2. Operation of centrifugal pumps
Pump Safety
Some of the more important safety rules that apply to pump operation
include the following:
Know what sort of liquid is being pumped.
Specific gravity.
Vapor pressures.
Temperature.
3. Operation of centrifugal pumps
Pump Safety
Observe proper purging precautions .
Venting vapor from casing, section line, discharge line and where
necessary.
When pumps vent directly to the atmosphere, the operator should
stand clear as the vapor is being purged.
The vent valve should be only cracked and not fully opened at the
start of purging
4. Operation of centrifugal pumps
Pump Safety
Maintain protective guards .
Guards are fitted to shield against accident and pumps must not
be operated unless all guards are secured in place.
Maintain correct lubrication .
Checking for correct lubricant levels before starting.
Tidiness around pump area .
Free area around the pump ( no rubbish or debris).
Any spillage of lubricant should be immediately cleaned up.
5. Operation of centrifugal pumps
Pump Place back
A pump that has been out of service for a given period must be
properly placed back in service before it may be started.
1. Check for safety hazards.
2. Checking lubricant level and cooling water flow .
3. Purging and priming the pump.
4. Purging and priming the pump:
If positive suction head is available, then the pump is purged as follows:
6. Operation of centrifugal pumps
Pump Place back
If the pump is operating on suction lift (negative suction head)
then the pump must be purged and primed using one of the two
following methods:
A. If there is liquid at the discharge side of the pump, then the
pump can be purged and primed by opening the discharge
block valve and also the suction block valve.
B. When liquid is not available at either the suction or discharge
sides of the pump, then liquid must be pumped into the pump
casing and suction line from another source, using an auxiliary
pump.
5. Resetting the pump circuit breaker.
6. Lining up the pump.
7. Operation of centrifugal pumps
Pump Start-up
Starting up a centrifugal pump involves the following steps:
1. Close all drains and vent lines after priming the pump.
2. Check that force-feed lubricators, seal oil system and
water cooling systems are fully operational.
3. Open the suction block valve to its fullest extent.
4. f the pump is being started to relieve another pump, then
open the discharge block valve fully. If, however, the flow
will be through a line that has been out of service, then
the discharge block valve should only be opened.
5. Press the pump start button or switch and check for an
increase in lube oil pressure.
8. Operation of centrifugal pumps
Pump Start-up
6. Gradually open the discharge block valve (if not already
opened in step 4).
7. Check the discharge flow controller for the desired flow
rate and make any adjustments to the set point that may
be necessary.
9. Operation of centrifugal pumps
Monitoring Pump Operation
After the pump has been started and running for several minutes, the
following checks should be made to make sure that the pump is
operating normally without any problems:
1. Monitor discharge pressure for abnormal values.
2. Re-check lubricant levels.
3. Check operation of force feed lube systems.
4. Check for excessive motor temperatures.
5. Check pump bearings and packing for excessive temperature.
6. Listen for abnormal noises.
7. Check for excessive vibration.
8. Check packing or mechanical seals for excessive leakage.
10. Operation of centrifugal pumps
Switching Pumps
Switching pumps involves shutting down one of two pumps arranged
in parallel whilst at the same time starting up a relief pump.
Since it is important that the load be switched from one pump to the
other with the least possible disturbance to the process, switching
should be carried out by two persons.
One person shuts down the pump to be taken out of service whilst
the other person starts up the relief pump.
24. Operation of centrifugal pumps
Securing a pump for maintenance
When a pump is to be taken out of service for maintenance, the
following steps should be carried out:
1. Shut down the pump using the stop button or switch. If
necessary, the process should be switched to a standby
pump.
2. Isolate the electrical supply to the pump by tripping the
circuit breaker in the switchgear building, then securing it
in the "open" position with a padlock and attaching a
warning tag. As an additional precaution, check that the
pump does not start when its start button is pressed.
3. Close completely both the suction and the discharge
block valves.
25. Operation of centrifugal pumps
Securing a pump for maintenance
4. Open the vent valve to allow the liquid pressure inside the
pump to be reduced to atmospheric.
5. Open drain valves (usually located at the bottom of the
pump casing) and allow the liquid to drain off. Close the
drain valves after all the liquid has been drained from the
pump.
6. Tag the pump for repairs.
SAFETY NOTE:
A pump which is locked out in the switchgear building or
tagged for repairs should never be re-started without first
checking that all work on it has been completed and a permit to
re-start has been issued.