Top Rated Kolkata Call Girls Dum Dum ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...
17th Edition Part 6
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15. 612 – Testing Section 612 details the required tests to be for initial verification. The tests should be carried out in a prescribed sequence, some prior to the circuits being energized.
16.
17.
18.
19.
20. The correct documentation must be issued to the person ordering the work TYPE OF WORK COMPLETED TYPE OF FORM REQUIRED New installation or change to existing installation Electrical Installation Certificate New installation work that does not include the provision of a new circuit Electrical Installation Certificate or Minor Electrical Installation Works Certificate Alterations or additions Electrical Installation Certificate Alterations or additions that does not include the provision of a new circuit Electrical Installation Certificate or Minor Electrical Installation Works Certificate Periodic Inspection and Testing Periodic Inspection Report
21. Electrical Installation Certificate (Form 1) This form to be used when only one person is responsible for the design, construction and testing of the installation
29. 612.12 – Check of phase sequence For multi-phase circuits there is a requirement to verify that phase sequence is maintained
30. 612.14 – Verification of voltage drop This subject matter was covered previously in Section 523 (and Appendix 12). Regulation 612.14 is short, so briefly familiarize yourself with its content.