PMP Practice Exam
PMI’s Project Management Professional (PMP) certification is just the
right credential to give your career as a project manager a huge boost.
Taking a PMP practice exam based on “A Guide to the Project
Management Body of Knowledge" (PMBOK) - Fourth Edition, the PMP
Examination Content Outline and other reference materials will
guarantee that you will only get real-test scenarios and questions.
This free test will help you prepare and earn your PMP certification.
Provided here are sample questions taken from a fully-interactive
practice test.
The answers and explanations ,plus more questions can be found here
and at Facebook.
Which of the following is not
     considered a process
            group?
 Initiating
 Planning
 Executing
 Integrating
As the architect of the project plan,
             the project
manager is expected to provide all of
       the following, except

   Detailed direction
   Basis for performance measurement
   Resource requirements
   Task definitions
To ensure definite boundaries to
         complete a project,
the project manager must follow the
   Scope definition
   Scope statement
   Risk management plan
   Scope verification
This tool is used to secure expert
            judgement.

 Expected value technique
 Work Breakdown Structure (WBS)
 Peer review
 Delphi technique
Which of the following is an example
           of a project?

   Enforcing security protocol
   Cleaning the office premises
   Buying your weekly grocery
   Building a water fountain
Which of the following is not a project
              category?

    Individual projects
    Staff projects
    Matrix or aggregate projects
    Combo projects
The following are considered KPIs (key
   performance indicators), except

   Client involvement
   Use of interim metrics
   Government support
   Establishment of control processes
It means being answerable for the
            satisfactory
completion of a specific assignment.
   Accountability
   Authority
   Responsibility
   Integrity
A preliminary estimate of the cost of a
              project is
           formally called a
    Rough order of magnitude
    Tentative cost analysis
    Estimate of costs and resources
    Budget schedule
What is the sequence of activities that
              takes the
     longest time to complete?
    Critical path
    Non-critical path
    Slack time
    Latest finish date
This is the amount of time that an
 activity can be delayed without
    causing a delay in the total
 completion time of the project.

 Fudge factor
 Slack time
 Non-critical time
 Forward pass
Using PERT methodology, calculate the
           average value or
    expected value if the optimistic
         estimate is one day,
pessimistic estimate is eight days and
              most likely
        estimate is two days.
    2.15 days
    2.45 days
    2.67 days
    2.85 days
The Project Management Triangle
           consists of:



 Cost, time/schedule, resources
 Cost, time/schedule, scope
 Cost, product, scope
 Cost, product, resources
A table that displays personnel's skills
and knowledge as well as their interest
       in work areas using these
    skills and knowledge is called a

    Knowledge base
    Skills and knowledge table
    Power graph
    Skills matrix
Your team wants to check if the software
packaging you are making for a client is up to
standards. However, you have 12,000 units to
check and decided to take a random sample.
            This is an example of:

   Benchmarking
   Statistical sampling
   Cost benefit analysis
   Root cause analysis
You are organizing a Christmas party for your team.
 As project manager, you sense that there is a low
likelihood of members not attending the event but
decides against taking any action against this. Your
         response strategy is referred to as

  Avoidance
  Transference
  Mitigation
  Acceptance
A hospital initiates a phase-out of mercury-based
   medical products as part of new regulatory
requirements. This project was primarily initiated
                     because of

     Market demand
     Organizational need
     Technological advance
     Legal requirements
Your company is performing an audit
           of projects for
quality standards in a process called
 Total Quality Management
 Perform Quality Assurance
 Perform Quality Management
 Perform Quality Control
Your company invests $800,00 on new
 office equipment. The cash savings is
  estimated to be $100,000 per year.
      What is the payback period?
    4 years
    6 years
    7 years
    8 years
To determine the impact of diminished
           resources from
your project schedule, what technique
           would you use?
    Worst-case scenario analysis
    Variance analysis
    What-if scenario analysis
    Fast tracking
For the complete answers to these
            questions,
  take the free, fully-interactive
       PMP Practice Exam!

Visit our website to take more free
   quizzes for your professional
certifications and other fun tests!

Mais conteúdo relacionado

Destaque

Project Time Management
Project Time Management Project Time Management
Project Time Management Ahmed Alageed
 
Pmp questions and explanations
Pmp questions and explanationsPmp questions and explanations
Pmp questions and explanationsVenkat Venkat
 
IT Project Management - Aligning PMBOK Processes and SDLC
IT Project Management  - Aligning PMBOK Processes and SDLCIT Project Management  - Aligning PMBOK Processes and SDLC
IT Project Management - Aligning PMBOK Processes and SDLCCrysanthus Raharjo, PMP
 
PMP preparation and PMI Framework
PMP preparation and PMI FrameworkPMP preparation and PMI Framework
PMP preparation and PMI FrameworkUzma Khan
 
2017 Project Management Workshop Schedule - Project Management Training - Dco...
2017 Project Management Workshop Schedule - Project Management Training - Dco...2017 Project Management Workshop Schedule - Project Management Training - Dco...
2017 Project Management Workshop Schedule - Project Management Training - Dco...Dcolearning
 
Example Project: Strategic Project Selection and Accelerated Development by J...
Example Project: Strategic Project Selection and Accelerated Development by J...Example Project: Strategic Project Selection and Accelerated Development by J...
Example Project: Strategic Project Selection and Accelerated Development by J...John Thornton
 
PMP TKS GUIDE: Closing Process Group; Tasks, Knowledge & Skills
PMP TKS GUIDE:  Closing Process Group; Tasks, Knowledge & SkillsPMP TKS GUIDE:  Closing Process Group; Tasks, Knowledge & Skills
PMP TKS GUIDE: Closing Process Group; Tasks, Knowledge & SkillsPMC Mentor
 

Destaque (16)

Project Time Management
Project Time Management Project Time Management
Project Time Management
 
PMP® Sample Questions 3
PMP® Sample Questions 3PMP® Sample Questions 3
PMP® Sample Questions 3
 
Pmp questions and explanations
Pmp questions and explanationsPmp questions and explanations
Pmp questions and explanations
 
PMP Sample Questions Set 5
PMP Sample Questions Set 5PMP Sample Questions Set 5
PMP Sample Questions Set 5
 
PMP Exam Sample Questions Set 8
PMP Exam Sample Questions Set 8PMP Exam Sample Questions Set 8
PMP Exam Sample Questions Set 8
 
PMP Exam Sample Questions Set 1
PMP Exam Sample Questions Set 1PMP Exam Sample Questions Set 1
PMP Exam Sample Questions Set 1
 
PMP Exam Sample Questions Set 6
PMP Exam Sample Questions Set 6PMP Exam Sample Questions Set 6
PMP Exam Sample Questions Set 6
 
IT Project Management - Aligning PMBOK Processes and SDLC
IT Project Management  - Aligning PMBOK Processes and SDLCIT Project Management  - Aligning PMBOK Processes and SDLC
IT Project Management - Aligning PMBOK Processes and SDLC
 
Pmp communication chapter 10
Pmp communication chapter 10Pmp communication chapter 10
Pmp communication chapter 10
 
PMP Exam Sample Questions Set 4
PMP Exam Sample Questions Set 4PMP Exam Sample Questions Set 4
PMP Exam Sample Questions Set 4
 
PMP preparation and PMI Framework
PMP preparation and PMI FrameworkPMP preparation and PMI Framework
PMP preparation and PMI Framework
 
PMP Exam Sample Questions Set 7
PMP Exam Sample Questions Set 7PMP Exam Sample Questions Set 7
PMP Exam Sample Questions Set 7
 
Pmp scope chapter 5
Pmp scope chapter 5Pmp scope chapter 5
Pmp scope chapter 5
 
2017 Project Management Workshop Schedule - Project Management Training - Dco...
2017 Project Management Workshop Schedule - Project Management Training - Dco...2017 Project Management Workshop Schedule - Project Management Training - Dco...
2017 Project Management Workshop Schedule - Project Management Training - Dco...
 
Example Project: Strategic Project Selection and Accelerated Development by J...
Example Project: Strategic Project Selection and Accelerated Development by J...Example Project: Strategic Project Selection and Accelerated Development by J...
Example Project: Strategic Project Selection and Accelerated Development by J...
 
PMP TKS GUIDE: Closing Process Group; Tasks, Knowledge & Skills
PMP TKS GUIDE:  Closing Process Group; Tasks, Knowledge & SkillsPMP TKS GUIDE:  Closing Process Group; Tasks, Knowledge & Skills
PMP TKS GUIDE: Closing Process Group; Tasks, Knowledge & Skills
 

Último

PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptxRoofing Contractor
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance managementVaishnaviGunji
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...meghakumariji156
 
BeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfBeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfDerekIwanaka1
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Omaninstagramfab782445
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfwill854175
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAITim Wilson
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Falcon Invoice Discounting
 
Rice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna ExportsRice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna ExportsShree Krishna Exports
 
Buy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified Binance Account
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challengeshemanthkumar470700
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon investment
 

Último (20)

PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
BeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfBeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdf
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Rice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna ExportsRice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna Exports
 
Buy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From Seosmmearth
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 

PMP Practice Exam

  • 1. PMP Practice Exam PMI’s Project Management Professional (PMP) certification is just the right credential to give your career as a project manager a huge boost. Taking a PMP practice exam based on “A Guide to the Project Management Body of Knowledge" (PMBOK) - Fourth Edition, the PMP Examination Content Outline and other reference materials will guarantee that you will only get real-test scenarios and questions. This free test will help you prepare and earn your PMP certification. Provided here are sample questions taken from a fully-interactive practice test. The answers and explanations ,plus more questions can be found here and at Facebook.
  • 2. Which of the following is not considered a process group?  Initiating  Planning  Executing  Integrating
  • 3. As the architect of the project plan, the project manager is expected to provide all of the following, except  Detailed direction  Basis for performance measurement  Resource requirements  Task definitions
  • 4. To ensure definite boundaries to complete a project, the project manager must follow the  Scope definition  Scope statement  Risk management plan  Scope verification
  • 5. This tool is used to secure expert judgement.  Expected value technique  Work Breakdown Structure (WBS)  Peer review  Delphi technique
  • 6. Which of the following is an example of a project?  Enforcing security protocol  Cleaning the office premises  Buying your weekly grocery  Building a water fountain
  • 7. Which of the following is not a project category?  Individual projects  Staff projects  Matrix or aggregate projects  Combo projects
  • 8. The following are considered KPIs (key performance indicators), except  Client involvement  Use of interim metrics  Government support  Establishment of control processes
  • 9. It means being answerable for the satisfactory completion of a specific assignment.  Accountability  Authority  Responsibility  Integrity
  • 10. A preliminary estimate of the cost of a project is formally called a  Rough order of magnitude  Tentative cost analysis  Estimate of costs and resources  Budget schedule
  • 11. What is the sequence of activities that takes the longest time to complete?  Critical path  Non-critical path  Slack time  Latest finish date
  • 12. This is the amount of time that an activity can be delayed without causing a delay in the total completion time of the project.  Fudge factor  Slack time  Non-critical time  Forward pass
  • 13. Using PERT methodology, calculate the average value or expected value if the optimistic estimate is one day, pessimistic estimate is eight days and most likely estimate is two days.  2.15 days  2.45 days  2.67 days  2.85 days
  • 14. The Project Management Triangle consists of:  Cost, time/schedule, resources  Cost, time/schedule, scope  Cost, product, scope  Cost, product, resources
  • 15. A table that displays personnel's skills and knowledge as well as their interest in work areas using these skills and knowledge is called a  Knowledge base  Skills and knowledge table  Power graph  Skills matrix
  • 16. Your team wants to check if the software packaging you are making for a client is up to standards. However, you have 12,000 units to check and decided to take a random sample. This is an example of:  Benchmarking  Statistical sampling  Cost benefit analysis  Root cause analysis
  • 17. You are organizing a Christmas party for your team. As project manager, you sense that there is a low likelihood of members not attending the event but decides against taking any action against this. Your response strategy is referred to as  Avoidance  Transference  Mitigation  Acceptance
  • 18. A hospital initiates a phase-out of mercury-based medical products as part of new regulatory requirements. This project was primarily initiated because of  Market demand  Organizational need  Technological advance  Legal requirements
  • 19. Your company is performing an audit of projects for quality standards in a process called  Total Quality Management  Perform Quality Assurance  Perform Quality Management  Perform Quality Control
  • 20. Your company invests $800,00 on new office equipment. The cash savings is estimated to be $100,000 per year. What is the payback period?  4 years  6 years  7 years  8 years
  • 21. To determine the impact of diminished resources from your project schedule, what technique would you use?  Worst-case scenario analysis  Variance analysis  What-if scenario analysis  Fast tracking
  • 22. For the complete answers to these questions, take the free, fully-interactive PMP Practice Exam! Visit our website to take more free quizzes for your professional certifications and other fun tests!