INTELLIGENT BUILDINGS
CASE STUDY: CISCO HEADQUARTERS, TORONTO, CANADA
CISCO Headquarters
• Location: RBC Waterpark Place, Toronto, Canada.
• CISCO headquarters is designed by HOK architects of 10,200Sq.m area
in 2015.
• A total of 900 people work inside the Headquarters.
• CISCO HQ is the first to achieve LEED EB Gold certification in a AAA
office tower in Canada.
Sustainability features:
• High performance building envelope and mechanical systems
• Water saving infrastructure, including a cistern and greywater re-use
• Daylight sensors and state-of-the-art lighting controls
• Bicycle storage, change rooms and showers
• A 7,500 square meter green roof
• A sophisticated energy measurement and verification system
Green Features:
• As it is a LEED Core and Shell Platinum building, CISCO HQ employs the
absolute highest standard in sustainable practices at every level.
• Heat reclaim on all ventilation units
reduces energy consumption and ensures consistent temperatures.
• Dedicated outdoor air system
with co2 sensors provides fresh air, similar to opening a window, improving air quality.
• Efficient lighting
with occupancy sensors and daylight harvesting throughout the complex meets LEED
core and shell platinum standards.
• Access to natural light creates a comfortable work environment through the
low height ceilings and core to glass and glazing to ceiling for maximum light penetration.
Sustainable Intelligence:
• CISCO HQ is the first to achieve LEED EB Gold certification in a
AAA office tower in Canada.
• 21.9% reduction in GHG emissions from. This is equivalent to the
emissions of 23,000 cars on the road for a year.
• 14.8% less water used from. This is equivalent to filling 225 olympic
sized swimming pools.
• 16.1% reduction in electricity from 2005 to 2010. This is equivalent to
powering 10,000 typical homes in Canada for a year
Space zoning:
• It is divided into three themed environments.
• The first is an industry experience and demonstration centre, where Cisco
can show how it addresses business problems in areas such as
manufacturing, health care and real estate.
• The second is a laboratory, a collaborative space where engineers and
start-up businesses can work together to solve customer problems.
• The third is a workroom environment, as a temporary display space where
Cisco can show the effects of transformation and digitization of a featured
industry, changing around once every quarter or so.
Internet of Everything
Smart Lighting
• Most Connected building in America.
• 1 million SF of commercial office.
• One Network for IP lighting, IP HVAC, metering, security, blinds
• Developer: Oxford Properties,
Building/integrators: EllisDon
• Central management through Cisco Integration Platform (CIP)
The user has the option to change the factors like temperature, lighting, adjusting the desk
height. The user can use his smart phone to control the operations by connecting to the
common network.
Smart Lighting
• The Philips connected lighting system at Waterpark Place integrates seamlessly
with Cisco’s Power-over-Ethernet (PoE) IT architecture.
• They merge with the building’s IT network and are uniquely identified by IP
address, allowing them to be individually monitored, managed, and controlled.
• Each light point sends and receives data, allowing managers to track occupancy
patterns, changes in temperature, and more while employees can personalise the
lighting in their workspaces.
• Overall, the system offers maximum visibility and better control, and allows Cisco
to reduce energy consumption in their office spaces.
Sophistication
• Heating, cooling and lighting will be controlled through the Ethernet rather than
traditional electrical cables; lights will provide advanced analytics such as
temperature, illumination and motion to help the building determine when lights
should be switched on or off.
• In addition, the lights will have their own Internet Protocol address, allowing a
user to turn them on or off with a computer or smartphone.
• Occupancy and weather data will also be fed directly to the air-conditioning
system, allowing the building itself to determine when it should ramp up or scale
back on heating and cooling.
The Headquarters is provided with more of Meeting spaces than that of Individual rooms. When a person enters the
office his phone gets all the details of rooms which are vacant and which are occupied when connected to network.
Smart meeting rooms adjust for the number of participants, with intelligent sensors monitoring and changing
the temperature, lighting and air as needed.
AWARDS
• CaGBC Toronto – Innovation Awards, Commercial Interiors
• ASID NYU/CE Design Competition – Commercial Category, First Place
• Core-Net Global Canadian Chapter – Remmy Award, Workplace Over
20,000 Square Feet
References
• www.hok.com/design/region/canada/cisco-systems
• http://www.cisco.com/c/m/enca/innovationcenter
• http://www.lighting.philips.com/main/cases/
• http://urbantoronto.ca/database/projects/rbc-waterpark-place
• Cisco IOT cases
THANK YOU

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Indira paryavaran bhawan
Indira paryavaran bhawanIndira paryavaran bhawan
Indira paryavaran bhawan
 
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
 
Case study- ATS Group housing
Case study- ATS Group housingCase study- ATS Group housing
Case study- ATS Group housing
 
Case study on group housing - Architectural design
Case study on group housing - Architectural designCase study on group housing - Architectural design
Case study on group housing - Architectural design
 
Mass Housing case study - Raheja Classique, Andheri
Mass Housing case study - Raheja Classique, AndheriMass Housing case study - Raheja Classique, Andheri
Mass Housing case study - Raheja Classique, Andheri
 
CIDCO HOUSING BELAPUR
CIDCO HOUSING BELAPURCIDCO HOUSING BELAPUR
CIDCO HOUSING BELAPUR
 
A Slum Redevelopment Project
A Slum Redevelopment ProjectA Slum Redevelopment Project
A Slum Redevelopment Project
 
5.1 Mixed use building
5.1 Mixed use building5.1 Mixed use building
5.1 Mixed use building
 
Low Cost Housing India
Low Cost Housing IndiaLow Cost Housing India
Low Cost Housing India
 
Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case study
 
A.d. 4.2 grp 81 (2)
A.d. 4.2 grp 81  (2)A.d. 4.2 grp 81  (2)
A.d. 4.2 grp 81 (2)
 
Amanora housing
Amanora housingAmanora housing
Amanora housing
 
ECBC Training_08-Compliance
ECBC Training_08-ComplianceECBC Training_08-Compliance
ECBC Training_08-Compliance
 
Sustainable Office Buildings
Sustainable Office BuildingsSustainable Office Buildings
Sustainable Office Buildings
 
ARANYA HOUSING CASE STUDY
ARANYA HOUSING CASE STUDYARANYA HOUSING CASE STUDY
ARANYA HOUSING CASE STUDY
 
Titan township by charles corea
Titan township by charles coreaTitan township by charles corea
Titan township by charles corea
 
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
 
Group Housing (Library Study)
Group Housing (Library Study)Group Housing (Library Study)
Group Housing (Library Study)
 
Mixed use building case study
Mixed use building case studyMixed use building case study
Mixed use building case study
 

Destaque

Tahun 4 pernafasan dan gerakbalas tumbuhan
Tahun 4   pernafasan dan gerakbalas tumbuhanTahun 4   pernafasan dan gerakbalas tumbuhan
Tahun 4 pernafasan dan gerakbalas tumbuhan
Badariah Ahmad
 
C1 cda approximate cost reference list for antihyperglycemic agents 2016
C1 cda  approximate cost reference list for antihyperglycemic agents 2016C1 cda  approximate cost reference list for antihyperglycemic agents 2016
C1 cda approximate cost reference list for antihyperglycemic agents 2016
Diabetes for all
 
Rm n° 627 2016-minedu norma técnica para el inicio del año 2017
Rm n° 627 2016-minedu  norma técnica para el inicio del año 2017Rm n° 627 2016-minedu  norma técnica para el inicio del año 2017
Rm n° 627 2016-minedu norma técnica para el inicio del año 2017
Alexis Barreto
 
(M)guía potenciando mi experiencia educativa de primera fase
(M)guía potenciando mi experiencia educativa de primera fase(M)guía potenciando mi experiencia educativa de primera fase
(M)guía potenciando mi experiencia educativa de primera fase
ana milena mamian anacona
 

Destaque (20)

Effects of ICT on Society
Effects of ICT on SocietyEffects of ICT on Society
Effects of ICT on Society
 
Guerrero pacifico
Guerrero pacificoGuerrero pacifico
Guerrero pacifico
 
CBS lecture at the opening of Data Science Campus of ONS
CBS lecture at the opening of Data Science Campus of ONSCBS lecture at the opening of Data Science Campus of ONS
CBS lecture at the opening of Data Science Campus of ONS
 
6asesionsecundariacte 170318114231
6asesionsecundariacte 1703181142316asesionsecundariacte 170318114231
6asesionsecundariacte 170318114231
 
Agência do Trabalho oferece 237 vagas nesta terça-feira (28)
Agência do Trabalho oferece 237 vagas nesta terça-feira (28)Agência do Trabalho oferece 237 vagas nesta terça-feira (28)
Agência do Trabalho oferece 237 vagas nesta terça-feira (28)
 
Tahun 4 pernafasan dan gerakbalas tumbuhan
Tahun 4   pernafasan dan gerakbalas tumbuhanTahun 4   pernafasan dan gerakbalas tumbuhan
Tahun 4 pernafasan dan gerakbalas tumbuhan
 
Sumatra earthquake - Tsunami
Sumatra earthquake - TsunamiSumatra earthquake - Tsunami
Sumatra earthquake - Tsunami
 
27 mar17
27 mar1727 mar17
27 mar17
 
The Creative Power of Groups
The Creative Power of GroupsThe Creative Power of Groups
The Creative Power of Groups
 
C1 cda approximate cost reference list for antihyperglycemic agents 2016
C1 cda  approximate cost reference list for antihyperglycemic agents 2016C1 cda  approximate cost reference list for antihyperglycemic agents 2016
C1 cda approximate cost reference list for antihyperglycemic agents 2016
 
презентація
презентаціяпрезентація
презентація
 
Q5 evaluation
Q5 evaluationQ5 evaluation
Q5 evaluation
 
Linea de tiempo Edad Comtemporanea
Linea de tiempo Edad ComtemporaneaLinea de tiempo Edad Comtemporanea
Linea de tiempo Edad Comtemporanea
 
Mandalas
MandalasMandalas
Mandalas
 
Fichas cine
Fichas cineFichas cine
Fichas cine
 
Rm n° 627 2016-minedu norma técnica para el inicio del año 2017
Rm n° 627 2016-minedu  norma técnica para el inicio del año 2017Rm n° 627 2016-minedu  norma técnica para el inicio del año 2017
Rm n° 627 2016-minedu norma técnica para el inicio del año 2017
 
Ebook daniela
Ebook danielaEbook daniela
Ebook daniela
 
(M)guía potenciando mi experiencia educativa de primera fase
(M)guía potenciando mi experiencia educativa de primera fase(M)guía potenciando mi experiencia educativa de primera fase
(M)guía potenciando mi experiencia educativa de primera fase
 
Presentacion espex educacion 2017
Presentacion espex educacion 2017Presentacion espex educacion 2017
Presentacion espex educacion 2017
 
Taller practico
Taller practicoTaller practico
Taller practico
 

Semelhante a Building automation - Cisco Headquarters

Practical IEC 61850 for Substation Automation for Engineers and Technicians
Practical IEC 61850 for Substation Automation for Engineers and TechniciansPractical IEC 61850 for Substation Automation for Engineers and Technicians
Practical IEC 61850 for Substation Automation for Engineers and Technicians
Living Online
 
Osquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECTOsquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECT
Anthony Osibajo
 
Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
Commercial Overview   DC Session 4   Introduction To Energy In The Data CentreCommercial Overview   DC Session 4   Introduction To Energy In The Data Centre
Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
paul_mathews
 

Semelhante a Building automation - Cisco Headquarters (20)

Cisco Connect Ottawa 2018 Cisco digital buildings and the 4th utility w co...
Cisco Connect Ottawa 2018  Cisco digital buildings and the 4th utility   w co...Cisco Connect Ottawa 2018  Cisco digital buildings and the 4th utility   w co...
Cisco Connect Ottawa 2018 Cisco digital buildings and the 4th utility w co...
 
eea desktop case study.pdf
eea desktop case study.pdfeea desktop case study.pdf
eea desktop case study.pdf
 
intelligentbuilding.pptx
intelligentbuilding.pptxintelligentbuilding.pptx
intelligentbuilding.pptx
 
How You Can Save Energy & Money with Building Performance Analysis
How You Can Save Energy & Money with Building Performance AnalysisHow You Can Save Energy & Money with Building Performance Analysis
How You Can Save Energy & Money with Building Performance Analysis
 
Retrofit, build, or go cloud/colo? Choosing your best direction
Retrofit, build, or go cloud/colo?  Choosing your best directionRetrofit, build, or go cloud/colo?  Choosing your best direction
Retrofit, build, or go cloud/colo? Choosing your best direction
 
Retrofit, build, or go cloud/colo? Choosing your best direction
Retrofit, build, or go cloud/colo?  Choosing your best directionRetrofit, build, or go cloud/colo?  Choosing your best direction
Retrofit, build, or go cloud/colo? Choosing your best direction
 
THE EDGE BUILDING PPT.pptx
THE EDGE BUILDING PPT.pptxTHE EDGE BUILDING PPT.pptx
THE EDGE BUILDING PPT.pptx
 
Lecture 1 2 of the course IFD402 at LPU(Building Design)
Lecture 1 2 of the course IFD402 at LPU(Building Design)Lecture 1 2 of the course IFD402 at LPU(Building Design)
Lecture 1 2 of the course IFD402 at LPU(Building Design)
 
Holistic Efficiency
Holistic EfficiencyHolistic Efficiency
Holistic Efficiency
 
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
 
2015 Turn Cycle Solutions Millyard Resentation
2015 Turn Cycle Solutions Millyard Resentation2015 Turn Cycle Solutions Millyard Resentation
2015 Turn Cycle Solutions Millyard Resentation
 
Practical IEC 61850 for Substation Automation for Engineers and Technicians
Practical IEC 61850 for Substation Automation for Engineers and TechniciansPractical IEC 61850 for Substation Automation for Engineers and Technicians
Practical IEC 61850 for Substation Automation for Engineers and Technicians
 
Osquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECTOsquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECT
 
Key areas to consider when evaluating a Data Centre
Key areas to consider when evaluating a Data CentreKey areas to consider when evaluating a Data Centre
Key areas to consider when evaluating a Data Centre
 
Modelling Natural Ventilation in IES-VE: Case studies & Research Outlook
Modelling Natural Ventilation in IES-VE: Case studies & Research OutlookModelling Natural Ventilation in IES-VE: Case studies & Research Outlook
Modelling Natural Ventilation in IES-VE: Case studies & Research Outlook
 
Modelling Natural Ventilation in IES-VE: Case studies & Research Outlook
Modelling Natural Ventilation in IES-VE: Case studies & Research OutlookModelling Natural Ventilation in IES-VE: Case studies & Research Outlook
Modelling Natural Ventilation in IES-VE: Case studies & Research Outlook
 
TechWiseTV Workshop: Cisco Digital Ceiling
TechWiseTV Workshop: Cisco Digital CeilingTechWiseTV Workshop: Cisco Digital Ceiling
TechWiseTV Workshop: Cisco Digital Ceiling
 
Steve hammond nrel
Steve hammond nrelSteve hammond nrel
Steve hammond nrel
 
IoT solutions for buildings by Schneider Electric
IoT solutions for buildings by Schneider ElectricIoT solutions for buildings by Schneider Electric
IoT solutions for buildings by Schneider Electric
 
Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
Commercial Overview   DC Session 4   Introduction To Energy In The Data CentreCommercial Overview   DC Session 4   Introduction To Energy In The Data Centre
Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
 

Mais de Prashanth Dommeti (7)

Building Energy Management Systems
Building Energy Management SystemsBuilding Energy Management Systems
Building Energy Management Systems
 
Housing finance in India
Housing finance in IndiaHousing finance in India
Housing finance in India
 
Air Condtioning Systems HVAC
Air Condtioning Systems HVACAir Condtioning Systems HVAC
Air Condtioning Systems HVAC
 
Auditorium
AuditoriumAuditorium
Auditorium
 
Warm humid climate
Warm humid climate Warm humid climate
Warm humid climate
 
Adobe construction
Adobe constructionAdobe construction
Adobe construction
 
Hafeez contractor
Hafeez contractorHafeez contractor
Hafeez contractor
 

Último

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 

Building automation - Cisco Headquarters

  • 1. INTELLIGENT BUILDINGS CASE STUDY: CISCO HEADQUARTERS, TORONTO, CANADA
  • 2.
  • 3. CISCO Headquarters • Location: RBC Waterpark Place, Toronto, Canada. • CISCO headquarters is designed by HOK architects of 10,200Sq.m area in 2015. • A total of 900 people work inside the Headquarters. • CISCO HQ is the first to achieve LEED EB Gold certification in a AAA office tower in Canada.
  • 4. Sustainability features: • High performance building envelope and mechanical systems • Water saving infrastructure, including a cistern and greywater re-use • Daylight sensors and state-of-the-art lighting controls • Bicycle storage, change rooms and showers • A 7,500 square meter green roof • A sophisticated energy measurement and verification system
  • 5. Green Features: • As it is a LEED Core and Shell Platinum building, CISCO HQ employs the absolute highest standard in sustainable practices at every level. • Heat reclaim on all ventilation units reduces energy consumption and ensures consistent temperatures. • Dedicated outdoor air system with co2 sensors provides fresh air, similar to opening a window, improving air quality. • Efficient lighting with occupancy sensors and daylight harvesting throughout the complex meets LEED core and shell platinum standards. • Access to natural light creates a comfortable work environment through the low height ceilings and core to glass and glazing to ceiling for maximum light penetration.
  • 6. Sustainable Intelligence: • CISCO HQ is the first to achieve LEED EB Gold certification in a AAA office tower in Canada. • 21.9% reduction in GHG emissions from. This is equivalent to the emissions of 23,000 cars on the road for a year. • 14.8% less water used from. This is equivalent to filling 225 olympic sized swimming pools. • 16.1% reduction in electricity from 2005 to 2010. This is equivalent to powering 10,000 typical homes in Canada for a year
  • 7. Space zoning: • It is divided into three themed environments. • The first is an industry experience and demonstration centre, where Cisco can show how it addresses business problems in areas such as manufacturing, health care and real estate. • The second is a laboratory, a collaborative space where engineers and start-up businesses can work together to solve customer problems. • The third is a workroom environment, as a temporary display space where Cisco can show the effects of transformation and digitization of a featured industry, changing around once every quarter or so.
  • 9. Smart Lighting • Most Connected building in America. • 1 million SF of commercial office. • One Network for IP lighting, IP HVAC, metering, security, blinds • Developer: Oxford Properties, Building/integrators: EllisDon • Central management through Cisco Integration Platform (CIP)
  • 10. The user has the option to change the factors like temperature, lighting, adjusting the desk height. The user can use his smart phone to control the operations by connecting to the common network.
  • 11. Smart Lighting • The Philips connected lighting system at Waterpark Place integrates seamlessly with Cisco’s Power-over-Ethernet (PoE) IT architecture. • They merge with the building’s IT network and are uniquely identified by IP address, allowing them to be individually monitored, managed, and controlled. • Each light point sends and receives data, allowing managers to track occupancy patterns, changes in temperature, and more while employees can personalise the lighting in their workspaces. • Overall, the system offers maximum visibility and better control, and allows Cisco to reduce energy consumption in their office spaces.
  • 12. Sophistication • Heating, cooling and lighting will be controlled through the Ethernet rather than traditional electrical cables; lights will provide advanced analytics such as temperature, illumination and motion to help the building determine when lights should be switched on or off. • In addition, the lights will have their own Internet Protocol address, allowing a user to turn them on or off with a computer or smartphone. • Occupancy and weather data will also be fed directly to the air-conditioning system, allowing the building itself to determine when it should ramp up or scale back on heating and cooling.
  • 13.
  • 14. The Headquarters is provided with more of Meeting spaces than that of Individual rooms. When a person enters the office his phone gets all the details of rooms which are vacant and which are occupied when connected to network.
  • 15. Smart meeting rooms adjust for the number of participants, with intelligent sensors monitoring and changing the temperature, lighting and air as needed.
  • 16. AWARDS • CaGBC Toronto – Innovation Awards, Commercial Interiors • ASID NYU/CE Design Competition – Commercial Category, First Place • Core-Net Global Canadian Chapter – Remmy Award, Workplace Over 20,000 Square Feet
  • 17. References • www.hok.com/design/region/canada/cisco-systems • http://www.cisco.com/c/m/enca/innovationcenter • http://www.lighting.philips.com/main/cases/ • http://urbantoronto.ca/database/projects/rbc-waterpark-place • Cisco IOT cases