INTERNSHIP PROGRAME




DEPARTMENT OF




   MEHRAN UNIVERSITY OF ENGINEERING & TECHNOLOGY, JAMSHORO




               (Internship Program Report)
                   PAKISTAN STEEL
    NO. OF WEEKS :- 4 WEEKS INTERSHIP PROGRAM
            Date : 14-06-2010 To 09-07-2010

   Submitted To:
                   Incharge (Trg. Wing) HRD
  Submitted By:
         MOHAMMAD YOUNUS           (08IN70)
         WAZIR AHMED JATOI         (08IN64)
         SUHAIL AHMED PALIJO       (08IN36)
         SAEED AHMED JANDON        (08IN34)
         KAMRAN MEMON              (08IN43)


                PAKISTAN STEEL MILL KARACHI                  1
       PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




         PAKISTAN STEEL MILL KARACHI          2
PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




                        PREFACE
                  This report contains the information about those
departments which are visited by the internees. Whatever the
machinery seen and the processes are observed, attracting the
human mind and realizes the men what science has achieved and
what kind of mericals has been done by it. Basically Pakistan steel
mill is quite attention attracting industry it provides lot of
opportunities to see, to observe, to achieve and to get the lot of
experience about the industry as well as about the machinery.
The technology installed at Pakistan steel mill is the old one but due
to the hardworking labor it can compete the latest technology even
today.
This report may also contains the facts and the real figures of the
various departments which are very beneficial for our experience
and the also for the practical knowledge. The functions and the
details of their working and the process as well as the timing and
work break down structure is also mentioned in this report. This is
edit by the students of the INDUSTRIAL ENGINEERING AND
MANAGEMENT DEPARTMENT of the nominated university of
jamshoro named MEHRAN UNIVERSITY OF ENGINEERING
AND TECHNOLOGY JAMSHORO SINDH PAKISTAN. The
details of the students are as under:-

               SUHAIL AHMED PALIJO (08IN36).

               MUHAMMAD YOUNUS (08IN70).

                WAZIR AHMED JATOI (08IN64).

              SAEED AHMED JANDAN (08IN34).

             KAMRAN AHMED MEMON (08IN43).
               PAKISTAN STEEL MILL KARACHI                           3
      PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




           ACKNOWLEDGEMENT
             We are very thankful from the core of my heart
to honorable CEO, Pakistan Steel, MALIK ISRAR
HUSSAIN for providing us opportunity for training and
whose intelligent, wise and sound leadership has converted
manpower into wining combination by this industry into a
gold mine.

           We wish to express my deep gratefulness to
MR. RIZWAN AHMED, Director (Personnel & HRD) for
his consideration and supervision. It was a memorable time
in Pakistan steel due to his kind concern.

         We are also thankful to MR. NISAR A.
KHOWAJA, Incharge (Training Wing) and MR. YOUSUF
AYUB, Dy. Manager/ Incharge ( In- Plant Training) for his
precious advice and for he great encouragement and
cooperation, because of which We have successfully
completed our internship training of PAKISTAN STEEL
where we learned a lot.




              PAKISTAN STEEL MILL KARACHI                     4
     PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




                CONTENTS
   UNIT’S                  DESCRIPTION                  PAGE
                                                        NO.
UNIT NO. 1   INTRODUCTION                               07
               • Brief History                          08
               • Location and Sites                     09
UNIT NO. 2   PRODUCTION PLANING & CONTROL               10
               • Introduction of Production, Planning   11
                 and Control.
               • Objective of Production, Planning      12
                 and Control.
               • Roll of Production Planning and        12
                 Control in Pak steel.
               • Hot metal section.                     13
               • Steel making section.                  16
               • Rolling section.                       17
               • Budgeting and procurement section.     18
UNIT NO. 3
             QUALITY CONTROL DEPARTMENT
                • Quality, Quality Control.             19
                • Quality Control in Pakistan steel.    20
                • Quality Control section in Pakistan   20
                  steel.                                21
             i)   RMHD Section.                         21
             ii) COBP Section.                          23
             iii) Sintering section.                    25
             iv) IMD Section.                           26
             v) SMD section.                            28
             vi) HSM section                            33
              PAKISTAN STEEL MILL KARACHI                    5
     PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




             vii) REFRACTORY Section.                     35
             viii) CRM SECTION                            40

UNIT NO. 4   MECHANICAL EQUIPMENT AND                     43
             REPAIR SECTION
               • Maintenance                              44
               • Objectives of Plant maintenance          44
               • Importance of the maintenance            44
               • Maintenance section in Pakistan steel.   45
               • M.E.R.S                                  45
               • Maintenance of HSM                       46
               • Maintenance of SINTERING                 48

UNITE NO. 5 INDUSTRIAL ENGINEERING                        50
            DEPARTMENT
              • DEFINITION                                51
              • FUNCTION                                  51
              • SALIENT FUNCTIONS’ OF I.E.D               51
              • PRESENT EXERCISE.                         51
              • FUTURE PROGRAMME.                         52
              • WORKING OF I.E.D NOW A                    52
                DAYS.                                     52
              • HAZARD ALLOWANCES




              PAKISTAN STEEL MILL KARACHI                      6
     PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




INTRODUCTION

Steel is the main metal in the world
without steel the life became incomplete
because steel is used in many places where
no metal or non-metal thing can not be
used not only Pakistan there so much
demand of in steel in world steel is the
bake bone of any country it plays vital role
in the development of any country not only
in physical sense but also economically.
Similarly like other countries Pakistan has
decided to install its own steel mill because
before steel mill, the steel and the related
metals are the imported from other
countries. Before steel mill he was
dependents of other countries. But now he
is capable of producing 1.1milion ton of
steel mill by his own which is not sufficient
but quit helpful for the country from every
aspect foundation of steel mill was kept by
the legend Qaid-e-awam ZULIFIQAR ALI
BHUTTO in 1976 with the co-operation of
Russia who have transferred the latest
technology of that time and this project of
about billion approximately it was
completed in 1981.first time in Pakistan
the blast furnace started in 1981 to produce
pig iron further it was converted into steel
of different grades.
Pakistan steel mill is separated over 18000
acres out of which 10000 was fixed for
mill and rest of will be for the housing and
medical facilities Pakistan steel mill not
only provides the medicate facilities but all
type of facilities such as education, sports, completion and higher education
facilities etc due to Pakistan steel mill thousands of people are employed and
living the prosperous life.
                PAKISTAN STEEL MILL KARACHI                                  7
       PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




BRIEF HISTORY

The engineering goods industry is recognized the world over as most critical for the
development of self reliant and vibrant economy. This industry, however, depends heavily
on basic metals industry, specially the iron & steel industry for the supply of resource
inputs. the iron & steel industry, therefore holds the key To the sustained growth of the
engineering sector and hence to the development of the economy as whole. As such the
steel industry can be termed as mother industry to all modern industries, being the basic
source of metal for them.
In this perspective the importance of the national assets such as PAKISTAN STEEL,
which determined on their strength and ability to sustain the national growth rate, need not
be emphasized. Abundant steel, sufficient power and adequate Transport are otherwise
also absolute necessities for the rapid industrialization of developing countries today. If
one desires to find out what PAKISTAN STEEL has done for the country, one will have
to venture back in time, into the early 70s when PAKISTAN STEEL was only a dream on
paper.
 By that time non-existence of an iron & steel making plant of a reasonable size in
Pakistan had shown its adverse effects on the industrial and economic development of the
country which continued to suffer various set backs because of dependence on import of
iron and steel products.
A stage had been reached when it had been realized that the import bill to meet all the
re3quirements of steel could not be supported indefinitely. In fact the idea of setting up of
a steel mill in the country had been cooking over the red hot coals of controversy since the
introduction of the first five year plan (1955-60) which laid emphasis on the domestic
production of iron and steel.
Debates over the manufacturing process, supply sources of the requisite machinery and
raw materials, plant site, domestic ore versus imported ore, ownership pattern, product-
mix and above all, foreign financing g credits, kept the projects simmering over as period
of two decades.
In 1968 beside other factors, it was considered by the Government that a basic steel
industry should be established in the public sector as public sponsorship of the project
would enable integrated development of steel industry in the country. in the light of this,
Government decided that the Karachi Steel Project should be sponsored in the public
sector for which a separate Corporation under the Companies act be formed, in the
pursuance of this decision Pakistan Steel Mills Corporation was setup as a private limited
company under companies act 1913 in the public sector on 2nd July, 1968 with the object
to establish and run Steel Mills at Karachi and other places in Pakistan.
In January, 1969, PAKISTAN STEEL concluded an agreement with V/O Tiajpromexport
of the then USSR for preparation of a feasibility report for the establishment of steel Mills
at Karachi. Subsequently in January, 1971 Pakistan and the USSR signed an agreement
under which the latter agreed to provide techno-financial assistance for the construction of
a coastal-based integrated Steel Mills at Karachi.


                 PAKISTAN STEEL MILL KARACHI                                               8
        PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




 The foundation stone of this vital and gigantic project was laid on 30th December,1973
the then Prime Minister of Pakistan., the mammoth construction and erection work, of an
integrated steel mills never experienced before in the country, was carried out by a
consortium of Pakistani construction companies under the overall supervision of soviet
experts.

PAKISTAN STEEL does not only have to construct the main production units but a host
of infrastructure facilities involving unprecedented volumes of work and expertise.
Component units of the Steel Mills numbering over twenty and each a big enough factory
in its own right were commissioned as they were august, 1985 with coke oven and by-
product plant coming on steam the first and the galvanizing unit the last. Commissioning
of blast furnace No. 1 on 14th August, 1981 marked Pakistan’s entry into the elite club of
iron and steel producing nations. The project was completed at a capital cost of Rs. 24,700
million. The completion of the steel mills was formally launched by the president of
Pakistan on 15th January, 1985.
PAKISTAN STEEL today is the country’s largest industrial undertaking having
production capacity of 1.1million tones of steel. The enormous dimensions of the project
can be visualized from the construction inputs which involved the use of unparalleled 1
29 million cubic meters of concrete, 5.70million cubic meters of earth work (secondly to
Tarbela Dam), 330,000 tones of machinery, steel structure and electrical equipment. It’s
unloading and conveyor system at Port Qasim is the third largest in the world and its
industrial water re3soervior with a capacity of 110 million gallons per day is the lar54gest
concrete reservoir in Asia. A 2.5 kilometers long sea water channel connects the plant site
to feed the sea water circulation system with 216 million gallons per day. The plant’s 2 km
long flyover which connects the steel mills with National Highway was the largest in the
country when built.
The above figures illustrate the massive civil works, intricate erect ions, installation of
sophisticate4d electrical and mechanical and equipment with the completion of
PAKISTAN STEEL, the local contractors gained the technical ability till the unknown to
them which they utilized later to undertake works worth millions of rupees/dollars both
within the country and abroad specially Middle East.

LOCATIOIN AND SITE:
PAKISTAN STEEL is located at a distance of 40 km South East of Karachi at Bin Qasim
in close vicinity of Port Muhammad Bin Qasim is a coastal site which lies on the National
Highway is linked to the railway network. It was found to be an ecologically preferable
location, alongside a tidal creek and having wind direction away from the city of Karachi.
PAKISTAN STEEL is spread over an area of 18,600 acres (about 29 square miles)
including 10,390 acres for township and 200 acres for 110 MG water reservoir. In addition
it has leasehold rights over an area of 7520 acres for mining of limestone and dolomite in
Makli and Jhampir areas of district Thatta.


                 PAKISTAN STEEL MILL KARACHI                                              9
        PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




         PAKISTAN STEEL MILL KARACHI          10
PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




INTRODUCTION:-
Production planning and control as its name suggest that it is combination of three
departments:

   1. PRODUCTION DEPTT:
   2. PLANNING DEPTT:
   3. CONTROL DEPT:

1-Production:

      It is the process or procedure to develop to transform a set of input element like
      men, material, machine and capital information and energy into ratio specified set
      of output elements like finished products and services in proper quantity and
      quantity to achieve the objectives of the enterprise

   PLANNING:

   1. Planning all aspects of the production, selling etc, are essential in order to
      minimize intangibles.
   2. Planning is the process by which a manager anticipates the future and discovers the
      alternative courses of actions open to him.
   3. Planning is the economic, rational, systematic way of making decisions today
      which will affect the future e.g what will be done in future, who will do it and
      where it will be done.
   4. Infect every managerial work/act whether it would be physical or mental is
      inexorably intertwined with planning.
   5. Without proper planning the activities of an enterprise became confused.
   6. Prior planning is necessary or very essential for utilizing the available facilities
      (Men, material, machine, etc) to the best of the advantage.

CONTROL :

   1. Controlling is the process that measures current performance and guides it towards
      some pre-determined goals.
   2. controlling involves:
              Monitoring of the activities to make sure that the objectives are being met.
              The initiation of corrective actions as required overcoming problems, if any
              hindrance is occurred during the process.
              Checking and the examination is required on the periodic basis to ensure
              that the things are preceding as per plan.
                PAKISTAN STEEL MILL KARACHI                                            11
       PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




               It is necessary to ensure that the orders are not miss-understood rules are
               not violated and objectives have not been unknowingly shifted.
               It is the continuous process that measures the progress of the operations
               (compares) verifies them confirms with the pre-determined plan and takes
               correctives actions if required.

   OBJECTIVES             OF THE          PRODUCTION PLANNAING                         AND
   CONTROL:-
   •   Effectiveness: goods to fulfill customers’ needs
   •   Maximizing output: maximum output with minimum input
   •   Quality control: Product/service quality meets planned quality specifications
   •   Minimize throughput time: conversion of RM to FG in minimum time
   •   Capacity: full utilization of men & machines
   •   Minimize cost: minimum cost of production
   •   Maintaining inventory: optimal inventory
   •   Flexibility: flexibility in production operations
   •   Coordination: between men & machines
   •   Capacity: plan for current & future needs
   •   Reduce bottlenecks: solve production problems early
   •   Maximize profit: minimize cost
   •   Production schedules: as per plan
   •   Routes & schedules: to optimize use of men, material & machinery
   •   Maintain performance: maintain standards

ROLE OF PRODUCTION PLANNING AND CONTROL IN STEEL
MILL:-
It is one of the main department of the steel mill basically its main function is to make
planning for the over all production either it is daily, weekly, monthly or annually.
It plays the role of the backbone in the steel mill. Without ppc steel mill is useless if you
really want to make it useful their must be ppc department. If any org. is working without
planning it has to bear heavy loss as well as the lot of wastage of the time and other factors
such as money, material, machinery. Planning is the single tool which minimizes that
effect and maximizes the profit.
In steel mill under the quit capable supervision of the production planning and control
deptt: almost all production deptt: are working. Due to large numbers of the department
ppc has divided them into the three groups. By grouping system it is easy to handle and
control. Details of the department are as under
There are 4 major groups:-
     1. Hot metal section/department.
     2. Steel making department/section.
     3. Rolling section.
                        PAKISTAN STEEL MILL KARACHI                                         12
         PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




    4. Budgeting and Procurement section.
All these sections are further divided into various units or departments.

   HOT METAL SECTION:-
   It is the main section of the ppc department. It deals with the all type of the hot metal
   and the raw material. It contains the following departments.

   1.   RAW MATERIAL AND HANDLIND DEPARTMENT.
   2.   SINITERING DEPARTMENT.
   3.   COCK OVEN AND BY PRODUCT DEPARTMENT.
   4.   IRON MAKING DEPARTMENT.


   RAW MATERIAL AND HANDLING DEPARTMENT
   Pakistan steel mill meets its raw material‘s requirement both from indigenous as well
   as foreign sources locally available materials include:-
           1).Limestone                      5.)Bauxites
           2).Dolomite                       6).Magnetite
           3).Fireclay                7).Chromites
           4).Fluoride

   Of these PAKISTAN STEEL MILL has also leasehold rights for limestone and
   dolomite quarries located within the convenient distance of the works. Nevertheless
   the basic minerals namely (iron ore, coking coal and manganese ore are imported
   because of the indigenous non-availability In appropriate chemistry /quality and
   quantity. Major raw material requirement at full production is given below:-

   ITEM                                            At 1.1MTPY
                                                   (IN THOUSAND TONNES).
   IMPORTED:-
   Coking coal                          1050
   Iron ore                             1910
   Manganese ore                        28
   Ferro-manganese                      6
   Ferro-silicon                        3
   Aluminum                             2
   Zinc                                 3
   Fluorite                             5
   LOCAL:-
   Limestone                            390
   Dolomite(sinitert grade)             185
                      PAKISTAN STEEL MILL KARACHI                                        13
        PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




Dolomite(refractory grade)                    46
Refractory clay                               28
Silica sand                                   19


ITEM                                          Location
IMPORTED:-
Coking coal                                   Australia ,Canada
Iron ore                                      Australia, Canada, Iran, India
Manganese ore                                 Canada
Ferro-manganese                               Canada, Iran, India
Ferro-silicon                                 India, Iran
Aluminum                                      Australia, Canada
Zinc                                          Iran, India
Fluorite                                      India, Iran
LOCAL:-
Limestone                                     Makli Distt: Thatta
Dolomite(sinitert grade)                      Jhumpir
Dolomite(refractory grade)                    Jhumpir
Refractory clay                               Balochistan
Silica sand                                   Balochistan

BLENDING YARD:-
    IT is the ground where blends are made by mixings the same material but ratio of
the % should be different.
BLEND:-
It is the mountain of the mixtures of the two materials of different % ratio.
Let have an example of the iron ore there are two types of the iron ore one is local and
other is imported.
Both these materials are mixed to attain the required % of the iron ore because the
imported iron ore is the expensive one so that we cannot used the imported iron ore at
all.




             PAKISTAN STEEL MILL KARACHI                                             14
    PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




SINITERING:-
This plant has two sintering machines with an effective
sintering area of the 75 square meters.
After BMR the sintering area has increased to 90 sq.m thereby
increasing the annual production capacity from 1.5 million
tones to 1.8 million tones of the sinter. These machines
provide sinter to the iron making deptt: for production of the
hot metal /pig iron sinter is prepared by heating up an
amalgam or cake ,dolomite, limestone and iron ore.


COKE OVEN AND BY PRODUCT
PLANT:
There two cokes over batteries in this plan
 and each battery consists of 49 ovens.
The first battery was commissioned von
 17th April, 1981 where as the second one was
commissioned on 7th may,
 1985. These batteries produce metallurgical
coke and other by by-products such as
 coke oven gas ammonium sulphate.
 Coal-tar etc. coke oven gas is used for
 generating electricity by thermal power plant.
 Coal-tar is a very useful item which
 can be used for producing basic chemical products. It is utilized in the manufacturing
of the black carbon, insecticides and even some perfumes. PAKISTAN STEEL’S coke
is of the highest international standards. It not only sells in the local market is in
demand in many foreign countries also other coke is exported to the overseas markets.


IRON MAKING DEPARTMENT
There are two blast furnaces in the iron making
deptt: each B.F with an effective volume of
1033cm3 and has the capacity of the 1750 tones of
the molten metal/iron per day the 1st B.F went into
the production on 14th august 1981 while the 2nd
B.F also became operational on the independence
day in 1984.this plant also produces the by-
products called the granulated slag from both the
blast furnaces. It is about 250,000 tons per year.
This is also utilized in the slag cement, slag
wools; slag blocks for the buildings and the
                    PAKISTAN STEEL MILL KARACHI                                     15
     PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




construction of the roads.
It also produces the gas utilized in thermal power plant for the generation of the
electricity. the molten iron produced by the iron making department called the pig iron
is not only sufficient for the internal demands of the Pakistan steel mill but numerous
foundries demands the pig iron in the country. This pig iron is measures up a/c to the
international standards and has been supplied to the various foreign countries such as
India, Bangladesh, Saudi Arabia, Indonesia, china, south Korea and Japan

STEEL                     MAKING                        PLANT/DEPARTMENT:-

In this plant two top-blown basic oxygen furnaces (linz-donawitz)
Converter of 130 tones charge weight each is installed which transform molten iron
into steel. In order cast molten steel in the shapes of the blooms, slabs, and billets. A
bloom caster and the billet caster are added in 1989and the two slab casters are also
installed in the plant blooms of 260*260mm size are used for making the billets in the
billet mill where as the slabs of the 150to200mm and width size of 700 to1550mm are
supplied to the 1700mm or hot strip mill for the manufacturing of the hot rolled sheets.
The cast billets of 80*80mm-150*150mm size produced in the billet caster are directly
marketed the first converter was commissioned on the 18th December 1982 and the
billet caster on the 22nd December 1982,first slab caster on the 10th august 1983and
the second on the 1st November 1983.


BILLET MILL(800mm):-
Prime quality rolled billets of the size 50*50mm to 100*100mm are being produced in
the billet mill which is most important plant of the Pakistan steel mill. Capability of
the manufacturing of the round billets of 56mm diameter has also been attained by the
Pakistan steel mill steel billets are utilized for producing, besides construction bars and
other products such as wire rods, nuts, bolts, balling hoops, rails, heavy structure
rolled sections, seamless pipes, gas cylinders etc. The 800mm billet mill was
commissioned on 11th October 1982.

CONTINOUS BILLET CASTER:-

In order to meet the demands of the billets in the market as well as to balance the
designed production capacity of the steel mill to cater for the market demand
PAKISTAN STEEL has set up a six strands continuous billet caster with production
capacity of 400,000 tones per annum, adjacent to steel making department.
Billet caster can produce billets in sizes of the 50*50mm,100*100mm,125*125mm,the
machinery and equipment were produced from M/s voest-alpine, Austria at the total
cost of Rs.167.7 millions .the project was commissioned on the 11th November
1989,product through the billet caster is more efficient and cost effective than through
bloom casting/billet re-rolling route.
              PAKISTAN STEEL MILL KARACHI                                               16
     PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




   ROLLING SECTION
   The rolling section has been further divided into the two sections.
      1. Hot strip mill (1700mm).
      2. Cold rolling mill.
      3.
HOT STRIP MILL (1700mm).

        With the commissioning of the hot stripe mill on the 25th December 1983.the
production of the steel sheets ,strips, coil commenced in the country.
The annual production capacity of the 1700mm hot strip mill is 790,000 tones. Cold rolled
sheets and stripes are also produced from the hot rolled coils and sheets, strips .Hot rolled
sheets and stripes are used for the manufacturing the pipes of the small, large and medium
sizes. Bodies of the cars and other vehicles, railway wagons transformers boilers big tanks
ocean going ships machines furniture and much more.

COLD ROLLING MILL:-
This plant is used for the production of the cold rolled coils which are more beneficial for
various types of works such as sheets pf the vehicles, as well as the body of the aero
planes and etc. An other assignment is also fulfilled which is of the slitting and shearing
these sheared sheets are used for the flouring, as well as ceiling and in various other
functions where there hot rolled sheets are not benefited.
         CRM is the one of the largest and the cleanest department in the whole steel mill
.It is the one of the best deptt: which always remain clean, all the products of the steel mill
depend on the CRM deptt because each and every product has to pass from that deptt:
CRM contains following units or sections:
              1. Continuous pickling unit.
              2. Reversible unit.
              3. Annealing furnace.
              4. Tempering mill unit.
              5. Combined slitting and shearing units.
              6. Galvanizing unit.
              7. Profile bending.

The most important section of the CRM deptt: is the single strand reversible mill which
has the annual production capacity of 200,000 tones .out of this 100,000tonnes can be
utilized to manufacture the formed sections and 90,000 tones are salable in the market as
the cold rolled sheets /coils. Cold rolled sheets and coils are used in the those industries
which are manufacturing the bicycles ,steel containers, drums, barrels, jerry can bodies of
the buses and other vehicles and steel furniture’s ,machinery parts instruments for oil and
gas etc. galvanized sheets are used for the manufacturing of the trucks, buckets ,iron
shuttering ceilings air-conditioning, ducts, ribbed sheets deserts, coolers utensils of the
                  PAKISTAN STEEL MILL KARACHI                                               17
         PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




daily use, air-conditioners water heaters, and water tanks, etc all the units of the cold
rolling mill were commissioned b/w the February to December 1984.the operation of the
main cold rolling mill units marked the completion of the phase of producing 1.1 millions
tones of steel products.

BUDGTING AND PROCURMENT:-
Budgeting and procurement are two different phrases each phrase has its own actual
meaning as the phrase budgeting from its name it suggest the process of the making
budget of the org.
Each and every organization must have a separate budgeting section because until and
unless an organization .doesn’t prepare its budget, obviously it will bear heavy losses not
only in case of capital but due to not perfectly defined budget it’ll also remain at the
backside in all fields. Similarly in Pakistan steel mill the budgeting section is performing
its duties under the kind control of the production planning and control department.

FUNCTION OF THE BUDGETING SECTION:-

It’s first and for most function is to make budget for the whole organization. Sometimes
the budget will be out of the situation so in that case first to overcome all types of the
waste or extra expenses then the strategy is made. This will prove better for the
organization.




                 PAKISTAN STEEL MILL KARACHI                                             18
        PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




         PAKISTAN STEEL MILL KARACHI          19
PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




QUALITY
        Quality means the degree of perfection of excellence when applied to
manufactured produces. It not necessary means “the beat”. It should imply “the best for
money” that is the product should meet the desired requirement at lowest cost.
The word “quality” is meaning less until and unless the product made up of high quality
has specified used means product serve the specified function for which it is made.
Quality of product is relative terms and it can only be comparing some standards hence the
quality of product may be defined as the conformance to standard and speciation. Quantity
also has a considerable effect on quality and hence it becomes more complex to manger to
control and to achieve the quantity output.

QUALITY CONTROL
         Basically “Quality control” we mean that those process or operation of testing
measuring and manufacturing components with a standard and then determining whether
it should be accepted, rejected, adjusted, or reworked.
It is off course more sensible to control the process so that the standard are being
maintained and that defective parts will not be produced instead of accepting or rejecting a
part after it has been manufactured thus the quality control means the systematic control of
those variable in a manufacturing process which affect the excessive.

QUALITY CONTROL IN PAKISTAN STEEL
        As we have already discussed that the importance of the quality control in any
organization in the above section so in any time of organization either it is manufacturing
industry or service industry or it any corporation all are bounded towards the quality of
their product to meet their consumer demand and hence o increase the productivity.
Pakistan steel is the largest organization of Pakistan and it produces wide variety of steel
product to meet their consumer demand and hence the demand of customer can be
checked by ensuring the quality of product.
Therefore Pakistan steel have their separate quality control department (Q.C.D) situated at
he operation building of Pakistan steel mill.
Q.C.D is under the supervision of various engineer’s, superidents etc those have wide
knowledge and skills t check the quality of their product, process and also control the
quality of whole process in each and every department involving in production in which
further necessary action is to be taken.
In Pakistan steel mill raw iron ore is converted into the required product through various
departments all have different function and task to complete their job hence in every
department there is section or plant of quality of control namely called Q.C.D section of
particular production side.
Therefore quality control originally based on 12 sections which are as follows.
    1) RAW MATERIAL HANDLING DEPARTMENT (RMHD)
    2) COCK OVEN BY PRODUCT COBP
    3) REFRACTORIES AND LIME PRODUCT SECTION
    4) STEEL MAKING DEPARTMENT (SMD)
    5) BILLET MILL
                        PAKISTAN STEEL MILL KARACHI                                       20
         PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




 6) IRON MAKING DEPARTMETN (IMD)
 7) SINTRING SECTION
 8) HOT STRIP MILL (HSM)
 9) COMBINE SHARING AND SILITING (CSSU)
 10) COLD ROLL MILL (CRM)
 11) FINAL PRODUCT DISPATCH CONTROL DEPARMTENT (FPDC).
 Above are the quality control section in every department and performing their job
 pleasantly. Here we are going to describe each one by one.


 RAW MATERIAL HANDLING DEPARTMENT

 INTORUDUCTION

                      This is the very stage in which the raw
  material is handle that has been taken either from local
  resources or it taken taken from internationally.
  RMHD section’s basically work about two particular
   field i-e
  i)       Blending ii) Primarary stock
       • Primarary stock is one which the various type of
raw material which is unloaded at jeetti and through
convare comes at RMHD and then to make pile through
layer’s of material, there are basically four type of pile are
there Pile1 and pile-2 containing material in lump form and
pile-3 and pile-4 of material in fine form.
       • Blending is a section in which the mixture of two
or more than two material if to be mixed both of same
 nature.

 TYPES OF RAW MATERIAL

                 Not only iron ore there is many other material that has been taken either
 locally or international and it can classified as follows
 1) IRON ORE
   The iron ore used is usually taken from international market but it also taken local as
 well when required
 a) Iron ore in LUMP form
 b) Iron ore in FINE form
 2) MAGNESSE
 The manganese has wide application in making of various grade therefore pak steel
 took manganese in two form i-e lump and fine.
 3) QUARTIZIDE

                PAKISTAN STEEL MILL KARACHI                                            21
       PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




4)   DOLOMITE
5)   LIME STONE
6)   SILICA SAND
7)   BANTONITE CLAY.

PROCEDURE OF RHMD

                The material that has come internationally is unloaded at JT.
There are two types of convare belt that has taken the unloaded material
i)      12’-1         ii)12’-2
There are two sampler is installed on each convere i-e
Sample no. 1 on 12’-1 and sampler no. 2 on 12’-2.
Whenever the ore flow over the convere the extreme of that ore is to be cutter and on
each sampler there is material box in which the cutter material is inserted until the
bucket is full the material is shifted down. After all that the reversing belt is there now
if the belt is moved forward there is sieve of -6mm to + 6 mm present.
The material less then under the size of 6 – 30, is to be sieved and drill down as fine
and which is not sieved is also taken from the surface and hence by forward moving
we get both lump and fine form of ore.
           On the other hand if the material is moved in reversed direction there is
combine crusher to crushes further into the size of -10 to +10 mm. Now all these ore
(material) is further crushing & girding the metal is becomes very much powder like
sand is shifted to the process so that through various analyses they may get the
required %age of Fe content in crushed ore and hence observed the quality.

RAW MATERIL QUALITY CONTROL SECTION

               At RMHD the quality control section is responsible to taken the sample
of raw material and make it in proper form by following a particular process and then
send it to the process lab so that to analyze the content of material and % age of their
presence in the material is also taken.




              PAKISTAN STEEL MILL KARACHI                                               22
     PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




        COCK OVEN BY PRODUCT (COBP )

INTRODUCTION
                   COBP abbreviated as cock oven
by products. It’s the one that provide the cock as
a basicwith various other by products those were
necessary to regulate in various section as a fuel
as some of them also sell into the market after little
processing as a extra profit to the organization.

COBP FUNCTION

     COBP works on to performs the following
actions,
COCK to convert COAL
          COBP has major works to produce coal
through
 cock so that it provided facility in the blast furnace
and
 in converter as well as a fuel. When the coal is to be
 taken from the battery one by one after that
quenching
of coal is to be done in two different fashion i-e dry or
 wet quenching.
After quenching sieve analysis is to be done if the size
of cock is in b/w 25-80 mm the cock is continuously transferred to the blast furnace
and more the 80 mm size mean’s +80 mm is to be sell out and -25 mm is lying down
and make use of it if required.

BY PRODUCT OF COBP

COAL TAR, COCO ONE GAS, AMMONIA GAS.
  • Ammonia gas after passing through sulfuric acid is to be manufactured as a by
    product which is used fertilizers.
  • Similarly coco one is also collected and this gas used as a burned in various
    even it is also used in cock battery. The coco one gas has low colorific value
    then natural gas but it is the by product so its provide facility as a fuel.
  • Coal tar is major by product it is used as a fuel in various section and also used
    in refractory bricks.


              PAKISTAN STEEL MILL KARACHI                                          23
     PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




   COBP QUALITY CONTROL SECTION

                   COBP has a continuous process the cock comes through battery and
   send it of required size to B.F but through sampler the sampler is also be taken after
   every 6 hours and check the quality of the coal and then gives specification of the B.F
   operator observers so now its depends upon B.F’s operator either he satisfied with the
   specification given by COBP quality section or don’t he.
   The quality of manufactured coal is to be checked by following process as we have
   done in RHMD. The sampler take’s the sample of cock and sample is to crushed ,
   grind and then make it into powder form which is then send to the process lab so that
   to understand the chemical composition.
   The most preferable composition of coal is as

                 Chemistry                    % age of material involved
                Ash                            12.2 %
                Volatile                        1.3 %
                Sulphur                          0.5 %
                Carbon                        Remaining %age

In the quality section of COBP the strength of the coal is also checked through the used of
the drum tester.
At this stage the sampler of 25 mm to 80 mm is to be filled into the drum and revolve it
about 10 revolution now we have 2 types of sieve’s namely the 40 M and 10 M sieve there
fore the drum cock is to be spread over 40 M sieve.
Hence in sieving of the cock taken from the drum so to be passé most of particle down the
40 M sieve to 10 M sieve and further from 10 M to -10 M so the strength of the coal is to
be called is poor strength but on the other hand if the drum of cock present more of it past
over the 40 M sieve and some of the 10 M sieve so in this case it is called good strength
coal.




                 PAKISTAN STEEL MILL KARACHI                                             24
        PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




SINTERING

   INTRODUCTION

          Sintering is one of the most important plant in pak
   steel sintering with its material provide basis to B.F so
   that it may produce the molten iron. The raw material either
   comes locally or it may internationally in fine or lump form
   so sintering basically make use of fine form of raw
    material.

   PROCESS OF SINTEIRND Q.C.D SECTION

                   First of all through conver’s raw material
   comes and it put into the mixture. When the mixture is to
   be filled by burner’s the quality observer has to observe
   how to operate the mixture and this mixture is also called
    the ball because it converts the fine forms of raw material into the balling drum
   which revolves, the quality observer observed the mixture or sinter is properly mixed
   or not and if he issue so that mixture to is send to the sintering machine now this
   mixture is to be burned by applying heat from up side after wards these mixture cake
   is fully burned and continuously cooling when of away from the hot blast and then this
   cake is diminish by jaw crusher and tend the sinter to the blast furnace now remember
   quality of sinter has major importance and hence it produce wonderful type of raw
   iron.

   SINTER COMPOSTION

                 As we know that nowadays the Pakistan steel facing a lot of problem due
to the lankness of raw material and many of its so now a day the composition of sintering
which is send to the B.F is as follow,

      Chemistry                  % age of material involved
      Fe                          55.85 - 57.85
     MnO                          0.90 – 1.10
     MgO                           1.85 – 2.05
     CaO                           1.19 – 1.39
    FeO                            11.0 – 13.00
    Al2O3                          1.65 – 1.85

                 PAKISTAN STEEL MILL KARACHI                                          25
        PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




  SiO2                          6.50 – 6.70


IRON MAKING DEPARTMENT

INTRODUCTION

            In this department the raw iron is to be prepared through sinter and lump
form of iron ore means it is a stage in which the ore (fine + lump) form is to be
converted a metal form. The metal obtain from IMD is generally serve two purpose
either molted material is shipped into the SMD or it may go to foundry section to
shape it into the pig called the pig iron.




PROCEDURE OF IMD SECTION

          At this stage the raw material or ore form is to be converted into the raw
metal from hence all the further process is based on this stage i-e when the coal of
required size (25 – 80) mm similarly various material’s taken from various
department depends upon the requirement and the order giving by PPC.
When the sinter of some composition is come from the sintering section and lump
form of iron ore is come from the RMHD both form as a charge in blast furnace and
hence when the charge in inserted into the blast furnace the operation of the blast
furnace is start by employing high pressure gas through tuyers. The operation of blast
furnace is depends greatly on the zones of blast furnaces because each zone have
different temperature to other.




             PAKISTAN STEEL MILL KARACHI                                           26
    PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




Zone’s of Blast Furnace
The blast furnace has the following zones with their temperature

   Zones                            Temperature
  Hearth                        1700 – 1800
 Bosh                           1600 - 1500
 Bally                           600, 700, 800
 Stack                           800 – 1000
 Throat                          600 – 1000

High pressure in employed through tuyers and all charge inside reaction and hence as
a result it is to be converted into two things i-e molten iron or slage.
 The iron has the high density and hence it is to be shifted down the blast furnace
where as the slag has low density is placed above the molted iron. Now through taping
whole first the iron is to be taking and filled it in the bowl and after that the slag is
also taken and it is also taken into the bowl.

Major Specification Of Typical B.F
  Specification                    Value
 Capacity                       1750 tonn daily
Volume                          1033 cubic m
height                          96 m
Stack                           800 – 1000
Throat                          600 – 1000


BLAS FURNANCE QULAITY SECTION

 Strictly speaking there is no quality section in blast furnace only the molten iron
whose sample is to be taken and that sample is send it the process labs so that they
applied very technique and using various parameters and then gives the specification
of he molten metal like to how much %age of carbon is places %age of sulpure,
phosphorus etc and give the report to the SMD section.




              PAKISTAN STEEL MILL KARACHI                                             27
     PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




STEEL MAKING DEPARTMENT SMD

INTRODUCTION
It is the one of the most important department of
Pakistan steel it’s not wrong if we called it as a heart
of Pak Steel. At this stage we prepared the steel of
required grade and shape into the various form casting
process slabs, blooms are the product of this stage.

PROCEDURE OF SMD

STEEL MAKING PROCESS THROUGH
CONVERTER
 Hot metal is transported from the twp blast
 furnace by rail cars in 140 tones open transfer ladles
and charged into the mixer by crane. The mixer acts
as a buffer storage vessel to accommodate variation
 b/w iron production and the steel making operation.
To maintain the temperature in the mixer natural gas
 burners heat the surface of the hot metal.
Hot metal is poured from the mixer into a charging ladle mounted on the self –
propelled rail car. During pouring the ladle car is positioned on a weighbridge.
The hot, metal is charged into the converter by crane.
After charging, the converter is rotated to a vertical position and one of the two water-
cooled oxygen lances nozzle relative to the liquid metal surface is important in order
to create the optimum reaction conditions.
To attain the desired carbon content in the refined and to oxidize other impurities a
calculated volume of oxygen is blow into the converter at a controlled flown rate.
During blowing process a pre- determined quantity of calcinated lime is added to the
vessel to produce a slag which aids the refining process. Fluoride is added for slag
fluidity control. Iron ore is sometimes added for temperature control. Coke can be
added for carbon control.
 If the desired steel temperature and carbon contents are not attained then a re blow is
undertaken. When the end-point conditions are achieved, the converter is tilted is
poured into a 130 tones steel ladle through a tap hole. Alloying materials are added to
the ladle during tapping. Ladle additives, namely for ferromanganese and ferrosilicon,
are weighed out of storage bins and loaded into boxes which are transported by a fork
lifter truck to the steel ladle side of the converter. Two boxes can be positioned
together on a discharging device and the contents added to the ladle. Aluminum bars
              PAKISTAN STEEL MILL KARACHI                                             28
     PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




   by bags of cokes breeze are added to the ladle by hand. For certain steel speciation
   calcium silicates is also added to the ladle.
   On completion of tapping, the steel ladle is moved by a self- propelled rail car into the
   ladle bay of casting area. The converter is tilted in the opposite direction and the slag
   is discharge into the slag pot, which is taken by a self- propelled a rail car to the slag
   bay.

   STEEL CONVERTER SPECFICATION
   The various specification of steel converter’s used in SMD shop is as follows,


No. of converter’s                     2 No.’s
Type                                   Top blown oxygen converter
Capacity                               130 tons capacity
 Working volume                        93 M³
Specific volume M³/T                  0.68
Ration H/L                            1.68
Mouth Dia                              2430 mm
Inner Dia                             4240 mm
Inner Height                           7125 mm
Total thickness of wall brick work    920 mm
 No. of bottoms                       3 No.s for two converter’s
Total thickness of the safety lining Chrome magnesite
bottom brick work
Working lining                       Ten bonded dolomite
Lining life                           400 heats
Rate of oxygen blowing                450 M³/min
Oxygen blowing time                   18 minute (average)
Oxygen consumption                    58 Cu.M/Ton.
Tap – to – Tap blowing time           40                             Min/Heat
                                      60 Max / Heat

   MIXER
   The mixer used has the following specifications

No. of Mixer                          One


                 PAKISTAN STEEL MILL KARACHI                                              29
        PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




Capacity                              1300 tones



   CONTINOUS CASTING PROCESS
   There are three machines, a 4-stand blooms caster and 2 stand slab caster and 6 stand
   of billet caster.
   The bloom and slab casters are similar in operation and the difference b/w the
   instruments and control systems of the two types of machine are described in the
   individual zone reports. The ladle from the steel making shop is moved by crane to a
   prepared caster. When stabilization of chemical composition or temperature of the
   steel is necessary the ladle is taken to a stirring station and nitrogen is blown through
   and immersed lance. The temperature of the steel is measured before the ladle is
   placed on a caster turret. When the ladle is positioned correctly on the turret arms the
   crane is unhooked and an operating cylinder is fitted to the slide gate valve of the
   discharge nozzle. The turret can accommodate two ladles, one in the casting position
   and the other in reserve or awaiting removal.

   A prepared tundish on a tundish car is positioned over the stands of the caster and the
   immersion nozzle for each water-cooled copper mould id fixed in position. A mould is
   sealed by the head of a dummy bar inserted through the rollers of the stand.
   The turret is rotated to bring the ladle into the casting position above the tundish. The
   slide gate valve of the ladle is opened and the tundish is filled to require level. The
   tundish stoppers are opened and when the liquid steel in each mould reaches the
   required level the respective mould oscillating mechanism and with drawl drive are
   started. The continuous cast bloom or slab, on being withdrawn iron the mould, is
   sprayed with water in the secondary cooling zone.
   During casting the levels in the tundish and moulds are regulated. The casting speed is
   set according to the steel temperature; the latter being measured periodically in the
   tundish by means of an expandable immersion thermocouple. Water flow to the
   secondary cooling zones is regulated as a function of casting speed.
    Samples are taken, from the steel flowing into the tundish, for analysis at the express
   spectrographic laboratory. The continuous cast bloom or slab is cut to specified length
   the gas cutting section. A gas cutter clamps onto the cast steel at a pre-set length and
   moves in synchronism until cutting is completed. The cut lengths are moved by roller
   table, transfer car and crane to the stock yard.
   Series casting can be undertaken if the interval b/w converter tapings allows a new
   ladle to be placed on the turret before the slide-gate valve of the previous ladle is
   close.
   CASTING MACHINE SPECIFICATION
   The various specification of continuous casting machines in SMD section are as
   follows

                 PAKISTAN STEEL MILL KARACHI                                             30
        PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




   SLAB CASTER

No. of Machines                     2 No.’s
No. of Strands                      Two strands each
Size : thickness                    150- 200 mm
 Size : width                       700-1550mm
Type of machine                    Radial Curvilinear
Machine radius                     10 meter
Casting speed                       0.6-0.9 m/minutes
Capacity                           825,000 T/year
Machine                     length
Mould     top    to    last  roller 22                            meter
Mould top to cutter                 36.5 meter
Metal flow control in mould         Mono- block tundish stopper

   BLOOM CASTER

No. of Machines                     1 No
No. of Strands                      04 No.s each
Size : 200 x 200 mm                 260 x 260 mm
Type of machine                    Radial
Machine radius                     12 meter
Cating speed                        1.1-1.2 m/minutes
Capacity                           400,000 T/year
Machine                     length
Mould     top    to    last  roller 20                           meter
Mould top to cutter                 30 meter
Metal flow control in mould          Hydraulically operated mono-block
                                    tundish stopper

   QUALITY CONTROL SECTION OF SMD


                 PAKISTAN STEEL MILL KARACHI                              31
        PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




The quality section of SMD containing no. of quality plant a various place taken fro the
material from IMD and shape into other slabs, blooms etc.
When the molted iron is to be taken from the IMD and then insert it into the mixer the
one of the quality observer has to look after the mixing process because any delay causes
the reduce the temperature.
            When the molted iron through ladle insert into the converter the quality
            observer has to take the sample of hot metal for analysis as it poured and the
            temperature of the charge in the ladle is measured using an expandable
            immersion thermocouple.
            After blowing the converter is tilled and the temperature of the steel is
            measured using an expandable immersion thermo couple. A sample is to be
            taken for analysis at he express spectrographic laboratory with in the SMD
            building.
            The prepared steel in casting section to cast the blooms, slabs the quality
            observer taken the temperature of steel and also see the tendish of mould is
            properly positioned or not, the cooling system is also ok or not and afterwards
            the ladle tap is open steel is casted in various blooms, slabs.
            When the casted slabs, blooms getting cooled the quality observer received
            various defects of casting because of cooling system these defects are as
                o Longitude straight crack
                o Longitudinal corner crack
                o Auxiliary crack
                o Technical
                o Mixing
                o Ballet etc
    the quality observer mark the error and sent the casted slabs to yard section.
                At the yard section the length and thickness (which is verifying) and also
                the scarfing process is to be done through gas welding to determine the
                stability of the crack slab after wards the verifying slab is going to HRM or
                hot rolling section.

   SUGGESTION

   Whatever we observe in SMD section through whole analysis we found the following
   those are needed to be change in order to increase the production.
   The must be computerized application those gives the perfect composition of
   manufactured steel when the air in blowing through lance because to observe the
   composition’s specially the %age of carbon (C) and volume or air blowing to get the
   required grade of steel through the observation of flame produce during blowing is
   totally logical and requires too much experience on the other hand if the blowing
   system is computerized which gives the minute to minute to change in composition.

   Latest technology should be installed in order to prepare various type of steel instead
   to produced steel of various grade.
                      PAKISTAN STEEL MILL KARACHI                                       32
        PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




HOT STRIP MILL (HSM)

INTRODUCTION
 It is one of the most important department
of pak steel. It is situated nearly to the SMD section.
 It works to produce the coils of various grad, quality,
 variety of the sheets / plates. The coils produced at
this section is either dispatch to sell or it may send to
 the CRM for further processing. The manufactured
coil can also be send to the CSSU section if the
shearing or silitted bundle is required. The coils
produced through HSM which is dispatch into the
market varies in thickness and some time more thick
coil can also be dispatch if the required demand is
 receive.

PROCEDURE
It is basically a forging process as a name
suggest hot rolled mean the red hoted slab of various
grade is rolled by high pressure and shape it into the
coil by passing through various pressing stand under a
heavy pressure.
 It can be started when the verified slabs is to be taken
through yard section hence ensure slabs going over the
 rolling section. First one by one slab are put it down
 on the rollers now these slabs are measured and then put it into the furnace, the
furnace has a capacity to carry 32 slabs at a time and to heated them at a temperature
more then 1500 degree centigrade therefore rolled the quality observed obtain the
temperature of slab so that it may sustain the roller’s action and hence through control
room it is allowed to perform job.
Now at rolling action there are various stage over which the red- hoted coil has passes
through the following,




              PAKISTAN STEEL MILL KARACHI                                             33
     PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




VERTICAL STAND
           Its function first to remove all the scrap
from the slab and 2nd the compressed the slab b/w
two rollers, the vertical also controls the width of
the slabs because when the slabs is to be
compressed through passes the width of it needed to
 be maintain. After the water from a huge pressure
130 kg is to be applied on the compressed slab and
hence to avoid the compressed to stick each other.

UNIVERSAL STAND
            It is one of the basic and it has the capacity to produce 35mm, 30mm,
25mm of thickness of coil (sheet) from 200mm. It also the width as well which is
necessary because when the sheet is to be compressed the width controlling is
necessary. Universal stand contain two type roller i-e back or press roller and working
roller. The coil obtain from universal stand is quit thick but it also has demanded in
market and many times pak steel has provided 35mm thickness of coil to shipping co-
corporation mostly , shipping corporation requires thick coil in making the body of
ship which is need to be to thick.
It is to be remembering that after universal stand the continuous supply of water is
necessary in order to avoid the sheets in the coil to stick each other.

FINISHING STAND
             There are 7-finishing stand in this shop which produced the coil of
thickness 2, 3 mm from 30-35mm on final stand. Each stand has two rollers i-e
working rollers and back roller
The quality inspector at this is responsible to watch either posses is successfully done
or not the water which is supplied in proper manner or not and hence watch through all
this can we achieve the required thickness with tolerance or not.




             PAKISTAN STEEL MILL KARACHI                                             34
    PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




                          REFRACTORIES SHOP

   INTRODUCTION
 o The main purpose of the department is to produce
   • Calcined lime for SMD and others.
   • Tar bonded dolomite bricks for SMD.
   • Fire clay bricks for different uses all-over the Pakistan steel mil.
o The department also deals with repair and installation of refractory bricks lining all
   over the plant. It has also a limited capacity to undertake thermal insulation wherever
   necessary.




MAJOR SECTIONS OF FIRE-CLAY SHOP
       Raw material storage with Crushing Section.
       Fire-clay Calcinations Section (Rotary Kiln).
       Milling, Mixing and pressing Section.
       Brick firing section (Tunnel kiln
       Finished Product stockyard.)

MAJOR SECTION OF DELOMITE SHOP
       Raw Material Storage with Crushing Section.
       Dolomite Calcinations Section (Rotary Kiln)
       Milling, Mixing and pressing Section.
       Brick Firing Finished Product stockyard.

MAJOR SECTIONOF LIME SHOP

                 PAKISTAN STEEL MILL KARACHI                                           35
        PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




       Lime stone storage section.
       Lime calcinations section (rotary kiln).
       Waste heat boiler section.
       Lime storage section.



           a. FIRE CALY SHOP
 Installed capacity             = 30,000 M.Tons
 No. of production lines         = 05

MAIN EQUIPMENTS

No. of toggle pressure         = 02,      Pressing force  = 630 tons
No. of friction pressure         = 04,      Pressing force = 200 tons
No. of Tube mills               = 03       capacity        = 2T / Hr
No. of rotary kiln              = 01,       charging rate   = 2.50- 3.0 tons / hr

           b. DOLOMITE SHOP
Installed capacity              =   7,600 M.tons
No. of production lines         =   02.

MAIN EQUIPMENTS

No. of hydraulic presses       =    02,     Pressing force = 1600 T
No. of Tube mills              =    01,    capacity        = 2 T/hr
No. of roll crusher            =    01,    capacity        = 2.5 T/hr
No. of rotary Kiln             =    01,    charging rate = 2.3 – 2.5 T/hr

   C) LIME SHOP

Installed capacity             =    87500 M.tons
No. of production lines        =    02

MAIN EQUIPMENTS

No. of rotary Kilns            = 02,     capacity = 20 T/hr
Length                         = 75 m
Dia                            = 3.6 m
No. of heat recovery boilers   =     02, capacity = 16-18 T/Hr each
No. of shaft coolers           = 02,               = steam generation

                 PAKISTAN STEEL MILL KARACHI                                        36
        PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




CHEMICAL COMPOSITION OF RAW MATERILAS
          The raw material used for production of fire- clay bricks, Tar bonded
Dolomite Bricks and Lime should meet the following requirement.


            FIRE CLAY BRICKS

                                         Semi flint Clay      Plastic Clay
Al2O3                                    48.0 % (Min)      36.0 (Min)
Al203+ Ti02 content                      51.0 % (Min)      39.0 (Min)
Fe203 content                            2.0 % (Max)       35.0 (Max)
SiO2 content                            30.0 % (Max)        50-55 %
Alkali                                   0.005 % (Max)     0.05 % (Max)
L.O.I (lost of ignition)                 15.0 % (Max)      14.0 % (Max)
Refractoriness                            1790°C           1710°C
Fraction size if in coming material       0.300 mm         0-300 mm
Source                                  KUNDIAN            KUNDIAN
                                        (Mianwali)         (Mianwali)

RAW DOLOMITE

  RAW DOLOMITE
MgO                        19.0 % (Min)
CaO content                33.0 % (Max)
SiO2 content               1.0 % (Max)
Al2O3 + Fe203 +            2.0 % (Max)
Ti02+ Mn3O4
L.O.I (lost of ignition)   45-47 % (Max)
Fraction size if      in    3-80mm
coiming material
Source                     PAIKHEL
                           (Mianwali)


                  PAKISTAN STEEL MILL KARACHI                                37
         PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




LIME STONE
  LIME STONE
 CaO content                             53.5 % (Min)
MgO content                              1.2 % (max)
SiO2 + Al2O3 content                     1.2 % (max)
 Fe203 content                           0.8 % (max)
L.O.I (lost of ignition)                 43-45 %
P contents                               0.060 % (max)
Fraction size if in coiming material       20-50mm
Ti02 content                             0.25 % (max)
S content                                0.025 % (max)
Source                                   MAKLI


FIRE CLAY BRICKS (Finished Products)
  Chemical composition and properties

Fe203 content                 2.4 %
SiO2 content                  42 %
Al2O3 content                 47.8 %
 CaO content                  0.9 %
MgO content                  1.3 %
Ti02 content                 3.4 %
L.O.I (lost of ignition)      0.18 %
Size variation               +1 to -1 mm
Porosity                       22.0 % (min)
Density                      2.3 g/cm³
Mechanical strength          150 Kg/Cm² (min)           230
                             Kg/Cm² (average)


                    PAKISTAN STEEL MILL KARACHI               38
           PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




DOLOMITE BRICKS
   The chemical composition of calcined dolomite


MgO                         34 % (min)
SiO2                        2 % (max)
Al2O3 + Ti02+ Mn3O4         4 % (max)
 L.O.I (lost of ignition)   1 % (max)
Density                     3 g/Cm³


   Properties of Tar bonded dolomite bricks / blocks are


Density                     2.9 g/Cm³ (min)
Mechanical strength         250 Kg/Cm³ (average)
Size variation              Length = +3 to -3 mm
                            Width = +2 to -2 mm
                            Height = +1 to -1 mm




                   PAKISTAN STEEL MILL KARACHI             39
          PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




                     COLD ROLLING MILL (CRM):
              This plant is used for the production of the
 cold rolled coils which are more beneficial for various
 types of works such as sheets pf the vehicles, as well as
the body of the aero planes and etc. an other assignment
 is also fulfilled which is of the siliting and shearing
these sheared sheets are used for the flouring, as well as
 celling and in various other functions where there hot
 rolled sheets are not beneficial.
            CRM is the one of the largest and the cleanest
 department in the whole steel mill. It is the one of the
best department which always remain clean, all the
products of the steel mill depend on the CRM
department because each and every product has to pass
 from that department

CRM contains following units or sections,

 i) Continuous pickling unit.
 ii) Reversible unit.
iii) Annealing furnace.
iv) Tempering mill unit.
v)   Combined slitting and shearing units.
vi) Galvanizing unit.
vii) Profile bending.

             Any type of raw material or coil come to CRM department it has to pass all
above mentioned units then that product can be said that it is the completely finished
product. The coil at time of entering in the CRM department is of about 14 tons but at the
time of discharging is of 5 tons sometime for special purpose its weight is increased from
5 tons to 10 tons and the thickness of the coil is below 4 mm ,at CRM it is further reduced
to 1.4 - 1.6mm.

DISCRIPTION OF THE VARIOUS SECTIONS AND THE QUALITY
CONTROL


                 PAKISTAN STEEL MILL KARACHI                                             40
        PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




CONTINOUS PICKLING UNIT.
            It is the unit where the coil came from the hot strip mill (1700mm) by the
underground conveyer belt which directly connects the HSM and the CRM. when the
coil reach at the pickling section there is lifter fixed in the machine whose work is to lift
the coil and wear it on the uncoiler which uncoils the coil and stretch it to the length of
about 5-6m through the coils after that these coils are dipped into the acid bath where all
types of scales has been removed and then goes to the an other stand where its width is
maintained by trimming the rough edges, it is set as follows:
  1250         1220
  1030         1000
  950          900.
After that it passes through gracing stand where it is grecced / oil is applied to coil as it
can be kept prevented from the corrosion and the natural effects.

FUNCTION OF THE PICKLING UNIT:-
        The most important function is defined as “hot rolled coils are pickled in order to
remove the scales and layers of the “FeO”iron oxide by the emersion of the sheet into the
hydrochloric acid (HCL)”.

QUALITY CONTROL IN THE PICKLING UNIT.
   In the pickling unit quality control only keep an eye on few of important things which
are mentioned as under:
the coil coming from the hot strip mill either it is usable or defective.
the coil’s specifications written on the heat card are correct or not. such as
o heat number
o slab number
o length, width and thickness.

the width at the time of trimming is as per requirement or not.
proper greecing is done at end of the pickling unit. It is done for prevention of the
corrosion.

REVERSIBLE STRAND:-

         It is the machine where thickness of the coil is further reduced to the required
size. The is passed through the reversible strand its length is minimized from 3.5mm to
1.45mm or 1.4mm,the coil is passed through the strand according to its thickness
sometimes it passed three times and sometimes it is passed 5 times but counting always
should be in odd numbers not in even. The emulsion solution is used in which 40% of oil
                  PAKISTAN STEEL MILL KARACHI                                                   41
         PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




and 60% of the water is included. The solution used is so much expensive about
Rs.750/lit.

Parts of the reversible strand:-

i) uncoiler
ii) working rollers
iii) supporting/back up rollers.
 These are the main parts of the reversible strand. it produces the two types of the coils one
is seen to the galvanizing plant and an other send to the annealing furnace.

QUALITY CONTROL AT REVERSIBLE STRAND.

   At the reversible machine mostly there are two most important things to be checked.
   The width of the coil
   The surface of the coil
   There are so many defects sometimes appears on the 0surface of the coil.
   Edge waveness
   Buckling
   Marking
   Bubbles
   Coil break
   Pores

ANNELING FURNACE:-
        It is the furnace which is used to improve the internal structure of the coil or to
increase the strength of the material.

MAIN PARTS OF THE ANNELING FURNACE
Main stand .
Tower
Furnace (moveable).
Stove
           In annealing furnace at a time there are 4 coils of width 950mm and 3 coils of
the width 1220mm can kept. Duration of the furnace is minimum 18-44 hours depending
on the grade of the coil. Internal atmosphere of the furnace is of nitrogen gas and the
heating process takes places in absence of the oxygen/air. After discharging from the
furnace these coils are cooled




                  PAKISTAN STEEL MILL KARACHI                                                 42
         PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




         PAKISTAN STEEL MILL KARACHI          43
PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




MAINTENANCE
            Today, in modern industry, equipment and a machinery are a very
 important part of the total productive effort than was the case years ago. Moreover,
 with the developments of special purpose and sophistical machines, equipment and
 machinery cost a lot more money and there fore their and does time becomes much
 more expensive. For this reason, it is vitally important that the plant machinery should
 be properly maintained.

 OBJECTIVES OF PLANT MAINTENANCE

 i)      The objective of plant maintenance is to achieve minimum breakdown and to
         keep the plant in good working condition at he lowest possible cost.
 ii)     Machines and other facilities should be kept in such a condition which permits
         them to be used at their optimum (profit making) capacity without any
         interruption or hindrance.
 iii)    Maintenance division of factory ensures the availability of the machines,
         buildings, and services required by other section of the factory for the
         performance of their function at optimum return on investment whether this
         investment be in material, machinery or personnel.

IMPORTANCE OF THE MAINTENANCE
 i)      The importance of the plant maintenance is varies with the type of the plant
         and its production.
 ii)     Equipment breaks down leads to the inevitable loose of production.
 iii)    An improperly maintained or neglected plant will sooner or later requires
         expensive and frequent repairs, because with the passage of the time all
         machines or other facilities (such as transportation facilities), buildings, etc
         wear out and need to be maintained to function properly.
 iv)     Plant maintenance plays a prominent role in production management the plant
         break down create problems such as,
             • Loss in production
             • Rescheduling of production
             • Spilet material (because sudden stoppage of process damages in-
                 process materials).
             • Failures to recover overheads (because of loss in production hours).
             • Need for over time.
             • Temporary work shortage- workers require alternative work.

                 PAKISTAN STEEL MILL KARACHI                                          44
        PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




MAINTENANCE SECTION IN PAK STEEL MILL
                               Basically the maintenance section of pak steel can be divided in
various sections or shop depends upon the nature of work which is under consideration.
       The maintenance section of pak steel mill can be classified as
       i)Pulse mechanical
       ii) Central maintenance department (CMD)
       iii) Mechanical Equipment and Repair Shop (M.E.R.S)
       and various other section those involve in providing the facilities to the production side for
their smooth production run.
       Maintenance can be done in the following fashion in any production side,
            • Prevantory maintenance
            • Break down / emergency maintenance
            • Capital maintenance
            • Modernize maintenance
               Preventary Maintenance
                   It is one in which we check the plant before starting production either is it ok or
it is not before as we know that the production giving section those were interlink to each other
and hence any type of damage in one part causes to stop the continuality of production and
hence the productivity.
               Capital maintenance
       The designer of plant section observing the actual life of plant and it can be done when
plant fully maintain, such type of maintenance can be done in year, a month, a day, its upon the
nature of the plant whose maintenance is to be done.
               Modernize maintenance
       It is one in which the modernize method require to handled the situation hence provide the
flexibility in the plant in order to increase the productivity.

     MECHANICAL EQUIPMENT AND REPAIR SECTION
     ( M.E.R.S)
     It is one of the most important maintenance section in pak steel mill. As the name suggest
     mechanical equipment repair section means they are involved in repairing the equipment
     those are necessary in order to run the smooth production.
     The shop work can be start when plant observer observes the lack in a machine by varying
     the product and hence obtain the defects now he is responsible to submit these defects to
     the plant top management (DM/GM) now the letter is to be issued through the plant with
     the machine which requires necessary maintenance and send it to the MERS section.


                        PAKISTAN STEEL MILL KARACHI                                                45
               PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




  Once the letter has been received by maintenance section now the concerned maintenance
  section is responsible to arrange all the resources, manpower’s and those necessary things
  and after that are schedule for the team now these team ether general or shift.
  The requires is to be taken by logistic section
              If the maintenance is large so the maintenance authority analysis the whole
problem       and then planned the huge maintenance by using the following network
technique’s
      • Critical path method (CPM)
      • Program evaluation and review technique (PERT)
                        Once the schedule is made and according to that schedule the
  maintenance team has to work over the concerned section.
  Now we discussing the department in which we went with MERS maintenance team one
  by one.




 HOT STRIP MILL (HSM)

 As we know that they HSM is one of the most
 important department because it converts the red-
 hoted slab into various coils and hence it produce the
 coil.
 In order to achieve the maximum efficiency the
  maintenance of HRM is necessary. The procedure as
  we have already discussed the plant technician
 observer the defect in the running plant and submit the
  report to the official and then official send letter to the
 concerned maintenance section and hence the
 maintenance team’s then responsible to comes in the
 concerned department.
 MERS assign’s the in charge of maintenance observe
  the nature of the job and hence schedule the manpower
  according to their skill about the specific job.
 e.g
 FURNANCE
 The furnace used in HSM is one which converts the slab into red hoted form so that the
 slabs easily further to roll and hence in last the coil is produce.
 The furnace have its own importance and any lacks in furnace may causes to stop the
 smooth production therefore in order to achieve maximum productivity in maintenance of
 furnace is necessary.



                   PAKISTAN STEEL MILL KARACHI                                           46
          PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




The maintenance section involves major to remove the defects in furnace like to change
the bricks i-e refractory inside the furnace and it is very to look after the active life of the
refractory.




VERTICAL STAND
Vertical stand is one of the most important it is the first which causes to compress 200mm
thick red hoted slab into the 35mm thickness means it provided basis to other stand for the
further reduce in thick, the key feature of the vertical is that with reducing the thickness it
also control the width of the coil.
The importance of vertical is also to the great extent and properly handled it necessary
which requires a lot of effort by department as well as the maintenance section.
The defect’s occur in vertical stand are mostly as follows the rollers used are some times
replaced and some times sanded for the polish the surface of the roller, sometimes defects
occur and hence some guiding provided by welding and some time the punk plates has to
change and many other defects that can occur and hence the maintenance section is
responsible to over all this defects in order to increase the life of the vertical stand and
hence to increase the productivity.

UNIVERSAL STAND
After vertical the sheet is further rolled in universal stand therefore maintenance section is
also to look after the universal stand and replaced the necessary parts if required and hence
to remove the defects that can be occur during processing. The one of the most major
defect is that the roller is to replaced when their life to be end when they are not in a
position for further grinding and many other parts and things are there depends upon the
nature of the defects.

FINISHING STAND
Once the sheet is obtain from the universal stand the next step is to finishing stand to
further reduce the thick ness and 3mm approximately hence the finishing stand has its own
importance hence the maintenance of the finishing is necessary mostly the maintenance
teams work to change the damp working role and also change the taper rolling heating
inside the cup etc there is many other parts that’s has been replaced or may be welded if
required.
In HSM there is various other part which requires maintenance but here we are not
concerned with all that.




                  PAKISTAN STEEL MILL KARACHI                                                47
         PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




SINTERING

It is also the one of the most important section is uses the
 fine form of ore and convert it into the sinter from by
passing through various process and hence this sinter is
 used in blast furnace in order to obtain the molted raw
 iron.
To avoid complete break down because of the
 maintenance in sintering plant machine -1 is allowed to
 running and machine -2 is lying down steadly for
 maintenance purpose similarly other concerned part to
 machine-2 are also lying down for maintenance purpose
 where as the machine-1 performing for the continuity
of the work.
On maintenance day the maintenance has come from
 various of its section is responsible to perform the
various some of them that we have seen in sintering shop
 which are as follows.

BALLING DRUM

It is used to mixed the sinter and also make the fine into the ball form, now these balling
has to be done by removing flaws and replacing various tools and also fastening various
parts, some of the few important consideration in balling are as follows,
Ring belt is checked and replaced if possible
Gear (driven) and pinion (driver) which rotates the drum is also check and make certain
operation in order to improve their workability.
To adjust the alignment up and down, left and right to support the wheel.

CHRGING DRUM

The material come from conveyer is to be charge over the charging drum so its
maintenance is also much necessary, some necessary action which is to be taken are as
follows
    • To check the bearing , map
    • Electric arc welding is used to insert flaws
                  PAKISTAN STEEL MILL KARACHI                                           48
         PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




   •   Scraper is used to clean the cut and check the charge
   •   Charge gate has to check and to set it.




PILOT CAR
It is also important part for the continuously of sintering process and hence requires
maintenance as few achieve those have been taken
To check slide plate bars wheel, bearing, and proper lubrication.

CRUSHER

When cake is prepared and is totally burned now the cakes is crushed through jaw crusher
and insert it into the conveyer bucket and now the sinter which crushed sent to the B.F.
The maintenance section is responsible to take the following necessary action.
To check all the jaw’s and hence to repair the jaw’s as well.




                 PAKISTAN STEEL MILL KARACHI                                         49
        PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




         PAKISTAN STEEL MILL KARACHI          50
PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




         PAKISTAN STEEL MILL KARACHI          51
PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




        INDUSTRIAL ENGINEERING
             DEPARTMENT
DEFINITION:-
      Industrial engineering can be defined as the “The engineering which
maximizes the profit by reducing the resources by the best utilization of the tools,
equipments and the industrial techniques.”

FUNCTION:-
       Industrial engineering department encompasses activities, which are concerned
with the organized and effective utilization of the manpower with the aim of increasing
the productivity of the organization.


SALIENT FUNCTIONS OF I.ED:-
   1. To analyze the requirement of the temporary manpower demaned on the regular
      basis by the different departments and to curtail wherever possible.
   2. To prepare the directorate-wise daily attendance of the Pakistan steel mill for a
      bird eye view of the competent authority.
   3. To collect the monthly manpower returns from all departments of the Pakistan
      steel for the various studies of the cases and analytical comparisons of the man
      power.
   4. To asses’ requirement of the temporary workers demanded for the different
      projects/specific works.
   5. To monitor and allocation of the hazards allowance.
   6. Analysis and recommendation for the various types of the contract manpower
      including through heeded trust.
   7. Monthly recommendation for the allocation of the department-wise overtime
      limits.
   8. Time-to time preparation of the analytical comparison of the rationalized, regular,
      temporary and other holding manpower on the department /directorate basses
      directed.
   9. Category-wise revision of the wages of the daily wagers and salaries of the
      contract employees, whenever desired.

PRESENT EXERCISE:-
IED is conducting an exercise for the requirement of daily wages workers to complete
each project/assignment on the basis of the nature of the job, its inevitability and number
of the persons/duration required for.



                 PAKISTAN STEEL MILL KARACHI                                                  52
        PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




FUTURE PROGRAMME:-
Conduction of the exercise to find out the shortcomings in the area where their
deployment is not in accordance to their suitability and induction of the qualified
engineers with respect to required disciplines.


WORKING OF THE I.E.D NOW A DAY:-
Now a days it is working on the following things;-
  1. Attendance.
  2. Hazards allowances.
  3. Control on the distribution of the uniforms among the employees.
  4. Controlling the man power.
  5. Keeping the records of the temporary and daily wages employees.


   HAZARDS ALLOWNCES;-
    There are four categories:-
        1. A-ONE(Most hazardous place)
        2. A(less than A-one)
        3. B(less than A).
        4. C(less than B).
There is lot of difference in allowances rates between these categories. These type of
incentives are introduced first time in the Pakistan steel mill in 1984.the committee is
formed whose is responsible for the hazard allowances.




                 PAKISTAN STEEL MILL KARACHI                                               53
        PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




                         PREPARED BY

Name: Mohammad Younus

Fathers Name: Mohammad Anwar Qureshi

Surname: Qureshi

Nationality: Pakistani

Date of birth: 24th November 1988

Place of Birth: Hyderabad

Domicile: Hyderabad Urban

Profession: Student

Degree: Graduation (B.E Industrial
         Engineering & Management)

Year of Study: Final year.

Roll No. 08IN70

University: Mehran University of Engineering
           and Technology (M.U.E.T) Jamshoro.




               PAKISTAN STEEL MILL KARACHI          54
      PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




         PAKISTAN STEEL MILL KARACHI          55
PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




         PAKISTAN STEEL MILL KARACHI          56
PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




         PAKISTAN STEEL MILL KARACHI          57
PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




         PAKISTAN STEEL MILL KARACHI          58
PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
INTERNSHIP PROGRAME




         PAKISTAN STEEL MILL KARACHI          59
PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED

Mais conteúdo relacionado

Mais procurados

INTERNSHIP REPORT ps
INTERNSHIP REPORT psINTERNSHIP REPORT ps
INTERNSHIP REPORT psTarab Wasi
 
Steel Melting Shop (SMS)
Steel Melting Shop (SMS)Steel Melting Shop (SMS)
Steel Melting Shop (SMS)Gautham Reddy
 
Business Economics #Economic Analysis of Amreli Steels (Pvt) Ltd
Business Economics #Economic Analysis of Amreli Steels (Pvt) LtdBusiness Economics #Economic Analysis of Amreli Steels (Pvt) Ltd
Business Economics #Economic Analysis of Amreli Steels (Pvt) LtdYousif Solangi
 
Industrial Training Report on Steel Melting Shop(SMS)
Industrial Training Report on Steel Melting Shop(SMS)Industrial Training Report on Steel Melting Shop(SMS)
Industrial Training Report on Steel Melting Shop(SMS)Shani Kumar Singh
 
BSP Project (Based on Continuous Casting) [Final]
BSP Project (Based on Continuous Casting) [Final]BSP Project (Based on Continuous Casting) [Final]
BSP Project (Based on Continuous Casting) [Final]Subham Shit
 
Training report on bokaro steel plant
Training report on bokaro steel plantTraining report on bokaro steel plant
Training report on bokaro steel plantPrashant Kumar
 
Steel industry Pakistan
Steel industry PakistanSteel industry Pakistan
Steel industry PakistanFaHaD .H. NooR
 
Overview of bhilai steel plant
Overview of bhilai steel plantOverview of bhilai steel plant
Overview of bhilai steel plantsourabh singh sen
 
Steel plant presentation
Steel plant presentationSteel plant presentation
Steel plant presentationjoycecm
 
BSLVTReport(Rishav-5912697)
BSLVTReport(Rishav-5912697)BSLVTReport(Rishav-5912697)
BSLVTReport(Rishav-5912697)Rishav Ghosh
 
ANALYSIS OF MAJOR STEEL INDUSTRY IN India
ANALYSIS OF MAJOR STEEL INDUSTRY IN IndiaANALYSIS OF MAJOR STEEL INDUSTRY IN India
ANALYSIS OF MAJOR STEEL INDUSTRY IN IndiaShashikant Singh
 
Summer internship Bhilai Steel Plant
Summer internship Bhilai Steel PlantSummer internship Bhilai Steel Plant
Summer internship Bhilai Steel PlantSaurabh Chaudhary
 
Amreli Steel-Internship Report-Yaseen Raza
Amreli Steel-Internship Report-Yaseen RazaAmreli Steel-Internship Report-Yaseen Raza
Amreli Steel-Internship Report-Yaseen RazaYaseen Raza
 
Jindal Steel & Power Ltd. FIIB, New Delhi
Jindal Steel & Power Ltd. FIIB, New DelhiJindal Steel & Power Ltd. FIIB, New Delhi
Jindal Steel & Power Ltd. FIIB, New DelhiMukesh Singh
 
Iron and steel industry 2008
Iron and steel industry 2008Iron and steel industry 2008
Iron and steel industry 2008fauzia samreen
 
Report of Pakistan Steel Mill
Report of Pakistan Steel MillReport of Pakistan Steel Mill
Report of Pakistan Steel MillMuhammad Ahmed
 
Steel Authority of India Limited
Steel Authority of India LimitedSteel Authority of India Limited
Steel Authority of India LimitedDiptesh chowdhury
 

Mais procurados (20)

INTERNSHIP REPORT ps
INTERNSHIP REPORT psINTERNSHIP REPORT ps
INTERNSHIP REPORT ps
 
Steel industry Analysis
Steel industry AnalysisSteel industry Analysis
Steel industry Analysis
 
Steel Melting Shop (SMS)
Steel Melting Shop (SMS)Steel Melting Shop (SMS)
Steel Melting Shop (SMS)
 
Business Economics #Economic Analysis of Amreli Steels (Pvt) Ltd
Business Economics #Economic Analysis of Amreli Steels (Pvt) LtdBusiness Economics #Economic Analysis of Amreli Steels (Pvt) Ltd
Business Economics #Economic Analysis of Amreli Steels (Pvt) Ltd
 
Industrial Training Report on Steel Melting Shop(SMS)
Industrial Training Report on Steel Melting Shop(SMS)Industrial Training Report on Steel Melting Shop(SMS)
Industrial Training Report on Steel Melting Shop(SMS)
 
BSP Project (Based on Continuous Casting) [Final]
BSP Project (Based on Continuous Casting) [Final]BSP Project (Based on Continuous Casting) [Final]
BSP Project (Based on Continuous Casting) [Final]
 
Training report on bokaro steel plant
Training report on bokaro steel plantTraining report on bokaro steel plant
Training report on bokaro steel plant
 
Steel industry Pakistan
Steel industry PakistanSteel industry Pakistan
Steel industry Pakistan
 
Overview of bhilai steel plant
Overview of bhilai steel plantOverview of bhilai steel plant
Overview of bhilai steel plant
 
Sail
SailSail
Sail
 
Steel plant presentation
Steel plant presentationSteel plant presentation
Steel plant presentation
 
BSLVTReport(Rishav-5912697)
BSLVTReport(Rishav-5912697)BSLVTReport(Rishav-5912697)
BSLVTReport(Rishav-5912697)
 
ANALYSIS OF MAJOR STEEL INDUSTRY IN India
ANALYSIS OF MAJOR STEEL INDUSTRY IN IndiaANALYSIS OF MAJOR STEEL INDUSTRY IN India
ANALYSIS OF MAJOR STEEL INDUSTRY IN India
 
Summer internship Bhilai Steel Plant
Summer internship Bhilai Steel PlantSummer internship Bhilai Steel Plant
Summer internship Bhilai Steel Plant
 
Amreli Steel-Internship Report-Yaseen Raza
Amreli Steel-Internship Report-Yaseen RazaAmreli Steel-Internship Report-Yaseen Raza
Amreli Steel-Internship Report-Yaseen Raza
 
Jindal Steel & Power Ltd. FIIB, New Delhi
Jindal Steel & Power Ltd. FIIB, New DelhiJindal Steel & Power Ltd. FIIB, New Delhi
Jindal Steel & Power Ltd. FIIB, New Delhi
 
Ppt on bokaro steel plant
Ppt on bokaro steel plantPpt on bokaro steel plant
Ppt on bokaro steel plant
 
Iron and steel industry 2008
Iron and steel industry 2008Iron and steel industry 2008
Iron and steel industry 2008
 
Report of Pakistan Steel Mill
Report of Pakistan Steel MillReport of Pakistan Steel Mill
Report of Pakistan Steel Mill
 
Steel Authority of India Limited
Steel Authority of India LimitedSteel Authority of India Limited
Steel Authority of India Limited
 

Destaque

Pak steel mill (presentation)
Pak steel mill (presentation)Pak steel mill (presentation)
Pak steel mill (presentation)Albert Martin
 
FINAL PSM REPORT EDITED
FINAL PSM REPORT EDITEDFINAL PSM REPORT EDITED
FINAL PSM REPORT EDITEDnizam ud din
 
Iron & Steel Industry Of Pakistan
Iron & Steel Industry Of PakistanIron & Steel Industry Of Pakistan
Iron & Steel Industry Of PakistanSajid Ali
 
Iron and steel industry 2008
Iron and steel industry 2008Iron and steel industry 2008
Iron and steel industry 2008fauziatariq
 
Final project report format
Final project report formatFinal project report format
Final project report formatMasud Sarkar
 
The_General_Tyre_and_Rubber_Company_of_Pakistan_Limited
The_General_Tyre_and_Rubber_Company_of_Pakistan_LimitedThe_General_Tyre_and_Rubber_Company_of_Pakistan_Limited
The_General_Tyre_and_Rubber_Company_of_Pakistan_LimitedWaseem Awan
 
General tyre report
General tyre reportGeneral tyre report
General tyre reportfalaknaz12
 
Final project
Final projectFinal project
Final projectAnfas Vp
 
Pak-Fan presentation of Management.
Pak-Fan presentation of Management.Pak-Fan presentation of Management.
Pak-Fan presentation of Management.Shahbaz Anwar
 
Fan Industry of Pakistan
Fan Industry of PakistanFan Industry of Pakistan
Fan Industry of PakistanTaha Mehmood
 
Internship report presentation on Baizid Steel Industries Ltd.
Internship report presentation on Baizid Steel Industries Ltd.Internship report presentation on Baizid Steel Industries Ltd.
Internship report presentation on Baizid Steel Industries Ltd.Mizanur Rahman Aanzim
 
General Tyre Pakistan Limited
General Tyre Pakistan LimitedGeneral Tyre Pakistan Limited
General Tyre Pakistan LimitedArsalan Sohail
 
PSO Finance Presentation
PSO Finance PresentationPSO Finance Presentation
PSO Finance Presentationshafiqabdullah
 
Muhammad Yunus
Muhammad YunusMuhammad Yunus
Muhammad Yunusakochian
 

Destaque (20)

Pak steel mill (presentation)
Pak steel mill (presentation)Pak steel mill (presentation)
Pak steel mill (presentation)
 
FINAL PSM REPORT EDITED
FINAL PSM REPORT EDITEDFINAL PSM REPORT EDITED
FINAL PSM REPORT EDITED
 
Iron & Steel Industry Of Pakistan
Iron & Steel Industry Of PakistanIron & Steel Industry Of Pakistan
Iron & Steel Industry Of Pakistan
 
Iron and steel industry 2008
Iron and steel industry 2008Iron and steel industry 2008
Iron and steel industry 2008
 
Final project report format
Final project report formatFinal project report format
Final project report format
 
Internship at Pakistan Steel
Internship at Pakistan SteelInternship at Pakistan Steel
Internship at Pakistan Steel
 
PBC Marketing Presentation
PBC Marketing Presentation  PBC Marketing Presentation
PBC Marketing Presentation
 
The_General_Tyre_and_Rubber_Company_of_Pakistan_Limited
The_General_Tyre_and_Rubber_Company_of_Pakistan_LimitedThe_General_Tyre_and_Rubber_Company_of_Pakistan_Limited
The_General_Tyre_and_Rubber_Company_of_Pakistan_Limited
 
GFC fans (2)
GFC fans (2)GFC fans (2)
GFC fans (2)
 
GENERAL TYRE INTERNSHIP REPORT
GENERAL TYRE INTERNSHIP REPORTGENERAL TYRE INTERNSHIP REPORT
GENERAL TYRE INTERNSHIP REPORT
 
Gfc
GfcGfc
Gfc
 
General tyre report
General tyre reportGeneral tyre report
General tyre report
 
Final project
Final projectFinal project
Final project
 
Pak-Fan presentation of Management.
Pak-Fan presentation of Management.Pak-Fan presentation of Management.
Pak-Fan presentation of Management.
 
Fan Industry of Pakistan
Fan Industry of PakistanFan Industry of Pakistan
Fan Industry of Pakistan
 
Internship report presentation on Baizid Steel Industries Ltd.
Internship report presentation on Baizid Steel Industries Ltd.Internship report presentation on Baizid Steel Industries Ltd.
Internship report presentation on Baizid Steel Industries Ltd.
 
General Tyre Pakistan Limited
General Tyre Pakistan LimitedGeneral Tyre Pakistan Limited
General Tyre Pakistan Limited
 
PSO Finance Presentation
PSO Finance PresentationPSO Finance Presentation
PSO Finance Presentation
 
Muhammad Yunus
Muhammad YunusMuhammad Yunus
Muhammad Yunus
 
PSO
PSOPSO
PSO
 

Semelhante a Pak steel intership report

Autocast internship report
Autocast internship reportAutocast internship report
Autocast internship reportEagle .
 
project report employee engagement (by ) mahadev rana
 project report employee engagement  (by ) mahadev rana project report employee engagement  (by ) mahadev rana
project report employee engagement (by ) mahadev ranaMahadev Rana
 
Study of various process in CCL plant at JSW Steel,Vasind
Study of various process in CCL plant at JSW Steel,VasindStudy of various process in CCL plant at JSW Steel,Vasind
Study of various process in CCL plant at JSW Steel,VasindSwapnil Parate
 
SSCPL Profile
SSCPL ProfileSSCPL Profile
SSCPL ProfileAP Murthy
 
Bhilai steel plant training report /
Bhilai steel plant  training report /Bhilai steel plant  training report /
Bhilai steel plant training report /Deepash Rajak
 
SUMMER TRAINING AT BHILAI STEEL PLANT
SUMMER TRAINING AT BHILAI STEEL PLANTSUMMER TRAINING AT BHILAI STEEL PLANT
SUMMER TRAINING AT BHILAI STEEL PLANTSharanya Menon
 
SUMMER TRAINING AT BHILAI STEEL PLANT
SUMMER TRAINING AT BHILAI STEEL PLANTSUMMER TRAINING AT BHILAI STEEL PLANT
SUMMER TRAINING AT BHILAI STEEL PLANTSharanya Menon
 
PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2HAIDER YOUNIS
 
A project report on study on foundry industry belgaum
A project report on study on foundry industry  belgaumA project report on study on foundry industry  belgaum
A project report on study on foundry industry belgaumBabasab Patil
 
Small%20 arms%20factory%20final%20report
Small%20 arms%20factory%20final%20reportSmall%20 arms%20factory%20final%20report
Small%20 arms%20factory%20final%20reportPrakharBhasker
 
Nbc training report on railway bearing(spherical bearing)
Nbc training report on railway bearing(spherical bearing)Nbc training report on railway bearing(spherical bearing)
Nbc training report on railway bearing(spherical bearing)Ashutosh Singh
 
Final Report BSp
Final Report BSpFinal Report BSp
Final Report BSpArpit Dubey
 
Dawlance internship report
Dawlance internship reportDawlance internship report
Dawlance internship reportMohammad Younus
 
Sujit kumar mahato report on bsl (sail)
Sujit  kumar mahato report on bsl  (sail)Sujit  kumar mahato report on bsl  (sail)
Sujit kumar mahato report on bsl (sail)1996kuldeep
 
Board and pillar working with lhd and sdl. Mining engineering final year project
Board and pillar working with lhd and sdl. Mining engineering final year projectBoard and pillar working with lhd and sdl. Mining engineering final year project
Board and pillar working with lhd and sdl. Mining engineering final year projectAnuragGupta39373
 

Semelhante a Pak steel intership report (20)

Autocast internship report
Autocast internship reportAutocast internship report
Autocast internship report
 
project report employee engagement (by ) mahadev rana
 project report employee engagement  (by ) mahadev rana project report employee engagement  (by ) mahadev rana
project report employee engagement (by ) mahadev rana
 
Visa steel Live Project
Visa steel Live ProjectVisa steel Live Project
Visa steel Live Project
 
Study of various process in CCL plant at JSW Steel,Vasind
Study of various process in CCL plant at JSW Steel,VasindStudy of various process in CCL plant at JSW Steel,Vasind
Study of various process in CCL plant at JSW Steel,Vasind
 
Qfd ppt
Qfd pptQfd ppt
Qfd ppt
 
SSCPL Profile
SSCPL ProfileSSCPL Profile
SSCPL Profile
 
Bhilai steel plant training report /
Bhilai steel plant  training report /Bhilai steel plant  training report /
Bhilai steel plant training report /
 
TAYO PROJECT FINAL
TAYO PROJECT FINALTAYO PROJECT FINAL
TAYO PROJECT FINAL
 
SUMMER TRAINING AT BHILAI STEEL PLANT
SUMMER TRAINING AT BHILAI STEEL PLANTSUMMER TRAINING AT BHILAI STEEL PLANT
SUMMER TRAINING AT BHILAI STEEL PLANT
 
SUMMER TRAINING AT BHILAI STEEL PLANT
SUMMER TRAINING AT BHILAI STEEL PLANTSUMMER TRAINING AT BHILAI STEEL PLANT
SUMMER TRAINING AT BHILAI STEEL PLANT
 
JSPL REPORT
JSPL REPORTJSPL REPORT
JSPL REPORT
 
PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2
 
A project report on study on foundry industry belgaum
A project report on study on foundry industry  belgaumA project report on study on foundry industry  belgaum
A project report on study on foundry industry belgaum
 
Small%20 arms%20factory%20final%20report
Small%20 arms%20factory%20final%20reportSmall%20 arms%20factory%20final%20report
Small%20 arms%20factory%20final%20report
 
Nbc training report on railway bearing(spherical bearing)
Nbc training report on railway bearing(spherical bearing)Nbc training report on railway bearing(spherical bearing)
Nbc training report on railway bearing(spherical bearing)
 
Final Report BSp
Final Report BSpFinal Report BSp
Final Report BSp
 
Dawlance internship report
Dawlance internship reportDawlance internship report
Dawlance internship report
 
Sujit kumar mahato report on bsl (sail)
Sujit  kumar mahato report on bsl  (sail)Sujit  kumar mahato report on bsl  (sail)
Sujit kumar mahato report on bsl (sail)
 
SAIL
SAIL SAIL
SAIL
 
Board and pillar working with lhd and sdl. Mining engineering final year project
Board and pillar working with lhd and sdl. Mining engineering final year projectBoard and pillar working with lhd and sdl. Mining engineering final year project
Board and pillar working with lhd and sdl. Mining engineering final year project
 

Mais de Mohammad Younus

Jab zindagi-shuru-ho-gee
Jab zindagi-shuru-ho-geeJab zindagi-shuru-ho-gee
Jab zindagi-shuru-ho-geeMohammad Younus
 
1947 ke mazalim ki kahani
1947 ke mazalim ki kahani1947 ke mazalim ki kahani
1947 ke mazalim ki kahaniMohammad Younus
 
Technical terms in oracle apps explained through real time example
Technical terms in oracle apps explained through real time exampleTechnical terms in oracle apps explained through real time example
Technical terms in oracle apps explained through real time exampleMohammad Younus
 
AME Requisition Approval Heirarchy
AME Requisition Approval Heirarchy AME Requisition Approval Heirarchy
AME Requisition Approval Heirarchy Mohammad Younus
 
Requisition Hierarchy Based on the Item Catagory
Requisition Hierarchy Based on the Item Catagory Requisition Hierarchy Based on the Item Catagory
Requisition Hierarchy Based on the Item Catagory Mohammad Younus
 
Lucky cement factory internship report
Lucky cement factory internship reportLucky cement factory internship report
Lucky cement factory internship reportMohammad Younus
 
Incentives and remuneration lecture presentation
Incentives and remuneration lecture presentation Incentives and remuneration lecture presentation
Incentives and remuneration lecture presentation Mohammad Younus
 
Incentives and remuneration
Incentives and remunerationIncentives and remuneration
Incentives and remunerationMohammad Younus
 
incentives and remuneration
incentives and remuneration incentives and remuneration
incentives and remuneration Mohammad Younus
 
Autocade 2D complete course
Autocade 2D complete course Autocade 2D complete course
Autocade 2D complete course Mohammad Younus
 
speed up sales using CRM system
speed up sales using CRM system speed up sales using CRM system
speed up sales using CRM system Mohammad Younus
 
Education system in pakistan
Education system in pakistan Education system in pakistan
Education system in pakistan Mohammad Younus
 
industrial accidents and their types , preventions
industrial accidents and their types , preventionsindustrial accidents and their types , preventions
industrial accidents and their types , preventionsMohammad Younus
 
Operation research's CPM techniques
Operation research's CPM techniques Operation research's CPM techniques
Operation research's CPM techniques Mohammad Younus
 

Mais de Mohammad Younus (20)

Jab zindagi-shuru-ho-gee
Jab zindagi-shuru-ho-geeJab zindagi-shuru-ho-gee
Jab zindagi-shuru-ho-gee
 
1947 ke mazalim ki kahani
1947 ke mazalim ki kahani1947 ke mazalim ki kahani
1947 ke mazalim ki kahani
 
Qasam us waqt_ki
Qasam us waqt_kiQasam us waqt_ki
Qasam us waqt_ki
 
Technical terms in oracle apps explained through real time example
Technical terms in oracle apps explained through real time exampleTechnical terms in oracle apps explained through real time example
Technical terms in oracle apps explained through real time example
 
AME Requisition Approval Heirarchy
AME Requisition Approval Heirarchy AME Requisition Approval Heirarchy
AME Requisition Approval Heirarchy
 
Requisition Hierarchy Based on the Item Catagory
Requisition Hierarchy Based on the Item Catagory Requisition Hierarchy Based on the Item Catagory
Requisition Hierarchy Based on the Item Catagory
 
Lucky cement factory internship report
Lucky cement factory internship reportLucky cement factory internship report
Lucky cement factory internship report
 
Incentives and remuneration lecture presentation
Incentives and remuneration lecture presentation Incentives and remuneration lecture presentation
Incentives and remuneration lecture presentation
 
Incentives and remuneration
Incentives and remunerationIncentives and remuneration
Incentives and remuneration
 
PSD Assignments
PSD Assignments PSD Assignments
PSD Assignments
 
incentives and remuneration
incentives and remuneration incentives and remuneration
incentives and remuneration
 
Autocade 2D complete course
Autocade 2D complete course Autocade 2D complete course
Autocade 2D complete course
 
Conflict management
Conflict managementConflict management
Conflict management
 
speed up sales using CRM system
speed up sales using CRM system speed up sales using CRM system
speed up sales using CRM system
 
human machine system
human machine system human machine system
human machine system
 
Education system in pakistan
Education system in pakistan Education system in pakistan
Education system in pakistan
 
industrial accidents and their types , preventions
industrial accidents and their types , preventionsindustrial accidents and their types , preventions
industrial accidents and their types , preventions
 
PRODUCTION CYCLE
PRODUCTION CYCLE PRODUCTION CYCLE
PRODUCTION CYCLE
 
Operation research's CPM techniques
Operation research's CPM techniques Operation research's CPM techniques
Operation research's CPM techniques
 
Hfe practicle final
Hfe practicle finalHfe practicle final
Hfe practicle final
 

Pak steel intership report

  • 1. INTERNSHIP PROGRAME DEPARTMENT OF MEHRAN UNIVERSITY OF ENGINEERING & TECHNOLOGY, JAMSHORO (Internship Program Report) PAKISTAN STEEL NO. OF WEEKS :- 4 WEEKS INTERSHIP PROGRAM Date : 14-06-2010 To 09-07-2010 Submitted To: Incharge (Trg. Wing) HRD Submitted By: MOHAMMAD YOUNUS (08IN70) WAZIR AHMED JATOI (08IN64) SUHAIL AHMED PALIJO (08IN36) SAEED AHMED JANDON (08IN34) KAMRAN MEMON (08IN43) PAKISTAN STEEL MILL KARACHI 1 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 2. INTERNSHIP PROGRAME PAKISTAN STEEL MILL KARACHI 2 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 3. INTERNSHIP PROGRAME PREFACE This report contains the information about those departments which are visited by the internees. Whatever the machinery seen and the processes are observed, attracting the human mind and realizes the men what science has achieved and what kind of mericals has been done by it. Basically Pakistan steel mill is quite attention attracting industry it provides lot of opportunities to see, to observe, to achieve and to get the lot of experience about the industry as well as about the machinery. The technology installed at Pakistan steel mill is the old one but due to the hardworking labor it can compete the latest technology even today. This report may also contains the facts and the real figures of the various departments which are very beneficial for our experience and the also for the practical knowledge. The functions and the details of their working and the process as well as the timing and work break down structure is also mentioned in this report. This is edit by the students of the INDUSTRIAL ENGINEERING AND MANAGEMENT DEPARTMENT of the nominated university of jamshoro named MEHRAN UNIVERSITY OF ENGINEERING AND TECHNOLOGY JAMSHORO SINDH PAKISTAN. The details of the students are as under:- SUHAIL AHMED PALIJO (08IN36). MUHAMMAD YOUNUS (08IN70). WAZIR AHMED JATOI (08IN64). SAEED AHMED JANDAN (08IN34). KAMRAN AHMED MEMON (08IN43). PAKISTAN STEEL MILL KARACHI 3 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 4. INTERNSHIP PROGRAME ACKNOWLEDGEMENT We are very thankful from the core of my heart to honorable CEO, Pakistan Steel, MALIK ISRAR HUSSAIN for providing us opportunity for training and whose intelligent, wise and sound leadership has converted manpower into wining combination by this industry into a gold mine. We wish to express my deep gratefulness to MR. RIZWAN AHMED, Director (Personnel & HRD) for his consideration and supervision. It was a memorable time in Pakistan steel due to his kind concern. We are also thankful to MR. NISAR A. KHOWAJA, Incharge (Training Wing) and MR. YOUSUF AYUB, Dy. Manager/ Incharge ( In- Plant Training) for his precious advice and for he great encouragement and cooperation, because of which We have successfully completed our internship training of PAKISTAN STEEL where we learned a lot. PAKISTAN STEEL MILL KARACHI 4 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 5. INTERNSHIP PROGRAME CONTENTS UNIT’S DESCRIPTION PAGE NO. UNIT NO. 1 INTRODUCTION 07 • Brief History 08 • Location and Sites 09 UNIT NO. 2 PRODUCTION PLANING & CONTROL 10 • Introduction of Production, Planning 11 and Control. • Objective of Production, Planning 12 and Control. • Roll of Production Planning and 12 Control in Pak steel. • Hot metal section. 13 • Steel making section. 16 • Rolling section. 17 • Budgeting and procurement section. 18 UNIT NO. 3 QUALITY CONTROL DEPARTMENT • Quality, Quality Control. 19 • Quality Control in Pakistan steel. 20 • Quality Control section in Pakistan 20 steel. 21 i) RMHD Section. 21 ii) COBP Section. 23 iii) Sintering section. 25 iv) IMD Section. 26 v) SMD section. 28 vi) HSM section 33 PAKISTAN STEEL MILL KARACHI 5 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 6. INTERNSHIP PROGRAME vii) REFRACTORY Section. 35 viii) CRM SECTION 40 UNIT NO. 4 MECHANICAL EQUIPMENT AND 43 REPAIR SECTION • Maintenance 44 • Objectives of Plant maintenance 44 • Importance of the maintenance 44 • Maintenance section in Pakistan steel. 45 • M.E.R.S 45 • Maintenance of HSM 46 • Maintenance of SINTERING 48 UNITE NO. 5 INDUSTRIAL ENGINEERING 50 DEPARTMENT • DEFINITION 51 • FUNCTION 51 • SALIENT FUNCTIONS’ OF I.E.D 51 • PRESENT EXERCISE. 51 • FUTURE PROGRAMME. 52 • WORKING OF I.E.D NOW A 52 DAYS. 52 • HAZARD ALLOWANCES PAKISTAN STEEL MILL KARACHI 6 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 7. INTERNSHIP PROGRAME INTRODUCTION Steel is the main metal in the world without steel the life became incomplete because steel is used in many places where no metal or non-metal thing can not be used not only Pakistan there so much demand of in steel in world steel is the bake bone of any country it plays vital role in the development of any country not only in physical sense but also economically. Similarly like other countries Pakistan has decided to install its own steel mill because before steel mill, the steel and the related metals are the imported from other countries. Before steel mill he was dependents of other countries. But now he is capable of producing 1.1milion ton of steel mill by his own which is not sufficient but quit helpful for the country from every aspect foundation of steel mill was kept by the legend Qaid-e-awam ZULIFIQAR ALI BHUTTO in 1976 with the co-operation of Russia who have transferred the latest technology of that time and this project of about billion approximately it was completed in 1981.first time in Pakistan the blast furnace started in 1981 to produce pig iron further it was converted into steel of different grades. Pakistan steel mill is separated over 18000 acres out of which 10000 was fixed for mill and rest of will be for the housing and medical facilities Pakistan steel mill not only provides the medicate facilities but all type of facilities such as education, sports, completion and higher education facilities etc due to Pakistan steel mill thousands of people are employed and living the prosperous life. PAKISTAN STEEL MILL KARACHI 7 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 8. INTERNSHIP PROGRAME BRIEF HISTORY The engineering goods industry is recognized the world over as most critical for the development of self reliant and vibrant economy. This industry, however, depends heavily on basic metals industry, specially the iron & steel industry for the supply of resource inputs. the iron & steel industry, therefore holds the key To the sustained growth of the engineering sector and hence to the development of the economy as whole. As such the steel industry can be termed as mother industry to all modern industries, being the basic source of metal for them. In this perspective the importance of the national assets such as PAKISTAN STEEL, which determined on their strength and ability to sustain the national growth rate, need not be emphasized. Abundant steel, sufficient power and adequate Transport are otherwise also absolute necessities for the rapid industrialization of developing countries today. If one desires to find out what PAKISTAN STEEL has done for the country, one will have to venture back in time, into the early 70s when PAKISTAN STEEL was only a dream on paper. By that time non-existence of an iron & steel making plant of a reasonable size in Pakistan had shown its adverse effects on the industrial and economic development of the country which continued to suffer various set backs because of dependence on import of iron and steel products. A stage had been reached when it had been realized that the import bill to meet all the re3quirements of steel could not be supported indefinitely. In fact the idea of setting up of a steel mill in the country had been cooking over the red hot coals of controversy since the introduction of the first five year plan (1955-60) which laid emphasis on the domestic production of iron and steel. Debates over the manufacturing process, supply sources of the requisite machinery and raw materials, plant site, domestic ore versus imported ore, ownership pattern, product- mix and above all, foreign financing g credits, kept the projects simmering over as period of two decades. In 1968 beside other factors, it was considered by the Government that a basic steel industry should be established in the public sector as public sponsorship of the project would enable integrated development of steel industry in the country. in the light of this, Government decided that the Karachi Steel Project should be sponsored in the public sector for which a separate Corporation under the Companies act be formed, in the pursuance of this decision Pakistan Steel Mills Corporation was setup as a private limited company under companies act 1913 in the public sector on 2nd July, 1968 with the object to establish and run Steel Mills at Karachi and other places in Pakistan. In January, 1969, PAKISTAN STEEL concluded an agreement with V/O Tiajpromexport of the then USSR for preparation of a feasibility report for the establishment of steel Mills at Karachi. Subsequently in January, 1971 Pakistan and the USSR signed an agreement under which the latter agreed to provide techno-financial assistance for the construction of a coastal-based integrated Steel Mills at Karachi. PAKISTAN STEEL MILL KARACHI 8 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 9. INTERNSHIP PROGRAME The foundation stone of this vital and gigantic project was laid on 30th December,1973 the then Prime Minister of Pakistan., the mammoth construction and erection work, of an integrated steel mills never experienced before in the country, was carried out by a consortium of Pakistani construction companies under the overall supervision of soviet experts. PAKISTAN STEEL does not only have to construct the main production units but a host of infrastructure facilities involving unprecedented volumes of work and expertise. Component units of the Steel Mills numbering over twenty and each a big enough factory in its own right were commissioned as they were august, 1985 with coke oven and by- product plant coming on steam the first and the galvanizing unit the last. Commissioning of blast furnace No. 1 on 14th August, 1981 marked Pakistan’s entry into the elite club of iron and steel producing nations. The project was completed at a capital cost of Rs. 24,700 million. The completion of the steel mills was formally launched by the president of Pakistan on 15th January, 1985. PAKISTAN STEEL today is the country’s largest industrial undertaking having production capacity of 1.1million tones of steel. The enormous dimensions of the project can be visualized from the construction inputs which involved the use of unparalleled 1 29 million cubic meters of concrete, 5.70million cubic meters of earth work (secondly to Tarbela Dam), 330,000 tones of machinery, steel structure and electrical equipment. It’s unloading and conveyor system at Port Qasim is the third largest in the world and its industrial water re3soervior with a capacity of 110 million gallons per day is the lar54gest concrete reservoir in Asia. A 2.5 kilometers long sea water channel connects the plant site to feed the sea water circulation system with 216 million gallons per day. The plant’s 2 km long flyover which connects the steel mills with National Highway was the largest in the country when built. The above figures illustrate the massive civil works, intricate erect ions, installation of sophisticate4d electrical and mechanical and equipment with the completion of PAKISTAN STEEL, the local contractors gained the technical ability till the unknown to them which they utilized later to undertake works worth millions of rupees/dollars both within the country and abroad specially Middle East. LOCATIOIN AND SITE: PAKISTAN STEEL is located at a distance of 40 km South East of Karachi at Bin Qasim in close vicinity of Port Muhammad Bin Qasim is a coastal site which lies on the National Highway is linked to the railway network. It was found to be an ecologically preferable location, alongside a tidal creek and having wind direction away from the city of Karachi. PAKISTAN STEEL is spread over an area of 18,600 acres (about 29 square miles) including 10,390 acres for township and 200 acres for 110 MG water reservoir. In addition it has leasehold rights over an area of 7520 acres for mining of limestone and dolomite in Makli and Jhampir areas of district Thatta. PAKISTAN STEEL MILL KARACHI 9 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 10. INTERNSHIP PROGRAME PAKISTAN STEEL MILL KARACHI 10 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 11. INTERNSHIP PROGRAME INTRODUCTION:- Production planning and control as its name suggest that it is combination of three departments: 1. PRODUCTION DEPTT: 2. PLANNING DEPTT: 3. CONTROL DEPT: 1-Production: It is the process or procedure to develop to transform a set of input element like men, material, machine and capital information and energy into ratio specified set of output elements like finished products and services in proper quantity and quantity to achieve the objectives of the enterprise PLANNING: 1. Planning all aspects of the production, selling etc, are essential in order to minimize intangibles. 2. Planning is the process by which a manager anticipates the future and discovers the alternative courses of actions open to him. 3. Planning is the economic, rational, systematic way of making decisions today which will affect the future e.g what will be done in future, who will do it and where it will be done. 4. Infect every managerial work/act whether it would be physical or mental is inexorably intertwined with planning. 5. Without proper planning the activities of an enterprise became confused. 6. Prior planning is necessary or very essential for utilizing the available facilities (Men, material, machine, etc) to the best of the advantage. CONTROL : 1. Controlling is the process that measures current performance and guides it towards some pre-determined goals. 2. controlling involves: Monitoring of the activities to make sure that the objectives are being met. The initiation of corrective actions as required overcoming problems, if any hindrance is occurred during the process. Checking and the examination is required on the periodic basis to ensure that the things are preceding as per plan. PAKISTAN STEEL MILL KARACHI 11 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 12. INTERNSHIP PROGRAME It is necessary to ensure that the orders are not miss-understood rules are not violated and objectives have not been unknowingly shifted. It is the continuous process that measures the progress of the operations (compares) verifies them confirms with the pre-determined plan and takes correctives actions if required. OBJECTIVES OF THE PRODUCTION PLANNAING AND CONTROL:- • Effectiveness: goods to fulfill customers’ needs • Maximizing output: maximum output with minimum input • Quality control: Product/service quality meets planned quality specifications • Minimize throughput time: conversion of RM to FG in minimum time • Capacity: full utilization of men & machines • Minimize cost: minimum cost of production • Maintaining inventory: optimal inventory • Flexibility: flexibility in production operations • Coordination: between men & machines • Capacity: plan for current & future needs • Reduce bottlenecks: solve production problems early • Maximize profit: minimize cost • Production schedules: as per plan • Routes & schedules: to optimize use of men, material & machinery • Maintain performance: maintain standards ROLE OF PRODUCTION PLANNING AND CONTROL IN STEEL MILL:- It is one of the main department of the steel mill basically its main function is to make planning for the over all production either it is daily, weekly, monthly or annually. It plays the role of the backbone in the steel mill. Without ppc steel mill is useless if you really want to make it useful their must be ppc department. If any org. is working without planning it has to bear heavy loss as well as the lot of wastage of the time and other factors such as money, material, machinery. Planning is the single tool which minimizes that effect and maximizes the profit. In steel mill under the quit capable supervision of the production planning and control deptt: almost all production deptt: are working. Due to large numbers of the department ppc has divided them into the three groups. By grouping system it is easy to handle and control. Details of the department are as under There are 4 major groups:- 1. Hot metal section/department. 2. Steel making department/section. 3. Rolling section. PAKISTAN STEEL MILL KARACHI 12 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 13. INTERNSHIP PROGRAME 4. Budgeting and Procurement section. All these sections are further divided into various units or departments. HOT METAL SECTION:- It is the main section of the ppc department. It deals with the all type of the hot metal and the raw material. It contains the following departments. 1. RAW MATERIAL AND HANDLIND DEPARTMENT. 2. SINITERING DEPARTMENT. 3. COCK OVEN AND BY PRODUCT DEPARTMENT. 4. IRON MAKING DEPARTMENT. RAW MATERIAL AND HANDLING DEPARTMENT Pakistan steel mill meets its raw material‘s requirement both from indigenous as well as foreign sources locally available materials include:- 1).Limestone 5.)Bauxites 2).Dolomite 6).Magnetite 3).Fireclay 7).Chromites 4).Fluoride Of these PAKISTAN STEEL MILL has also leasehold rights for limestone and dolomite quarries located within the convenient distance of the works. Nevertheless the basic minerals namely (iron ore, coking coal and manganese ore are imported because of the indigenous non-availability In appropriate chemistry /quality and quantity. Major raw material requirement at full production is given below:- ITEM At 1.1MTPY (IN THOUSAND TONNES). IMPORTED:- Coking coal 1050 Iron ore 1910 Manganese ore 28 Ferro-manganese 6 Ferro-silicon 3 Aluminum 2 Zinc 3 Fluorite 5 LOCAL:- Limestone 390 Dolomite(sinitert grade) 185 PAKISTAN STEEL MILL KARACHI 13 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 14. INTERNSHIP PROGRAME Dolomite(refractory grade) 46 Refractory clay 28 Silica sand 19 ITEM Location IMPORTED:- Coking coal Australia ,Canada Iron ore Australia, Canada, Iran, India Manganese ore Canada Ferro-manganese Canada, Iran, India Ferro-silicon India, Iran Aluminum Australia, Canada Zinc Iran, India Fluorite India, Iran LOCAL:- Limestone Makli Distt: Thatta Dolomite(sinitert grade) Jhumpir Dolomite(refractory grade) Jhumpir Refractory clay Balochistan Silica sand Balochistan BLENDING YARD:- IT is the ground where blends are made by mixings the same material but ratio of the % should be different. BLEND:- It is the mountain of the mixtures of the two materials of different % ratio. Let have an example of the iron ore there are two types of the iron ore one is local and other is imported. Both these materials are mixed to attain the required % of the iron ore because the imported iron ore is the expensive one so that we cannot used the imported iron ore at all. PAKISTAN STEEL MILL KARACHI 14 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 15. INTERNSHIP PROGRAME SINITERING:- This plant has two sintering machines with an effective sintering area of the 75 square meters. After BMR the sintering area has increased to 90 sq.m thereby increasing the annual production capacity from 1.5 million tones to 1.8 million tones of the sinter. These machines provide sinter to the iron making deptt: for production of the hot metal /pig iron sinter is prepared by heating up an amalgam or cake ,dolomite, limestone and iron ore. COKE OVEN AND BY PRODUCT PLANT: There two cokes over batteries in this plan and each battery consists of 49 ovens. The first battery was commissioned von 17th April, 1981 where as the second one was commissioned on 7th may, 1985. These batteries produce metallurgical coke and other by by-products such as coke oven gas ammonium sulphate. Coal-tar etc. coke oven gas is used for generating electricity by thermal power plant. Coal-tar is a very useful item which can be used for producing basic chemical products. It is utilized in the manufacturing of the black carbon, insecticides and even some perfumes. PAKISTAN STEEL’S coke is of the highest international standards. It not only sells in the local market is in demand in many foreign countries also other coke is exported to the overseas markets. IRON MAKING DEPARTMENT There are two blast furnaces in the iron making deptt: each B.F with an effective volume of 1033cm3 and has the capacity of the 1750 tones of the molten metal/iron per day the 1st B.F went into the production on 14th august 1981 while the 2nd B.F also became operational on the independence day in 1984.this plant also produces the by- products called the granulated slag from both the blast furnaces. It is about 250,000 tons per year. This is also utilized in the slag cement, slag wools; slag blocks for the buildings and the PAKISTAN STEEL MILL KARACHI 15 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 16. INTERNSHIP PROGRAME construction of the roads. It also produces the gas utilized in thermal power plant for the generation of the electricity. the molten iron produced by the iron making department called the pig iron is not only sufficient for the internal demands of the Pakistan steel mill but numerous foundries demands the pig iron in the country. This pig iron is measures up a/c to the international standards and has been supplied to the various foreign countries such as India, Bangladesh, Saudi Arabia, Indonesia, china, south Korea and Japan STEEL MAKING PLANT/DEPARTMENT:- In this plant two top-blown basic oxygen furnaces (linz-donawitz) Converter of 130 tones charge weight each is installed which transform molten iron into steel. In order cast molten steel in the shapes of the blooms, slabs, and billets. A bloom caster and the billet caster are added in 1989and the two slab casters are also installed in the plant blooms of 260*260mm size are used for making the billets in the billet mill where as the slabs of the 150to200mm and width size of 700 to1550mm are supplied to the 1700mm or hot strip mill for the manufacturing of the hot rolled sheets. The cast billets of 80*80mm-150*150mm size produced in the billet caster are directly marketed the first converter was commissioned on the 18th December 1982 and the billet caster on the 22nd December 1982,first slab caster on the 10th august 1983and the second on the 1st November 1983. BILLET MILL(800mm):- Prime quality rolled billets of the size 50*50mm to 100*100mm are being produced in the billet mill which is most important plant of the Pakistan steel mill. Capability of the manufacturing of the round billets of 56mm diameter has also been attained by the Pakistan steel mill steel billets are utilized for producing, besides construction bars and other products such as wire rods, nuts, bolts, balling hoops, rails, heavy structure rolled sections, seamless pipes, gas cylinders etc. The 800mm billet mill was commissioned on 11th October 1982. CONTINOUS BILLET CASTER:- In order to meet the demands of the billets in the market as well as to balance the designed production capacity of the steel mill to cater for the market demand PAKISTAN STEEL has set up a six strands continuous billet caster with production capacity of 400,000 tones per annum, adjacent to steel making department. Billet caster can produce billets in sizes of the 50*50mm,100*100mm,125*125mm,the machinery and equipment were produced from M/s voest-alpine, Austria at the total cost of Rs.167.7 millions .the project was commissioned on the 11th November 1989,product through the billet caster is more efficient and cost effective than through bloom casting/billet re-rolling route. PAKISTAN STEEL MILL KARACHI 16 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 17. INTERNSHIP PROGRAME ROLLING SECTION The rolling section has been further divided into the two sections. 1. Hot strip mill (1700mm). 2. Cold rolling mill. 3. HOT STRIP MILL (1700mm). With the commissioning of the hot stripe mill on the 25th December 1983.the production of the steel sheets ,strips, coil commenced in the country. The annual production capacity of the 1700mm hot strip mill is 790,000 tones. Cold rolled sheets and stripes are also produced from the hot rolled coils and sheets, strips .Hot rolled sheets and stripes are used for the manufacturing the pipes of the small, large and medium sizes. Bodies of the cars and other vehicles, railway wagons transformers boilers big tanks ocean going ships machines furniture and much more. COLD ROLLING MILL:- This plant is used for the production of the cold rolled coils which are more beneficial for various types of works such as sheets pf the vehicles, as well as the body of the aero planes and etc. An other assignment is also fulfilled which is of the slitting and shearing these sheared sheets are used for the flouring, as well as ceiling and in various other functions where there hot rolled sheets are not benefited. CRM is the one of the largest and the cleanest department in the whole steel mill .It is the one of the best deptt: which always remain clean, all the products of the steel mill depend on the CRM deptt because each and every product has to pass from that deptt: CRM contains following units or sections: 1. Continuous pickling unit. 2. Reversible unit. 3. Annealing furnace. 4. Tempering mill unit. 5. Combined slitting and shearing units. 6. Galvanizing unit. 7. Profile bending. The most important section of the CRM deptt: is the single strand reversible mill which has the annual production capacity of 200,000 tones .out of this 100,000tonnes can be utilized to manufacture the formed sections and 90,000 tones are salable in the market as the cold rolled sheets /coils. Cold rolled sheets and coils are used in the those industries which are manufacturing the bicycles ,steel containers, drums, barrels, jerry can bodies of the buses and other vehicles and steel furniture’s ,machinery parts instruments for oil and gas etc. galvanized sheets are used for the manufacturing of the trucks, buckets ,iron shuttering ceilings air-conditioning, ducts, ribbed sheets deserts, coolers utensils of the PAKISTAN STEEL MILL KARACHI 17 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 18. INTERNSHIP PROGRAME daily use, air-conditioners water heaters, and water tanks, etc all the units of the cold rolling mill were commissioned b/w the February to December 1984.the operation of the main cold rolling mill units marked the completion of the phase of producing 1.1 millions tones of steel products. BUDGTING AND PROCURMENT:- Budgeting and procurement are two different phrases each phrase has its own actual meaning as the phrase budgeting from its name it suggest the process of the making budget of the org. Each and every organization must have a separate budgeting section because until and unless an organization .doesn’t prepare its budget, obviously it will bear heavy losses not only in case of capital but due to not perfectly defined budget it’ll also remain at the backside in all fields. Similarly in Pakistan steel mill the budgeting section is performing its duties under the kind control of the production planning and control department. FUNCTION OF THE BUDGETING SECTION:- It’s first and for most function is to make budget for the whole organization. Sometimes the budget will be out of the situation so in that case first to overcome all types of the waste or extra expenses then the strategy is made. This will prove better for the organization. PAKISTAN STEEL MILL KARACHI 18 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 19. INTERNSHIP PROGRAME PAKISTAN STEEL MILL KARACHI 19 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 20. INTERNSHIP PROGRAME QUALITY Quality means the degree of perfection of excellence when applied to manufactured produces. It not necessary means “the beat”. It should imply “the best for money” that is the product should meet the desired requirement at lowest cost. The word “quality” is meaning less until and unless the product made up of high quality has specified used means product serve the specified function for which it is made. Quality of product is relative terms and it can only be comparing some standards hence the quality of product may be defined as the conformance to standard and speciation. Quantity also has a considerable effect on quality and hence it becomes more complex to manger to control and to achieve the quantity output. QUALITY CONTROL Basically “Quality control” we mean that those process or operation of testing measuring and manufacturing components with a standard and then determining whether it should be accepted, rejected, adjusted, or reworked. It is off course more sensible to control the process so that the standard are being maintained and that defective parts will not be produced instead of accepting or rejecting a part after it has been manufactured thus the quality control means the systematic control of those variable in a manufacturing process which affect the excessive. QUALITY CONTROL IN PAKISTAN STEEL As we have already discussed that the importance of the quality control in any organization in the above section so in any time of organization either it is manufacturing industry or service industry or it any corporation all are bounded towards the quality of their product to meet their consumer demand and hence o increase the productivity. Pakistan steel is the largest organization of Pakistan and it produces wide variety of steel product to meet their consumer demand and hence the demand of customer can be checked by ensuring the quality of product. Therefore Pakistan steel have their separate quality control department (Q.C.D) situated at he operation building of Pakistan steel mill. Q.C.D is under the supervision of various engineer’s, superidents etc those have wide knowledge and skills t check the quality of their product, process and also control the quality of whole process in each and every department involving in production in which further necessary action is to be taken. In Pakistan steel mill raw iron ore is converted into the required product through various departments all have different function and task to complete their job hence in every department there is section or plant of quality of control namely called Q.C.D section of particular production side. Therefore quality control originally based on 12 sections which are as follows. 1) RAW MATERIAL HANDLING DEPARTMENT (RMHD) 2) COCK OVEN BY PRODUCT COBP 3) REFRACTORIES AND LIME PRODUCT SECTION 4) STEEL MAKING DEPARTMENT (SMD) 5) BILLET MILL PAKISTAN STEEL MILL KARACHI 20 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 21. INTERNSHIP PROGRAME 6) IRON MAKING DEPARTMETN (IMD) 7) SINTRING SECTION 8) HOT STRIP MILL (HSM) 9) COMBINE SHARING AND SILITING (CSSU) 10) COLD ROLL MILL (CRM) 11) FINAL PRODUCT DISPATCH CONTROL DEPARMTENT (FPDC). Above are the quality control section in every department and performing their job pleasantly. Here we are going to describe each one by one. RAW MATERIAL HANDLING DEPARTMENT INTORUDUCTION This is the very stage in which the raw material is handle that has been taken either from local resources or it taken taken from internationally. RMHD section’s basically work about two particular field i-e i) Blending ii) Primarary stock • Primarary stock is one which the various type of raw material which is unloaded at jeetti and through convare comes at RMHD and then to make pile through layer’s of material, there are basically four type of pile are there Pile1 and pile-2 containing material in lump form and pile-3 and pile-4 of material in fine form. • Blending is a section in which the mixture of two or more than two material if to be mixed both of same nature. TYPES OF RAW MATERIAL Not only iron ore there is many other material that has been taken either locally or international and it can classified as follows 1) IRON ORE The iron ore used is usually taken from international market but it also taken local as well when required a) Iron ore in LUMP form b) Iron ore in FINE form 2) MAGNESSE The manganese has wide application in making of various grade therefore pak steel took manganese in two form i-e lump and fine. 3) QUARTIZIDE PAKISTAN STEEL MILL KARACHI 21 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 22. INTERNSHIP PROGRAME 4) DOLOMITE 5) LIME STONE 6) SILICA SAND 7) BANTONITE CLAY. PROCEDURE OF RHMD The material that has come internationally is unloaded at JT. There are two types of convare belt that has taken the unloaded material i) 12’-1 ii)12’-2 There are two sampler is installed on each convere i-e Sample no. 1 on 12’-1 and sampler no. 2 on 12’-2. Whenever the ore flow over the convere the extreme of that ore is to be cutter and on each sampler there is material box in which the cutter material is inserted until the bucket is full the material is shifted down. After all that the reversing belt is there now if the belt is moved forward there is sieve of -6mm to + 6 mm present. The material less then under the size of 6 – 30, is to be sieved and drill down as fine and which is not sieved is also taken from the surface and hence by forward moving we get both lump and fine form of ore. On the other hand if the material is moved in reversed direction there is combine crusher to crushes further into the size of -10 to +10 mm. Now all these ore (material) is further crushing & girding the metal is becomes very much powder like sand is shifted to the process so that through various analyses they may get the required %age of Fe content in crushed ore and hence observed the quality. RAW MATERIL QUALITY CONTROL SECTION At RMHD the quality control section is responsible to taken the sample of raw material and make it in proper form by following a particular process and then send it to the process lab so that to analyze the content of material and % age of their presence in the material is also taken. PAKISTAN STEEL MILL KARACHI 22 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 23. INTERNSHIP PROGRAME COCK OVEN BY PRODUCT (COBP ) INTRODUCTION COBP abbreviated as cock oven by products. It’s the one that provide the cock as a basicwith various other by products those were necessary to regulate in various section as a fuel as some of them also sell into the market after little processing as a extra profit to the organization. COBP FUNCTION COBP works on to performs the following actions, COCK to convert COAL COBP has major works to produce coal through cock so that it provided facility in the blast furnace and in converter as well as a fuel. When the coal is to be taken from the battery one by one after that quenching of coal is to be done in two different fashion i-e dry or wet quenching. After quenching sieve analysis is to be done if the size of cock is in b/w 25-80 mm the cock is continuously transferred to the blast furnace and more the 80 mm size mean’s +80 mm is to be sell out and -25 mm is lying down and make use of it if required. BY PRODUCT OF COBP COAL TAR, COCO ONE GAS, AMMONIA GAS. • Ammonia gas after passing through sulfuric acid is to be manufactured as a by product which is used fertilizers. • Similarly coco one is also collected and this gas used as a burned in various even it is also used in cock battery. The coco one gas has low colorific value then natural gas but it is the by product so its provide facility as a fuel. • Coal tar is major by product it is used as a fuel in various section and also used in refractory bricks. PAKISTAN STEEL MILL KARACHI 23 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 24. INTERNSHIP PROGRAME COBP QUALITY CONTROL SECTION COBP has a continuous process the cock comes through battery and send it of required size to B.F but through sampler the sampler is also be taken after every 6 hours and check the quality of the coal and then gives specification of the B.F operator observers so now its depends upon B.F’s operator either he satisfied with the specification given by COBP quality section or don’t he. The quality of manufactured coal is to be checked by following process as we have done in RHMD. The sampler take’s the sample of cock and sample is to crushed , grind and then make it into powder form which is then send to the process lab so that to understand the chemical composition. The most preferable composition of coal is as Chemistry % age of material involved Ash 12.2 % Volatile 1.3 % Sulphur 0.5 % Carbon Remaining %age In the quality section of COBP the strength of the coal is also checked through the used of the drum tester. At this stage the sampler of 25 mm to 80 mm is to be filled into the drum and revolve it about 10 revolution now we have 2 types of sieve’s namely the 40 M and 10 M sieve there fore the drum cock is to be spread over 40 M sieve. Hence in sieving of the cock taken from the drum so to be passé most of particle down the 40 M sieve to 10 M sieve and further from 10 M to -10 M so the strength of the coal is to be called is poor strength but on the other hand if the drum of cock present more of it past over the 40 M sieve and some of the 10 M sieve so in this case it is called good strength coal. PAKISTAN STEEL MILL KARACHI 24 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 25. INTERNSHIP PROGRAME SINTERING INTRODUCTION Sintering is one of the most important plant in pak steel sintering with its material provide basis to B.F so that it may produce the molten iron. The raw material either comes locally or it may internationally in fine or lump form so sintering basically make use of fine form of raw material. PROCESS OF SINTEIRND Q.C.D SECTION First of all through conver’s raw material comes and it put into the mixture. When the mixture is to be filled by burner’s the quality observer has to observe how to operate the mixture and this mixture is also called the ball because it converts the fine forms of raw material into the balling drum which revolves, the quality observer observed the mixture or sinter is properly mixed or not and if he issue so that mixture to is send to the sintering machine now this mixture is to be burned by applying heat from up side after wards these mixture cake is fully burned and continuously cooling when of away from the hot blast and then this cake is diminish by jaw crusher and tend the sinter to the blast furnace now remember quality of sinter has major importance and hence it produce wonderful type of raw iron. SINTER COMPOSTION As we know that nowadays the Pakistan steel facing a lot of problem due to the lankness of raw material and many of its so now a day the composition of sintering which is send to the B.F is as follow, Chemistry % age of material involved Fe 55.85 - 57.85 MnO 0.90 – 1.10 MgO 1.85 – 2.05 CaO 1.19 – 1.39 FeO 11.0 – 13.00 Al2O3 1.65 – 1.85 PAKISTAN STEEL MILL KARACHI 25 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 26. INTERNSHIP PROGRAME SiO2 6.50 – 6.70 IRON MAKING DEPARTMENT INTRODUCTION In this department the raw iron is to be prepared through sinter and lump form of iron ore means it is a stage in which the ore (fine + lump) form is to be converted a metal form. The metal obtain from IMD is generally serve two purpose either molted material is shipped into the SMD or it may go to foundry section to shape it into the pig called the pig iron. PROCEDURE OF IMD SECTION At this stage the raw material or ore form is to be converted into the raw metal from hence all the further process is based on this stage i-e when the coal of required size (25 – 80) mm similarly various material’s taken from various department depends upon the requirement and the order giving by PPC. When the sinter of some composition is come from the sintering section and lump form of iron ore is come from the RMHD both form as a charge in blast furnace and hence when the charge in inserted into the blast furnace the operation of the blast furnace is start by employing high pressure gas through tuyers. The operation of blast furnace is depends greatly on the zones of blast furnaces because each zone have different temperature to other. PAKISTAN STEEL MILL KARACHI 26 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 27. INTERNSHIP PROGRAME Zone’s of Blast Furnace The blast furnace has the following zones with their temperature Zones Temperature Hearth 1700 – 1800 Bosh 1600 - 1500 Bally 600, 700, 800 Stack 800 – 1000 Throat 600 – 1000 High pressure in employed through tuyers and all charge inside reaction and hence as a result it is to be converted into two things i-e molten iron or slage. The iron has the high density and hence it is to be shifted down the blast furnace where as the slag has low density is placed above the molted iron. Now through taping whole first the iron is to be taking and filled it in the bowl and after that the slag is also taken and it is also taken into the bowl. Major Specification Of Typical B.F Specification Value Capacity 1750 tonn daily Volume 1033 cubic m height 96 m Stack 800 – 1000 Throat 600 – 1000 BLAS FURNANCE QULAITY SECTION Strictly speaking there is no quality section in blast furnace only the molten iron whose sample is to be taken and that sample is send it the process labs so that they applied very technique and using various parameters and then gives the specification of he molten metal like to how much %age of carbon is places %age of sulpure, phosphorus etc and give the report to the SMD section. PAKISTAN STEEL MILL KARACHI 27 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 28. INTERNSHIP PROGRAME STEEL MAKING DEPARTMENT SMD INTRODUCTION It is the one of the most important department of Pakistan steel it’s not wrong if we called it as a heart of Pak Steel. At this stage we prepared the steel of required grade and shape into the various form casting process slabs, blooms are the product of this stage. PROCEDURE OF SMD STEEL MAKING PROCESS THROUGH CONVERTER Hot metal is transported from the twp blast furnace by rail cars in 140 tones open transfer ladles and charged into the mixer by crane. The mixer acts as a buffer storage vessel to accommodate variation b/w iron production and the steel making operation. To maintain the temperature in the mixer natural gas burners heat the surface of the hot metal. Hot metal is poured from the mixer into a charging ladle mounted on the self – propelled rail car. During pouring the ladle car is positioned on a weighbridge. The hot, metal is charged into the converter by crane. After charging, the converter is rotated to a vertical position and one of the two water- cooled oxygen lances nozzle relative to the liquid metal surface is important in order to create the optimum reaction conditions. To attain the desired carbon content in the refined and to oxidize other impurities a calculated volume of oxygen is blow into the converter at a controlled flown rate. During blowing process a pre- determined quantity of calcinated lime is added to the vessel to produce a slag which aids the refining process. Fluoride is added for slag fluidity control. Iron ore is sometimes added for temperature control. Coke can be added for carbon control. If the desired steel temperature and carbon contents are not attained then a re blow is undertaken. When the end-point conditions are achieved, the converter is tilted is poured into a 130 tones steel ladle through a tap hole. Alloying materials are added to the ladle during tapping. Ladle additives, namely for ferromanganese and ferrosilicon, are weighed out of storage bins and loaded into boxes which are transported by a fork lifter truck to the steel ladle side of the converter. Two boxes can be positioned together on a discharging device and the contents added to the ladle. Aluminum bars PAKISTAN STEEL MILL KARACHI 28 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 29. INTERNSHIP PROGRAME by bags of cokes breeze are added to the ladle by hand. For certain steel speciation calcium silicates is also added to the ladle. On completion of tapping, the steel ladle is moved by a self- propelled rail car into the ladle bay of casting area. The converter is tilted in the opposite direction and the slag is discharge into the slag pot, which is taken by a self- propelled a rail car to the slag bay. STEEL CONVERTER SPECFICATION The various specification of steel converter’s used in SMD shop is as follows, No. of converter’s 2 No.’s Type Top blown oxygen converter Capacity 130 tons capacity Working volume 93 M³ Specific volume M³/T 0.68 Ration H/L 1.68 Mouth Dia 2430 mm Inner Dia 4240 mm Inner Height 7125 mm Total thickness of wall brick work 920 mm No. of bottoms 3 No.s for two converter’s Total thickness of the safety lining Chrome magnesite bottom brick work Working lining Ten bonded dolomite Lining life 400 heats Rate of oxygen blowing 450 M³/min Oxygen blowing time 18 minute (average) Oxygen consumption 58 Cu.M/Ton. Tap – to – Tap blowing time 40 Min/Heat 60 Max / Heat MIXER The mixer used has the following specifications No. of Mixer One PAKISTAN STEEL MILL KARACHI 29 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 30. INTERNSHIP PROGRAME Capacity 1300 tones CONTINOUS CASTING PROCESS There are three machines, a 4-stand blooms caster and 2 stand slab caster and 6 stand of billet caster. The bloom and slab casters are similar in operation and the difference b/w the instruments and control systems of the two types of machine are described in the individual zone reports. The ladle from the steel making shop is moved by crane to a prepared caster. When stabilization of chemical composition or temperature of the steel is necessary the ladle is taken to a stirring station and nitrogen is blown through and immersed lance. The temperature of the steel is measured before the ladle is placed on a caster turret. When the ladle is positioned correctly on the turret arms the crane is unhooked and an operating cylinder is fitted to the slide gate valve of the discharge nozzle. The turret can accommodate two ladles, one in the casting position and the other in reserve or awaiting removal. A prepared tundish on a tundish car is positioned over the stands of the caster and the immersion nozzle for each water-cooled copper mould id fixed in position. A mould is sealed by the head of a dummy bar inserted through the rollers of the stand. The turret is rotated to bring the ladle into the casting position above the tundish. The slide gate valve of the ladle is opened and the tundish is filled to require level. The tundish stoppers are opened and when the liquid steel in each mould reaches the required level the respective mould oscillating mechanism and with drawl drive are started. The continuous cast bloom or slab, on being withdrawn iron the mould, is sprayed with water in the secondary cooling zone. During casting the levels in the tundish and moulds are regulated. The casting speed is set according to the steel temperature; the latter being measured periodically in the tundish by means of an expandable immersion thermocouple. Water flow to the secondary cooling zones is regulated as a function of casting speed. Samples are taken, from the steel flowing into the tundish, for analysis at the express spectrographic laboratory. The continuous cast bloom or slab is cut to specified length the gas cutting section. A gas cutter clamps onto the cast steel at a pre-set length and moves in synchronism until cutting is completed. The cut lengths are moved by roller table, transfer car and crane to the stock yard. Series casting can be undertaken if the interval b/w converter tapings allows a new ladle to be placed on the turret before the slide-gate valve of the previous ladle is close. CASTING MACHINE SPECIFICATION The various specification of continuous casting machines in SMD section are as follows PAKISTAN STEEL MILL KARACHI 30 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 31. INTERNSHIP PROGRAME SLAB CASTER No. of Machines 2 No.’s No. of Strands Two strands each Size : thickness 150- 200 mm Size : width 700-1550mm Type of machine Radial Curvilinear Machine radius 10 meter Casting speed 0.6-0.9 m/minutes Capacity 825,000 T/year Machine length Mould top to last roller 22 meter Mould top to cutter 36.5 meter Metal flow control in mould Mono- block tundish stopper BLOOM CASTER No. of Machines 1 No No. of Strands 04 No.s each Size : 200 x 200 mm 260 x 260 mm Type of machine Radial Machine radius 12 meter Cating speed 1.1-1.2 m/minutes Capacity 400,000 T/year Machine length Mould top to last roller 20 meter Mould top to cutter 30 meter Metal flow control in mould Hydraulically operated mono-block tundish stopper QUALITY CONTROL SECTION OF SMD PAKISTAN STEEL MILL KARACHI 31 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 32. INTERNSHIP PROGRAME The quality section of SMD containing no. of quality plant a various place taken fro the material from IMD and shape into other slabs, blooms etc. When the molted iron is to be taken from the IMD and then insert it into the mixer the one of the quality observer has to look after the mixing process because any delay causes the reduce the temperature. When the molted iron through ladle insert into the converter the quality observer has to take the sample of hot metal for analysis as it poured and the temperature of the charge in the ladle is measured using an expandable immersion thermocouple. After blowing the converter is tilled and the temperature of the steel is measured using an expandable immersion thermo couple. A sample is to be taken for analysis at he express spectrographic laboratory with in the SMD building. The prepared steel in casting section to cast the blooms, slabs the quality observer taken the temperature of steel and also see the tendish of mould is properly positioned or not, the cooling system is also ok or not and afterwards the ladle tap is open steel is casted in various blooms, slabs. When the casted slabs, blooms getting cooled the quality observer received various defects of casting because of cooling system these defects are as o Longitude straight crack o Longitudinal corner crack o Auxiliary crack o Technical o Mixing o Ballet etc the quality observer mark the error and sent the casted slabs to yard section. At the yard section the length and thickness (which is verifying) and also the scarfing process is to be done through gas welding to determine the stability of the crack slab after wards the verifying slab is going to HRM or hot rolling section. SUGGESTION Whatever we observe in SMD section through whole analysis we found the following those are needed to be change in order to increase the production. The must be computerized application those gives the perfect composition of manufactured steel when the air in blowing through lance because to observe the composition’s specially the %age of carbon (C) and volume or air blowing to get the required grade of steel through the observation of flame produce during blowing is totally logical and requires too much experience on the other hand if the blowing system is computerized which gives the minute to minute to change in composition. Latest technology should be installed in order to prepare various type of steel instead to produced steel of various grade. PAKISTAN STEEL MILL KARACHI 32 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 33. INTERNSHIP PROGRAME HOT STRIP MILL (HSM) INTRODUCTION It is one of the most important department of pak steel. It is situated nearly to the SMD section. It works to produce the coils of various grad, quality, variety of the sheets / plates. The coils produced at this section is either dispatch to sell or it may send to the CRM for further processing. The manufactured coil can also be send to the CSSU section if the shearing or silitted bundle is required. The coils produced through HSM which is dispatch into the market varies in thickness and some time more thick coil can also be dispatch if the required demand is receive. PROCEDURE It is basically a forging process as a name suggest hot rolled mean the red hoted slab of various grade is rolled by high pressure and shape it into the coil by passing through various pressing stand under a heavy pressure. It can be started when the verified slabs is to be taken through yard section hence ensure slabs going over the rolling section. First one by one slab are put it down on the rollers now these slabs are measured and then put it into the furnace, the furnace has a capacity to carry 32 slabs at a time and to heated them at a temperature more then 1500 degree centigrade therefore rolled the quality observed obtain the temperature of slab so that it may sustain the roller’s action and hence through control room it is allowed to perform job. Now at rolling action there are various stage over which the red- hoted coil has passes through the following, PAKISTAN STEEL MILL KARACHI 33 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 34. INTERNSHIP PROGRAME VERTICAL STAND Its function first to remove all the scrap from the slab and 2nd the compressed the slab b/w two rollers, the vertical also controls the width of the slabs because when the slabs is to be compressed through passes the width of it needed to be maintain. After the water from a huge pressure 130 kg is to be applied on the compressed slab and hence to avoid the compressed to stick each other. UNIVERSAL STAND It is one of the basic and it has the capacity to produce 35mm, 30mm, 25mm of thickness of coil (sheet) from 200mm. It also the width as well which is necessary because when the sheet is to be compressed the width controlling is necessary. Universal stand contain two type roller i-e back or press roller and working roller. The coil obtain from universal stand is quit thick but it also has demanded in market and many times pak steel has provided 35mm thickness of coil to shipping co- corporation mostly , shipping corporation requires thick coil in making the body of ship which is need to be to thick. It is to be remembering that after universal stand the continuous supply of water is necessary in order to avoid the sheets in the coil to stick each other. FINISHING STAND There are 7-finishing stand in this shop which produced the coil of thickness 2, 3 mm from 30-35mm on final stand. Each stand has two rollers i-e working rollers and back roller The quality inspector at this is responsible to watch either posses is successfully done or not the water which is supplied in proper manner or not and hence watch through all this can we achieve the required thickness with tolerance or not. PAKISTAN STEEL MILL KARACHI 34 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 35. INTERNSHIP PROGRAME REFRACTORIES SHOP INTRODUCTION o The main purpose of the department is to produce • Calcined lime for SMD and others. • Tar bonded dolomite bricks for SMD. • Fire clay bricks for different uses all-over the Pakistan steel mil. o The department also deals with repair and installation of refractory bricks lining all over the plant. It has also a limited capacity to undertake thermal insulation wherever necessary. MAJOR SECTIONS OF FIRE-CLAY SHOP Raw material storage with Crushing Section. Fire-clay Calcinations Section (Rotary Kiln). Milling, Mixing and pressing Section. Brick firing section (Tunnel kiln Finished Product stockyard.) MAJOR SECTION OF DELOMITE SHOP Raw Material Storage with Crushing Section. Dolomite Calcinations Section (Rotary Kiln) Milling, Mixing and pressing Section. Brick Firing Finished Product stockyard. MAJOR SECTIONOF LIME SHOP PAKISTAN STEEL MILL KARACHI 35 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 36. INTERNSHIP PROGRAME Lime stone storage section. Lime calcinations section (rotary kiln). Waste heat boiler section. Lime storage section. a. FIRE CALY SHOP Installed capacity = 30,000 M.Tons No. of production lines = 05 MAIN EQUIPMENTS No. of toggle pressure = 02, Pressing force = 630 tons No. of friction pressure = 04, Pressing force = 200 tons No. of Tube mills = 03 capacity = 2T / Hr No. of rotary kiln = 01, charging rate = 2.50- 3.0 tons / hr b. DOLOMITE SHOP Installed capacity = 7,600 M.tons No. of production lines = 02. MAIN EQUIPMENTS No. of hydraulic presses = 02, Pressing force = 1600 T No. of Tube mills = 01, capacity = 2 T/hr No. of roll crusher = 01, capacity = 2.5 T/hr No. of rotary Kiln = 01, charging rate = 2.3 – 2.5 T/hr C) LIME SHOP Installed capacity = 87500 M.tons No. of production lines = 02 MAIN EQUIPMENTS No. of rotary Kilns = 02, capacity = 20 T/hr Length = 75 m Dia = 3.6 m No. of heat recovery boilers = 02, capacity = 16-18 T/Hr each No. of shaft coolers = 02, = steam generation PAKISTAN STEEL MILL KARACHI 36 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 37. INTERNSHIP PROGRAME CHEMICAL COMPOSITION OF RAW MATERILAS The raw material used for production of fire- clay bricks, Tar bonded Dolomite Bricks and Lime should meet the following requirement. FIRE CLAY BRICKS Semi flint Clay Plastic Clay Al2O3 48.0 % (Min) 36.0 (Min) Al203+ Ti02 content 51.0 % (Min) 39.0 (Min) Fe203 content 2.0 % (Max) 35.0 (Max) SiO2 content 30.0 % (Max) 50-55 % Alkali 0.005 % (Max) 0.05 % (Max) L.O.I (lost of ignition) 15.0 % (Max) 14.0 % (Max) Refractoriness 1790°C 1710°C Fraction size if in coming material 0.300 mm 0-300 mm Source KUNDIAN KUNDIAN (Mianwali) (Mianwali) RAW DOLOMITE RAW DOLOMITE MgO 19.0 % (Min) CaO content 33.0 % (Max) SiO2 content 1.0 % (Max) Al2O3 + Fe203 + 2.0 % (Max) Ti02+ Mn3O4 L.O.I (lost of ignition) 45-47 % (Max) Fraction size if in 3-80mm coiming material Source PAIKHEL (Mianwali) PAKISTAN STEEL MILL KARACHI 37 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 38. INTERNSHIP PROGRAME LIME STONE LIME STONE CaO content 53.5 % (Min) MgO content 1.2 % (max) SiO2 + Al2O3 content 1.2 % (max) Fe203 content 0.8 % (max) L.O.I (lost of ignition) 43-45 % P contents 0.060 % (max) Fraction size if in coiming material 20-50mm Ti02 content 0.25 % (max) S content 0.025 % (max) Source MAKLI FIRE CLAY BRICKS (Finished Products) Chemical composition and properties Fe203 content 2.4 % SiO2 content 42 % Al2O3 content 47.8 % CaO content 0.9 % MgO content 1.3 % Ti02 content 3.4 % L.O.I (lost of ignition) 0.18 % Size variation +1 to -1 mm Porosity 22.0 % (min) Density 2.3 g/cm³ Mechanical strength 150 Kg/Cm² (min) 230 Kg/Cm² (average) PAKISTAN STEEL MILL KARACHI 38 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 39. INTERNSHIP PROGRAME DOLOMITE BRICKS The chemical composition of calcined dolomite MgO 34 % (min) SiO2 2 % (max) Al2O3 + Ti02+ Mn3O4 4 % (max) L.O.I (lost of ignition) 1 % (max) Density 3 g/Cm³ Properties of Tar bonded dolomite bricks / blocks are Density 2.9 g/Cm³ (min) Mechanical strength 250 Kg/Cm³ (average) Size variation Length = +3 to -3 mm Width = +2 to -2 mm Height = +1 to -1 mm PAKISTAN STEEL MILL KARACHI 39 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 40. INTERNSHIP PROGRAME COLD ROLLING MILL (CRM): This plant is used for the production of the cold rolled coils which are more beneficial for various types of works such as sheets pf the vehicles, as well as the body of the aero planes and etc. an other assignment is also fulfilled which is of the siliting and shearing these sheared sheets are used for the flouring, as well as celling and in various other functions where there hot rolled sheets are not beneficial. CRM is the one of the largest and the cleanest department in the whole steel mill. It is the one of the best department which always remain clean, all the products of the steel mill depend on the CRM department because each and every product has to pass from that department CRM contains following units or sections, i) Continuous pickling unit. ii) Reversible unit. iii) Annealing furnace. iv) Tempering mill unit. v) Combined slitting and shearing units. vi) Galvanizing unit. vii) Profile bending. Any type of raw material or coil come to CRM department it has to pass all above mentioned units then that product can be said that it is the completely finished product. The coil at time of entering in the CRM department is of about 14 tons but at the time of discharging is of 5 tons sometime for special purpose its weight is increased from 5 tons to 10 tons and the thickness of the coil is below 4 mm ,at CRM it is further reduced to 1.4 - 1.6mm. DISCRIPTION OF THE VARIOUS SECTIONS AND THE QUALITY CONTROL PAKISTAN STEEL MILL KARACHI 40 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 41. INTERNSHIP PROGRAME CONTINOUS PICKLING UNIT. It is the unit where the coil came from the hot strip mill (1700mm) by the underground conveyer belt which directly connects the HSM and the CRM. when the coil reach at the pickling section there is lifter fixed in the machine whose work is to lift the coil and wear it on the uncoiler which uncoils the coil and stretch it to the length of about 5-6m through the coils after that these coils are dipped into the acid bath where all types of scales has been removed and then goes to the an other stand where its width is maintained by trimming the rough edges, it is set as follows: 1250 1220 1030 1000 950 900. After that it passes through gracing stand where it is grecced / oil is applied to coil as it can be kept prevented from the corrosion and the natural effects. FUNCTION OF THE PICKLING UNIT:- The most important function is defined as “hot rolled coils are pickled in order to remove the scales and layers of the “FeO”iron oxide by the emersion of the sheet into the hydrochloric acid (HCL)”. QUALITY CONTROL IN THE PICKLING UNIT. In the pickling unit quality control only keep an eye on few of important things which are mentioned as under: the coil coming from the hot strip mill either it is usable or defective. the coil’s specifications written on the heat card are correct or not. such as o heat number o slab number o length, width and thickness. the width at the time of trimming is as per requirement or not. proper greecing is done at end of the pickling unit. It is done for prevention of the corrosion. REVERSIBLE STRAND:- It is the machine where thickness of the coil is further reduced to the required size. The is passed through the reversible strand its length is minimized from 3.5mm to 1.45mm or 1.4mm,the coil is passed through the strand according to its thickness sometimes it passed three times and sometimes it is passed 5 times but counting always should be in odd numbers not in even. The emulsion solution is used in which 40% of oil PAKISTAN STEEL MILL KARACHI 41 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 42. INTERNSHIP PROGRAME and 60% of the water is included. The solution used is so much expensive about Rs.750/lit. Parts of the reversible strand:- i) uncoiler ii) working rollers iii) supporting/back up rollers. These are the main parts of the reversible strand. it produces the two types of the coils one is seen to the galvanizing plant and an other send to the annealing furnace. QUALITY CONTROL AT REVERSIBLE STRAND. At the reversible machine mostly there are two most important things to be checked. The width of the coil The surface of the coil There are so many defects sometimes appears on the 0surface of the coil. Edge waveness Buckling Marking Bubbles Coil break Pores ANNELING FURNACE:- It is the furnace which is used to improve the internal structure of the coil or to increase the strength of the material. MAIN PARTS OF THE ANNELING FURNACE Main stand . Tower Furnace (moveable). Stove In annealing furnace at a time there are 4 coils of width 950mm and 3 coils of the width 1220mm can kept. Duration of the furnace is minimum 18-44 hours depending on the grade of the coil. Internal atmosphere of the furnace is of nitrogen gas and the heating process takes places in absence of the oxygen/air. After discharging from the furnace these coils are cooled PAKISTAN STEEL MILL KARACHI 42 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 43. INTERNSHIP PROGRAME PAKISTAN STEEL MILL KARACHI 43 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 44. INTERNSHIP PROGRAME MAINTENANCE Today, in modern industry, equipment and a machinery are a very important part of the total productive effort than was the case years ago. Moreover, with the developments of special purpose and sophistical machines, equipment and machinery cost a lot more money and there fore their and does time becomes much more expensive. For this reason, it is vitally important that the plant machinery should be properly maintained. OBJECTIVES OF PLANT MAINTENANCE i) The objective of plant maintenance is to achieve minimum breakdown and to keep the plant in good working condition at he lowest possible cost. ii) Machines and other facilities should be kept in such a condition which permits them to be used at their optimum (profit making) capacity without any interruption or hindrance. iii) Maintenance division of factory ensures the availability of the machines, buildings, and services required by other section of the factory for the performance of their function at optimum return on investment whether this investment be in material, machinery or personnel. IMPORTANCE OF THE MAINTENANCE i) The importance of the plant maintenance is varies with the type of the plant and its production. ii) Equipment breaks down leads to the inevitable loose of production. iii) An improperly maintained or neglected plant will sooner or later requires expensive and frequent repairs, because with the passage of the time all machines or other facilities (such as transportation facilities), buildings, etc wear out and need to be maintained to function properly. iv) Plant maintenance plays a prominent role in production management the plant break down create problems such as, • Loss in production • Rescheduling of production • Spilet material (because sudden stoppage of process damages in- process materials). • Failures to recover overheads (because of loss in production hours). • Need for over time. • Temporary work shortage- workers require alternative work. PAKISTAN STEEL MILL KARACHI 44 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 45. INTERNSHIP PROGRAME MAINTENANCE SECTION IN PAK STEEL MILL Basically the maintenance section of pak steel can be divided in various sections or shop depends upon the nature of work which is under consideration. The maintenance section of pak steel mill can be classified as i)Pulse mechanical ii) Central maintenance department (CMD) iii) Mechanical Equipment and Repair Shop (M.E.R.S) and various other section those involve in providing the facilities to the production side for their smooth production run. Maintenance can be done in the following fashion in any production side, • Prevantory maintenance • Break down / emergency maintenance • Capital maintenance • Modernize maintenance Preventary Maintenance It is one in which we check the plant before starting production either is it ok or it is not before as we know that the production giving section those were interlink to each other and hence any type of damage in one part causes to stop the continuality of production and hence the productivity. Capital maintenance The designer of plant section observing the actual life of plant and it can be done when plant fully maintain, such type of maintenance can be done in year, a month, a day, its upon the nature of the plant whose maintenance is to be done. Modernize maintenance It is one in which the modernize method require to handled the situation hence provide the flexibility in the plant in order to increase the productivity. MECHANICAL EQUIPMENT AND REPAIR SECTION ( M.E.R.S) It is one of the most important maintenance section in pak steel mill. As the name suggest mechanical equipment repair section means they are involved in repairing the equipment those are necessary in order to run the smooth production. The shop work can be start when plant observer observes the lack in a machine by varying the product and hence obtain the defects now he is responsible to submit these defects to the plant top management (DM/GM) now the letter is to be issued through the plant with the machine which requires necessary maintenance and send it to the MERS section. PAKISTAN STEEL MILL KARACHI 45 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 46. INTERNSHIP PROGRAME Once the letter has been received by maintenance section now the concerned maintenance section is responsible to arrange all the resources, manpower’s and those necessary things and after that are schedule for the team now these team ether general or shift. The requires is to be taken by logistic section If the maintenance is large so the maintenance authority analysis the whole problem and then planned the huge maintenance by using the following network technique’s • Critical path method (CPM) • Program evaluation and review technique (PERT) Once the schedule is made and according to that schedule the maintenance team has to work over the concerned section. Now we discussing the department in which we went with MERS maintenance team one by one. HOT STRIP MILL (HSM) As we know that they HSM is one of the most important department because it converts the red- hoted slab into various coils and hence it produce the coil. In order to achieve the maximum efficiency the maintenance of HRM is necessary. The procedure as we have already discussed the plant technician observer the defect in the running plant and submit the report to the official and then official send letter to the concerned maintenance section and hence the maintenance team’s then responsible to comes in the concerned department. MERS assign’s the in charge of maintenance observe the nature of the job and hence schedule the manpower according to their skill about the specific job. e.g FURNANCE The furnace used in HSM is one which converts the slab into red hoted form so that the slabs easily further to roll and hence in last the coil is produce. The furnace have its own importance and any lacks in furnace may causes to stop the smooth production therefore in order to achieve maximum productivity in maintenance of furnace is necessary. PAKISTAN STEEL MILL KARACHI 46 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 47. INTERNSHIP PROGRAME The maintenance section involves major to remove the defects in furnace like to change the bricks i-e refractory inside the furnace and it is very to look after the active life of the refractory. VERTICAL STAND Vertical stand is one of the most important it is the first which causes to compress 200mm thick red hoted slab into the 35mm thickness means it provided basis to other stand for the further reduce in thick, the key feature of the vertical is that with reducing the thickness it also control the width of the coil. The importance of vertical is also to the great extent and properly handled it necessary which requires a lot of effort by department as well as the maintenance section. The defect’s occur in vertical stand are mostly as follows the rollers used are some times replaced and some times sanded for the polish the surface of the roller, sometimes defects occur and hence some guiding provided by welding and some time the punk plates has to change and many other defects that can occur and hence the maintenance section is responsible to over all this defects in order to increase the life of the vertical stand and hence to increase the productivity. UNIVERSAL STAND After vertical the sheet is further rolled in universal stand therefore maintenance section is also to look after the universal stand and replaced the necessary parts if required and hence to remove the defects that can be occur during processing. The one of the most major defect is that the roller is to replaced when their life to be end when they are not in a position for further grinding and many other parts and things are there depends upon the nature of the defects. FINISHING STAND Once the sheet is obtain from the universal stand the next step is to finishing stand to further reduce the thick ness and 3mm approximately hence the finishing stand has its own importance hence the maintenance of the finishing is necessary mostly the maintenance teams work to change the damp working role and also change the taper rolling heating inside the cup etc there is many other parts that’s has been replaced or may be welded if required. In HSM there is various other part which requires maintenance but here we are not concerned with all that. PAKISTAN STEEL MILL KARACHI 47 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 48. INTERNSHIP PROGRAME SINTERING It is also the one of the most important section is uses the fine form of ore and convert it into the sinter from by passing through various process and hence this sinter is used in blast furnace in order to obtain the molted raw iron. To avoid complete break down because of the maintenance in sintering plant machine -1 is allowed to running and machine -2 is lying down steadly for maintenance purpose similarly other concerned part to machine-2 are also lying down for maintenance purpose where as the machine-1 performing for the continuity of the work. On maintenance day the maintenance has come from various of its section is responsible to perform the various some of them that we have seen in sintering shop which are as follows. BALLING DRUM It is used to mixed the sinter and also make the fine into the ball form, now these balling has to be done by removing flaws and replacing various tools and also fastening various parts, some of the few important consideration in balling are as follows, Ring belt is checked and replaced if possible Gear (driven) and pinion (driver) which rotates the drum is also check and make certain operation in order to improve their workability. To adjust the alignment up and down, left and right to support the wheel. CHRGING DRUM The material come from conveyer is to be charge over the charging drum so its maintenance is also much necessary, some necessary action which is to be taken are as follows • To check the bearing , map • Electric arc welding is used to insert flaws PAKISTAN STEEL MILL KARACHI 48 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 49. INTERNSHIP PROGRAME • Scraper is used to clean the cut and check the charge • Charge gate has to check and to set it. PILOT CAR It is also important part for the continuously of sintering process and hence requires maintenance as few achieve those have been taken To check slide plate bars wheel, bearing, and proper lubrication. CRUSHER When cake is prepared and is totally burned now the cakes is crushed through jaw crusher and insert it into the conveyer bucket and now the sinter which crushed sent to the B.F. The maintenance section is responsible to take the following necessary action. To check all the jaw’s and hence to repair the jaw’s as well. PAKISTAN STEEL MILL KARACHI 49 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 50. INTERNSHIP PROGRAME PAKISTAN STEEL MILL KARACHI 50 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 51. INTERNSHIP PROGRAME PAKISTAN STEEL MILL KARACHI 51 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 52. INTERNSHIP PROGRAME INDUSTRIAL ENGINEERING DEPARTMENT DEFINITION:- Industrial engineering can be defined as the “The engineering which maximizes the profit by reducing the resources by the best utilization of the tools, equipments and the industrial techniques.” FUNCTION:- Industrial engineering department encompasses activities, which are concerned with the organized and effective utilization of the manpower with the aim of increasing the productivity of the organization. SALIENT FUNCTIONS OF I.ED:- 1. To analyze the requirement of the temporary manpower demaned on the regular basis by the different departments and to curtail wherever possible. 2. To prepare the directorate-wise daily attendance of the Pakistan steel mill for a bird eye view of the competent authority. 3. To collect the monthly manpower returns from all departments of the Pakistan steel for the various studies of the cases and analytical comparisons of the man power. 4. To asses’ requirement of the temporary workers demanded for the different projects/specific works. 5. To monitor and allocation of the hazards allowance. 6. Analysis and recommendation for the various types of the contract manpower including through heeded trust. 7. Monthly recommendation for the allocation of the department-wise overtime limits. 8. Time-to time preparation of the analytical comparison of the rationalized, regular, temporary and other holding manpower on the department /directorate basses directed. 9. Category-wise revision of the wages of the daily wagers and salaries of the contract employees, whenever desired. PRESENT EXERCISE:- IED is conducting an exercise for the requirement of daily wages workers to complete each project/assignment on the basis of the nature of the job, its inevitability and number of the persons/duration required for. PAKISTAN STEEL MILL KARACHI 52 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 53. INTERNSHIP PROGRAME FUTURE PROGRAMME:- Conduction of the exercise to find out the shortcomings in the area where their deployment is not in accordance to their suitability and induction of the qualified engineers with respect to required disciplines. WORKING OF THE I.E.D NOW A DAY:- Now a days it is working on the following things;- 1. Attendance. 2. Hazards allowances. 3. Control on the distribution of the uniforms among the employees. 4. Controlling the man power. 5. Keeping the records of the temporary and daily wages employees. HAZARDS ALLOWNCES;- There are four categories:- 1. A-ONE(Most hazardous place) 2. A(less than A-one) 3. B(less than A). 4. C(less than B). There is lot of difference in allowances rates between these categories. These type of incentives are introduced first time in the Pakistan steel mill in 1984.the committee is formed whose is responsible for the hazard allowances. PAKISTAN STEEL MILL KARACHI 53 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 54. INTERNSHIP PROGRAME PREPARED BY Name: Mohammad Younus Fathers Name: Mohammad Anwar Qureshi Surname: Qureshi Nationality: Pakistani Date of birth: 24th November 1988 Place of Birth: Hyderabad Domicile: Hyderabad Urban Profession: Student Degree: Graduation (B.E Industrial Engineering & Management) Year of Study: Final year. Roll No. 08IN70 University: Mehran University of Engineering and Technology (M.U.E.T) Jamshoro. PAKISTAN STEEL MILL KARACHI 54 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 55. INTERNSHIP PROGRAME PAKISTAN STEEL MILL KARACHI 55 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 56. INTERNSHIP PROGRAME PAKISTAN STEEL MILL KARACHI 56 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED
  • 57. INTERNSHIP PROGRAME PAKISTAN STEEL MILL KARACHI 57 PREPARED BY :MOHAMMAD YOUNUS & SUHAIL AHMED