International Conference on Earthquake Engineering and Seismology
(ICEES 2011), NUST, Islamabad, Pakistan
April 25-26, 2011
EARTHQUAKE RESISTANT CONFINED MASNORY STRUCTURE
WITH CONCRETE BEAMS AND COLUMNS
(Zulqarnain Ali Sabir. 1*
, Aftab Alam.2
, Rao Arsalan Khushnood3
, Sajjad Ahmad4
)
1*
Civil Engineer, Earthquake Reconstruction Rehabilitation Authority Zonal Field Office Muzaffarabad, Azad
Jammu and Kashmir.
(zulqarnainalisabir@yahoo.com)
2
Senior Engineer NESPAK (ER Division) Muzaffarabad, Azad Jammu and Kashmir.
(Aftab_229@yahoo.com)
3
Military College of Engineering (MCE) Risalpur, NUST, Sector H-12 Islamabad, Pakistan
4
NUST Institute of Civil Engineering (NICE), School of Civil and Environmental Engineering(SCEE)
NUST, Sector H-12 Islamabad, Pakistan
Abstract
The article is focused on confined masonry structures. A number of unreinforced masonry
buildings collapsed, several multistorey buildings in confined masonry damaged slightly in the
past earthquake in Pakistan. Based on the results of additional model experiments, the confined
masonry and concentrated reinforced masonry structures have been widely applied to the low-
rise and medium-rise buildings respectively in the seismic-zone. For the low-rise buildings the
reinforced concrete ring beams are placed at each floor and the post-cast tie columns are placed
at each intersection of interior and exterior masonry walls. For the medium –rise building in
additions to the ring beams and tie columns ,the post-cast reinforced concrete intermediate
columns and horizontal belts are placed in all the masonry walls at spacing of 2~3m and 1~1.5m
respectively. Model Experiments and engineering practices show that masonry structures have a
good strength, deformability, seismic reliability and can be applied to the multistorey buildings
up to 10 stories in the seismic zone.
Keywords: Confined Masonry; Ring Band; Tie Beams; Tie Columns
1. Introduction
Pakistan divided into four seismic zones .Confined masonry structures are best suitable for
seismic resistance and from economical point of view in these areas. In these seismic zones a lot
of unreinforced masonry buildings were damaged in past earth quakes. Therefore it is
important to take countermeasures to improve the horizontal load bearing capacity and a
seismic reliability of masonry buildings. To strengthen the masonry structures it is essential to
provide tie-columns and tie-beams .Confined masonry structure resist both vertical and lateral
loads .The tie-columns resist overturning moments and confinement effects, due to tie-columns
and tie-beams improves the wall displacement capacity and the seismic behavior under cyclic
loads. The building structure is approximately symmetrical along each principal axis in plan for
both stiffness and mass distribution.
International Conference on Earthquake Engineering and Seismology
(ICEES 2011), NUST, Islamabad, Pakistan
April 25-26, 2011
2. Analytical Model
Experimental results show that tie-beam at different levels prevents diagonals cracks and
the crack on the wall surface is restricted with in the area between the bands. Experimental
results show also that on the increment of the horizontal bearing capacity of the wall the
reinforced concrete belt is better than mortar joints reinforcement. Experimental results
shows that the tie-
Column provided in the structures increase the horizontal and vertical load bearing
capacity of the wall and it gives the partial method on the improvement of ductility and
bearing capacity of masonry building. The confining members reduce the brittleness of the
masonry wall under earthquake load and hence improving this earthquake performance.
The confined masonry structure shown in fig.01.
Fig.01: A confined Masonry earthquake-resistant structure.
The behavior of strip foundation depends on the ground conditions. A trench digging for
continuous foundation should be made. Bottom of trench should be compacted and leveled.
Reinforcement bars of columns previously assembled as a basket are placed and previously
fixed into the foundation with reinforcement of all columns placed and provisionally fixed,
continuous foundation is filled with simple concrete. It will be better to use steel in floor
slab. A plinth band should be constructed on top of foundation, the function of plinth band
in confined masonry is to tie the neck column as shown in fig. 02and 03.
Plinth Beam
Transfer the loads from the walls to
the foundation and protect the first
floor wall.
Foundation
Transfer all the loads from the structure
to the ground
Walls
Masonry structure transfer all
vertical loads from roof slab to
foundation and to resist the
seismic forces, only confined
wall are able to resist the forces
Roof Slab
Roof slab is connect
with the wall and
transfer loads to walls
and both elements
resistant against
earthquake
International Conference on Earthquake Engineering and Seismology
(ICEES 2011), NUST, Islamabad, Pakistan
April 25-26, 2011
Fig.02: Plinth beam/band Steel Reinforcement.
Fig .03 Beam with Column Reinforcement.
About the over-plinth beam, it starts layering of brick/block units over mortar bed, forming
masonry wall. Toothed edge must be left on each side of the wall. Toothed edges are
essential for adequate wall confinement, which contributes to satisfactory earthquake
performance. Masonry wall structure is uniform and regular. Details of confined masonry
walls shown in following fig 04.
International Conference on Earthquake Engineering and Seismology
(ICEES 2011), NUST, Islamabad, Pakistan
April 25-26, 2011
Fig 04: Left figure shows maximum distance the confined elements with the masonry wall
and right figure shows toothed edges of the wall with tie columns.
In Confined masonry structures walls are the main load bearing and earthquake resistance
elements. Wall density of at least 2% in each of two orthogonal directions is required to
ensure good earthquake performance of confined masonry construction. Since the
earthquake performance of confined masonry buildings largely depends on the shear
resistance of masonry walls Confined masonry structures will be more safe and stable if the
walls are symmetrical along both sides, as shown in fig. 05.
Fig 05: Left figure shows poor distribution of walls and right figure shows good distribution
of walls in confined masonry structures.
Then tie-column will be poured after construction of masonry wall in the performs vertical
channel of walls. Reinforced concrete tie-columns are the main structural members to
confine the masonry wall in order to increase the horizontal and vertical load bearing
capacities, deformation ability and seismic reliability. It may be divided into wall terminal
tie-columns and wall intermediate tie-columns. Reinforcement details of column are shown
as follow in fig 06.
International Conference on Earthquake Engineering and Seismology
(ICEES 2011), NUST, Islamabad, Pakistan
April 25-26, 2011
Fig 06: Tie-column steel reinforcement shown before the pouring of concrete.
Horizontal reinforced concrete bands are placed at sill and lintel level .The band do as well
have a role of “crack stopper” blocking diagonal cracks before they stretch over the whole
wall panel, thus ensuring an increase in wall homogeneity during earthquake. Tie-beams
should be placed on every floor level. Vertical spacing of tie-beams should not exceed
3m.Hooks for column and beams must be bent at 135 degree in earthquake construction.
The details are shown in following figure i.e. fig 07and fig 08.
Fig 07: Tie-beam and Tie-Column reinforcement at intersection must be satisfactory for
earthquake performance.
International Conference on Earthquake Engineering and Seismology
(ICEES 2011), NUST, Islamabad, Pakistan
April 25-26, 2011
Fig 08: Hooks of column and beam at 135 degree and length of hook is 3inches/7.5 cm.
All opening are confined with vertical bands. Contrary to the main vertical ties (with 4bars,
dia1/2inch, 12mm).The confinement of opening have only 2 bars. The length of the opening
not larger than the half length of the wall. Otherwise special lintel beam required for large
openings and tie-columns placed at both sides of any large opening in order to enable the
diagonal strut action. Opening (door and windows) should be placed in the same position
up the building height. Details of opening are as shown figure 09, 10 and 11.
Fig 09: Confined opening reinforcement details.
International Conference on Earthquake Engineering and Seismology
(ICEES 2011), NUST, Islamabad, Pakistan
April 25-26, 2011
.
Fig 10: Left figure shows inadequate opening proportions and right figure shows adequate
opening proportions for confined masonry structures.
Fig 11: Left figure shows poor location of window and door openings and right figure shows
good location of window and doors openings for confined masonry structures.
These differences between Confined masonry structures and RC frame structures are
summarized in the Table 1.
Table 1. A Comparison between Confined Masonry building with RC frame construction
building.
Confined masonry
construction
RC frame construction
Gravity and lateral load-
resisting system
Masonry walls are the main
load bearing elements and are
expected to resist both gravity
and lateral loads. Confining
elements (tie-beams and tie-
columns) are significantly
smaller in size than RC beams
and columns.
RC frames resist both gravity
and lateral loads through
their relatively large beams,
columns, and their
connections. Masonry in fills
is not load-bearing walls.
Foundation Construction Strip footing beneath the wall
and the RC plinth beam
Isolated footing beneath each
column.
Superstructure construction
sequence
1. Masonry walls are
constructed first.
1. The frame is constructed
first.
International Conference on Earthquake Engineering and Seismology
(ICEES 2011), NUST, Islamabad, Pakistan
April 25-26, 2011
2. Subsequently, tie-
columns are cast in
place.
3. Finally, tie-beams
are constructed on
top of the walls,
simultaneously with
the floor/roof slab
construction.
2. Masnory walls are
constructed at a later stage
and are not bonded to the
frame members; these walls
are nonstructural, that is,
non-load bearing walls.
Time period Confined masonry building
takes less time for completion.
RC frame construction
building takes more time for
completion.
Economical Confined masonry is more
economical than RC structure.
RC frame construction
building is less economical
than confined masonry
structures.
Architectural Design Confined masonry building
architectural design is simpler
than RC frame construction
buildings.
RC frame construction
building architectural design
is less simple than Confined
masonry buildings.
Easier Construction Confined masonry buildings
are easier to construct as
compare to RC frame
construction.
RC frame Construction is
difficult to construct as
compare to Confined
masonry buildings.
Confined masonry structures construction practices in Pakistan are shown in the following
figure.
Fig 12: Construction procedure of tie-column poring with brick masonry
International Conference on Earthquake Engineering and Seismology
(ICEES 2011), NUST, Islamabad, Pakistan
April 25-26, 2011
Fig 13: Vertical reinforcements around openings
Fig 14: Under construction confined masonry structure
Fig 15: Finished confined masonry structure showing seismic reinforcement
International Conference on Earthquake Engineering and Seismology
(ICEES 2011), NUST, Islamabad, Pakistan
April 25-26, 2011
3. Conclusions
In the light of above discussion and experimental results we prefer confined masonry
structures are best suitable in earthquake region because of its good strength, seismic
reliability, deformability, ductility, stability, economical and easier in construction.
References
[1] Craig Totten, P.E, Confined Masonry Workshop Handbook, the Construction and Maintenance of
Masonry Building in Haiti, 3rd Edition / October 2010.
[2] Liu, D.H. and Yang, C.R. (1996), Structural Concepts and System of Tall Buildings, China
Building Industrial Press, Beijing.
[3] Svetlana Brzev (2007), Earthquake-Resistant Confined Masonry Construction, A NICEE
Publication India.

Mais conteúdo relacionado

Mais procurados

Presentation on earthquake resistance massonary structure
Presentation on earthquake resistance  massonary structurePresentation on earthquake resistance  massonary structure
Presentation on earthquake resistance massonary structure
Radhey Verma
 
Building Construction Analysis Report
Building Construction Analysis ReportBuilding Construction Analysis Report
Building Construction Analysis Report
Daniel Yap
 

Mais procurados (20)

Moment Resisting Frame.pdf
Moment Resisting Frame.pdfMoment Resisting Frame.pdf
Moment Resisting Frame.pdf
 
Pre-stressed concrete
Pre-stressed concrete Pre-stressed concrete
Pre-stressed concrete
 
Presentation on earthquake resistance massonary structure
Presentation on earthquake resistance  massonary structurePresentation on earthquake resistance  massonary structure
Presentation on earthquake resistance massonary structure
 
R.C.C. STAIRS
R.C.C. STAIRSR.C.C. STAIRS
R.C.C. STAIRS
 
Type of structural joints
Type of structural joints Type of structural joints
Type of structural joints
 
CONSTRUCTION ENGINEERING
CONSTRUCTION ENGINEERINGCONSTRUCTION ENGINEERING
CONSTRUCTION ENGINEERING
 
Building Construction Analysis Report
Building Construction Analysis ReportBuilding Construction Analysis Report
Building Construction Analysis Report
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
prestressed concrete
prestressed concreteprestressed concrete
prestressed concrete
 
HIGH STRENGTH CONCRETE PPT
HIGH STRENGTH CONCRETE PPTHIGH STRENGTH CONCRETE PPT
HIGH STRENGTH CONCRETE PPT
 
Structural Steel Work
 Structural Steel  Work Structural Steel  Work
Structural Steel Work
 
TYPES OF TESTS ON CONCRETE
TYPES OF TESTS ON CONCRETETYPES OF TESTS ON CONCRETE
TYPES OF TESTS ON CONCRETE
 
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSFERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
 
CIVIL ENGINEERING CONSTRUCTIONS MATERIALS
CIVIL ENGINEERING  CONSTRUCTIONS MATERIALS CIVIL ENGINEERING  CONSTRUCTIONS MATERIALS
CIVIL ENGINEERING CONSTRUCTIONS MATERIALS
 
Earthquake Resistant Masonry Buildings
Earthquake Resistant Masonry Buildings Earthquake Resistant Masonry Buildings
Earthquake Resistant Masonry Buildings
 
Foundation
FoundationFoundation
Foundation
 
specification of Rcc
specification of Rccspecification of Rcc
specification of Rcc
 
Precast construction
Precast constructionPrecast construction
Precast construction
 
Expansion joints in bridge
Expansion joints in bridgeExpansion joints in bridge
Expansion joints in bridge
 
Details of RCC Building
Details of RCC BuildingDetails of RCC Building
Details of RCC Building
 

Destaque

Materials and Molecules - Behind What You See
Materials and Molecules - Behind What You SeeMaterials and Molecules - Behind What You See
Materials and Molecules - Behind What You See
Sajjad Ahmad
 
Organisation des chantiers 04
Organisation des chantiers 04Organisation des chantiers 04
Organisation des chantiers 04
Sami Sahli
 
Hydrology principles ragunath
Hydrology principles ragunathHydrology principles ragunath
Hydrology principles ragunath
Sajjad Ahmad
 
INFLUENCE OF SOIL-STRUCTURE INTERACTION ON RESPONSE OF A MULTI-STORIED BUILDI...
INFLUENCE OF SOIL-STRUCTURE INTERACTION ON RESPONSE OF A MULTI-STORIED BUILDI...INFLUENCE OF SOIL-STRUCTURE INTERACTION ON RESPONSE OF A MULTI-STORIED BUILDI...
INFLUENCE OF SOIL-STRUCTURE INTERACTION ON RESPONSE OF A MULTI-STORIED BUILDI...
SJ BASHA
 
Runoff and Hydrograph
Runoff and HydrographRunoff and Hydrograph
Runoff and Hydrograph
Sajjad Ahmad
 

Destaque (20)

Earthquake resistant structure
Earthquake resistant structureEarthquake resistant structure
Earthquake resistant structure
 
Module 4 module 2 structural layout & details
Module 4   module 2 structural layout & detailsModule 4   module 2 structural layout & details
Module 4 module 2 structural layout & details
 
Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)
 
Analytical study on stress strain behaviour of reinforced concrete column
Analytical study on stress strain behaviour of reinforced concrete columnAnalytical study on stress strain behaviour of reinforced concrete column
Analytical study on stress strain behaviour of reinforced concrete column
 
System of units
System of unitsSystem of units
System of units
 
State-Switched Control Algorithm for Multi Degree of Freedom Smart Base Isola...
State-Switched Control Algorithm for Multi Degree of Freedom Smart Base Isola...State-Switched Control Algorithm for Multi Degree of Freedom Smart Base Isola...
State-Switched Control Algorithm for Multi Degree of Freedom Smart Base Isola...
 
Application of Packing Concepts to High Performance Self-Consolidating Morta...
Application of Packing Concepts to High  Performance Self-Consolidating Morta...Application of Packing Concepts to High  Performance Self-Consolidating Morta...
Application of Packing Concepts to High Performance Self-Consolidating Morta...
 
Materials and Molecules - Behind What You See
Materials and Molecules - Behind What You SeeMaterials and Molecules - Behind What You See
Materials and Molecules - Behind What You See
 
Prestige Concrete Web Presentation
Prestige Concrete Web PresentationPrestige Concrete Web Presentation
Prestige Concrete Web Presentation
 
The Building Blocks of the Industrial Network
The Building Blocks of the Industrial NetworkThe Building Blocks of the Industrial Network
The Building Blocks of the Industrial Network
 
SEISMIC EVALUATION OF REINFORCED CONCRETE AND MASONRY BUILDINGS BUILT UNDER C...
SEISMIC EVALUATION OF REINFORCED CONCRETE AND MASONRY BUILDINGS BUILT UNDER C...SEISMIC EVALUATION OF REINFORCED CONCRETE AND MASONRY BUILDINGS BUILT UNDER C...
SEISMIC EVALUATION OF REINFORCED CONCRETE AND MASONRY BUILDINGS BUILT UNDER C...
 
Precipitation
PrecipitationPrecipitation
Precipitation
 
CE-235 EH Lec 1
CE-235 EH Lec 1CE-235 EH Lec 1
CE-235 EH Lec 1
 
Earthquake resistant structure By Engr. Ghulam Yasin Taunsvi
Earthquake resistant structure By Engr. Ghulam Yasin TaunsviEarthquake resistant structure By Engr. Ghulam Yasin Taunsvi
Earthquake resistant structure By Engr. Ghulam Yasin Taunsvi
 
Organisation des chantiers 04
Organisation des chantiers 04Organisation des chantiers 04
Organisation des chantiers 04
 
Hydrology principles ragunath
Hydrology principles ragunathHydrology principles ragunath
Hydrology principles ragunath
 
INFLUENCE OF SOIL-STRUCTURE INTERACTION ON RESPONSE OF A MULTI-STORIED BUILDI...
INFLUENCE OF SOIL-STRUCTURE INTERACTION ON RESPONSE OF A MULTI-STORIED BUILDI...INFLUENCE OF SOIL-STRUCTURE INTERACTION ON RESPONSE OF A MULTI-STORIED BUILDI...
INFLUENCE OF SOIL-STRUCTURE INTERACTION ON RESPONSE OF A MULTI-STORIED BUILDI...
 
Ce 451 design of commercial building in jubail industrial city
Ce 451 design of commercial building in jubail industrial cityCe 451 design of commercial building in jubail industrial city
Ce 451 design of commercial building in jubail industrial city
 
Earthquake resistance building construction
Earthquake resistance building constructionEarthquake resistance building construction
Earthquake resistance building construction
 
Runoff and Hydrograph
Runoff and HydrographRunoff and Hydrograph
Runoff and Hydrograph
 

Semelhante a Earthquake resistant confined masonry structure with concrete beams and columns

Seismic Vulnerability Assessment of Steel Moment Resisting Frame due to Infil...
Seismic Vulnerability Assessment of Steel Moment Resisting Frame due to Infil...Seismic Vulnerability Assessment of Steel Moment Resisting Frame due to Infil...
Seismic Vulnerability Assessment of Steel Moment Resisting Frame due to Infil...
IDES Editor
 

Semelhante a Earthquake resistant confined masonry structure with concrete beams and columns (20)

Seismic Vulnerability Assessment of Steel Moment Resisting Frame due to Infil...
Seismic Vulnerability Assessment of Steel Moment Resisting Frame due to Infil...Seismic Vulnerability Assessment of Steel Moment Resisting Frame due to Infil...
Seismic Vulnerability Assessment of Steel Moment Resisting Frame due to Infil...
 
Linear Dynamic Analysis of Different Structural Systems for Medium Rise Buil...
Linear Dynamic Analysis of Different Structural Systems for  Medium Rise Buil...Linear Dynamic Analysis of Different Structural Systems for  Medium Rise Buil...
Linear Dynamic Analysis of Different Structural Systems for Medium Rise Buil...
 
13
1313
13
 
IRJET- Post Peak Response of Reinforced Concrete Frames with and without in F...
IRJET- Post Peak Response of Reinforced Concrete Frames with and without in F...IRJET- Post Peak Response of Reinforced Concrete Frames with and without in F...
IRJET- Post Peak Response of Reinforced Concrete Frames with and without in F...
 
IRJET- Analysis of Various Effects on Multistory Building (G+27) by Staad Pro...
IRJET- Analysis of Various Effects on Multistory Building (G+27) by Staad Pro...IRJET- Analysis of Various Effects on Multistory Building (G+27) by Staad Pro...
IRJET- Analysis of Various Effects on Multistory Building (G+27) by Staad Pro...
 
LATERAL LOAD ANALYSIS OF SOFT STORY BUILDING AND IMPORTANCE OF MODELING MASON...
LATERAL LOAD ANALYSIS OF SOFT STORY BUILDING AND IMPORTANCE OF MODELING MASON...LATERAL LOAD ANALYSIS OF SOFT STORY BUILDING AND IMPORTANCE OF MODELING MASON...
LATERAL LOAD ANALYSIS OF SOFT STORY BUILDING AND IMPORTANCE OF MODELING MASON...
 
Seismic Retrofitting of RC Building with Jacketing and Shear Wall Seismic Ret...
Seismic Retrofitting of RC Buildingwith Jacketing and Shear Wall Seismic Ret...Seismic Retrofitting of RC Buildingwith Jacketing and Shear Wall Seismic Ret...
Seismic Retrofitting of RC Building with Jacketing and Shear Wall Seismic Ret...
 
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
 
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
Lateral Load Analysis of Shear Wall and Concrete Braced Multi-Storeyed R.C Fr...
 
Importance of Modeling of Masonry Infill and Effect of Soft Storey on Seismic...
Importance of Modeling of Masonry Infill and Effect of Soft Storey on Seismic...Importance of Modeling of Masonry Infill and Effect of Soft Storey on Seismic...
Importance of Modeling of Masonry Infill and Effect of Soft Storey on Seismic...
 
Shear wall
Shear wallShear wall
Shear wall
 
Influence of Modeling Masonry Infill on Seismic Performance of Multi-Storeyed...
Influence of Modeling Masonry Infill on Seismic Performance of Multi-Storeyed...Influence of Modeling Masonry Infill on Seismic Performance of Multi-Storeyed...
Influence of Modeling Masonry Infill on Seismic Performance of Multi-Storeyed...
 
Comparative Study of RC Structures with Different Types of Infill Walls with ...
Comparative Study of RC Structures with Different Types of Infill Walls with ...Comparative Study of RC Structures with Different Types of Infill Walls with ...
Comparative Study of RC Structures with Different Types of Infill Walls with ...
 
IRJET-Seismic Performance of High Rise Flat Slab Building with Various Latera...
IRJET-Seismic Performance of High Rise Flat Slab Building with Various Latera...IRJET-Seismic Performance of High Rise Flat Slab Building with Various Latera...
IRJET-Seismic Performance of High Rise Flat Slab Building with Various Latera...
 
23
2323
23
 
NONLINEAR BEHAVIOR AND FRAGILITY ASSESSMENT OF MULTI-STORY CONFINED MASONRY W...
NONLINEAR BEHAVIOR AND FRAGILITY ASSESSMENT OF MULTI-STORY CONFINED MASONRY W...NONLINEAR BEHAVIOR AND FRAGILITY ASSESSMENT OF MULTI-STORY CONFINED MASONRY W...
NONLINEAR BEHAVIOR AND FRAGILITY ASSESSMENT OF MULTI-STORY CONFINED MASONRY W...
 
Krishna final overall ppt (2) eccentrically loaded masonry walls
Krishna final overall ppt (2) eccentrically loaded masonry wallsKrishna final overall ppt (2) eccentrically loaded masonry walls
Krishna final overall ppt (2) eccentrically loaded masonry walls
 
IRJET- Comparative Analysis of Square Shape RC Frame by Replacing Masonry fro...
IRJET- Comparative Analysis of Square Shape RC Frame by Replacing Masonry fro...IRJET- Comparative Analysis of Square Shape RC Frame by Replacing Masonry fro...
IRJET- Comparative Analysis of Square Shape RC Frame by Replacing Masonry fro...
 
Inelastic seismic response of single-story structure in hilly areas owing to ...
Inelastic seismic response of single-story structure in hilly areas owing to ...Inelastic seismic response of single-story structure in hilly areas owing to ...
Inelastic seismic response of single-story structure in hilly areas owing to ...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 

Mais de Sajjad Ahmad

Hydrology measuring rain
Hydrology measuring rainHydrology measuring rain
Hydrology measuring rain
Sajjad Ahmad
 
Bernoulli’s equation
Bernoulli’s equationBernoulli’s equation
Bernoulli’s equation
Sajjad Ahmad
 
Matrix Structural Analysis, Steel Frame Analysis in SAP2000
Matrix Structural Analysis, Steel Frame Analysis in SAP2000Matrix Structural Analysis, Steel Frame Analysis in SAP2000
Matrix Structural Analysis, Steel Frame Analysis in SAP2000
Sajjad Ahmad
 
Analysis of Arch Structure By Qazi Jvaid
Analysis of Arch Structure By Qazi JvaidAnalysis of Arch Structure By Qazi Jvaid
Analysis of Arch Structure By Qazi Jvaid
Sajjad Ahmad
 
Runoff and Hydrograph
Runoff and HydrographRunoff and Hydrograph
Runoff and Hydrograph
Sajjad Ahmad
 
CE-235 EH Coursepack 2010
CE-235 EH Coursepack 2010CE-235 EH Coursepack 2010
CE-235 EH Coursepack 2010
Sajjad Ahmad
 

Mais de Sajjad Ahmad (9)

Hydrology measuring rain
Hydrology measuring rainHydrology measuring rain
Hydrology measuring rain
 
Bernoulli’s equation
Bernoulli’s equationBernoulli’s equation
Bernoulli’s equation
 
Matrix Structural Analysis, Steel Frame Analysis in SAP2000
Matrix Structural Analysis, Steel Frame Analysis in SAP2000Matrix Structural Analysis, Steel Frame Analysis in SAP2000
Matrix Structural Analysis, Steel Frame Analysis in SAP2000
 
Analysis of Arch Structure By Qazi Jvaid
Analysis of Arch Structure By Qazi JvaidAnalysis of Arch Structure By Qazi Jvaid
Analysis of Arch Structure By Qazi Jvaid
 
Runoff and Hydrograph
Runoff and HydrographRunoff and Hydrograph
Runoff and Hydrograph
 
CE-235 EH Lec 3
CE-235 EH Lec 3CE-235 EH Lec 3
CE-235 EH Lec 3
 
ce235-eh-lec-2
ce235-eh-lec-2ce235-eh-lec-2
ce235-eh-lec-2
 
CE-235 EH Coursepack 2010
CE-235 EH Coursepack 2010CE-235 EH Coursepack 2010
CE-235 EH Coursepack 2010
 
Hydro power
Hydro powerHydro power
Hydro power
 

Último

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 

Último (20)

80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 

Earthquake resistant confined masonry structure with concrete beams and columns

  • 1. International Conference on Earthquake Engineering and Seismology (ICEES 2011), NUST, Islamabad, Pakistan April 25-26, 2011 EARTHQUAKE RESISTANT CONFINED MASNORY STRUCTURE WITH CONCRETE BEAMS AND COLUMNS (Zulqarnain Ali Sabir. 1* , Aftab Alam.2 , Rao Arsalan Khushnood3 , Sajjad Ahmad4 ) 1* Civil Engineer, Earthquake Reconstruction Rehabilitation Authority Zonal Field Office Muzaffarabad, Azad Jammu and Kashmir. (zulqarnainalisabir@yahoo.com) 2 Senior Engineer NESPAK (ER Division) Muzaffarabad, Azad Jammu and Kashmir. (Aftab_229@yahoo.com) 3 Military College of Engineering (MCE) Risalpur, NUST, Sector H-12 Islamabad, Pakistan 4 NUST Institute of Civil Engineering (NICE), School of Civil and Environmental Engineering(SCEE) NUST, Sector H-12 Islamabad, Pakistan Abstract The article is focused on confined masonry structures. A number of unreinforced masonry buildings collapsed, several multistorey buildings in confined masonry damaged slightly in the past earthquake in Pakistan. Based on the results of additional model experiments, the confined masonry and concentrated reinforced masonry structures have been widely applied to the low- rise and medium-rise buildings respectively in the seismic-zone. For the low-rise buildings the reinforced concrete ring beams are placed at each floor and the post-cast tie columns are placed at each intersection of interior and exterior masonry walls. For the medium –rise building in additions to the ring beams and tie columns ,the post-cast reinforced concrete intermediate columns and horizontal belts are placed in all the masonry walls at spacing of 2~3m and 1~1.5m respectively. Model Experiments and engineering practices show that masonry structures have a good strength, deformability, seismic reliability and can be applied to the multistorey buildings up to 10 stories in the seismic zone. Keywords: Confined Masonry; Ring Band; Tie Beams; Tie Columns 1. Introduction Pakistan divided into four seismic zones .Confined masonry structures are best suitable for seismic resistance and from economical point of view in these areas. In these seismic zones a lot of unreinforced masonry buildings were damaged in past earth quakes. Therefore it is important to take countermeasures to improve the horizontal load bearing capacity and a seismic reliability of masonry buildings. To strengthen the masonry structures it is essential to provide tie-columns and tie-beams .Confined masonry structure resist both vertical and lateral loads .The tie-columns resist overturning moments and confinement effects, due to tie-columns and tie-beams improves the wall displacement capacity and the seismic behavior under cyclic loads. The building structure is approximately symmetrical along each principal axis in plan for both stiffness and mass distribution.
  • 2. International Conference on Earthquake Engineering and Seismology (ICEES 2011), NUST, Islamabad, Pakistan April 25-26, 2011 2. Analytical Model Experimental results show that tie-beam at different levels prevents diagonals cracks and the crack on the wall surface is restricted with in the area between the bands. Experimental results show also that on the increment of the horizontal bearing capacity of the wall the reinforced concrete belt is better than mortar joints reinforcement. Experimental results shows that the tie- Column provided in the structures increase the horizontal and vertical load bearing capacity of the wall and it gives the partial method on the improvement of ductility and bearing capacity of masonry building. The confining members reduce the brittleness of the masonry wall under earthquake load and hence improving this earthquake performance. The confined masonry structure shown in fig.01. Fig.01: A confined Masonry earthquake-resistant structure. The behavior of strip foundation depends on the ground conditions. A trench digging for continuous foundation should be made. Bottom of trench should be compacted and leveled. Reinforcement bars of columns previously assembled as a basket are placed and previously fixed into the foundation with reinforcement of all columns placed and provisionally fixed, continuous foundation is filled with simple concrete. It will be better to use steel in floor slab. A plinth band should be constructed on top of foundation, the function of plinth band in confined masonry is to tie the neck column as shown in fig. 02and 03. Plinth Beam Transfer the loads from the walls to the foundation and protect the first floor wall. Foundation Transfer all the loads from the structure to the ground Walls Masonry structure transfer all vertical loads from roof slab to foundation and to resist the seismic forces, only confined wall are able to resist the forces Roof Slab Roof slab is connect with the wall and transfer loads to walls and both elements resistant against earthquake
  • 3. International Conference on Earthquake Engineering and Seismology (ICEES 2011), NUST, Islamabad, Pakistan April 25-26, 2011 Fig.02: Plinth beam/band Steel Reinforcement. Fig .03 Beam with Column Reinforcement. About the over-plinth beam, it starts layering of brick/block units over mortar bed, forming masonry wall. Toothed edge must be left on each side of the wall. Toothed edges are essential for adequate wall confinement, which contributes to satisfactory earthquake performance. Masonry wall structure is uniform and regular. Details of confined masonry walls shown in following fig 04.
  • 4. International Conference on Earthquake Engineering and Seismology (ICEES 2011), NUST, Islamabad, Pakistan April 25-26, 2011 Fig 04: Left figure shows maximum distance the confined elements with the masonry wall and right figure shows toothed edges of the wall with tie columns. In Confined masonry structures walls are the main load bearing and earthquake resistance elements. Wall density of at least 2% in each of two orthogonal directions is required to ensure good earthquake performance of confined masonry construction. Since the earthquake performance of confined masonry buildings largely depends on the shear resistance of masonry walls Confined masonry structures will be more safe and stable if the walls are symmetrical along both sides, as shown in fig. 05. Fig 05: Left figure shows poor distribution of walls and right figure shows good distribution of walls in confined masonry structures. Then tie-column will be poured after construction of masonry wall in the performs vertical channel of walls. Reinforced concrete tie-columns are the main structural members to confine the masonry wall in order to increase the horizontal and vertical load bearing capacities, deformation ability and seismic reliability. It may be divided into wall terminal tie-columns and wall intermediate tie-columns. Reinforcement details of column are shown as follow in fig 06.
  • 5. International Conference on Earthquake Engineering and Seismology (ICEES 2011), NUST, Islamabad, Pakistan April 25-26, 2011 Fig 06: Tie-column steel reinforcement shown before the pouring of concrete. Horizontal reinforced concrete bands are placed at sill and lintel level .The band do as well have a role of “crack stopper” blocking diagonal cracks before they stretch over the whole wall panel, thus ensuring an increase in wall homogeneity during earthquake. Tie-beams should be placed on every floor level. Vertical spacing of tie-beams should not exceed 3m.Hooks for column and beams must be bent at 135 degree in earthquake construction. The details are shown in following figure i.e. fig 07and fig 08. Fig 07: Tie-beam and Tie-Column reinforcement at intersection must be satisfactory for earthquake performance.
  • 6. International Conference on Earthquake Engineering and Seismology (ICEES 2011), NUST, Islamabad, Pakistan April 25-26, 2011 Fig 08: Hooks of column and beam at 135 degree and length of hook is 3inches/7.5 cm. All opening are confined with vertical bands. Contrary to the main vertical ties (with 4bars, dia1/2inch, 12mm).The confinement of opening have only 2 bars. The length of the opening not larger than the half length of the wall. Otherwise special lintel beam required for large openings and tie-columns placed at both sides of any large opening in order to enable the diagonal strut action. Opening (door and windows) should be placed in the same position up the building height. Details of opening are as shown figure 09, 10 and 11. Fig 09: Confined opening reinforcement details.
  • 7. International Conference on Earthquake Engineering and Seismology (ICEES 2011), NUST, Islamabad, Pakistan April 25-26, 2011 . Fig 10: Left figure shows inadequate opening proportions and right figure shows adequate opening proportions for confined masonry structures. Fig 11: Left figure shows poor location of window and door openings and right figure shows good location of window and doors openings for confined masonry structures. These differences between Confined masonry structures and RC frame structures are summarized in the Table 1. Table 1. A Comparison between Confined Masonry building with RC frame construction building. Confined masonry construction RC frame construction Gravity and lateral load- resisting system Masonry walls are the main load bearing elements and are expected to resist both gravity and lateral loads. Confining elements (tie-beams and tie- columns) are significantly smaller in size than RC beams and columns. RC frames resist both gravity and lateral loads through their relatively large beams, columns, and their connections. Masonry in fills is not load-bearing walls. Foundation Construction Strip footing beneath the wall and the RC plinth beam Isolated footing beneath each column. Superstructure construction sequence 1. Masonry walls are constructed first. 1. The frame is constructed first.
  • 8. International Conference on Earthquake Engineering and Seismology (ICEES 2011), NUST, Islamabad, Pakistan April 25-26, 2011 2. Subsequently, tie- columns are cast in place. 3. Finally, tie-beams are constructed on top of the walls, simultaneously with the floor/roof slab construction. 2. Masnory walls are constructed at a later stage and are not bonded to the frame members; these walls are nonstructural, that is, non-load bearing walls. Time period Confined masonry building takes less time for completion. RC frame construction building takes more time for completion. Economical Confined masonry is more economical than RC structure. RC frame construction building is less economical than confined masonry structures. Architectural Design Confined masonry building architectural design is simpler than RC frame construction buildings. RC frame construction building architectural design is less simple than Confined masonry buildings. Easier Construction Confined masonry buildings are easier to construct as compare to RC frame construction. RC frame Construction is difficult to construct as compare to Confined masonry buildings. Confined masonry structures construction practices in Pakistan are shown in the following figure. Fig 12: Construction procedure of tie-column poring with brick masonry
  • 9. International Conference on Earthquake Engineering and Seismology (ICEES 2011), NUST, Islamabad, Pakistan April 25-26, 2011 Fig 13: Vertical reinforcements around openings Fig 14: Under construction confined masonry structure Fig 15: Finished confined masonry structure showing seismic reinforcement
  • 10. International Conference on Earthquake Engineering and Seismology (ICEES 2011), NUST, Islamabad, Pakistan April 25-26, 2011 3. Conclusions In the light of above discussion and experimental results we prefer confined masonry structures are best suitable in earthquake region because of its good strength, seismic reliability, deformability, ductility, stability, economical and easier in construction. References [1] Craig Totten, P.E, Confined Masonry Workshop Handbook, the Construction and Maintenance of Masonry Building in Haiti, 3rd Edition / October 2010. [2] Liu, D.H. and Yang, C.R. (1996), Structural Concepts and System of Tall Buildings, China Building Industrial Press, Beijing. [3] Svetlana Brzev (2007), Earthquake-Resistant Confined Masonry Construction, A NICEE Publication India.