SlideShare uma empresa Scribd logo
1 de 3
Baixar para ler offline
Dubai, U.A.E
Tel: +971502108442
Email: osama.jaber91@yahoo.com
Osama Jaber
____________________________________________________________
PERSONAL INFORMATION:
Date & place of Birth: June, 1991 – Sharjah, UAE
Nationality: Jordanian.
.
Languages: Arabic: Native, English: Fluent
Work Experience.
Nov 2013 to date: ADC Energy Systems LLC:
As a turnkey contractor in the fields of Cooling Plants, Energy Services, Grain Handling and
Infrastructure, ADC continuously work on bringing industrial application to good conclusion
through continuous engagements with all stakeholders starting with the client and his
representatives, in partnership with our suppliers, service providers and our own talented team,
and through the practice of detailed attention and care to conclude matters successfully.
Project Engineer:
Site Engineers work on a project from the initial brief, through the design and
development stage, to the testing and commissioning activities up to hand over the
project.
Key Responsibilities:
• In charge of generating methods and work plan on 2 weeks look-ahead and working
towards achieving planned activities.
• Responsible for day-to-day running of the discipline activities.
• Responsible for raising, discussing and approving manpower plans for discipline and
revising the manpower schedule based on 2 weeks look-ahead.
• To review discipline drawings, prepare shop drawings, and analytically comment on
discipline design.
• Review of project technical documents; project technical specifications, owner project
requirements, tender drawings and estimates.
• Carry out design calculations using state-of-the-art software’s to find out design
requirements.
• Preparations of drawings (Civil/Mechanical/Electrical) through each stage as per project
scope of work.
• Procurement log: tool where we can track our procured materials ordered on site.
projects: SAADIYAT DCP-4 COOLING PLANT New York University - UAE
Employer: Tourism Developement & Investment Company (TDIC)
Client: PAL Technology Services LLC
Consultant: Architects Crang & Boake Inc.
MEP Consultant: The Three Factors (EN3)
Design Capacity: 13,500 TR Chillers + 2,500 TR TES Tank
Year of Completion: F-2014
- Prepare Operation and maintenance manuals.
- Review ‘As Built’ drawings.
- Witnesses testing and commissioning and performance of plant.
SARAYA DEVELOPEMENT DCP ABU DHABI CORNICHE – UAE
Employer: AL DAR PROPERTIES P.J.S.C
Client: PAL Technology Services LLC
Consultant: Architects Crang & Boake Inc.
MEP Consultant: The Three Factors (EN3)
Design Capacity: 20,000 TR Chillers
Year of Completion: F-2016
- Extract BOQs from design drawings for procurement purposes.
- Prepare coordination drawings for installation of equipments at site.
- Carry out constructability review during design stages.
- Confer with engineers and other personnel to implement operating procedures, resolve
system malfunctions, and provide technical information.
- Reviews materials and equipment to ensure that they are in accordance with the
specifications.
- Specify system components to ensure conformance with engineering design and
performance specifications.
- Reviews shop drawings to ensure that they are in accordance with the design and that
they are coordinated.
- Oversee installation, operation, maintenance, and repair to ensure that machines and
equipment are installed and functioning according to specifications.
Reverse Osmosis Polishing Plant - Lusail Qatar.
Owner: MARAFEQ QATAR
EPC Contractor: ADC Energy Systems LLC & BUTEC
MEP Consultant: The Three Factors (EN3)
Design Capacity: 6,600 m3/day
Year of Completion: F-2016
- Prepare process design concepts for polishing TSE (Treated Sewage Effluent) to meet
the water quality required for DCP.
- Prepare and develop PFD, P&ID ,SLD & Schematic drawings required for the project.
- Extract BOQ for all equipments, items & materials required for installation and in line with
design basis and specifications.
- Procure all materials & items with coordination of technical department.
- Preparation of Coordination drawings with existing services at site.
- Preparation of Operating & maintenance manuals.
- Develop installation, testing & commissioning procedure.
Education
• 2008-2013 University of Jordan B.SC Chemical engineering
• 2005-2008 Al-Shola Private School (Sharjah, U.A.E.) High School
Computer Skills
- Microsoft Office: (Excel, Word, Power Point,Outlook)
- ASPEN HYSYS
- AUTOCAD
- Peachtree Program for issuing of Local Purchase Order (LPO)
- ERP Software
REFERENCE
Up On your request

Mais conteúdo relacionado

Mais procurados

Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad
 
Nawab civil supervisor cv
Nawab civil supervisor cvNawab civil supervisor cv
Nawab civil supervisor cvWasimIqbal28
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSOHAIL SHAH
 
Rameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez K
 
Planning engineer cv (mehtab)
Planning engineer cv (mehtab)Planning engineer cv (mehtab)
Planning engineer cv (mehtab)Mehtab Zaidi
 
Civil Engineer CV
Civil Engineer CVCivil Engineer CV
Civil Engineer CVAfzal Khan
 
PROFESSIONAL EXPERIENCE
PROFESSIONAL EXPERIENCEPROFESSIONAL EXPERIENCE
PROFESSIONAL EXPERIENCErajesh Rajesh
 
Land Surveyor Updated CV
Land Surveyor Updated CVLand Surveyor Updated CV
Land Surveyor Updated CVIbrar Hussain
 
Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)S Ajith
 
nizamuddinG Planning Engineer
nizamuddinG Planning EngineernizamuddinG Planning Engineer
nizamuddinG Planning Engineerghulam nizamuddin
 
Civil Engineer & Inspector
Civil Engineer & InspectorCivil Engineer & Inspector
Civil Engineer & InspectorMOHAMED RASHEED
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Amir Mohammed
 

Mais procurados (20)

Project Engineer Cv
Project Engineer CvProject Engineer Cv
Project Engineer Cv
 
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CV
 
Nawab civil supervisor cv
Nawab civil supervisor cvNawab civil supervisor cv
Nawab civil supervisor cv
 
HUM-Surveyor-CV
HUM-Surveyor-CVHUM-Surveyor-CV
HUM-Surveyor-CV
 
Ahmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineerAhmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineer
 
Planning Engineer CV
Planning Engineer CVPlanning Engineer CV
Planning Engineer CV
 
Senior Planning Engineer.
Senior Planning Engineer.Senior Planning Engineer.
Senior Planning Engineer.
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
 
Rameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez - Site Engineer - CV
Rameez - Site Engineer - CV
 
Planning engineer cv (mehtab)
Planning engineer cv (mehtab)Planning engineer cv (mehtab)
Planning engineer cv (mehtab)
 
Civil Engineer CV
Civil Engineer CVCivil Engineer CV
Civil Engineer CV
 
PROFESSIONAL EXPERIENCE
PROFESSIONAL EXPERIENCEPROFESSIONAL EXPERIENCE
PROFESSIONAL EXPERIENCE
 
2 btech civil engineer resume
2 btech civil engineer resume2 btech civil engineer resume
2 btech civil engineer resume
 
Land Surveyor Updated CV
Land Surveyor Updated CVLand Surveyor Updated CV
Land Surveyor Updated CV
 
Curriculum Vitae Of Khalid
Curriculum Vitae Of KhalidCurriculum Vitae Of Khalid
Curriculum Vitae Of Khalid
 
Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)
 
Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)
 
nizamuddinG Planning Engineer
nizamuddinG Planning EngineernizamuddinG Planning Engineer
nizamuddinG Planning Engineer
 
Civil Engineer & Inspector
Civil Engineer & InspectorCivil Engineer & Inspector
Civil Engineer & Inspector
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 

Destaque

Interview Techniques
Interview TechniquesInterview Techniques
Interview TechniquesAnshul Gupta
 
Implementing and Measuring Google+ and +1s
Implementing and Measuring Google+ and +1sImplementing and Measuring Google+ and +1s
Implementing and Measuring Google+ and +1sMarketing Mojo
 
Emotional Mapping of a Place of Interest Using Mobile Devices for Learning
Emotional Mapping of a Place of Interest Using Mobile Devices for LearningEmotional Mapping of a Place of Interest Using Mobile Devices for Learning
Emotional Mapping of a Place of Interest Using Mobile Devices for LearningMinistry of Education
 
L'organizzazione dei contenuti è la nuova SEO
L'organizzazione dei contenuti è la nuova SEOL'organizzazione dei contenuti è la nuova SEO
L'organizzazione dei contenuti è la nuova SEOLuca Conti
 
Augmented Reality: guardare il mondo da un altro punto di vista
Augmented Reality: guardare il mondo da un altro punto di vistaAugmented Reality: guardare il mondo da un altro punto di vista
Augmented Reality: guardare il mondo da un altro punto di vistaCodemotion
 
Rusty Remakes - Presentation
Rusty Remakes - PresentationRusty Remakes - Presentation
Rusty Remakes - PresentationRusty Remakes
 
Pubcon New Orleans: Best Tactics in Landing Page Optimization
Pubcon New Orleans: Best Tactics in Landing Page OptimizationPubcon New Orleans: Best Tactics in Landing Page Optimization
Pubcon New Orleans: Best Tactics in Landing Page OptimizationMarketing Mojo
 
Comparing Lessons from Two Health Systems and Two Projects
Comparing Lessons from Two Health Systems and Two ProjectsComparing Lessons from Two Health Systems and Two Projects
Comparing Lessons from Two Health Systems and Two ProjectsHealth Informatics New Zealand
 
Social Media CPEC Exemplary Practice #AFC63
Social Media CPEC Exemplary Practice #AFC63Social Media CPEC Exemplary Practice #AFC63
Social Media CPEC Exemplary Practice #AFC63Joshua Murdock
 
Programa de seminario
Programa de seminarioPrograma de seminario
Programa de seminarioCUNSUROC-USAC
 
Identifying deficiencies in long-term condition management using electronic m...
Identifying deficiencies in long-term condition management using electronic m...Identifying deficiencies in long-term condition management using electronic m...
Identifying deficiencies in long-term condition management using electronic m...Health Informatics New Zealand
 
Lisa Castaneda, Steven Isaacs & Mark Suter - Virtual Reality in Education: Ex...
Lisa Castaneda, Steven Isaacs & Mark Suter - Virtual Reality in Education: Ex...Lisa Castaneda, Steven Isaacs & Mark Suter - Virtual Reality in Education: Ex...
Lisa Castaneda, Steven Isaacs & Mark Suter - Virtual Reality in Education: Ex...SeriousGamesAssoc
 
7 Apps Augmented Reality per la classe
7 Apps Augmented Reality per la classe7 Apps Augmented Reality per la classe
7 Apps Augmented Reality per la classeLaura Antichi
 
Introduction to the Interoperability Reference Architecture
Introduction to the Interoperability Reference ArchitectureIntroduction to the Interoperability Reference Architecture
Introduction to the Interoperability Reference ArchitectureHealth Informatics New Zealand
 
White Cement | Market, Demand, Growth & Manufacturing Plant Report
White Cement | Market, Demand, Growth & Manufacturing Plant ReportWhite Cement | Market, Demand, Growth & Manufacturing Plant Report
White Cement | Market, Demand, Growth & Manufacturing Plant ReportIMARC Group
 
PAS, Laboratorio 1 Episodi di Apprendimento Situati
PAS, Laboratorio 1 Episodi di Apprendimento SituatiPAS, Laboratorio 1 Episodi di Apprendimento Situati
PAS, Laboratorio 1 Episodi di Apprendimento SituatiLaura Antichi
 

Destaque (20)

Presentation east delhi
Presentation east delhiPresentation east delhi
Presentation east delhi
 
Interview Techniques
Interview TechniquesInterview Techniques
Interview Techniques
 
Implementing and Measuring Google+ and +1s
Implementing and Measuring Google+ and +1sImplementing and Measuring Google+ and +1s
Implementing and Measuring Google+ and +1s
 
Emotional Mapping of a Place of Interest Using Mobile Devices for Learning
Emotional Mapping of a Place of Interest Using Mobile Devices for LearningEmotional Mapping of a Place of Interest Using Mobile Devices for Learning
Emotional Mapping of a Place of Interest Using Mobile Devices for Learning
 
L'organizzazione dei contenuti è la nuova SEO
L'organizzazione dei contenuti è la nuova SEOL'organizzazione dei contenuti è la nuova SEO
L'organizzazione dei contenuti è la nuova SEO
 
Augmented Reality: guardare il mondo da un altro punto di vista
Augmented Reality: guardare il mondo da un altro punto di vistaAugmented Reality: guardare il mondo da un altro punto di vista
Augmented Reality: guardare il mondo da un altro punto di vista
 
Rusty Remakes - Presentation
Rusty Remakes - PresentationRusty Remakes - Presentation
Rusty Remakes - Presentation
 
Pubcon New Orleans: Best Tactics in Landing Page Optimization
Pubcon New Orleans: Best Tactics in Landing Page OptimizationPubcon New Orleans: Best Tactics in Landing Page Optimization
Pubcon New Orleans: Best Tactics in Landing Page Optimization
 
Tabla contenido estudiantes
Tabla contenido estudiantesTabla contenido estudiantes
Tabla contenido estudiantes
 
Comparing Lessons from Two Health Systems and Two Projects
Comparing Lessons from Two Health Systems and Two ProjectsComparing Lessons from Two Health Systems and Two Projects
Comparing Lessons from Two Health Systems and Two Projects
 
Bux1c
Bux1cBux1c
Bux1c
 
Social Media CPEC Exemplary Practice #AFC63
Social Media CPEC Exemplary Practice #AFC63Social Media CPEC Exemplary Practice #AFC63
Social Media CPEC Exemplary Practice #AFC63
 
Programa de seminario
Programa de seminarioPrograma de seminario
Programa de seminario
 
Identifying deficiencies in long-term condition management using electronic m...
Identifying deficiencies in long-term condition management using electronic m...Identifying deficiencies in long-term condition management using electronic m...
Identifying deficiencies in long-term condition management using electronic m...
 
Lisa Castaneda, Steven Isaacs & Mark Suter - Virtual Reality in Education: Ex...
Lisa Castaneda, Steven Isaacs & Mark Suter - Virtual Reality in Education: Ex...Lisa Castaneda, Steven Isaacs & Mark Suter - Virtual Reality in Education: Ex...
Lisa Castaneda, Steven Isaacs & Mark Suter - Virtual Reality in Education: Ex...
 
7 Apps Augmented Reality per la classe
7 Apps Augmented Reality per la classe7 Apps Augmented Reality per la classe
7 Apps Augmented Reality per la classe
 
Introduction to the Interoperability Reference Architecture
Introduction to the Interoperability Reference ArchitectureIntroduction to the Interoperability Reference Architecture
Introduction to the Interoperability Reference Architecture
 
Rin Case Study
Rin Case StudyRin Case Study
Rin Case Study
 
White Cement | Market, Demand, Growth & Manufacturing Plant Report
White Cement | Market, Demand, Growth & Manufacturing Plant ReportWhite Cement | Market, Demand, Growth & Manufacturing Plant Report
White Cement | Market, Demand, Growth & Manufacturing Plant Report
 
PAS, Laboratorio 1 Episodi di Apprendimento Situati
PAS, Laboratorio 1 Episodi di Apprendimento SituatiPAS, Laboratorio 1 Episodi di Apprendimento Situati
PAS, Laboratorio 1 Episodi di Apprendimento Situati
 

Semelhante a Osama-CV-uni

MY CV PROJECT ENGINEER
MY CV PROJECT ENGINEERMY CV PROJECT ENGINEER
MY CV PROJECT ENGINEERMoaiad Mdm
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_originalNeeladri varma
 
Venkata Chandra Sekhar Sure
Venkata Chandra Sekhar SureVenkata Chandra Sekhar Sure
Venkata Chandra Sekhar Surechandu52
 
professionalResume e
professionalResume eprofessionalResume e
professionalResume epandiyaraj k
 
CV Engr Imran Brkat
CV Engr Imran BrkatCV Engr Imran Brkat
CV Engr Imran Brkatimran barkat
 
Asim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updatedAsim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updatedasim siraj
 
CURRICLUM VITAE-Kashif
CURRICLUM VITAE-KashifCURRICLUM VITAE-Kashif
CURRICLUM VITAE-KashifKashif Bhatti
 
CURRICLUM VITAE-Kashif
CURRICLUM VITAE-KashifCURRICLUM VITAE-Kashif
CURRICLUM VITAE-KashifKashif Bhatti
 
Professional resume
Professional resumeProfessional resume
Professional resumeayman adawy
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa
 
Janakiraman.M _Process Designer & SPP&ID Co-ordinator
Janakiraman.M _Process Designer & SPP&ID Co-ordinatorJanakiraman.M _Process Designer & SPP&ID Co-ordinator
Janakiraman.M _Process Designer & SPP&ID Co-ordinatorJanakiraman muthu
 

Semelhante a Osama-CV-uni (20)

MY CV PROJECT ENGINEER
MY CV PROJECT ENGINEERMY CV PROJECT ENGINEER
MY CV PROJECT ENGINEER
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_original
 
Venkata Chandra Sekhar Sure
Venkata Chandra Sekhar SureVenkata Chandra Sekhar Sure
Venkata Chandra Sekhar Sure
 
professionalResume e
professionalResume eprofessionalResume e
professionalResume e
 
CV Engr Imran Brkat
CV Engr Imran BrkatCV Engr Imran Brkat
CV Engr Imran Brkat
 
Imran barkat.
Imran barkat.Imran barkat.
Imran barkat.
 
Asim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updatedAsim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updated
 
CURRICLUM VITAE-Kashif
CURRICLUM VITAE-KashifCURRICLUM VITAE-Kashif
CURRICLUM VITAE-Kashif
 
CURRICLUM VITAE-Kashif
CURRICLUM VITAE-KashifCURRICLUM VITAE-Kashif
CURRICLUM VITAE-Kashif
 
NARESH 3+
NARESH 3+NARESH 3+
NARESH 3+
 
Professional resume
Professional resumeProfessional resume
Professional resume
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
99855115 GHULAM ASZAD
99855115 GHULAM ASZAD99855115 GHULAM ASZAD
99855115 GHULAM ASZAD
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Abo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & DutiesAbo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & Duties
 
Resume
Resume Resume
Resume
 
Aftab CV.
Aftab CV.Aftab CV.
Aftab CV.
 
Jabir CV
Jabir CVJabir CV
Jabir CV
 
Janakiraman.M _Process Designer & SPP&ID Co-ordinator
Janakiraman.M _Process Designer & SPP&ID Co-ordinatorJanakiraman.M _Process Designer & SPP&ID Co-ordinator
Janakiraman.M _Process Designer & SPP&ID Co-ordinator
 

Osama-CV-uni

  • 1. Dubai, U.A.E Tel: +971502108442 Email: osama.jaber91@yahoo.com Osama Jaber ____________________________________________________________ PERSONAL INFORMATION: Date & place of Birth: June, 1991 – Sharjah, UAE Nationality: Jordanian. . Languages: Arabic: Native, English: Fluent Work Experience. Nov 2013 to date: ADC Energy Systems LLC: As a turnkey contractor in the fields of Cooling Plants, Energy Services, Grain Handling and Infrastructure, ADC continuously work on bringing industrial application to good conclusion through continuous engagements with all stakeholders starting with the client and his representatives, in partnership with our suppliers, service providers and our own talented team, and through the practice of detailed attention and care to conclude matters successfully. Project Engineer: Site Engineers work on a project from the initial brief, through the design and development stage, to the testing and commissioning activities up to hand over the project. Key Responsibilities: • In charge of generating methods and work plan on 2 weeks look-ahead and working towards achieving planned activities. • Responsible for day-to-day running of the discipline activities. • Responsible for raising, discussing and approving manpower plans for discipline and revising the manpower schedule based on 2 weeks look-ahead. • To review discipline drawings, prepare shop drawings, and analytically comment on discipline design. • Review of project technical documents; project technical specifications, owner project requirements, tender drawings and estimates. • Carry out design calculations using state-of-the-art software’s to find out design requirements. • Preparations of drawings (Civil/Mechanical/Electrical) through each stage as per project scope of work. • Procurement log: tool where we can track our procured materials ordered on site.
  • 2. projects: SAADIYAT DCP-4 COOLING PLANT New York University - UAE Employer: Tourism Developement & Investment Company (TDIC) Client: PAL Technology Services LLC Consultant: Architects Crang & Boake Inc. MEP Consultant: The Three Factors (EN3) Design Capacity: 13,500 TR Chillers + 2,500 TR TES Tank Year of Completion: F-2014 - Prepare Operation and maintenance manuals. - Review ‘As Built’ drawings. - Witnesses testing and commissioning and performance of plant. SARAYA DEVELOPEMENT DCP ABU DHABI CORNICHE – UAE Employer: AL DAR PROPERTIES P.J.S.C Client: PAL Technology Services LLC Consultant: Architects Crang & Boake Inc. MEP Consultant: The Three Factors (EN3) Design Capacity: 20,000 TR Chillers Year of Completion: F-2016 - Extract BOQs from design drawings for procurement purposes. - Prepare coordination drawings for installation of equipments at site. - Carry out constructability review during design stages. - Confer with engineers and other personnel to implement operating procedures, resolve system malfunctions, and provide technical information. - Reviews materials and equipment to ensure that they are in accordance with the specifications. - Specify system components to ensure conformance with engineering design and performance specifications. - Reviews shop drawings to ensure that they are in accordance with the design and that they are coordinated. - Oversee installation, operation, maintenance, and repair to ensure that machines and equipment are installed and functioning according to specifications. Reverse Osmosis Polishing Plant - Lusail Qatar. Owner: MARAFEQ QATAR EPC Contractor: ADC Energy Systems LLC & BUTEC MEP Consultant: The Three Factors (EN3) Design Capacity: 6,600 m3/day Year of Completion: F-2016 - Prepare process design concepts for polishing TSE (Treated Sewage Effluent) to meet the water quality required for DCP. - Prepare and develop PFD, P&ID ,SLD & Schematic drawings required for the project. - Extract BOQ for all equipments, items & materials required for installation and in line with design basis and specifications. - Procure all materials & items with coordination of technical department. - Preparation of Coordination drawings with existing services at site. - Preparation of Operating & maintenance manuals. - Develop installation, testing & commissioning procedure.
  • 3. Education • 2008-2013 University of Jordan B.SC Chemical engineering • 2005-2008 Al-Shola Private School (Sharjah, U.A.E.) High School Computer Skills - Microsoft Office: (Excel, Word, Power Point,Outlook) - ASPEN HYSYS - AUTOCAD - Peachtree Program for issuing of Local Purchase Order (LPO) - ERP Software REFERENCE Up On your request