1.2 million to start this
 business, should be invest?

So...
                  11       RAHMAD KURNIAWAN P68500
Cont...

0                   1                2                 3                   4 years
|                   |                |                 |                   |
|                   |                |                 |                   |
CF –$1.2 mil        $200,000         $400,000          $600,000        $800,000
 Discount rate = 12%
                   C1         C2              CT
  NPV      C0                         
                 (1 r )1    (1 r ) 2        (1 r ) T
                         200,000 400,000 600,000            800,000
   NPV         1,200,000
                         (1.12)1     (1.12) 2    (1.12) 3   (1.12) 4

         = $232,932




                                     12                 RAHMAD KURNIAWAN P68500
Resources of data based on exercisesNo. 2

        Investing $     15.000.000                      Revenue         year 1         $ 4.000.000

Cost,   Year 1      $    2.000.000                      Revenue,        year 2         $ 5.000.000

Cost,   Year 2      $    2.000.000                      Revenue,        year 3         $ 5.000.000

Cost,   Year 3      $    1.500.000                      Revenue,        year 4         $ 5.000.000

Cost,   Year 4      $   1.500.000                       Revenue         year 5         $ 5.000.000
Cost,   Year 5      $   1.500.000                                       Total          $ 24.000.000
        Total       $   23.500.000
                                                        Interest rate            10%

                                                        Assumed first year include investment and
        cash flow   year 1           $     (13.000.000) cost
        cash flow   year 2           $       3.000.000
        cash flow   year 3           $       3.500.000
        cash flow   year 4           $       3.500.000
        cash flow   year 5           $       3.500.000

                    NPV=             $ (2.145.469,45)

                                          13                        RAHMAD KURNIAWAN P68500
What is Payback Period?

Payback Period can be defined as:
     Number of years needed to recover the initial
      cash outlay of a project
Computation
     Estimate the cash flows
     Subtract the future cash flows from the initial
      cost until the initial investment has been
      recovered
Decision Rule – Accept if the payback
 period is less than some preset limit


                         14           RAHMAD KURNIAWAN P68500
Example of Payback

Example:
 Project with an initial cash outlay of $10,000
  Free Cash Flows of $2,500 per year for 6
  years
 Year     Cash Flow        Balance
                            $10,000
  1        $2,500           $7,500
  2        $2,500           $5,000
  3        $2,500           $2,500
  4        $2,500           --------

Payback is 4 years

                     15          RAHMAD KURNIAWAN P68500
References


 Turban, McLean, Wetherbe. Information
  Technology for Management: Transforming
  Organizations in the Digital Economy (4th
  edition)
 Turban, Volonin, Wood. (2012).
  Information Technology for Management,
  8th edition. John Wiley & Sons (Asia) Pte
  Ltd.
 http://www.cwu.edu/
 http://www.passitoncenter.org
 http://business.fullerton.edu

                    16        RAHMAD KURNIAWAN P68500
Thank you




17   RAHMAD KURNIAWAN P68500

Mais conteúdo relacionado

Mais procurados

Payback period by harikrishnanan
Payback period by harikrishnananPayback period by harikrishnanan
Payback period by harikrishnananHari krishna
 
Time value of money
Time value of moneyTime value of money
Time value of moneyAnkit Jain
 
Chapter 2.Time Value of Money ppt
Chapter 2.Time Value of Money pptChapter 2.Time Value of Money ppt
Chapter 2.Time Value of Money pptZahraMirzayeva
 
Chapter 16 depreciation methods
Chapter 16   depreciation methodsChapter 16   depreciation methods
Chapter 16 depreciation methodsBich Lien Pham
 
Chapter 1 foundations of engineering economy
Chapter 1   foundations of engineering economyChapter 1   foundations of engineering economy
Chapter 1 foundations of engineering economyBich Lien Pham
 
Chapter 5 present worth analysis
Chapter 5   present worth analysisChapter 5   present worth analysis
Chapter 5 present worth analysisBich Lien Pham
 
Chapter 4 nominal & effective interest rates
Chapter 4   nominal & effective interest ratesChapter 4   nominal & effective interest rates
Chapter 4 nominal & effective interest ratesBich Lien Pham
 
Time Value of Money
Time Value of MoneyTime Value of Money
Time Value of MoneySajad Nazari
 
Time Value of Money (Financial Management)
Time Value of Money (Financial Management)Time Value of Money (Financial Management)
Time Value of Money (Financial Management)Qasim Raza
 
9.2 Estimate Activity Resources
9.2 Estimate Activity Resources9.2 Estimate Activity Resources
9.2 Estimate Activity ResourcesDavidMcLachlan1
 
Chapter 4 nominal & effective interest rates
Chapter 4   nominal & effective interest ratesChapter 4   nominal & effective interest rates
Chapter 4 nominal & effective interest ratesBich Lien Pham
 

Mais procurados (20)

Npv
NpvNpv
Npv
 
Time value of money
Time value of moneyTime value of money
Time value of money
 
Payback period by harikrishnanan
Payback period by harikrishnananPayback period by harikrishnanan
Payback period by harikrishnanan
 
Time value of money
Time value of moneyTime value of money
Time value of money
 
Chapter 2.Time Value of Money ppt
Chapter 2.Time Value of Money pptChapter 2.Time Value of Money ppt
Chapter 2.Time Value of Money ppt
 
Time Value of Money
Time Value of MoneyTime Value of Money
Time Value of Money
 
Internal rate of return
Internal rate of returnInternal rate of return
Internal rate of return
 
Chapter 16 depreciation methods
Chapter 16   depreciation methodsChapter 16   depreciation methods
Chapter 16 depreciation methods
 
Chapter 1 foundations of engineering economy
Chapter 1   foundations of engineering economyChapter 1   foundations of engineering economy
Chapter 1 foundations of engineering economy
 
Chapter 5 present worth analysis
Chapter 5   present worth analysisChapter 5   present worth analysis
Chapter 5 present worth analysis
 
Npv Irr
Npv IrrNpv Irr
Npv Irr
 
Financial maths
Financial mathsFinancial maths
Financial maths
 
Chapter 4 nominal & effective interest rates
Chapter 4   nominal & effective interest ratesChapter 4   nominal & effective interest rates
Chapter 4 nominal & effective interest rates
 
Time Value of Money
Time Value of MoneyTime Value of Money
Time Value of Money
 
Time Value of Money (Financial Management)
Time Value of Money (Financial Management)Time Value of Money (Financial Management)
Time Value of Money (Financial Management)
 
9.2 Estimate Activity Resources
9.2 Estimate Activity Resources9.2 Estimate Activity Resources
9.2 Estimate Activity Resources
 
Net present value (NPV)
Net present value (NPV) Net present value (NPV)
Net present value (NPV)
 
Cpm pert
Cpm pertCpm pert
Cpm pert
 
Chapter 4 nominal & effective interest rates
Chapter 4   nominal & effective interest ratesChapter 4   nominal & effective interest rates
Chapter 4 nominal & effective interest rates
 
Net present value
Net present valueNet present value
Net present value
 

Semelhante a ROI, NPV and PP

3.7 making investment decisions (part 2) - moodle
3.7   making investment decisions (part 2) - moodle3.7   making investment decisions (part 2) - moodle
3.7 making investment decisions (part 2) - moodleMissHowardHA
 
3.7 making investment decisions (part 2) - moodle
3.7   making investment decisions (part 2) - moodle3.7   making investment decisions (part 2) - moodle
3.7 making investment decisions (part 2) - moodleMissHowardHA
 
Chap009
Chap009Chap009
Chap009LUXSVB
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgetingALOK GIRI
 
| Capital Budgeting | CB | Payback Period | PBP | Accounting Rate of Return |...
| Capital Budgeting | CB | Payback Period | PBP | Accounting Rate of Return |...| Capital Budgeting | CB | Payback Period | PBP | Accounting Rate of Return |...
| Capital Budgeting | CB | Payback Period | PBP | Accounting Rate of Return |...Ahmad Hassan
 
Making capital investment decisions
Making capital investment decisionsMaking capital investment decisions
Making capital investment decisionsRahmatia Azzindani
 
Chapter8 investmentcriteria
Chapter8 investmentcriteriaChapter8 investmentcriteria
Chapter8 investmentcriteriaAKSHAYA0000
 
present worth analysis.ppt
present worth analysis.pptpresent worth analysis.ppt
present worth analysis.pptashwinigupta38
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgetingshagun jain
 
Lecture cash flow evaluation new
Lecture cash flow evaluation newLecture cash flow evaluation new
Lecture cash flow evaluation newBsgr Planmin
 
Lecture cash flow evaluation new
Lecture cash flow evaluation newLecture cash flow evaluation new
Lecture cash flow evaluation newBsgr Planmin
 
Chapter 13 Capital Investment Decisions
Chapter 13 Capital Investment DecisionsChapter 13 Capital Investment Decisions
Chapter 13 Capital Investment DecisionsYesica Adicondro
 
Capital Budgeting Decisions
Capital Budgeting DecisionsCapital Budgeting Decisions
Capital Budgeting DecisionsPANKAJ PANDEY
 
Aminullah assagaf p6 manj keu 2 (2 april 2020)_versi 2
Aminullah assagaf p6 manj keu 2 (2 april 2020)_versi 2Aminullah assagaf p6 manj keu 2 (2 april 2020)_versi 2
Aminullah assagaf p6 manj keu 2 (2 april 2020)_versi 2Aminullah Assagaf
 
Business Finance Chapter 8
Business Finance Chapter 8Business Finance Chapter 8
Business Finance Chapter 8Tinku Kumar
 
Project Evaluation Report
Project Evaluation ReportProject Evaluation Report
Project Evaluation ReportJawad Ahmed
 
Capital budgeting methods lecture notes
Capital budgeting methods lecture notesCapital budgeting methods lecture notes
Capital budgeting methods lecture notesWarui Maina
 

Semelhante a ROI, NPV and PP (20)

Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
3.7 making investment decisions (part 2) - moodle
3.7   making investment decisions (part 2) - moodle3.7   making investment decisions (part 2) - moodle
3.7 making investment decisions (part 2) - moodle
 
3.7 making investment decisions (part 2) - moodle
3.7   making investment decisions (part 2) - moodle3.7   making investment decisions (part 2) - moodle
3.7 making investment decisions (part 2) - moodle
 
Chap009
Chap009Chap009
Chap009
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
| Capital Budgeting | CB | Payback Period | PBP | Accounting Rate of Return |...
| Capital Budgeting | CB | Payback Period | PBP | Accounting Rate of Return |...| Capital Budgeting | CB | Payback Period | PBP | Accounting Rate of Return |...
| Capital Budgeting | CB | Payback Period | PBP | Accounting Rate of Return |...
 
Making capital investment decisions
Making capital investment decisionsMaking capital investment decisions
Making capital investment decisions
 
Chapter8 investmentcriteria
Chapter8 investmentcriteriaChapter8 investmentcriteria
Chapter8 investmentcriteria
 
present worth analysis.ppt
present worth analysis.pptpresent worth analysis.ppt
present worth analysis.ppt
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Lecture cash flow evaluation new
Lecture cash flow evaluation newLecture cash flow evaluation new
Lecture cash flow evaluation new
 
Lecture cash flow evaluation new
Lecture cash flow evaluation newLecture cash flow evaluation new
Lecture cash flow evaluation new
 
Chapter 13 Capital Investment Decisions
Chapter 13 Capital Investment DecisionsChapter 13 Capital Investment Decisions
Chapter 13 Capital Investment Decisions
 
Npv suci
Npv suciNpv suci
Npv suci
 
Capital Budgeting Decisions
Capital Budgeting DecisionsCapital Budgeting Decisions
Capital Budgeting Decisions
 
Aminullah assagaf p6 manj keu 2 (2 april 2020)_versi 2
Aminullah assagaf p6 manj keu 2 (2 april 2020)_versi 2Aminullah assagaf p6 manj keu 2 (2 april 2020)_versi 2
Aminullah assagaf p6 manj keu 2 (2 april 2020)_versi 2
 
Business Finance Chapter 8
Business Finance Chapter 8Business Finance Chapter 8
Business Finance Chapter 8
 
Project Evaluation Report
Project Evaluation ReportProject Evaluation Report
Project Evaluation Report
 
Capital budgeting methods lecture notes
Capital budgeting methods lecture notesCapital budgeting methods lecture notes
Capital budgeting methods lecture notes
 
Pme
PmePme
Pme
 

Último

DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamUiPathCommunity
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontologyjohnbeverley2021
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxRemote DBA Services
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 

Último (20)

DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 

ROI, NPV and PP

  • 1. ASSALAMU’ALAIKUM INFORMATION TECHNOLOGY MANAGEMENT ROI, NVP, AND PAYBACK PERIOD Return on Investment, Net Present Value and Payback Period Disajikan Oleh : RAHMAD KURNIAWAN P68500
  • 2. Contents 1. ROI 2. NPV 1. NPV on “Chapter 17, Exercises and Project, No.2” 3. Payback Period 2 RAHMAD KURNIAWAN P68500
  • 3. What is ROI? ROI can be defined as:  One of several approaches to building a financial business case (Solution Matrix).  A performance measure used to evaluate the efficiency of an investment.  A performance measure to compare the efficiency of different investments.  ROI is a metric that yields some insights into how to improve business results in the future (L. Dombrowski) 3 RAHMAD KURNIAWAN P68500
  • 4. Cont...  Another traditional tool for evalating capital investments is return on investment (ROI), which measures the effectiveness of management in generating profits with its available assets. (Turban)  The ROI measure is a percentage, and the higher this percentage return, the better.  It is calculated essentially by dividing net income attributable to a project by the average assets invested in the project. 4 RAHMAD KURNIAWAN P68500
  • 5. Simple ROI The benefit (return) of an investment is divided by the cost of the investments. The result is expressed as a percentage or a ratio. This is referred to as “simple ROI”. ROI= Gains from investment – Cost of investment Cost of Investment $700,000 - $500,000 = 40% $500,000 5 RAHMAD KURNIAWAN P68500
  • 6. Example of ROI For example, a $1000 investment that earns $50 in interest obviously generates more cash than a $100 investment that earns $20 interest, but the $100 investment earns a higher return. So... 6 RAHMAD KURNIAWAN P68500
  • 7. Cont... $1050 $1000 $50 ROI $50 / 1000 5% $1000 $1000 $120 $100 $20 ROI $20 / 100 20% $100 $100 7 RAHMAD KURNIAWAN P68500
  • 8. What is NPV? NPV can be defined as:  NPV is one of Capital budgeting analysis uses standard financial models. (Turban)  Net present value is the present value of net cash inflows generated by a project including salvage value, if any, less the initial investment on the project. If NPV > 0, accept If NPV < 0, reject 8 RAHMAD KURNIAWAN P68500
  • 9. Cont... Organizations often use net present value (NPV) calculations for cost benefit analyses. In an NPV analysis, analysts convert future values of benefits to their present-value equivalent by discounting them at the organization’s cost of funds. 9 RAHMAD KURNIAWAN P68500
  • 10. NPV Formula C1 C2 CT NPV C0  (1 r )1 (1 r ) 2 (1 r ) T  Where,  r is the target rate of return per period;  C0 is the Initial investment.  C1 is the net cash inflow during the first period;  C2 is the net cash inflow during the second period;  C3 is the net cash inflow during the third period, and so on ... 10 RAHMAD KURNIAWAN P68500
  • 11. Example of NPV There is an opportunity to invest in a business that will pay $200,000 in one year, $400,000 in two years, $600,000 in three years and $800,000 in four years. It can earn 12% per year compounded annually on a mutual fund that has similar risk. If it costs $1.2 million to start this business, should be invest? So... 11 RAHMAD KURNIAWAN P68500
  • 12. Cont... 0 1 2 3 4 years | | | | | | | | | | CF –$1.2 mil $200,000 $400,000 $600,000 $800,000  Discount rate = 12% C1 C2 CT NPV C0  (1 r )1 (1 r ) 2 (1 r ) T 200,000 400,000 600,000 800,000 NPV 1,200,000 (1.12)1 (1.12) 2 (1.12) 3 (1.12) 4 = $232,932 12 RAHMAD KURNIAWAN P68500
  • 13. Resources of data based on exercisesNo. 2 Investing $ 15.000.000 Revenue year 1 $ 4.000.000 Cost, Year 1 $ 2.000.000 Revenue, year 2 $ 5.000.000 Cost, Year 2 $ 2.000.000 Revenue, year 3 $ 5.000.000 Cost, Year 3 $ 1.500.000 Revenue, year 4 $ 5.000.000 Cost, Year 4 $ 1.500.000 Revenue year 5 $ 5.000.000 Cost, Year 5 $ 1.500.000 Total $ 24.000.000 Total $ 23.500.000 Interest rate 10% Assumed first year include investment and cash flow year 1 $ (13.000.000) cost cash flow year 2 $ 3.000.000 cash flow year 3 $ 3.500.000 cash flow year 4 $ 3.500.000 cash flow year 5 $ 3.500.000 NPV= $ (2.145.469,45) 13 RAHMAD KURNIAWAN P68500
  • 14. What is Payback Period? Payback Period can be defined as:  Number of years needed to recover the initial cash outlay of a project Computation  Estimate the cash flows  Subtract the future cash flows from the initial cost until the initial investment has been recovered Decision Rule – Accept if the payback period is less than some preset limit 14 RAHMAD KURNIAWAN P68500
  • 15. Example of Payback Example:  Project with an initial cash outlay of $10,000 Free Cash Flows of $2,500 per year for 6 years  Year Cash Flow Balance $10,000 1 $2,500 $7,500 2 $2,500 $5,000 3 $2,500 $2,500 4 $2,500 -------- Payback is 4 years 15 RAHMAD KURNIAWAN P68500
  • 16. References  Turban, McLean, Wetherbe. Information Technology for Management: Transforming Organizations in the Digital Economy (4th edition)  Turban, Volonin, Wood. (2012). Information Technology for Management, 8th edition. John Wiley & Sons (Asia) Pte Ltd.  http://www.cwu.edu/  http://www.passitoncenter.org  http://business.fullerton.edu 16 RAHMAD KURNIAWAN P68500