SlideShare uma empresa Scribd logo
1 de 63
PRESSURE MOUND
SYSTEM TIMED DOSE
Michael A. Schwartz, P.E.
mschwartz@preinnewhof.com
Changing Regulations
   New Kalamazoo County Sanitary Code
       Kalamazoo County Health & Community Services
       New in December 2007
       Restrictions now include properties:
         Where a public sewer is available to the property.
         Where the proposed location of a septic tank would render the
          septic tank inaccessible for cleaning or inspection purposes.
         Where the property to be served by the onsite sewage
          treatment system is too small to allow for proper isolation
          distances between the onsite sewage treatment system which
          includes the replacement area and any existing or proposed
          water wells, or surface waters.
Changing Regulations
   New Kalamazoo County Sanitary Code
       Restrictions now include properties:
         Where the property lacks sufficient drainage area and/or
          replacement area.
         Where the property’s high groundwater and/or mottling is 24
          inches or less of the natural ground surface elevation for
          installation of an onsite sewage treatment system on new
          construction sites.
         Where the property’s stabilized percolation rate exceeds 60
          minutes per inch.
         Where the Department determines that the property’s soil
          classification and/or physical conditions are unsatisfactory for
          the treatment of sewage effluent.
Changing Regulations
   New Kalamazoo County Sanitary Code
       Restrictions now include properties:
         Where conditions exist upon the property, or may occur upon
          the property, which may endanger the public health or the
          environment.
         Where the proposed site is subject to flooding and/or is included
          within the 100-year flood plain.
Changing Regulations
   Appeals Board
       Engineered Alternative System required
       Not every site has the space and porous soil needed
        to support a septic system. If an alternative system is
        required it will be:
         More  Costly
         Ongoing Maintenance
         Yearly Inspections
         Engineered System
Denial of Permits: The Big 3

     Lack of Land Area
     Poor Soils
     Seasonal High Water Table (<24”)
Denial of Permits: The Big 3
   Lack of Land Area
       Potential Problems:
         Treatment (strength of   waste)
         Hydraulic Issue (drain field size)
         Both
Denial of Permits: The Big 3
   Poor Soils
       Percolation: Soils drain too fast
         Problem: treatment leaving the septic tank
         Solution: treatment system in conjunction with septic tank
         Example: Re-Circulating Sand Filter
Sample Design Sand Filter




                     Advantex Treatment System
                     Re-Circulating Sand Filter
Denial of Permits: The Big 3
   Poor Soils
       Percolation: Soils drain too fast
         Problem: treatment leaving the septic tank
         Solution: treatment system in conjunction with septic tank
         Example: Re-Circulating Sand Filter

       Percolation: Soils drain too slow
         Problem: Hydraulic disposal  of effluent leaving septic tank
         Treatment: System to reduce particles to soils would be
          beneficial
         Solution: Larger drain field
Denial of Permits: The Big 3
   Seasonal High Water Table (<24”)
       Potential Problems:
         Treatment (strength of   waste)
         Hydraulic Issue (drain field size)
         Both

       Must get oxygen into the treatment system (drain
        field)
       Solution: Mound System
Sample Design Mound




        Mound System for High Water Table
Denial of Permits: The Big 3
   Seasonal High Water Table (<24”)
       Potential Problems
       Must get oxygen into the treatment system (drain
        field)
       Solution: Mound System
         “Pump    and Dump”
              4” Laterals – Gravity Feed
         Pressure   Distribution
              Small Laterals – Pressurized
              “Pump & Dump”
              Timed Dose
This is what we want to avoid!
COOPER TOWNSHIP
Case Study #1
Case Study: Cooper Township
   1st One Built, 2nd One Permitted
   Issue for Denial
   Water Table within 24” of Ground Surface
   Suitable Soils
   Solution: Pressure Distribution Mound with Timed
    Dose
COOPER TOWNSHIP
Pre-Construction
Beginning construction of the house. The
septic tanks and pump chamber will be set on
the existing ground and the proposed grade
will be built around the system.
Another view of where the system will be
constructed, immediately in front of the house.
The bottom of the basement is basically at the
elevation of the existing ground.
Area in front of the house where the base of
the mound (absorption system) will be
installed upon.
COOPER TOWNSHIP
Construction
The site has been rough graded (area
around building is filled). Contractor is
excavating to install the septic tank.
Contractor installed the septic tank. Pipe
sticking out is the discharge to the pump
chamber.
Contractor is on the septic
tank and the installed pump
chamber is on the right.
The force main from the pump chamber
to the new drain field. Note since the
system is a pumped system it is very
flexible in the configuration and field
installation. The piping will go around the
tanks to avoid and other utility conflicts.
Continuation of the forcemain. Pump
chamber is on the left and the septic tank
is on the right.
2NS sand fill for the soil absorption system.
 This is the layer the stone will be placed
upon.
Looking at the 100’ long drainfield.
Standing at approximately where the
header pipe will be installed.
Rough grading around the drainfield prior
to placing the stone.
Very rough grading above tanks
Header pipe on top of the newly installed
stone.
Looking at the 100’ pressure distribution
laterals within the new drainbed. Pipe
about half way down is the observation
port.
Looking at the 100’ pressure distribution laterals within the new drainbed.
Pipe about half way down is the observation port. The orifice shield are
removed from the up-holes to testing of the system. There is a down-hole in
between each of the up-holes.
Looking at the 100’ pressure distribution laterals within the
new drainbed. Pipe about half way down is the observation
port. The orifice shield are removed from the up-holes to
testing of the system. There is a down-hole in between each of
the up-holes.
Contractor waiting for the pump chamber
to fill with water to test the system.
Pump is activated and “squirt” test is performed.
Health Department personnel verifying squirt test.
Orifice shield place back over the up-
holes.
Contractor installing the fabric prior to covering the system.
Contractor installed fabric prior to covering
the system and placing final fill over the
system
Contractor placing final cover over system
Contractor placing final cover over system
Existing site behind the new mound. Pipe is the downspout from
the roof that is directed away from the system.
Contractor placing final cover over system
Inside the new control panel
COOPER TOWNSHIP
Post-Construction
Post-Construction
Post-Construction
What did we learn?
   Pre-Construction meetings can answer a lot of
    questions.
   The system can perform (squirt test) as the
    math and calculations show should occur.
   Pump Systems are very flexible in design and
    configuration.
   Multiple arrangement of float configurations
    are possible (2 floats, 3 floats, 4 floats).
   Health Department is there to help and to
    make sure it will be a “good” system.
ALAMO TOWNSHIP
Case Study #2
Case Study: Alamo Township
   1st One Permitted, 2nd One Built
   Issue for Denial
   Water Table within 24” of Ground Surface
   Suitable Soils
   Solution: Pressure Distribution Mound with Timed
    Dose
Case Study: Alamo Township
Case Study: Alamo Township
Mound prior to seeding.
Squirt test being performed. No one was
present during construction, so the
contractor had to dig and expose the first
and last orifice to perform a squirt test.
Squirt Test being performed.
Rough grades around the
tanks (septic tank and
pump chamber). The open
lid is the pump chamber.
Looking inside the riser of the pump
                           chamber.
Some final site photos a few weeks after new system was installed.
Some final site photos a few weeks after new system was installed.
What did we learn?
   Contractor – have a preconstruction meeting
   Contractor – Follow what the KCHSD permitted for
    the system
   Contractor – Follow what is specified (soils) per
    the codes and drawings
   If Not – you will start over
   It will cost the Contractor $$$
THANK YOU.
DO YOU HAVE QUESTIONS?
           Mike Schwartz, P.E.
           mschwartz@preinnewhof.com
           (269) 372-1158

Mais conteúdo relacionado

Mais procurados

Multi slot divisor
Multi slot divisorMulti slot divisor
Multi slot divisorRaghu1522
 
ESTIMATION OF SOIL LOSS BY USING MULTISLOT DEVISOR
ESTIMATION OF SOIL LOSS BY USING MULTISLOT DEVISORESTIMATION OF SOIL LOSS BY USING MULTISLOT DEVISOR
ESTIMATION OF SOIL LOSS BY USING MULTISLOT DEVISORRaghu1522
 
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEMPROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEMAB MAKASANA
 
Design and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer AppurtenancesDesign and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer AppurtenancesTulsiram Bhattarai
 
Collection of sewage & estimation of its discharge
Collection of sewage & estimation of its dischargeCollection of sewage & estimation of its discharge
Collection of sewage & estimation of its dischargeRajdip Bhdaraka
 
Micro irrigation systems- at field level
Micro irrigation systems- at field levelMicro irrigation systems- at field level
Micro irrigation systems- at field levelSai Mohan Samala
 
Dewatering System
Dewatering SystemDewatering System
Dewatering Systemnik kin
 
Design and construction of sewer
Design and construction of sewer Design and construction of sewer
Design and construction of sewer SitalParajuli
 
Oil Sands Water Management Initiative Notes
Oil Sands Water Management Initiative NotesOil Sands Water Management Initiative Notes
Oil Sands Water Management Initiative Noteswilliampatricklaw
 
Sistem bekalan air di dalam bangunan
Sistem bekalan air di dalam bangunanSistem bekalan air di dalam bangunan
Sistem bekalan air di dalam bangunanUngku OmarPolytechnic
 

Mais procurados (20)

Multi slot divisor
Multi slot divisorMulti slot divisor
Multi slot divisor
 
L 9 pumping stations
L 9 pumping stationsL 9 pumping stations
L 9 pumping stations
 
ESTIMATION OF SOIL LOSS BY USING MULTISLOT DEVISOR
ESTIMATION OF SOIL LOSS BY USING MULTISLOT DEVISORESTIMATION OF SOIL LOSS BY USING MULTISLOT DEVISOR
ESTIMATION OF SOIL LOSS BY USING MULTISLOT DEVISOR
 
Boat Washpad Designs To Meet NPDES
Boat Washpad Designs To Meet NPDESBoat Washpad Designs To Meet NPDES
Boat Washpad Designs To Meet NPDES
 
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEMPROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
 
Design and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer AppurtenancesDesign and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer Appurtenances
 
Sewerage System
Sewerage SystemSewerage System
Sewerage System
 
Sewerage
SewerageSewerage
Sewerage
 
Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer Appurtenances
 
Drainage
DrainageDrainage
Drainage
 
Coshocton wheel
Coshocton wheelCoshocton wheel
Coshocton wheel
 
Low Cost Sanitation Systems
Low Cost Sanitation SystemsLow Cost Sanitation Systems
Low Cost Sanitation Systems
 
Collection of sewage & estimation of its discharge
Collection of sewage & estimation of its dischargeCollection of sewage & estimation of its discharge
Collection of sewage & estimation of its discharge
 
Micro irrigation systems- at field level
Micro irrigation systems- at field levelMicro irrigation systems- at field level
Micro irrigation systems- at field level
 
Dewatering System
Dewatering SystemDewatering System
Dewatering System
 
Design and construction of sewer
Design and construction of sewer Design and construction of sewer
Design and construction of sewer
 
Storm water drainage
Storm water drainageStorm water drainage
Storm water drainage
 
Hydraulicdesignofsewer
HydraulicdesignofsewerHydraulicdesignofsewer
Hydraulicdesignofsewer
 
Oil Sands Water Management Initiative Notes
Oil Sands Water Management Initiative NotesOil Sands Water Management Initiative Notes
Oil Sands Water Management Initiative Notes
 
Sistem bekalan air di dalam bangunan
Sistem bekalan air di dalam bangunanSistem bekalan air di dalam bangunan
Sistem bekalan air di dalam bangunan
 

Semelhante a Pressure mound system: Septic Installers - Mike Schwartz, P.E.

Drainage presentation
Drainage presentationDrainage presentation
Drainage presentationBilly Wiggins
 
Groundwater Management
Groundwater ManagementGroundwater Management
Groundwater ManagementSean Carroll
 
Richland co. installer mtg. 12 10-10
Richland co. installer mtg. 12 10-10Richland co. installer mtg. 12 10-10
Richland co. installer mtg. 12 10-10Jason Menchhofer
 
Drainage engineering presentation work done
Drainage engineering presentation work doneDrainage engineering presentation work done
Drainage engineering presentation work donepavik13
 
Preparation for Depressurization: How to Survive a Major Water Main Break
Preparation for Depressurization:How to Survive a Major Water Main BreakPreparation for Depressurization:How to Survive a Major Water Main Break
Preparation for Depressurization: How to Survive a Major Water Main BreakDan Barr
 
Vacuum Plumbing Systems - Future Frontiers for Plumbing Design
Vacuum Plumbing Systems - Future Frontiers for Plumbing DesignVacuum Plumbing Systems - Future Frontiers for Plumbing Design
Vacuum Plumbing Systems - Future Frontiers for Plumbing DesignMorris Group International
 
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxLectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxAsnelTiffa
 
constructiondewatering.pptx
constructiondewatering.pptxconstructiondewatering.pptx
constructiondewatering.pptxCarolTumaneng
 
Feeling the Pressure on Drilling and Completion1
Feeling the Pressure on Drilling and Completion1Feeling the Pressure on Drilling and Completion1
Feeling the Pressure on Drilling and Completion1Logan Lewis
 

Semelhante a Pressure mound system: Septic Installers - Mike Schwartz, P.E. (20)

Area 21 & 23 Pic1 display panels
Area 21 & 23 Pic1 display panelsArea 21 & 23 Pic1 display panels
Area 21 & 23 Pic1 display panels
 
Drainage presentation
Drainage presentationDrainage presentation
Drainage presentation
 
Area36 final pic1 boards
Area36 final pic1 boardsArea36 final pic1 boards
Area36 final pic1 boards
 
Area39 pic 1 panels final
Area39 pic 1 panels finalArea39 pic 1 panels final
Area39 pic 1 panels final
 
Area 38 pic 1 final presentation
Area 38 pic 1   final presentationArea 38 pic 1   final presentation
Area 38 pic 1 final presentation
 
Groundwater Management
Groundwater ManagementGroundwater Management
Groundwater Management
 
BF Area 35 PIC 1 Boards_final
BF Area 35 PIC 1 Boards_finalBF Area 35 PIC 1 Boards_final
BF Area 35 PIC 1 Boards_final
 
Stormwater Filtering Design
Stormwater Filtering DesignStormwater Filtering Design
Stormwater Filtering Design
 
2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information 2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information
 
Richland co. installer mtg. 12 10-10
Richland co. installer mtg. 12 10-10Richland co. installer mtg. 12 10-10
Richland co. installer mtg. 12 10-10
 
Wastewater
WastewaterWastewater
Wastewater
 
Drainage engineering presentation work done
Drainage engineering presentation work doneDrainage engineering presentation work done
Drainage engineering presentation work done
 
Huddersfield - Process Commisioning presentation 030209
Huddersfield - Process Commisioning presentation 030209Huddersfield - Process Commisioning presentation 030209
Huddersfield - Process Commisioning presentation 030209
 
De watering-ppt
De watering-pptDe watering-ppt
De watering-ppt
 
Preparation for Depressurization: How to Survive a Major Water Main Break
Preparation for Depressurization:How to Survive a Major Water Main BreakPreparation for Depressurization:How to Survive a Major Water Main Break
Preparation for Depressurization: How to Survive a Major Water Main Break
 
Vacuum Plumbing Systems - Future Frontiers for Plumbing Design
Vacuum Plumbing Systems - Future Frontiers for Plumbing DesignVacuum Plumbing Systems - Future Frontiers for Plumbing Design
Vacuum Plumbing Systems - Future Frontiers for Plumbing Design
 
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxLectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
 
constructiondewatering.pptx
constructiondewatering.pptxconstructiondewatering.pptx
constructiondewatering.pptx
 
Feeling the Pressure on Drilling and Completion1
Feeling the Pressure on Drilling and Completion1Feeling the Pressure on Drilling and Completion1
Feeling the Pressure on Drilling and Completion1
 
anu
anuanu
anu
 

Último

Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Angeliki Cooney
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...apidays
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistandanishmna97
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamUiPathCommunity
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Zilliz
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Bhuvaneswari Subramani
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfOrbitshub
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityWSO2
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 

Último (20)

Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 

Pressure mound system: Septic Installers - Mike Schwartz, P.E.

  • 1. PRESSURE MOUND SYSTEM TIMED DOSE Michael A. Schwartz, P.E. mschwartz@preinnewhof.com
  • 2. Changing Regulations  New Kalamazoo County Sanitary Code  Kalamazoo County Health & Community Services  New in December 2007  Restrictions now include properties:  Where a public sewer is available to the property.  Where the proposed location of a septic tank would render the septic tank inaccessible for cleaning or inspection purposes.  Where the property to be served by the onsite sewage treatment system is too small to allow for proper isolation distances between the onsite sewage treatment system which includes the replacement area and any existing or proposed water wells, or surface waters.
  • 3. Changing Regulations  New Kalamazoo County Sanitary Code  Restrictions now include properties:  Where the property lacks sufficient drainage area and/or replacement area.  Where the property’s high groundwater and/or mottling is 24 inches or less of the natural ground surface elevation for installation of an onsite sewage treatment system on new construction sites.  Where the property’s stabilized percolation rate exceeds 60 minutes per inch.  Where the Department determines that the property’s soil classification and/or physical conditions are unsatisfactory for the treatment of sewage effluent.
  • 4. Changing Regulations  New Kalamazoo County Sanitary Code  Restrictions now include properties:  Where conditions exist upon the property, or may occur upon the property, which may endanger the public health or the environment.  Where the proposed site is subject to flooding and/or is included within the 100-year flood plain.
  • 5. Changing Regulations  Appeals Board  Engineered Alternative System required  Not every site has the space and porous soil needed to support a septic system. If an alternative system is required it will be:  More Costly  Ongoing Maintenance  Yearly Inspections  Engineered System
  • 6. Denial of Permits: The Big 3  Lack of Land Area  Poor Soils  Seasonal High Water Table (<24”)
  • 7. Denial of Permits: The Big 3  Lack of Land Area  Potential Problems:  Treatment (strength of waste)  Hydraulic Issue (drain field size)  Both
  • 8. Denial of Permits: The Big 3  Poor Soils  Percolation: Soils drain too fast  Problem: treatment leaving the septic tank  Solution: treatment system in conjunction with septic tank  Example: Re-Circulating Sand Filter
  • 9. Sample Design Sand Filter Advantex Treatment System Re-Circulating Sand Filter
  • 10. Denial of Permits: The Big 3  Poor Soils  Percolation: Soils drain too fast  Problem: treatment leaving the septic tank  Solution: treatment system in conjunction with septic tank  Example: Re-Circulating Sand Filter  Percolation: Soils drain too slow  Problem: Hydraulic disposal of effluent leaving septic tank  Treatment: System to reduce particles to soils would be beneficial  Solution: Larger drain field
  • 11. Denial of Permits: The Big 3  Seasonal High Water Table (<24”)  Potential Problems:  Treatment (strength of waste)  Hydraulic Issue (drain field size)  Both  Must get oxygen into the treatment system (drain field)  Solution: Mound System
  • 12. Sample Design Mound Mound System for High Water Table
  • 13. Denial of Permits: The Big 3  Seasonal High Water Table (<24”)  Potential Problems  Must get oxygen into the treatment system (drain field)  Solution: Mound System  “Pump and Dump”  4” Laterals – Gravity Feed  Pressure Distribution  Small Laterals – Pressurized  “Pump & Dump”  Timed Dose
  • 14. This is what we want to avoid!
  • 16. Case Study: Cooper Township  1st One Built, 2nd One Permitted  Issue for Denial  Water Table within 24” of Ground Surface  Suitable Soils  Solution: Pressure Distribution Mound with Timed Dose
  • 17.
  • 19. Beginning construction of the house. The septic tanks and pump chamber will be set on the existing ground and the proposed grade will be built around the system.
  • 20. Another view of where the system will be constructed, immediately in front of the house. The bottom of the basement is basically at the elevation of the existing ground.
  • 21. Area in front of the house where the base of the mound (absorption system) will be installed upon.
  • 23. The site has been rough graded (area around building is filled). Contractor is excavating to install the septic tank.
  • 24. Contractor installed the septic tank. Pipe sticking out is the discharge to the pump chamber.
  • 25. Contractor is on the septic tank and the installed pump chamber is on the right.
  • 26. The force main from the pump chamber to the new drain field. Note since the system is a pumped system it is very flexible in the configuration and field installation. The piping will go around the tanks to avoid and other utility conflicts.
  • 27. Continuation of the forcemain. Pump chamber is on the left and the septic tank is on the right.
  • 28. 2NS sand fill for the soil absorption system. This is the layer the stone will be placed upon.
  • 29. Looking at the 100’ long drainfield. Standing at approximately where the header pipe will be installed.
  • 30. Rough grading around the drainfield prior to placing the stone.
  • 31. Very rough grading above tanks
  • 32. Header pipe on top of the newly installed stone.
  • 33. Looking at the 100’ pressure distribution laterals within the new drainbed. Pipe about half way down is the observation port.
  • 34. Looking at the 100’ pressure distribution laterals within the new drainbed. Pipe about half way down is the observation port. The orifice shield are removed from the up-holes to testing of the system. There is a down-hole in between each of the up-holes.
  • 35. Looking at the 100’ pressure distribution laterals within the new drainbed. Pipe about half way down is the observation port. The orifice shield are removed from the up-holes to testing of the system. There is a down-hole in between each of the up-holes.
  • 36. Contractor waiting for the pump chamber to fill with water to test the system.
  • 37. Pump is activated and “squirt” test is performed.
  • 38. Health Department personnel verifying squirt test.
  • 39. Orifice shield place back over the up- holes.
  • 40. Contractor installing the fabric prior to covering the system.
  • 41. Contractor installed fabric prior to covering the system and placing final fill over the system
  • 42. Contractor placing final cover over system
  • 43. Contractor placing final cover over system
  • 44. Existing site behind the new mound. Pipe is the downspout from the roof that is directed away from the system.
  • 45. Contractor placing final cover over system
  • 46. Inside the new control panel
  • 50. What did we learn?  Pre-Construction meetings can answer a lot of questions.  The system can perform (squirt test) as the math and calculations show should occur.  Pump Systems are very flexible in design and configuration.  Multiple arrangement of float configurations are possible (2 floats, 3 floats, 4 floats).  Health Department is there to help and to make sure it will be a “good” system.
  • 52. Case Study: Alamo Township  1st One Permitted, 2nd One Built  Issue for Denial  Water Table within 24” of Ground Surface  Suitable Soils  Solution: Pressure Distribution Mound with Timed Dose
  • 53. Case Study: Alamo Township
  • 54. Case Study: Alamo Township
  • 55. Mound prior to seeding.
  • 56. Squirt test being performed. No one was present during construction, so the contractor had to dig and expose the first and last orifice to perform a squirt test.
  • 57. Squirt Test being performed.
  • 58. Rough grades around the tanks (septic tank and pump chamber). The open lid is the pump chamber.
  • 59. Looking inside the riser of the pump chamber.
  • 60. Some final site photos a few weeks after new system was installed.
  • 61. Some final site photos a few weeks after new system was installed.
  • 62. What did we learn?  Contractor – have a preconstruction meeting  Contractor – Follow what the KCHSD permitted for the system  Contractor – Follow what is specified (soils) per the codes and drawings  If Not – you will start over  It will cost the Contractor $$$
  • 63. THANK YOU. DO YOU HAVE QUESTIONS? Mike Schwartz, P.E. mschwartz@preinnewhof.com (269) 372-1158

Notas do Editor

  1. Thanks, etc. Today’s talk focuses on a couple of water issues currently playing out in Michigan. But first, I’d like to take you back to your seventh grade science class.