The Graciosa Project
Adios supertankers, ahoy energy autonomy




Basel, 21 February 2012
Martin Röder
Graciosa Island ( Azores)

Inhabitants: 4500

Area: 67 km2

Peak load: ~ 3 MW


Electricity consumption:
~14 G h
      W

Energy supply:
Fossil fuels (85%)
W power (15%)
 ind

Local Utility: EDA
Graciosa’s current power system




 Power station 4200 kW
 (Fuel consumption ~ 4 Mio. l/ a)
Adios supertankers, ahoy energy autonomy
Project Graciosa: 70-80% renewables
Island Test Site
To address technical issues in island projects, we set up the Island Test Site to simulate up
to 100% renewable energy systems. The grid based system can be configured to use wind,
irradiation and load measurements from anywhere.
Potential for wind and solar energy

               14
               12
               10                                                    Wind
                8
m/s




                                                                     Wind speed @ 15 m     > 9 m/ s
                6
                4
                                                                     estim. yield              3.0 MWh/ kW
                2
                0
                    J   F   M   A   M   J    J   A   S   O   N   D

                                        Month

               6
               5
                                                                     Solar radiation
  kWh/m2-day




               4
               3                                                     daily average       3.3     kWh/ m2d
               2
                                                                     estim. yield        1.3 MWh/ kW
               1
               0
                    J   F   M   A   M    J   J   A   S   O   N   D
                                        Month


                                                                                                             7
Expected Results:

Mais conteúdo relacionado

Mais procurados

Green house solor cost breakdown
Green house solor cost breakdownGreen house solor cost breakdown
Green house solor cost breakdown
Ultimate Water inc.
 
Smart Aquarium LEDS Price List
Smart Aquarium LEDS Price ListSmart Aquarium LEDS Price List
Smart Aquarium LEDS Price List
Wil Vargas
 
P2a Solar Power
P2a Solar PowerP2a Solar Power
P2a Solar Power
M F Ebden
 
Zero Point Magnetic Power Generator - Shocking Truth Revealed
Zero Point Magnetic Power Generator - Shocking Truth RevealedZero Point Magnetic Power Generator - Shocking Truth Revealed
Zero Point Magnetic Power Generator - Shocking Truth Revealed
kash455
 

Mais procurados (20)

Sun run home solar infographics
Sun run home solar infographicsSun run home solar infographics
Sun run home solar infographics
 
Solar Pv Payback
Solar Pv PaybackSolar Pv Payback
Solar Pv Payback
 
LUWAN 5G
LUWAN 5GLUWAN 5G
LUWAN 5G
 
MICRO GRID OPERATION AND CONTROL_C.S.P
MICRO GRID OPERATION AND CONTROL_C.S.PMICRO GRID OPERATION AND CONTROL_C.S.P
MICRO GRID OPERATION AND CONTROL_C.S.P
 
Max Joel - NY Community Solar Confluence Presentation
Max Joel - NY Community Solar Confluence PresentationMax Joel - NY Community Solar Confluence Presentation
Max Joel - NY Community Solar Confluence Presentation
 
Electricity quiz hieper link
Electricity quiz hieper linkElectricity quiz hieper link
Electricity quiz hieper link
 
Solar power analysed
Solar power analysedSolar power analysed
Solar power analysed
 
Lefdal Mine Data Center - Sindre Kvalheim - Localhost - April 2010
Lefdal Mine Data Center - Sindre Kvalheim - Localhost - April 2010Lefdal Mine Data Center - Sindre Kvalheim - Localhost - April 2010
Lefdal Mine Data Center - Sindre Kvalheim - Localhost - April 2010
 
Promoviendo el aprovechamiento de energías en la comunidad
Promoviendo el aprovechamiento de energías en la comunidadPromoviendo el aprovechamiento de energías en la comunidad
Promoviendo el aprovechamiento de energías en la comunidad
 
Austin Energy Solar 2012
Austin Energy Solar 2012Austin Energy Solar 2012
Austin Energy Solar 2012
 
2008 Percent Maintenance Cost per year as a percent of Replacement Asset Value
2008 Percent Maintenance Cost per year as a percent of Replacement Asset Value2008 Percent Maintenance Cost per year as a percent of Replacement Asset Value
2008 Percent Maintenance Cost per year as a percent of Replacement Asset Value
 
Green house solor cost breakdown
Green house solor cost breakdownGreen house solor cost breakdown
Green house solor cost breakdown
 
Exercises chapter 2 Energy, environment and climate second edition
Exercises chapter 2 Energy, environment and climate second editionExercises chapter 2 Energy, environment and climate second edition
Exercises chapter 2 Energy, environment and climate second edition
 
Smart Aquarium LEDS Price List
Smart Aquarium LEDS Price ListSmart Aquarium LEDS Price List
Smart Aquarium LEDS Price List
 
P2a Solar Power
P2a Solar PowerP2a Solar Power
P2a Solar Power
 
Sedona Energy Labs
Sedona Energy LabsSedona Energy Labs
Sedona Energy Labs
 
Electricity mcq
Electricity mcqElectricity mcq
Electricity mcq
 
Top 10 Energy Problems of Pakistan
Top 10 Energy Problems of PakistanTop 10 Energy Problems of Pakistan
Top 10 Energy Problems of Pakistan
 
Ecosaversocket Presentation
Ecosaversocket Presentation Ecosaversocket Presentation
Ecosaversocket Presentation
 
Zero Point Magnetic Power Generator - Shocking Truth Revealed
Zero Point Magnetic Power Generator - Shocking Truth RevealedZero Point Magnetic Power Generator - Shocking Truth Revealed
Zero Point Magnetic Power Generator - Shocking Truth Revealed
 

Destaque (9)

Cebb Graciosa
Cebb GraciosaCebb Graciosa
Cebb Graciosa
 
Finalistas episj graciosa
Finalistas episj   graciosaFinalistas episj   graciosa
Finalistas episj graciosa
 
Graciosa Home Resort
Graciosa Home ResortGraciosa Home Resort
Graciosa Home Resort
 
Graciosa Resort - Booklet
Graciosa Resort - BookletGraciosa Resort - Booklet
Graciosa Resort - Booklet
 
יפו ג
יפו גיפו ג
יפו ג
 
Wind Power in Portugal
Wind Power in PortugalWind Power in Portugal
Wind Power in Portugal
 
Arquipelago dos acores
Arquipelago dos acoresArquipelago dos acores
Arquipelago dos acores
 
Trabalho das ilhas acores
Trabalho das ilhas acoresTrabalho das ilhas acores
Trabalho das ilhas acores
 
Arquipélago dos Açores
Arquipélago dos AçoresArquipélago dos Açores
Arquipélago dos Açores
 

Semelhante a The Graciosa Project 1

Calpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINALCalpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINAL
finance29
 
Calpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINALCalpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINAL
finance29
 
Pakistan wind-power- arif alauddin
Pakistan wind-power- arif alauddinPakistan wind-power- arif alauddin
Pakistan wind-power- arif alauddin
IPPAI
 
Dw31595598
Dw31595598Dw31595598
Dw31595598
IJMER
 
Photovoltic solar energy
Photovoltic solar energyPhotovoltic solar energy
Photovoltic solar energy
Reshop Nanda
 
Particle Swarm Optimization PSO Algorithm Based MPPT for PV System Operating ...
Particle Swarm Optimization PSO Algorithm Based MPPT for PV System Operating ...Particle Swarm Optimization PSO Algorithm Based MPPT for PV System Operating ...
Particle Swarm Optimization PSO Algorithm Based MPPT for PV System Operating ...
ijtsrd
 

Semelhante a The Graciosa Project 1 (13)

Where will CSP plants be built? Incentives, RPS requirements, and Project Eco...
Where will CSP plants be built? Incentives, RPS requirements, and Project Eco...Where will CSP plants be built? Incentives, RPS requirements, and Project Eco...
Where will CSP plants be built? Incentives, RPS requirements, and Project Eco...
 
Could Texas Become The Largest Solar Opportunity in the World? An Update on t...
Could Texas Become The Largest Solar Opportunity in the World? An Update on t...Could Texas Become The Largest Solar Opportunity in the World? An Update on t...
Could Texas Become The Largest Solar Opportunity in the World? An Update on t...
 
Calpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINALCalpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINAL
 
Calpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINALCalpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINAL
 
Pakistan wind-power- arif alauddin
Pakistan wind-power- arif alauddinPakistan wind-power- arif alauddin
Pakistan wind-power- arif alauddin
 
Session2 morocco’s swh applications (abdelali dakkina, ciede cder - memee
Session2  morocco’s swh applications (abdelali dakkina, ciede   cder - memeeSession2  morocco’s swh applications (abdelali dakkina, ciede   cder - memee
Session2 morocco’s swh applications (abdelali dakkina, ciede cder - memee
 
Dw31595598
Dw31595598Dw31595598
Dw31595598
 
14.00 o1 c sutton
14.00 o1 c sutton14.00 o1 c sutton
14.00 o1 c sutton
 
Energetic payback time of PV: In Germany and Tunisia
Energetic payback time of PV: In Germany and TunisiaEnergetic payback time of PV: In Germany and Tunisia
Energetic payback time of PV: In Germany and Tunisia
 
Photovoltic solar energy
Photovoltic solar energyPhotovoltic solar energy
Photovoltic solar energy
 
Jnnsm november 2012
Jnnsm november 2012Jnnsm november 2012
Jnnsm november 2012
 
Pv plant references
Pv plant referencesPv plant references
Pv plant references
 
Particle Swarm Optimization PSO Algorithm Based MPPT for PV System Operating ...
Particle Swarm Optimization PSO Algorithm Based MPPT for PV System Operating ...Particle Swarm Optimization PSO Algorithm Based MPPT for PV System Operating ...
Particle Swarm Optimization PSO Algorithm Based MPPT for PV System Operating ...
 

Mais de Global Infrastructure Basel Foundation

Mais de Global Infrastructure Basel Foundation (20)

GIB2015_Structuring Sustainable Infrastructure Projects_IISD Panel
GIB2015_Structuring Sustainable Infrastructure Projects_IISD PanelGIB2015_Structuring Sustainable Infrastructure Projects_IISD Panel
GIB2015_Structuring Sustainable Infrastructure Projects_IISD Panel
 
GIB2015_Solid Standards and Ratings_Schneider_Roos
GIB2015_Solid Standards and Ratings_Schneider_RoosGIB2015_Solid Standards and Ratings_Schneider_Roos
GIB2015_Solid Standards and Ratings_Schneider_Roos
 
GIB2015_Solid Standards and Ratings_Ruijie
GIB2015_Solid Standards and Ratings_RuijieGIB2015_Solid Standards and Ratings_Ruijie
GIB2015_Solid Standards and Ratings_Ruijie
 
GIB20115_Solid Standards and Ratings-Kornmann
GIB20115_Solid Standards and Ratings-KornmannGIB20115_Solid Standards and Ratings-Kornmann
GIB20115_Solid Standards and Ratings-Kornmann
 
GIB2015_Solid Standards and Ratings_Georgoulias
GIB2015_Solid Standards and Ratings_GeorgouliasGIB2015_Solid Standards and Ratings_Georgoulias
GIB2015_Solid Standards and Ratings_Georgoulias
 
GIB2015_Solid Standards and Ratings_Baillon
GIB2015_Solid Standards and Ratings_BaillonGIB2015_Solid Standards and Ratings_Baillon
GIB2015_Solid Standards and Ratings_Baillon
 
GIB2015_Public and Private Sector Transit Development_Hughes
GIB2015_Public and Private Sector Transit Development_HughesGIB2015_Public and Private Sector Transit Development_Hughes
GIB2015_Public and Private Sector Transit Development_Hughes
 
GIB2015_Public and Private Sector Transit Development_Grant
GIB2015_Public and Private Sector Transit Development_GrantGIB2015_Public and Private Sector Transit Development_Grant
GIB2015_Public and Private Sector Transit Development_Grant
 
GIB2015_Public and Private sector Transit Development_Gonzalez
GIB2015_Public and Private sector Transit Development_GonzalezGIB2015_Public and Private sector Transit Development_Gonzalez
GIB2015_Public and Private sector Transit Development_Gonzalez
 
GIB2015_Public and Private Sector Transit Development_Bustinduy
GIB2015_Public and Private Sector Transit Development_BustinduyGIB2015_Public and Private Sector Transit Development_Bustinduy
GIB2015_Public and Private Sector Transit Development_Bustinduy
 
GIB2015_Investors Approach to Sustainable Infrastructure_Valahu
GIB2015_Investors Approach to Sustainable Infrastructure_ValahuGIB2015_Investors Approach to Sustainable Infrastructure_Valahu
GIB2015_Investors Approach to Sustainable Infrastructure_Valahu
 
GIB2015_Investors Approach to Sustainable Infrastructure_Barben
GIB2015_Investors Approach to Sustainable Infrastructure_BarbenGIB2015_Investors Approach to Sustainable Infrastructure_Barben
GIB2015_Investors Approach to Sustainable Infrastructure_Barben
 
GIB2015_Instruments for Increasing Capital Flows_Zhang
GIB2015_Instruments for Increasing Capital Flows_ZhangGIB2015_Instruments for Increasing Capital Flows_Zhang
GIB2015_Instruments for Increasing Capital Flows_Zhang
 
GIB2015_Instruments for Increasing Capital Flows_von Gunten
GIB2015_Instruments for Increasing Capital Flows_von GuntenGIB2015_Instruments for Increasing Capital Flows_von Gunten
GIB2015_Instruments for Increasing Capital Flows_von Gunten
 
GIB2015_Instruments for Increasing Capital Flows_Fischer
GIB2015_Instruments for Increasing Capital Flows_FischerGIB2015_Instruments for Increasing Capital Flows_Fischer
GIB2015_Instruments for Increasing Capital Flows_Fischer
 
GIB2015_Instruments for Increasing Capital Flows_Alexander
GIB2015_Instruments for Increasing Capital Flows_AlexanderGIB2015_Instruments for Increasing Capital Flows_Alexander
GIB2015_Instruments for Increasing Capital Flows_Alexander
 
GIB2015_Increasing Efficiency of Sustainable Infrastructure_Changsheng
GIB2015_Increasing Efficiency of Sustainable Infrastructure_ChangshengGIB2015_Increasing Efficiency of Sustainable Infrastructure_Changsheng
GIB2015_Increasing Efficiency of Sustainable Infrastructure_Changsheng
 
GIB2015_Increase Investment in Sustainable Infrasructure_Jianzhong
GIB2015_Increase Investment in Sustainable Infrasructure_JianzhongGIB2015_Increase Investment in Sustainable Infrasructure_Jianzhong
GIB2015_Increase Investment in Sustainable Infrasructure_Jianzhong
 
GIB2015_Closing Financing Gap in Resilient Infrastructure_Pretel
GIB2015_Closing Financing Gap in Resilient Infrastructure_PretelGIB2015_Closing Financing Gap in Resilient Infrastructure_Pretel
GIB2015_Closing Financing Gap in Resilient Infrastructure_Pretel
 
GIB2015_Closing Financing Gap in Resilient Infrastructure_Bresch
GIB2015_Closing Financing Gap in Resilient Infrastructure_BreschGIB2015_Closing Financing Gap in Resilient Infrastructure_Bresch
GIB2015_Closing Financing Gap in Resilient Infrastructure_Bresch
 

Último

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 

Último (20)

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 

The Graciosa Project 1

  • 1. The Graciosa Project Adios supertankers, ahoy energy autonomy Basel, 21 February 2012 Martin Röder
  • 2. Graciosa Island ( Azores) Inhabitants: 4500 Area: 67 km2 Peak load: ~ 3 MW Electricity consumption: ~14 G h W Energy supply: Fossil fuels (85%) W power (15%) ind Local Utility: EDA
  • 3. Graciosa’s current power system Power station 4200 kW (Fuel consumption ~ 4 Mio. l/ a)
  • 4. Adios supertankers, ahoy energy autonomy
  • 6. Island Test Site To address technical issues in island projects, we set up the Island Test Site to simulate up to 100% renewable energy systems. The grid based system can be configured to use wind, irradiation and load measurements from anywhere.
  • 7. Potential for wind and solar energy 14 12 10 Wind 8 m/s Wind speed @ 15 m > 9 m/ s 6 4 estim. yield 3.0 MWh/ kW 2 0 J F M A M J J A S O N D Month 6 5 Solar radiation kWh/m2-day 4 3 daily average 3.3 kWh/ m2d 2 estim. yield 1.3 MWh/ kW 1 0 J F M A M J J A S O N D Month 7

Notas do Editor

  1. EDA seems the ideal partner because the people are concerned about their islands and well aware of their dependence. Therefore they are already maximizing the use of renewables. Together with EDA we identified Graciosa as the ideal candidate, because it has good wind and sun resource and no other options like hydro or geothermal. This is an overview of the islands main characteristics. 1200 people plus tourists consumed about 5.3 GWh in 2004 and will approximately consume 6.7 GWh in 2008 which we took as the base year for our calculations. The load peaks in summer which fortunatly consides with the renewable energy potential on the island
  2. There engines might look familiar to you. This is the main source of electricity today. 85% of the islands needs are generated by CAT diesel generators