LEGO Group –
An Outsourcing Journey
Presented by:
Achintya
Arun
Avishek
Manish
Pankaj
Prashant
Agenda
Contents

1
2
3
4
5
6
7
8

Company Profile
Product Profile
What went Wrong
Reasons
Solution: Outsourcing
Problems with Flextronics
Lessons to be Learnt
LEGO’s Success Criteria
Company Profile
Billund
• LEGO group was formed by a carpenter
Ole Kirk Christiansen in 1932
Billund, Denmark.
• Word LEGO is derived from Danish phrase
“leg godt” meaning “Play well”.
• LEGO was initially producing wooden
bricks.
• Motto “ Only the best is the best”
• Lego Brick was produced in 1958
• Bricks made up of interlocking tubes
offered unlimited building opportunities.
• Purpose was to stimulate creative and
structured problem
solving, curiosity, imagination.
• Awarded “Toy of the century” by Forbes
Magazine as well as British association of
toy retailers.

Denmark
Product Profile
•LEGO was sold in more than 130 countries.
•Major products and market is shown below
No

Segmentation

Products

1

Pre school
products

LEGO DUPLO

2

Creative Building

LEGO bricks without
building
instructions

3

Play Themes

LEGO city line,
BIONICLE

4

Licensed Products

Built up around
movies or books

5

Mindstormnext

Programmable
robot kit

6

LEGO Education
Board game
category

US, Australia, UK, NZ

> Than 30%

Central & Southern Europe

27%

Scandinavia, Benelux, Eastern
Europe & Asia

26.5%

Educational purpose

7

Region

Revenue
Contribution

LEGO games
(Source: Case Handout)
What went wrong?
• In 2004, a major internal crisis drew LEGO near
bankruptcy
• Accumulated a net loss of DKK 888 mn and DKK 1.8 bn in
2003 & 2004 respectively.
• The Lego Group had lost money four out of the seven years
from 1998 through 2004
• It was losing DKK 2.2 mn per day during these years.
• The sales had dropped by more than 30% and 40% in 2003
& 2004 respectively
• The manufacturing cost, inventory cost were too high and
was difficult to control
Reasons

• New products were delivering
less profit and were more
complex
• The company designers were
not factoring in the price of
materials or the costs of
production
• Two-thirds of the company’s
1,500-plus SKUs were items that
it no longer manufactured

• Lego Group had an astonishing
11,000 suppliers
• Company lacked procurement
compliance procedures
• The inventory were being underutilized and finally led to the
wastage of the materials

• Had more than 10 variants of
each of the product
• Every product variant
required different molding
equipments
• Diversification into apparel
and theme parks

Product

Sourcing

Diversification
Reasons
• Capacity utilization was just 70 percent
• Production teams operated as hundreds
of independent toy shops
• Orders were placed and changed
haphazardly preventing operations from
working together
• Operators routinely responded to lastminute demands, readily implementing
costly changeovers
• Production sites were located in high-cost
countries

• Absence of clearly defined service
policies
• Multiple-tier inventory system with local
centres
• Non-availability of the right product in
the right distribution centre
• Supply chain was geared up for custom
deliver to even the smaller retailers

Manufacturing

Distributions
Solution
Outsourcing
•In business, outsourcing is the contracting out of a business process to
a third-party.
•Outsourcing includes both foreign and domestic contracting, and
sometimes includes off-shoring or relocating a business function to
another country.

Advantages of Outsourcing
•It helps focus on core activities during rapid growth periods.
•Cost and efficiency savings.
•Reduced Overhead
•Operational Control
•Continuity & Risk Management
Production Centres

Production Value Chain Model
Development
Function
Development of
Molding Machines
Molding

Pre-pack

DUPLO and Technic products

Denmark

LEGO System Products

US

Cost –
intensive
parts

Product

Switzerland

Assembling

Country

For catering to US demand

Chinese
manufacturers

5-10% of production
outsourcing

Post-pack

Distribution Centres
(Source: Case Handout)

(Source: Case Handout)
Supply chain
Problem
•The increasing variety of colors and shapes LEGO elements was a threat.
•Challenges to ensure that right components are constantly in the stock.
•Inventory piling due to forecast errors and seasonal demand fluctuations.
•High number of components required heavy investment in molds.
Solution
•Limit the growth in number of product components
•Outsourced production capacities to Czech Republic & Hungary
•The US production capacity was shifted to Mexico.
•Outsourced the production capacity to subcontractors like
Sonoco, Greiner , Weldenhammer, 2B Pack and Flextronics.
Distribution Channels
Problem
•Flexibility towards all retailers made it impossible to manage supply chain
•Decentralized distribution centre pressurized the supply chain more
Solution
•Lego decided to focus on the large retailers to sell its products.
•The 55 European DC facilities were centralised in Jirny, Czech Republic
and the operation was outsourced to DHL, which controlled the whole
world (except NA).
•The 55 logistics carriers were trimmed to 11 carriers.
•The NA DC facilities were centralised at Alliance, Texas and the
operation was outsourced.
•Reduced supply chain complexity by centralizing DC
•Helped in ease of analysis of demand for its product
Traditional Vs Centralised DC

Source: supplychaionquarterly.com
Challenges with the Flextronics Relationship
• Effective coordination and control of various production facilities
became too complex for Lego
• Since the outsourcing was done at a very rapid pace, the transfer of
production knowledge could not be reliably transferred
• Ensuring that manufacturer's business model matches with client's
operation schedule and demand needs
 LEGO needed flexible and responsive production to handle seasonal fluctuations
and demand uncertainties
 Flextronics method designed to optimize economies of scale through
predictable, uniform production schedule
 LEGO did not recognize the "uniqueness" of their products and needs in relation
to Flextronics' expertise in standardization
Lessons to be Learnt
 Three main conditions toy industry faces are:
1. Seasonal Imbalances (Capacity Management)
2. Introduction of new products(inventory Management)
3. Cost-cutting pressures
 Outsourcing isn’t always the best solution for cutting costs and reducing
complexity; it might even complicate matters instead of simplifying them.
 It forces organization to rely on not only outsourcing but also off shoring. Both
the things are complementary to each other.
 Outsourcing must be a strategic decision. It should not be short term cost
reduction strategy.
 Long-term strategy should not lock the organization with supplier.
 With no prior large-scale outsourcing experience, decision to embark on such
an extensive project wasn't practical.
 More research needed to ensure both firms' operation models could properly
align to accomplish goals.
 Understanding one’s own processes and structures is the key for optimizing in order
to manage the constant change of market demands and attain competitive
advantage.
 Major standardization needed in all aspects of the Lego company and products
 Documentation of work processes and other areas is paramount to establishing an
optimal and effective supply chain network and fostering outsourcing collaboration
 “We have learned that we are more special than we expected to be”.
This quote of Lego vice president Niels Duedahl points to the fact that Lego was
expecting a contractor (Flextronics) to know more about its operational activities
and processes than Lego itself.
 Ex:
MATTEL (Top toy manufacturer)
1

Global Manufacturing Principle

2

Outsourcing to China

3

Strategic Acquisition

4

Innovation
LEGO’s Success Criteria

Written Documentation
• Documentation of all supply
chain processes
• Consistent through entire
company
• Provides clear
communication lines
Integration of Work
Processes
• S&OP - sales and operation
planning
• Integrates and coordinates
all the production facilities
roles and responsibilities.

Standardization
• Three Levels
• Upper Level - Way of
thinking, values, attitudes
• Middle Level - Planning
processes, Follow up
processes
• Lower Level -Hardware and
factory layout Adaptability?
• ERP would help to
standardize and speed up
manufacturing processes.
• ERP helps to reduce
inventory and duplicate
information - the partners
will be able to consolidate
data.

Build Competencies
• Develop a plan for training
and education.
• Have Local leader that know
working culture of country.
• Ensure measurable statistics
present for benchmark/KPI
Current Supply Chain
Production Site

Hungary

Mexico

Denmark

Czech
Republic

Sub Contractors

Mexico

China
Europe

Processes through Supply Chain
Granulate

Molding

Pre-pack

Post-pack

DC

Customer
References
•
•
•
•
•

http://www.strategy-business.com/article/07306?pg=all
http://www.slideshare.net/9oodness/lego-outsourcing
https://www.lego.com
http://www.authorstream.com
http://www.supplychaionquarterly.com
Thank You

Mais conteúdo relacionado

Mais procurados

Seven- Eleven Japan Co. Case Analysis
Seven- Eleven Japan Co. Case AnalysisSeven- Eleven Japan Co. Case Analysis
Seven- Eleven Japan Co. Case Analysis
Geeta Hansdah
 
Lego: Strategy Analysis & Business Model
Lego: Strategy Analysis & Business ModelLego: Strategy Analysis & Business Model
Lego: Strategy Analysis & Business Model
Evgenii Gvozdev
 
Operations strategy at galanz
Operations strategy at galanzOperations strategy at galanz
Operations strategy at galanz
Gaurav Bisht
 

Mais procurados (20)

Li & fung
Li & fungLi & fung
Li & fung
 
P&G supply chain
P&G supply chainP&G supply chain
P&G supply chain
 
Scm presentation L'oreal
Scm presentation  L'orealScm presentation  L'oreal
Scm presentation L'oreal
 
Walmart scm
Walmart scmWalmart scm
Walmart scm
 
Porters five forces model on fmcg
Porters five forces model on fmcgPorters five forces model on fmcg
Porters five forces model on fmcg
 
Tanishq - Positioning to capture Indian woman’s heart - Marketing Management...
Tanishq - Positioning to capture Indian woman’s heart - Marketing Management...Tanishq - Positioning to capture Indian woman’s heart - Marketing Management...
Tanishq - Positioning to capture Indian woman’s heart - Marketing Management...
 
wal mart case study
wal mart case study wal mart case study
wal mart case study
 
HP Supply Chain
HP Supply ChainHP Supply Chain
HP Supply Chain
 
IKEA
IKEAIKEA
IKEA
 
Seven- Eleven Japan Co. Case Analysis
Seven- Eleven Japan Co. Case AnalysisSeven- Eleven Japan Co. Case Analysis
Seven- Eleven Japan Co. Case Analysis
 
FMCG industry
FMCG industryFMCG industry
FMCG industry
 
Lego: Strategy Analysis & Business Model
Lego: Strategy Analysis & Business ModelLego: Strategy Analysis & Business Model
Lego: Strategy Analysis & Business Model
 
Barilla Spa: A case on Supply Chain Integration
Barilla Spa: A case on Supply Chain IntegrationBarilla Spa: A case on Supply Chain Integration
Barilla Spa: A case on Supply Chain Integration
 
House of Tata: Acquiring a Global Footprint
House of Tata: Acquiring a Global FootprintHouse of Tata: Acquiring a Global Footprint
House of Tata: Acquiring a Global Footprint
 
Operations strategy at galanz
Operations strategy at galanzOperations strategy at galanz
Operations strategy at galanz
 
IKEA Supply Chain Mangament
IKEA Supply Chain MangamentIKEA Supply Chain Mangament
IKEA Supply Chain Mangament
 
Presentation on flipkart distribution channel, prepared by BAHARUL ISLAM
Presentation on flipkart distribution channel, prepared by BAHARUL ISLAMPresentation on flipkart distribution channel, prepared by BAHARUL ISLAM
Presentation on flipkart distribution channel, prepared by BAHARUL ISLAM
 
Tektronix : Global ERP Implementation
Tektronix : Global ERP Implementation Tektronix : Global ERP Implementation
Tektronix : Global ERP Implementation
 
IKEA Business Model - Success Factors
IKEA Business Model - Success FactorsIKEA Business Model - Success Factors
IKEA Business Model - Success Factors
 
Value chain nestle analysis
Value chain nestle analysisValue chain nestle analysis
Value chain nestle analysis
 

Semelhante a Lego Outsourcing

Keeping the spin - from idea to cash in 6 weeks (ICGSE2011)
Keeping the spin - from idea to cash in 6 weeks (ICGSE2011)Keeping the spin - from idea to cash in 6 weeks (ICGSE2011)
Keeping the spin - from idea to cash in 6 weeks (ICGSE2011)
Marcin Kokott
 
Procurement chain management
Procurement chain managementProcurement chain management
Procurement chain management
cynasore
 
Dometic Group
Dometic GroupDometic Group
Dometic Group
kevinp720
 

Semelhante a Lego Outsourcing (20)

Lego case
Lego caseLego case
Lego case
 
The Evolution of Lean
The Evolution of LeanThe Evolution of Lean
The Evolution of Lean
 
SCM Outsourcing
SCM OutsourcingSCM Outsourcing
SCM Outsourcing
 
Keeping the spin - from idea to cash in 6 weeks (ICGSE2011)
Keeping the spin - from idea to cash in 6 weeks (ICGSE2011)Keeping the spin - from idea to cash in 6 weeks (ICGSE2011)
Keeping the spin - from idea to cash in 6 weeks (ICGSE2011)
 
Four Laws of Tech Product Economics - Rich Mironov
Four Laws of Tech Product Economics - Rich MironovFour Laws of Tech Product Economics - Rich Mironov
Four Laws of Tech Product Economics - Rich Mironov
 
Poster Samples Mix Tape.pdf
Poster Samples Mix Tape.pdfPoster Samples Mix Tape.pdf
Poster Samples Mix Tape.pdf
 
Product is Hard - Marty Cagan
Product is Hard - Marty CaganProduct is Hard - Marty Cagan
Product is Hard - Marty Cagan
 
sprint
sprintsprint
sprint
 
Procurement chain management
Procurement chain managementProcurement chain management
Procurement chain management
 
Oracle value chain summit 14
Oracle value chain summit 14Oracle value chain summit 14
Oracle value chain summit 14
 
Inclusive innovation - Patrick Dalle, Minds & More
Inclusive innovation - Patrick Dalle, Minds & MoreInclusive innovation - Patrick Dalle, Minds & More
Inclusive innovation - Patrick Dalle, Minds & More
 
Capgemini Flexplm Case Studies
Capgemini Flexplm Case StudiesCapgemini Flexplm Case Studies
Capgemini Flexplm Case Studies
 
agilemanufacturing.ppt
agilemanufacturing.pptagilemanufacturing.ppt
agilemanufacturing.ppt
 
Lego company
Lego companyLego company
Lego company
 
Cb3 Lego Case Study-Raye Danny Abdu Riki
Cb3  Lego Case Study-Raye  Danny Abdu RikiCb3  Lego Case Study-Raye  Danny Abdu Riki
Cb3 Lego Case Study-Raye Danny Abdu Riki
 
Agile manufacturing
Agile manufacturingAgile manufacturing
Agile manufacturing
 
Dometic Group
Dometic GroupDometic Group
Dometic Group
 
DITA and the Integrated Product Lifecycle
DITA and the Integrated Product LifecycleDITA and the Integrated Product Lifecycle
DITA and the Integrated Product Lifecycle
 
DELL supply chain management
DELL supply chain management DELL supply chain management
DELL supply chain management
 
Business Plan (UniShelf) Presentation
Business Plan (UniShelf) PresentationBusiness Plan (UniShelf) Presentation
Business Plan (UniShelf) Presentation
 

Mais de Prasant Patro

Google-Work Culture and Innovation
Google-Work Culture and InnovationGoogle-Work Culture and Innovation
Google-Work Culture and Innovation
Prasant Patro
 
Tata Indica-Product Analysis
Tata Indica-Product AnalysisTata Indica-Product Analysis
Tata Indica-Product Analysis
Prasant Patro
 
Toyota Industrial Relation
Toyota Industrial RelationToyota Industrial Relation
Toyota Industrial Relation
Prasant Patro
 
Inner line allowance
Inner line allowanceInner line allowance
Inner line allowance
Prasant Patro
 
Pillsbury-Perception Map
Pillsbury-Perception MapPillsbury-Perception Map
Pillsbury-Perception Map
Prasant Patro
 
Parry Ad Concept Testing
Parry Ad Concept TestingParry Ad Concept Testing
Parry Ad Concept Testing
Prasant Patro
 
Investing in Nigeria
Investing in NigeriaInvesting in Nigeria
Investing in Nigeria
Prasant Patro
 
McDonalds - International Business
McDonalds - International BusinessMcDonalds - International Business
McDonalds - International Business
Prasant Patro
 
Innovative HRM Practices at IKEA
Innovative HRM Practices at IKEAInnovative HRM Practices at IKEA
Innovative HRM Practices at IKEA
Prasant Patro
 
Real Estate in India
Real Estate in IndiaReal Estate in India
Real Estate in India
Prasant Patro
 
Operartions research in US Healthcare Industry
Operartions research in US Healthcare IndustryOperartions research in US Healthcare Industry
Operartions research in US Healthcare Industry
Prasant Patro
 
Economy of Oil Price
Economy of Oil PriceEconomy of Oil Price
Economy of Oil Price
Prasant Patro
 
Cost Accounting at 3M
Cost Accounting at 3MCost Accounting at 3M
Cost Accounting at 3M
Prasant Patro
 

Mais de Prasant Patro (20)

Google-Work Culture and Innovation
Google-Work Culture and InnovationGoogle-Work Culture and Innovation
Google-Work Culture and Innovation
 
Tata Indica-Product Analysis
Tata Indica-Product AnalysisTata Indica-Product Analysis
Tata Indica-Product Analysis
 
Toyota Industrial Relation
Toyota Industrial RelationToyota Industrial Relation
Toyota Industrial Relation
 
Inner line allowance
Inner line allowanceInner line allowance
Inner line allowance
 
Pillsbury-Perception Map
Pillsbury-Perception MapPillsbury-Perception Map
Pillsbury-Perception Map
 
Banking in India
Banking in IndiaBanking in India
Banking in India
 
HP Way
HP WayHP Way
HP Way
 
Parry Ad Concept Testing
Parry Ad Concept TestingParry Ad Concept Testing
Parry Ad Concept Testing
 
Investing in Nigeria
Investing in NigeriaInvesting in Nigeria
Investing in Nigeria
 
Corporate Nigeria
Corporate NigeriaCorporate Nigeria
Corporate Nigeria
 
McDonalds - International Business
McDonalds - International BusinessMcDonalds - International Business
McDonalds - International Business
 
Innovative HRM Practices at IKEA
Innovative HRM Practices at IKEAInnovative HRM Practices at IKEA
Innovative HRM Practices at IKEA
 
DLF-Building India
DLF-Building IndiaDLF-Building India
DLF-Building India
 
Real Estate in India
Real Estate in IndiaReal Estate in India
Real Estate in India
 
Operartions research in US Healthcare Industry
Operartions research in US Healthcare IndustryOperartions research in US Healthcare Industry
Operartions research in US Healthcare Industry
 
Aqualisa
AqualisaAqualisa
Aqualisa
 
Economy of Oil Price
Economy of Oil PriceEconomy of Oil Price
Economy of Oil Price
 
Ikea_White Paper
Ikea_White PaperIkea_White Paper
Ikea_White Paper
 
Cost Accounting at 3M
Cost Accounting at 3MCost Accounting at 3M
Cost Accounting at 3M
 
Satyam Scam
Satyam ScamSatyam Scam
Satyam Scam
 

Último

Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 

Último (20)

Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
KALYANI 💋 Call Girl 9827461493 Call Girls in Escort service book now
KALYANI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowKALYANI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
KALYANI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
KOTA 💋 Call Girl 9827461493 Call Girls in Escort service book now
KOTA 💋 Call Girl 9827461493 Call Girls in  Escort service book nowKOTA 💋 Call Girl 9827461493 Call Girls in  Escort service book now
KOTA 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableCuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 

Lego Outsourcing

  • 1. LEGO Group – An Outsourcing Journey Presented by: Achintya Arun Avishek Manish Pankaj Prashant
  • 2. Agenda Contents 1 2 3 4 5 6 7 8 Company Profile Product Profile What went Wrong Reasons Solution: Outsourcing Problems with Flextronics Lessons to be Learnt LEGO’s Success Criteria
  • 3. Company Profile Billund • LEGO group was formed by a carpenter Ole Kirk Christiansen in 1932 Billund, Denmark. • Word LEGO is derived from Danish phrase “leg godt” meaning “Play well”. • LEGO was initially producing wooden bricks. • Motto “ Only the best is the best” • Lego Brick was produced in 1958 • Bricks made up of interlocking tubes offered unlimited building opportunities. • Purpose was to stimulate creative and structured problem solving, curiosity, imagination. • Awarded “Toy of the century” by Forbes Magazine as well as British association of toy retailers. Denmark
  • 4. Product Profile •LEGO was sold in more than 130 countries. •Major products and market is shown below No Segmentation Products 1 Pre school products LEGO DUPLO 2 Creative Building LEGO bricks without building instructions 3 Play Themes LEGO city line, BIONICLE 4 Licensed Products Built up around movies or books 5 Mindstormnext Programmable robot kit 6 LEGO Education Board game category US, Australia, UK, NZ > Than 30% Central & Southern Europe 27% Scandinavia, Benelux, Eastern Europe & Asia 26.5% Educational purpose 7 Region Revenue Contribution LEGO games (Source: Case Handout)
  • 5.
  • 6. What went wrong? • In 2004, a major internal crisis drew LEGO near bankruptcy • Accumulated a net loss of DKK 888 mn and DKK 1.8 bn in 2003 & 2004 respectively. • The Lego Group had lost money four out of the seven years from 1998 through 2004 • It was losing DKK 2.2 mn per day during these years. • The sales had dropped by more than 30% and 40% in 2003 & 2004 respectively • The manufacturing cost, inventory cost were too high and was difficult to control
  • 7. Reasons • New products were delivering less profit and were more complex • The company designers were not factoring in the price of materials or the costs of production • Two-thirds of the company’s 1,500-plus SKUs were items that it no longer manufactured • Lego Group had an astonishing 11,000 suppliers • Company lacked procurement compliance procedures • The inventory were being underutilized and finally led to the wastage of the materials • Had more than 10 variants of each of the product • Every product variant required different molding equipments • Diversification into apparel and theme parks Product Sourcing Diversification
  • 8. Reasons • Capacity utilization was just 70 percent • Production teams operated as hundreds of independent toy shops • Orders were placed and changed haphazardly preventing operations from working together • Operators routinely responded to lastminute demands, readily implementing costly changeovers • Production sites were located in high-cost countries • Absence of clearly defined service policies • Multiple-tier inventory system with local centres • Non-availability of the right product in the right distribution centre • Supply chain was geared up for custom deliver to even the smaller retailers Manufacturing Distributions
  • 9. Solution Outsourcing •In business, outsourcing is the contracting out of a business process to a third-party. •Outsourcing includes both foreign and domestic contracting, and sometimes includes off-shoring or relocating a business function to another country. Advantages of Outsourcing •It helps focus on core activities during rapid growth periods. •Cost and efficiency savings. •Reduced Overhead •Operational Control •Continuity & Risk Management
  • 10. Production Centres Production Value Chain Model Development Function Development of Molding Machines Molding Pre-pack DUPLO and Technic products Denmark LEGO System Products US Cost – intensive parts Product Switzerland Assembling Country For catering to US demand Chinese manufacturers 5-10% of production outsourcing Post-pack Distribution Centres (Source: Case Handout) (Source: Case Handout)
  • 11. Supply chain Problem •The increasing variety of colors and shapes LEGO elements was a threat. •Challenges to ensure that right components are constantly in the stock. •Inventory piling due to forecast errors and seasonal demand fluctuations. •High number of components required heavy investment in molds. Solution •Limit the growth in number of product components •Outsourced production capacities to Czech Republic & Hungary •The US production capacity was shifted to Mexico. •Outsourced the production capacity to subcontractors like Sonoco, Greiner , Weldenhammer, 2B Pack and Flextronics.
  • 12. Distribution Channels Problem •Flexibility towards all retailers made it impossible to manage supply chain •Decentralized distribution centre pressurized the supply chain more Solution •Lego decided to focus on the large retailers to sell its products. •The 55 European DC facilities were centralised in Jirny, Czech Republic and the operation was outsourced to DHL, which controlled the whole world (except NA). •The 55 logistics carriers were trimmed to 11 carriers. •The NA DC facilities were centralised at Alliance, Texas and the operation was outsourced. •Reduced supply chain complexity by centralizing DC •Helped in ease of analysis of demand for its product
  • 13. Traditional Vs Centralised DC Source: supplychaionquarterly.com
  • 14. Challenges with the Flextronics Relationship • Effective coordination and control of various production facilities became too complex for Lego • Since the outsourcing was done at a very rapid pace, the transfer of production knowledge could not be reliably transferred • Ensuring that manufacturer's business model matches with client's operation schedule and demand needs  LEGO needed flexible and responsive production to handle seasonal fluctuations and demand uncertainties  Flextronics method designed to optimize economies of scale through predictable, uniform production schedule  LEGO did not recognize the "uniqueness" of their products and needs in relation to Flextronics' expertise in standardization
  • 15.
  • 16. Lessons to be Learnt  Three main conditions toy industry faces are: 1. Seasonal Imbalances (Capacity Management) 2. Introduction of new products(inventory Management) 3. Cost-cutting pressures  Outsourcing isn’t always the best solution for cutting costs and reducing complexity; it might even complicate matters instead of simplifying them.  It forces organization to rely on not only outsourcing but also off shoring. Both the things are complementary to each other.  Outsourcing must be a strategic decision. It should not be short term cost reduction strategy.  Long-term strategy should not lock the organization with supplier.  With no prior large-scale outsourcing experience, decision to embark on such an extensive project wasn't practical.  More research needed to ensure both firms' operation models could properly align to accomplish goals.
  • 17.  Understanding one’s own processes and structures is the key for optimizing in order to manage the constant change of market demands and attain competitive advantage.  Major standardization needed in all aspects of the Lego company and products  Documentation of work processes and other areas is paramount to establishing an optimal and effective supply chain network and fostering outsourcing collaboration  “We have learned that we are more special than we expected to be”. This quote of Lego vice president Niels Duedahl points to the fact that Lego was expecting a contractor (Flextronics) to know more about its operational activities and processes than Lego itself.  Ex: MATTEL (Top toy manufacturer) 1 Global Manufacturing Principle 2 Outsourcing to China 3 Strategic Acquisition 4 Innovation
  • 18. LEGO’s Success Criteria Written Documentation • Documentation of all supply chain processes • Consistent through entire company • Provides clear communication lines Integration of Work Processes • S&OP - sales and operation planning • Integrates and coordinates all the production facilities roles and responsibilities. Standardization • Three Levels • Upper Level - Way of thinking, values, attitudes • Middle Level - Planning processes, Follow up processes • Lower Level -Hardware and factory layout Adaptability? • ERP would help to standardize and speed up manufacturing processes. • ERP helps to reduce inventory and duplicate information - the partners will be able to consolidate data. Build Competencies • Develop a plan for training and education. • Have Local leader that know working culture of country. • Ensure measurable statistics present for benchmark/KPI
  • 19. Current Supply Chain Production Site Hungary Mexico Denmark Czech Republic Sub Contractors Mexico China Europe Processes through Supply Chain Granulate Molding Pre-pack Post-pack DC Customer