PG&E E-9A/B Rate Update
            Sub-Metering Protocol Development


                                       Paul Stith
                                 Principal Consultant – SUM
                              Vice President, EAA Silicon Valley




Project Green On Ramp                                                     Paul Stith
SUM – Sustainable Unlimited Mobility                               December 10, 2011
Project Green On Ramp                                          Paul Stith
SUM – Sustainable Unlimited Mobility                    December 10, 2011
                                       Page 61
                                                 Source PA Consulting – November 15, 2011
Our PG&E “Relationship” & EV Purchase




     November 2010 – November 2011 Kilowatts Used / Roof not viable for Solar


Project Green On Ramp                                                    Paul Stith
SUM – Sustainable Unlimited Mobility                              December 10, 2011
Our PG&E Electric Bills




       November 2010 – November 2011 Kilowatts Used / Terrible Roof for Solar


Project Green On Ramp                                                     Paul Stith
SUM – Sustainable Unlimited Mobility                               December 10, 2011
PG&E E-9A / E-9B “Experimental” EV Rates
           Introduced over a decade ago, only allowed for owners of
          registered Electric Vehicles - Time of Use (TOU), Tiered Rates


       E-9A = Whole House, One Meter                        < 350 PG&E Customers



       E-9B = Dedicated Meter for EV
              + Household Meter                              < 40 PG&E Customers



                E-9B Allows you to receive TWO baseline allocations
                     Household can be on any other rate plan
Project Green On Ramp                                                  Paul Stith
SUM – Sustainable Unlimited Mobility                            December 10, 2011
PG&E E-9A Current TOU, Tiered Rate




Project Green On Ramp                         Paul Stith
SUM – Sustainable Unlimited Mobility   December 10, 2011
PG&E E-9B Current TOU, Tiered Rate




Project Green On Ramp                         Paul Stith
SUM – Sustainable Unlimited Mobility   December 10, 2011
PUC July 2011 PG&E Directive


                           PG&E Review Only E-9B Rates
                           Propose Flat Rate


               E-9B = Dedicated Meter for EV + Household Meter




Project Green On Ramp                                                   Paul Stith
SUM – Sustainable Unlimited Mobility                             December 10, 2011
Southern California Edison EV Rates June 2011




Project Green On Ramp                            Paul Stith
SUM – Sustainable Unlimited Mobility      December 10, 2011
Summer                                                    $0.38451    ()     $0.21431    ()      $0.11041




      PUC July 2011 PG&E Directive Results
       Rate A & B
                     Winter
                                                    TOTAL RATES

                                                                               $0.27932 ( )       $0.17365 ( )        $0.11305
       Total Energy Rates ($ per kWh)                          PEAK               PART-PEAK        OFF-PEAK
         Summer                                     TOTAL RATES
                                                           $0.38451 ( )        $0.21431    ()     $0.11041   ()
       Rate A & B

       Total Energy Rates ($ per kWh)                             PEAK            PART-PEAK        OFF-PEAK
         Summer                                               $0.38451   ()    $0.21431    ()     $0.11041   ()

        Winter                                                $0.27932    ()   $0.17365    ()     $0.11305    ()

                    Total Customer Charge Rate ($ per meter per day)           $0.26283

         Winter                                               $0.27932    ()   $0.17365    ()     $0.11305    ()
                                         Total bundled service charges shown on customer’s bills are unbundled according to
               PG&E Proposed Flat TOU shown below. E-9A AND E-9B
                             component rates Rates for
               Raised Base Rate from ~5 Cents to ~11 Cents
       Total Customer Charge Rate ($ per meter per day)       $0.26283


               80% of Existing E-9A/B rate payers will see higher bills
                           Total bundled service charges shown on customer’s bills are unbundled according to the
       Total Customer Charge Rate ($ per meter per below.
                           component rates shown day)        $0.26283
               Some rate payers will be better on standard E1 Plan
               High use bundled service charges shown onwith high 24x7 use may to the
                     Total accounts, especially customer’s bills are unbundled according
                     component rates shown below.
                actually be better off with proposed rates


Project Green On Ramp
               Advice Letter No:                                            Issued by                    Paul Stith
                                                                                                        Date Filed
SUM – Sustainable Unlimited Mobility
               Decision No.                                              Brian K. Cherry         December 10, 2011
                                                                                                        Effective
                                                                          Vice President                     Resolution No.
PG&E E-9A & E-9B Rate Proposal
                  - Challenges and Responses -
                                Activities
             Letter Writing Campaign
             PG&E Response (Can’t sell below cost)
             Letter Writing Campaign – Version 2
             PG&E Response???

                                    Action Items
             Full rate analysis of E1 vs. E9 specific cases
             Request rate freeze until scheduled 2013-2014 analysis
             Analyze other Time of Use Applications & Rates, Marginal Cost Off-Peak
             Examine EVSE Service Provider Rates
             Legislative Support for Residential Subsidies
             Support Sub-Metering Technologies



Project Green On Ramp                                                         Paul Stith
SUM – Sustainable Unlimited Mobility                                   December 10, 2011
PUC July 2011 Directive – All IOUs

                                                                              PU1
          PG&E, SCE & San Diego Power & Gas
          Required to develop a Sub-Metering Protocol MM1
                                                                           FSubA1
           Isolate EV Charging Load from Primary Load
           Sub-Meter can not be owned by Utility

             Simplify the EV service offerings by segregating use
             Application-specific utility rates to drive charging behavior
             Lower the cost to access application-specific rates
             Expand workplace and multi-family charging

                     Input from EVSE Providers, Service Providers,
                              Auto Makers & Consumers
Project Green On Ramp                                                       Paul Stith
SUM – Sustainable Unlimited Mobility                                 December 10, 2011
Source: Joint IOU Work Groups 11/2011

Project Green On Ramp                                   Paul Stith
SUM – Sustainable Unlimited Mobility             December 10, 2011
Proposed Joint Utility Submetering Protocol Development Plan Description And Activities

                                     Phase 1                                         Phase 2                                      Phase 3                                       Phase 4
                                   Define / Plan                                 Design / Develop                         Build Interim Solution                        Build Scalable Solution
                                Short-Term                                                                    Mid-Term                                                           Long-Term
                      CUSTOMER OR 3RD PARTY-OWNED SUBMETERING IS                                                         CUSTOMER OR 3RD PARTY-OWNED SUBMETERING IS
                        AVAILABLE TO CUSTOMERS FOR NON-BILLING                                                           AVAILABLE TO CUSTOMERS FOR BILLING PURPOSES
                                       PURPOSES
                                                                                                                   • Submeters for IOU subtractive billing are        • National Standards are in place
                  •       IOU customers may have the choice of residential and several EV rates                      owned by customers or 3rd parties
                                                                                                                                                                      • Submeters for subtractive billing are
                  •       IOU customers can continue to use the utility’s single whole house meter, which                                                               owned by customers or 3rd parties
DESCRIPTION




                          includes EV charging and billing                                                         • Submeter data for IOU subtractive billing
                                                                                                                                                                      • Submeter data for IOU subtractive
                  •       IOU customers can add a parallel meter service panel for a dedicated utility-owned         to be provided according to protocol
                                                                                                                                                                        billing to be provided according to
                          and read parallel meter for EV charging and billing                                        (includes submeter ID, premise ID, and
                                                                                                                                                                        protocol
                                                                                                                     date/time stamped interval usage)
                  •       IOU customers can install a submeter, either owned by the customer or a 3rd party,                                                          • Utilities execute automated, full scale
                          and receive usage data from those (non-utility) sources for energy monitoring            • Utilities execute manual, small scale
                                                                                                                                                                        subtractive billing
                                                                                                                     subtractive billing of EV charging loads
                                                                                                                                                                      • Full utility cost recovery in place for
                                                                                                                   • Full utility cost recovery in place for
                                                                                                                                                                        upgrades to IT/billing systems and
                                                                                                                     upgrades to IT/billing systems and related
                                                                                                                                                                        related costs
                                                                                                                     costs
              •       Define the CA Submetering Protocol             •   Develop the California Submetering        • Implement a solution - build, test, and refine   • Upgrade utility systems to handle
                      Roadmap                                            Protocol                                    the necessary processes, systems, and system       automated, full scale subtractive
                      -     Goals, objectives, scope, guidelines                                                     interfaces                                         billing
                                                                         -   Business requirements and specs for
                      -     List of Issues and/or Requirements               utilities, customers and 3rd party    • Pursue development of national standards for     • Leverage utility investments in Smart
                            and Preliminary Recommendations                  meter service providers                 submeters and subtractive billing                  Grid technologies
ACTIVITIES




                      -     Key tasks or activities and timing for       -   Technical, security, privacy          • Enable 3-way handshake among the utility,        • National standards are completed and
                            each                                             requirements, specs, and standards      customer, and 3rd party meter service              implemented by this time
                      -     Responsible organizations and                    aligned with national standards         provider
                            individuals for each
                                                                         -   Architectural design for end-to-end   • Develop certification process for 3rd party
              •       Complete and submit the Submetering                    systems (including back office          devices, systems, processes
                      Roadmap Report                                         integration)
                                                                                                                   • Develop and carry out customer information
                                                                         -   Implementation strategy and plan,       campaign
                                                                             schedule, tasks, and deliverables
                      Project Green On Ramp                                                           Source: Joint IOU Work Groups 11/2011                                  Paul Stith
                      SUM – Sustainable Unlimited Mobility                                                                                                            December 10, 2011
                                                                                                                                                                                                   14
CPUC Submetering Protocol Timeline
                                       PROTOCOL DEVELOPMENT


                                                                                               TARIFF
          ROADMAP DEVELOPMENT                                                               DEVELOPMENT
      Decision 7.25.2011
       AFV OIR Phase 2




                                 Public           Submeter                                     Tariff sheet changes to
                               workshop           protocol                                            implement
                              with external       roadmap                                      submetering protocol
                              stakeholders         report
                                                                                                   into tariff rules
                               10/27/11           1/3/2012 *                                         9/3/2012


                           9/15/11     11/14/11                                   7/31/2012                       1/2013
              IOU joint   Workshop                                                Tier 2 advice                   Decision
           meetings with   report                                                    letter &                     Closing
           CPUC Energy                                                              Protocol                    Proceedings
              Division,                                                              Report
            Automakers,
                EVSE
           Manufacturers,
             and EVSPs                              * Potential extension to be evaluated
 Project Green On Ramp                                       Source: Joint IOU Work Groups 11/2011                Paul Stith
 SUM – Sustainable Unlimited Mobility                                                                      December 10, 2011
                                                                                                                              15
Use Case 1: Fixed Submeter                                                           Electricity
                                                                                     Usage Data
                                                                                     Billing
Utility = Electric Commodity Provider (One to One EVSP)                              Master Meter Usage
                                                                                     Submeter Usage
Customer of Record for the Fixed Submeter is the Premise Owner                       Premises Usage




     Premises 1


                         PU1                                             Utility Systems
                                                                           Stagin
     MM1                                    FSubA         Open                           Back
                                                                              g
                                            DMA            EV                          Office
                       FSubA1                                             Server
                                                           AMI
 Implications
 –      Assumes 3rd Party sends data from their Data Management Agent
        (DMA) to the utility via the OpenEV interface                               OpenEV
 –      Requires 3-way association among customer, 3rd party, and utility
        prior to accurate subtractive billing (i.e. no ad-hoc associations)
 –      Submeter adheres to the same certification and requirements as a
        utility master meter based on national standards
 –      OpenEV standard must be established, and 3rd Party DMA is
        certified to it
 –      AMI network is not used to transport submeter data
     Project Green On Ramp                                                           Paul Stith
     SUM – Sustainable Unlimited Mobility                                     December 10, 2011
                                                                                                   16
Use Case 2: Fixed Submeter                                                        Electricity
                                                                                                          Usage Data
                                                                                                          Billing
           Utility = Electric Commodity Provider (One to Many EVSPs)                                      Master Meter Usage
                                                                                                          Submeter Usage
        Customer of Record for the Fixed Submeter is the Premise Owner                                    Submeter Usage
                                                                                                          Submeter Usage
                                                                                                          Premises Usage


Premises 1
                                                                                           Utility Systems
                       PU1
                                                                                              Staging        Back
MM1                                               FSubA                Open                                  Office
                                                                                              Server
                    FSubA1                        DMA                   EV
                    FSubA2
                    FSubA3
                                                  FSubB                Open
                    FSubB1                        DMA                   EV
                    FSubB2
                                                  FSubC                Open
                                                  DMA                   EV
                    FSubC1

                                                             AMI
Example: shopping center garage with multiple vendors with multiple submetered charging points.
NOTE: Submeter data is not aggregated.
Project Green On Ramp                                                                                    Paul Stith
SUM – Sustainable Unlimited Mobility                                                              December 10, 2011
                                                                                                                       17
Use Case 3: Fixed Submeter                                                             Electricity
                                                                                       Usage Data
                                                                                       Billing
EVSP = Resells Electricity to Consumer (One to One)                                    Master Meter Usage
                                                                                       Submeter Usage
Customer of Record for the Fixed Submeter is EVSP                                      Premises Usage




     Premises 1
                                     Could include

                         PU1
                                      value-added
                                          services
                                                                          Utility Systems

     MM1                                        FSubA       Open            Staging         Back
                                                DMA          EV             Server          Office
                       FSubA1
                                                             AMI
 Implications
 –     This arrangement is qualitatively the same as Use Case 1
 –     Both the premise owner and EVSP are direct tariff customers
       of the utility (load serving entity)
 –     Customer of record for the fixed submeter is the EVSP
 –     Utility is charging 3rd parties for their usage, and 3rd parties
       may recoup their costs in addition to any value-added service
       cost


     Project Green On Ramp                                                             Paul Stith
     SUM – Sustainable Unlimited Mobility                                       December 10, 2011
                                                                                                     18
Mobile Submeters
                    EVSP = Resells Electricity to Consumer
       Customer of Record for Mobile Submeter can be Customer or EVSP

                                                                      OpenEV


                                        Friday,
                                       2011/9/9
                      Premises
MM1                   Identifier
                                   

                                                  Association

                                    Saturday,
                                    2011/9/10
                      Premises
MM2                   Identifier                           MSubA
                                   
                                                      EV charges at
                                                      different
                                     Monday,
                                                      Premises each
                                    2011/9/12         day
                      Premises
MM3                   Identifier
                                   



Project Green On Ramp                                                                 Paul Stith
SUM – Sustainable Unlimited Mobility                                           December 10, 2011
                                                                                              19
PG&E E-9A/B Rate Update
            Sub-Metering Protocol Development


                                        Paul Stith
                                 Principal Consultant – SUM
                              Vice President, EAA Silicon Valley



                                       Paul.Stith@sum.com




Project Green On Ramp                                                     Paul Stith
SUM – Sustainable Unlimited Mobility                               December 10, 2011

Mais conteúdo relacionado

Mais procurados

Delta Energy Service In Europe Summit Insight
Delta Energy Service In Europe Summit InsightDelta Energy Service In Europe Summit Insight
Delta Energy Service In Europe Summit Insightcianreville
 
GreenPlus Opportunity
GreenPlus OpportunityGreenPlus Opportunity
GreenPlus OpportunityKeithSandor
 
public serviceenterprise group Investor 06/23/08
public serviceenterprise group Investor 06/23/08public serviceenterprise group Investor 06/23/08
public serviceenterprise group Investor 06/23/08finance20
 
PoleCo Presentation
PoleCo PresentationPoleCo Presentation
PoleCo PresentationPoleCo
 
D11 Energy Education Nexus
D11 Energy Education NexusD11 Energy Education Nexus
D11 Energy Education NexusJacob Anderson
 
Estar presentation mielec 061011
Estar presentation mielec 061011Estar presentation mielec 061011
Estar presentation mielec 061011ESTAR_HU
 
The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achi...
The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achi...The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achi...
The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achi...Paul van der Linden
 
Charles McGlashan: Marin Clean Energy
Charles McGlashan: Marin Clean EnergyCharles McGlashan: Marin Clean Energy
Charles McGlashan: Marin Clean EnergyClean Energy Action
 
Green Energy Incentives Workbook
Green Energy Incentives WorkbookGreen Energy Incentives Workbook
Green Energy Incentives WorkbookDarren Welker, CPA
 
GENI.org: There Is No Energy Crisis
GENI.org: There Is No Energy CrisisGENI.org: There Is No Energy Crisis
GENI.org: There Is No Energy CrisisAileen Robi
 
Energy finance for building retrofits: Energy Performance Contracting UK
Energy finance for building retrofits: Energy Performance Contracting UKEnergy finance for building retrofits: Energy Performance Contracting UK
Energy finance for building retrofits: Energy Performance Contracting UKdrpaulfisher
 
Direct Load Control (DLC) Program Benchmarks
Direct Load Control (DLC) Program BenchmarksDirect Load Control (DLC) Program Benchmarks
Direct Load Control (DLC) Program BenchmarksE Source Companies, LLC
 
The Green Deal - an innovative energy efficient delivery structure for UK homes
The Green Deal - an innovative energy efficient delivery structure for UK homesThe Green Deal - an innovative energy efficient delivery structure for UK homes
The Green Deal - an innovative energy efficient delivery structure for UK homesGrant Thornton
 
Igloo3 Overview
Igloo3 OverviewIgloo3 Overview
Igloo3 Overviewsefton74
 

Mais procurados (15)

Delta Energy Service In Europe Summit Insight
Delta Energy Service In Europe Summit InsightDelta Energy Service In Europe Summit Insight
Delta Energy Service In Europe Summit Insight
 
GreenPlus Opportunity
GreenPlus OpportunityGreenPlus Opportunity
GreenPlus Opportunity
 
public serviceenterprise group Investor 06/23/08
public serviceenterprise group Investor 06/23/08public serviceenterprise group Investor 06/23/08
public serviceenterprise group Investor 06/23/08
 
PoleCo Presentation
PoleCo PresentationPoleCo Presentation
PoleCo Presentation
 
D11 Energy Education Nexus
D11 Energy Education NexusD11 Energy Education Nexus
D11 Energy Education Nexus
 
Estar presentation mielec 061011
Estar presentation mielec 061011Estar presentation mielec 061011
Estar presentation mielec 061011
 
The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achi...
The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achi...The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achi...
The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achi...
 
Charles McGlashan: Marin Clean Energy
Charles McGlashan: Marin Clean EnergyCharles McGlashan: Marin Clean Energy
Charles McGlashan: Marin Clean Energy
 
Dorset Transition Energy Survey 2009
Dorset Transition Energy Survey 2009Dorset Transition Energy Survey 2009
Dorset Transition Energy Survey 2009
 
Green Energy Incentives Workbook
Green Energy Incentives WorkbookGreen Energy Incentives Workbook
Green Energy Incentives Workbook
 
GENI.org: There Is No Energy Crisis
GENI.org: There Is No Energy CrisisGENI.org: There Is No Energy Crisis
GENI.org: There Is No Energy Crisis
 
Energy finance for building retrofits: Energy Performance Contracting UK
Energy finance for building retrofits: Energy Performance Contracting UKEnergy finance for building retrofits: Energy Performance Contracting UK
Energy finance for building retrofits: Energy Performance Contracting UK
 
Direct Load Control (DLC) Program Benchmarks
Direct Load Control (DLC) Program BenchmarksDirect Load Control (DLC) Program Benchmarks
Direct Load Control (DLC) Program Benchmarks
 
The Green Deal - an innovative energy efficient delivery structure for UK homes
The Green Deal - an innovative energy efficient delivery structure for UK homesThe Green Deal - an innovative energy efficient delivery structure for UK homes
The Green Deal - an innovative energy efficient delivery structure for UK homes
 
Igloo3 Overview
Igloo3 OverviewIgloo3 Overview
Igloo3 Overview
 

Semelhante a Electric Auto Silicon Valley - E9 PG&E Rates

Net Energy Metering (N.E.M.) 2.0 - Solar Regulations in San Diego
Net Energy Metering (N.E.M.) 2.0 - Solar Regulations in San DiegoNet Energy Metering (N.E.M.) 2.0 - Solar Regulations in San Diego
Net Energy Metering (N.E.M.) 2.0 - Solar Regulations in San DiegoHome Energy Systems
 
Euec(2009)Final
Euec(2009)FinalEuec(2009)Final
Euec(2009)Finalfijigeorge
 
Highlights from the Evaluation of California\'s Statewide Base Interruptible ...
Highlights from the Evaluation of California\'s Statewide Base Interruptible ...Highlights from the Evaluation of California\'s Statewide Base Interruptible ...
Highlights from the Evaluation of California\'s Statewide Base Interruptible ...joshschel
 
Highlights from the Evaluation of California\'s Base Interruptible Program
Highlights from the Evaluation of California\'s Base Interruptible ProgramHighlights from the Evaluation of California\'s Base Interruptible Program
Highlights from the Evaluation of California\'s Base Interruptible Programjoshschel
 
How Economic Value Management can be Applied to Power Plant Management
How Economic Value Management can be Applied to Power Plant ManagementHow Economic Value Management can be Applied to Power Plant Management
How Economic Value Management can be Applied to Power Plant ManagementPar Sut
 
Generating a Return with Renewables on your Farm - Fiona Hildick (Tradelink S...
Generating a Return with Renewables on your Farm - Fiona Hildick (Tradelink S...Generating a Return with Renewables on your Farm - Fiona Hildick (Tradelink S...
Generating a Return with Renewables on your Farm - Fiona Hildick (Tradelink S...Farming Futures
 
pepco WSUG107
pepco WSUG107pepco WSUG107
pepco WSUG107finance41
 
public serviceenterprise group ExelonEEI
public serviceenterprise group ExelonEEIpublic serviceenterprise group ExelonEEI
public serviceenterprise group ExelonEEIfinance20
 
public serviceenterprise group ExelonEEI
public serviceenterprise group ExelonEEIpublic serviceenterprise group ExelonEEI
public serviceenterprise group ExelonEEIfinance20
 
2012 07 Low Carbon Green Building Performance Design
2012 07 Low Carbon Green Building Performance Design2012 07 Low Carbon Green Building Performance Design
2012 07 Low Carbon Green Building Performance DesignSteve Lojuntin
 
Sustainable Tulsa program
Sustainable Tulsa programSustainable Tulsa program
Sustainable Tulsa programGaren Ewbank
 
Renewable Energy Implementations
Renewable Energy ImplementationsRenewable Energy Implementations
Renewable Energy ImplementationsRachmadi Gustrian
 
energy future holindings 1908Q108ConfCallDeck_FINAL
 energy future holindings  1908Q108ConfCallDeck_FINAL energy future holindings  1908Q108ConfCallDeck_FINAL
energy future holindings 1908Q108ConfCallDeck_FINALfinance29
 
Owning zero usgbc co rmg 2012
Owning zero usgbc co rmg 2012Owning zero usgbc co rmg 2012
Owning zero usgbc co rmg 2012Tom Hootman
 
Dānijas pieredze Energoefektivitātes pienākuma shēmas ieviešanā enerģijas sad...
Dānijas pieredze Energoefektivitātes pienākuma shēmas ieviešanā enerģijas sad...Dānijas pieredze Energoefektivitātes pienākuma shēmas ieviešanā enerģijas sad...
Dānijas pieredze Energoefektivitātes pienākuma shēmas ieviešanā enerģijas sad...Ekonomikas ministrija/ Dzīvo siltāk
 
Exelon Corporation at Morgan Stanley Global Electricity & Energy Conference
Exelon Corporation at Morgan Stanley Global Electricity & Energy ConferenceExelon Corporation at Morgan Stanley Global Electricity & Energy Conference
Exelon Corporation at Morgan Stanley Global Electricity & Energy Conferencefinance14
 
Market 2015: Power, Energy, and Ground Source HVAC/R
Market 2015: Power, Energy, and Ground Source HVAC/RMarket 2015: Power, Energy, and Ground Source HVAC/R
Market 2015: Power, Energy, and Ground Source HVAC/RGaren Ewbank
 
Alan Pears - slides - price on carbon forum Aug 2011
Alan Pears - slides - price on carbon forum Aug 2011Alan Pears - slides - price on carbon forum Aug 2011
Alan Pears - slides - price on carbon forum Aug 2011simon5678
 
Brakey First Energy Capacity White Paper
Brakey First Energy Capacity White PaperBrakey First Energy Capacity White Paper
Brakey First Energy Capacity White Papermnickoson
 

Semelhante a Electric Auto Silicon Valley - E9 PG&E Rates (20)

SDG&E CCSE 10 04 10
SDG&E CCSE 10 04 10SDG&E CCSE 10 04 10
SDG&E CCSE 10 04 10
 
Net Energy Metering (N.E.M.) 2.0 - Solar Regulations in San Diego
Net Energy Metering (N.E.M.) 2.0 - Solar Regulations in San DiegoNet Energy Metering (N.E.M.) 2.0 - Solar Regulations in San Diego
Net Energy Metering (N.E.M.) 2.0 - Solar Regulations in San Diego
 
Euec(2009)Final
Euec(2009)FinalEuec(2009)Final
Euec(2009)Final
 
Highlights from the Evaluation of California\'s Statewide Base Interruptible ...
Highlights from the Evaluation of California\'s Statewide Base Interruptible ...Highlights from the Evaluation of California\'s Statewide Base Interruptible ...
Highlights from the Evaluation of California\'s Statewide Base Interruptible ...
 
Highlights from the Evaluation of California\'s Base Interruptible Program
Highlights from the Evaluation of California\'s Base Interruptible ProgramHighlights from the Evaluation of California\'s Base Interruptible Program
Highlights from the Evaluation of California\'s Base Interruptible Program
 
How Economic Value Management can be Applied to Power Plant Management
How Economic Value Management can be Applied to Power Plant ManagementHow Economic Value Management can be Applied to Power Plant Management
How Economic Value Management can be Applied to Power Plant Management
 
Generating a Return with Renewables on your Farm - Fiona Hildick (Tradelink S...
Generating a Return with Renewables on your Farm - Fiona Hildick (Tradelink S...Generating a Return with Renewables on your Farm - Fiona Hildick (Tradelink S...
Generating a Return with Renewables on your Farm - Fiona Hildick (Tradelink S...
 
pepco WSUG107
pepco WSUG107pepco WSUG107
pepco WSUG107
 
public serviceenterprise group ExelonEEI
public serviceenterprise group ExelonEEIpublic serviceenterprise group ExelonEEI
public serviceenterprise group ExelonEEI
 
public serviceenterprise group ExelonEEI
public serviceenterprise group ExelonEEIpublic serviceenterprise group ExelonEEI
public serviceenterprise group ExelonEEI
 
2012 07 Low Carbon Green Building Performance Design
2012 07 Low Carbon Green Building Performance Design2012 07 Low Carbon Green Building Performance Design
2012 07 Low Carbon Green Building Performance Design
 
Sustainable Tulsa program
Sustainable Tulsa programSustainable Tulsa program
Sustainable Tulsa program
 
Renewable Energy Implementations
Renewable Energy ImplementationsRenewable Energy Implementations
Renewable Energy Implementations
 
energy future holindings 1908Q108ConfCallDeck_FINAL
 energy future holindings  1908Q108ConfCallDeck_FINAL energy future holindings  1908Q108ConfCallDeck_FINAL
energy future holindings 1908Q108ConfCallDeck_FINAL
 
Owning zero usgbc co rmg 2012
Owning zero usgbc co rmg 2012Owning zero usgbc co rmg 2012
Owning zero usgbc co rmg 2012
 
Dānijas pieredze Energoefektivitātes pienākuma shēmas ieviešanā enerģijas sad...
Dānijas pieredze Energoefektivitātes pienākuma shēmas ieviešanā enerģijas sad...Dānijas pieredze Energoefektivitātes pienākuma shēmas ieviešanā enerģijas sad...
Dānijas pieredze Energoefektivitātes pienākuma shēmas ieviešanā enerģijas sad...
 
Exelon Corporation at Morgan Stanley Global Electricity & Energy Conference
Exelon Corporation at Morgan Stanley Global Electricity & Energy ConferenceExelon Corporation at Morgan Stanley Global Electricity & Energy Conference
Exelon Corporation at Morgan Stanley Global Electricity & Energy Conference
 
Market 2015: Power, Energy, and Ground Source HVAC/R
Market 2015: Power, Energy, and Ground Source HVAC/RMarket 2015: Power, Energy, and Ground Source HVAC/R
Market 2015: Power, Energy, and Ground Source HVAC/R
 
Alan Pears - slides - price on carbon forum Aug 2011
Alan Pears - slides - price on carbon forum Aug 2011Alan Pears - slides - price on carbon forum Aug 2011
Alan Pears - slides - price on carbon forum Aug 2011
 
Brakey First Energy Capacity White Paper
Brakey First Energy Capacity White PaperBrakey First Energy Capacity White Paper
Brakey First Energy Capacity White Paper
 

Electric Auto Silicon Valley - E9 PG&E Rates

  • 1. PG&E E-9A/B Rate Update Sub-Metering Protocol Development Paul Stith Principal Consultant – SUM Vice President, EAA Silicon Valley Project Green On Ramp Paul Stith SUM – Sustainable Unlimited Mobility December 10, 2011
  • 2. Project Green On Ramp Paul Stith SUM – Sustainable Unlimited Mobility December 10, 2011 Page 61 Source PA Consulting – November 15, 2011
  • 3. Our PG&E “Relationship” & EV Purchase November 2010 – November 2011 Kilowatts Used / Roof not viable for Solar Project Green On Ramp Paul Stith SUM – Sustainable Unlimited Mobility December 10, 2011
  • 4. Our PG&E Electric Bills November 2010 – November 2011 Kilowatts Used / Terrible Roof for Solar Project Green On Ramp Paul Stith SUM – Sustainable Unlimited Mobility December 10, 2011
  • 5. PG&E E-9A / E-9B “Experimental” EV Rates Introduced over a decade ago, only allowed for owners of registered Electric Vehicles - Time of Use (TOU), Tiered Rates E-9A = Whole House, One Meter < 350 PG&E Customers E-9B = Dedicated Meter for EV + Household Meter < 40 PG&E Customers E-9B Allows you to receive TWO baseline allocations Household can be on any other rate plan Project Green On Ramp Paul Stith SUM – Sustainable Unlimited Mobility December 10, 2011
  • 6. PG&E E-9A Current TOU, Tiered Rate Project Green On Ramp Paul Stith SUM – Sustainable Unlimited Mobility December 10, 2011
  • 7. PG&E E-9B Current TOU, Tiered Rate Project Green On Ramp Paul Stith SUM – Sustainable Unlimited Mobility December 10, 2011
  • 8. PUC July 2011 PG&E Directive  PG&E Review Only E-9B Rates  Propose Flat Rate E-9B = Dedicated Meter for EV + Household Meter Project Green On Ramp Paul Stith SUM – Sustainable Unlimited Mobility December 10, 2011
  • 9. Southern California Edison EV Rates June 2011 Project Green On Ramp Paul Stith SUM – Sustainable Unlimited Mobility December 10, 2011
  • 10. Summer $0.38451 () $0.21431 () $0.11041 PUC July 2011 PG&E Directive Results Rate A & B Winter TOTAL RATES $0.27932 ( ) $0.17365 ( ) $0.11305 Total Energy Rates ($ per kWh) PEAK PART-PEAK OFF-PEAK Summer TOTAL RATES $0.38451 ( ) $0.21431 () $0.11041 () Rate A & B Total Energy Rates ($ per kWh) PEAK PART-PEAK OFF-PEAK Summer $0.38451 () $0.21431 () $0.11041 () Winter $0.27932 () $0.17365 () $0.11305 () Total Customer Charge Rate ($ per meter per day) $0.26283 Winter $0.27932 () $0.17365 () $0.11305 () Total bundled service charges shown on customer’s bills are unbundled according to  PG&E Proposed Flat TOU shown below. E-9A AND E-9B component rates Rates for  Raised Base Rate from ~5 Cents to ~11 Cents Total Customer Charge Rate ($ per meter per day) $0.26283  80% of Existing E-9A/B rate payers will see higher bills Total bundled service charges shown on customer’s bills are unbundled according to the Total Customer Charge Rate ($ per meter per below. component rates shown day) $0.26283  Some rate payers will be better on standard E1 Plan  High use bundled service charges shown onwith high 24x7 use may to the Total accounts, especially customer’s bills are unbundled according component rates shown below. actually be better off with proposed rates Project Green On Ramp Advice Letter No: Issued by Paul Stith Date Filed SUM – Sustainable Unlimited Mobility Decision No. Brian K. Cherry December 10, 2011 Effective Vice President Resolution No.
  • 11. PG&E E-9A & E-9B Rate Proposal - Challenges and Responses - Activities  Letter Writing Campaign  PG&E Response (Can’t sell below cost)  Letter Writing Campaign – Version 2  PG&E Response??? Action Items  Full rate analysis of E1 vs. E9 specific cases  Request rate freeze until scheduled 2013-2014 analysis  Analyze other Time of Use Applications & Rates, Marginal Cost Off-Peak  Examine EVSE Service Provider Rates  Legislative Support for Residential Subsidies  Support Sub-Metering Technologies Project Green On Ramp Paul Stith SUM – Sustainable Unlimited Mobility December 10, 2011
  • 12. PUC July 2011 Directive – All IOUs PU1 PG&E, SCE & San Diego Power & Gas Required to develop a Sub-Metering Protocol MM1 FSubA1  Isolate EV Charging Load from Primary Load  Sub-Meter can not be owned by Utility  Simplify the EV service offerings by segregating use  Application-specific utility rates to drive charging behavior  Lower the cost to access application-specific rates  Expand workplace and multi-family charging Input from EVSE Providers, Service Providers, Auto Makers & Consumers Project Green On Ramp Paul Stith SUM – Sustainable Unlimited Mobility December 10, 2011
  • 13. Source: Joint IOU Work Groups 11/2011 Project Green On Ramp Paul Stith SUM – Sustainable Unlimited Mobility December 10, 2011
  • 14. Proposed Joint Utility Submetering Protocol Development Plan Description And Activities Phase 1 Phase 2 Phase 3 Phase 4 Define / Plan Design / Develop Build Interim Solution Build Scalable Solution Short-Term Mid-Term Long-Term CUSTOMER OR 3RD PARTY-OWNED SUBMETERING IS CUSTOMER OR 3RD PARTY-OWNED SUBMETERING IS AVAILABLE TO CUSTOMERS FOR NON-BILLING AVAILABLE TO CUSTOMERS FOR BILLING PURPOSES PURPOSES • Submeters for IOU subtractive billing are • National Standards are in place • IOU customers may have the choice of residential and several EV rates owned by customers or 3rd parties • Submeters for subtractive billing are • IOU customers can continue to use the utility’s single whole house meter, which owned by customers or 3rd parties DESCRIPTION includes EV charging and billing • Submeter data for IOU subtractive billing • Submeter data for IOU subtractive • IOU customers can add a parallel meter service panel for a dedicated utility-owned to be provided according to protocol billing to be provided according to and read parallel meter for EV charging and billing (includes submeter ID, premise ID, and protocol date/time stamped interval usage) • IOU customers can install a submeter, either owned by the customer or a 3rd party, • Utilities execute automated, full scale and receive usage data from those (non-utility) sources for energy monitoring • Utilities execute manual, small scale subtractive billing subtractive billing of EV charging loads • Full utility cost recovery in place for • Full utility cost recovery in place for upgrades to IT/billing systems and upgrades to IT/billing systems and related related costs costs • Define the CA Submetering Protocol • Develop the California Submetering • Implement a solution - build, test, and refine • Upgrade utility systems to handle Roadmap Protocol the necessary processes, systems, and system automated, full scale subtractive - Goals, objectives, scope, guidelines interfaces billing - Business requirements and specs for - List of Issues and/or Requirements utilities, customers and 3rd party • Pursue development of national standards for • Leverage utility investments in Smart and Preliminary Recommendations meter service providers submeters and subtractive billing Grid technologies ACTIVITIES - Key tasks or activities and timing for - Technical, security, privacy • Enable 3-way handshake among the utility, • National standards are completed and each requirements, specs, and standards customer, and 3rd party meter service implemented by this time - Responsible organizations and aligned with national standards provider individuals for each - Architectural design for end-to-end • Develop certification process for 3rd party • Complete and submit the Submetering systems (including back office devices, systems, processes Roadmap Report integration) • Develop and carry out customer information - Implementation strategy and plan, campaign schedule, tasks, and deliverables Project Green On Ramp Source: Joint IOU Work Groups 11/2011 Paul Stith SUM – Sustainable Unlimited Mobility December 10, 2011 14
  • 15. CPUC Submetering Protocol Timeline PROTOCOL DEVELOPMENT TARIFF ROADMAP DEVELOPMENT DEVELOPMENT Decision 7.25.2011 AFV OIR Phase 2 Public Submeter Tariff sheet changes to workshop protocol implement with external roadmap submetering protocol stakeholders report into tariff rules 10/27/11 1/3/2012 * 9/3/2012 9/15/11 11/14/11 7/31/2012 1/2013 IOU joint Workshop Tier 2 advice Decision meetings with report letter & Closing CPUC Energy Protocol Proceedings Division, Report Automakers, EVSE Manufacturers, and EVSPs * Potential extension to be evaluated Project Green On Ramp Source: Joint IOU Work Groups 11/2011 Paul Stith SUM – Sustainable Unlimited Mobility December 10, 2011 15
  • 16. Use Case 1: Fixed Submeter Electricity Usage Data Billing Utility = Electric Commodity Provider (One to One EVSP) Master Meter Usage Submeter Usage Customer of Record for the Fixed Submeter is the Premise Owner Premises Usage Premises 1 PU1 Utility Systems Stagin MM1 FSubA Open Back g DMA EV Office FSubA1 Server AMI Implications – Assumes 3rd Party sends data from their Data Management Agent (DMA) to the utility via the OpenEV interface OpenEV – Requires 3-way association among customer, 3rd party, and utility prior to accurate subtractive billing (i.e. no ad-hoc associations) – Submeter adheres to the same certification and requirements as a utility master meter based on national standards – OpenEV standard must be established, and 3rd Party DMA is certified to it – AMI network is not used to transport submeter data Project Green On Ramp Paul Stith SUM – Sustainable Unlimited Mobility December 10, 2011 16
  • 17. Use Case 2: Fixed Submeter Electricity Usage Data Billing Utility = Electric Commodity Provider (One to Many EVSPs) Master Meter Usage Submeter Usage Customer of Record for the Fixed Submeter is the Premise Owner Submeter Usage Submeter Usage Premises Usage Premises 1 Utility Systems PU1 Staging Back MM1 FSubA Open Office Server FSubA1 DMA EV FSubA2 FSubA3 FSubB Open FSubB1 DMA EV FSubB2 FSubC Open DMA EV FSubC1 AMI Example: shopping center garage with multiple vendors with multiple submetered charging points. NOTE: Submeter data is not aggregated. Project Green On Ramp Paul Stith SUM – Sustainable Unlimited Mobility December 10, 2011 17
  • 18. Use Case 3: Fixed Submeter Electricity Usage Data Billing EVSP = Resells Electricity to Consumer (One to One) Master Meter Usage Submeter Usage Customer of Record for the Fixed Submeter is EVSP Premises Usage Premises 1 Could include PU1 value-added services Utility Systems MM1 FSubA Open Staging Back DMA EV Server Office FSubA1 AMI Implications – This arrangement is qualitatively the same as Use Case 1 – Both the premise owner and EVSP are direct tariff customers of the utility (load serving entity) – Customer of record for the fixed submeter is the EVSP – Utility is charging 3rd parties for their usage, and 3rd parties may recoup their costs in addition to any value-added service cost Project Green On Ramp Paul Stith SUM – Sustainable Unlimited Mobility December 10, 2011 18
  • 19. Mobile Submeters EVSP = Resells Electricity to Consumer Customer of Record for Mobile Submeter can be Customer or EVSP OpenEV Friday, 2011/9/9 Premises MM1 Identifier  Association Saturday, 2011/9/10 Premises MM2 Identifier MSubA  EV charges at different Monday, Premises each 2011/9/12 day Premises MM3 Identifier  Project Green On Ramp Paul Stith SUM – Sustainable Unlimited Mobility December 10, 2011 19
  • 20. PG&E E-9A/B Rate Update Sub-Metering Protocol Development Paul Stith Principal Consultant – SUM Vice President, EAA Silicon Valley Paul.Stith@sum.com Project Green On Ramp Paul Stith SUM – Sustainable Unlimited Mobility December 10, 2011

Notas do Editor

  1. ----- Meeting Notes (12/10/11 08:27) -----Intro
  2. See if you can figure out three dates: Started looking @ EVsPlaced OrderTook Delivery
  3. See if you can figure out three dates: Started looking @ EVsPlaced OrderTook Delivery
  4. ----- Meeting Notes (12/9/11 10:28) -----Key words - Experimental, decade, tiered.
  5. PG&amp;E Was asked only to adjust their EV rates for dedicated meter “B” service, but they proposed both A and B rate changes.