Menu, Functions and Security Profile 
Oracle HRMS Functional Document 
AIM Phases and Documentations 
Part 0.3 
Note: This Document is created only for Class Room Training Purpose 
By 
Regintala Chandra Sekhar 
ora17hr@gmail.com 
Regintala Chandra Sekhar Page 1 ora17hr@gmail.com
Menu, Functions and Security Profile 
Table of Contents 
Oracle Project AIM ....................................................................................................................................................................... 3 
AIM Phases: .................................................................................................................................................................................... 3 
1. Project Definition ........................................................................................................................................................... 3 
2. Operation Analysis ......................................................................................................................................................... 4 
3. Solution Design ................................................................................................................................................................ 4 
4. Build .................................................................................................................................................................................... 4 
5. Transition .......................................................................................................................................................................... 5 
6. Production ......................................................................................................................................................................... 5 
Trying to understand AIM (Application Implementation Methodology): ............................................................... 6 
1. Understand the Existing Business Processes and current business baseline .............................................. 6 
2. Creating Future Business Model .................................................................................................................................... 6 
3. Business Mapping and Gap Resolution ....................................................................................................................... 7 
4. Creation of Application and Technical architecture .............................................................................................. 8 
5. Gaps and Interfaces Resolution ..................................................................................................................................... 9 
6. Business System Testing ............................................................................................................................................... 10 
7. Data Migration .................................................................................................................................................................. 11 
8. Documentation ................................................................................................................................................................. 13 
Regintala Chandra Sekhar Page 2 ora17hr@gmail.com
Oracle Project AIM 
Documents which are Prepared at the time of Implementation 
Documents 
BR Business Mapping and Gap Resolution 10 30 50 90 100 110 
MD Gaps and Interface Resolutions 50 70 80 90 110 120 
TE Business System Testing 20 30 40 50 60 70 80 100 110 120 130 
BP Business Process Document 40 70 80 
CF 
CV Data Migration 10 50 60 70 80 90 100 110 130 
RD Business Requirement Document 20 50 80 
TA Creation of Application and Technical Architecture 10 120 140 150 
DO Documentation 50 70 90 
AIM Phases: 
1. Project Definition 
This is the phase of project scoping; project planning, resource planning, phase planning, budgeting and 
defining constraints and facilitate crucial informed project startup decisions. 
This is also the phase to lay down the communication channel, design an effective infrastructure for delegation 
and ensure project executive team is in place. In this phase executive team is engaged in interactive sessions 
and project team is organized and oriented. 
In case, business process change is applicable, then high-level process scenarios are developed. 
The main tasks in this phase are: 
 Understanding the current business process and baseline current business process. 
 Develop the Preliminary Conceptual Architecture (TA.030). 
 Develop TO-BE process model, i.e. determine the high-level architectural, technological, and 
configuration requirements to support the functional and information needs of the application system 
(BP.080). 
 Design improved high-level business processes (BP.070). 
Regintala Chandra Sekhar Page 3 ora17hr@gmail.com
2. Operation Analysis 
This phase is mainly to drill down to the next levels of details from where it was in the previous phase. 
In this phase flow of information, function and process models are captured and detailed with all possible 
variants. 
This is also the phase to define the detailed function, data, and operational requirements that the new 
application system must support and map business requirements to application capabilities and propose 
solutions to gaps. This will demonstrate that the proposed business process design is feasible for the 
organization. The technical architecture of hardware and software is refined and a transition strategy is for 
moving from the current system to the new application system is drawn. 
Performance testing models and scenarios should be developed and proposed. 
3. Solution Design 
The objectives of Solution Design are to produce a design that meets functional requirements within 
business, technical, and financial constraints and document the design specifications in a way that facilitates 
and supports future maintenance of the system. 
In this phase functional and technical designs for custom extensions, interfaces, conversion programs and 
database extensions are developed along with security architecture and application set-up and test plans. Also 
unit, link, system, and system integration test scripts are developed. Test scripts, test transaction programs and 
test data load programs are prepared for taking up system performance testing. User-learning needs and User 
Learning Plans are developed in this phase. 
4. Build 
The objectives of the Build phase is to Develop, test, and accept custom software, including application 
extensions, interface programs, data conversion software, custom application subsystems integrated with 
Oracle Applications, temporary bridge subsystems which transaction data between legacy and new systems 
during multiple 
Deployments. 
The Application and Database Server Architecture (TA.090), Platform and Network Architecture (TA.120) and 
Development Environment (MD.090) are defined prior to start the development work. 
In this phase, all documentation deliverables are developed and delivered to customer. 
They may be User Reference Manual (DO.060), User Guide (DO.070), Technical Reference Manual (DO.080) and 
System Management Guide (DO.090). 
The database extension and installation routines are created, tested, and accepted along with performance 
testing and reports. 
Regintala Chandra Sekhar Page 4 ora17hr@gmail.com
5. Transition 
The transition phase is to plan cut-over and actual scheduling of cut-over. This phase calls for preparation of 
going live in terms of application, operating environment, user readiness and cut-over plans. This is the period 
of end-user training, users learning and adoption plans is executed. 
After the application environment is prepared for production instance and all application, database extensions 
are in place, the application is loaded with initial configuration set-ups. 
Once the initial configuration set-up is ready, the environment is prepared to load application set-ups for 
individual modules and master data files are loaded either using loading scripts are using manual process. 
The master data is then verified with users and legacy files to assess data accuracy and ensure that masters are 
loaded error-free. 
The dynamic data files are then extracted from the legacy and verified for their correctness and then loaded 
inside application tables using loading scripts or manual process. All these data are cut-off data on a given date. 
Generally, the amount of legacy data to be loaded in the new system is as per the agreed migration strategy. 
However, the dynamic data needs to be validated to ensure accuracy and its reliability. 
By this time all jobs and routines must have been set. Once the migration process is successful, the system is 
handed over to production support. 
6. Production 
This is the period of hand-holding support for the system newly gone live and devote attention to post-implementation 
issues like user acceptance 
Regintala Chandra Sekhar Page 5 ora17hr@gmail.com
Trying to understand AIM (Application Implementation Methodology): 
1. Understand the Existing Business Processes and current business baseline 
AS-IS Business Model 
RD.020 – Conduct Current Business Baseline (C) 
Understand current processes and practices and document the main activities that keep the 
organization operating today. 
Output: Current Business Baseline 
BP.040 – Develop Current Process Model (O) 
Examine current business processes and practices and to identify how the existing business system 
meets current business requirements. 
Output: Current Process Model 
2. Creating Future Business Model 
TO-BE Business Model 
RD.050 – Gather Business Requirements (C) 
Define detailed business requirements and perform an initial assessment of 
application fit to these requirements. 
Output: Business Requirement Scenarios 
BP.070 – Develop High-Level Process Designs (C) 
Produce high-level designs, documenting how the new organization will operate after 
the applications are implemented. 
Output: High Level Process Design 
BP.080 – Develop Future Process Model (C) 
Defining the future business model in the form of integrated process flows built on the 
business processes supported by the new applications. 
Output: Future Process Model 
RD.080 – Identify Reporting and Information Access Requirements (C) 
Identify organization’s future reporting requirements. 
Output: Master Report Tracking List 
Regintala Chandra Sekhar Page 6 ora17hr@gmail.com
3. Business Mapping and Gap Resolution 
Mapping and Gap 
Identification 
BR.030 – Map Business Requirements (C) 
Assess the fit of standard application and system features to detailed business 
requirements. 
Output: Mapped Business Requirements 
BR.010 – Analyze High Level Gaps (C) 
Compare the process as envisioned in the High-Level Process Designs (BP.070) with 
the processes supported by Oracle Applications. The differences (gaps) revealed by this analysis need to be 
resolved by producing alternatives that balance change in the application against change in processes and 
organization. 
Output: High Level Gap Analysis 
BR.050 – Conduct Integration Fit Analysis (O) 
Identify the new integration points that you require, based on your conceptual 
architecture and the mapping of the new applications onto the existing architecture. 
Output: Integration Fit Analysis 
BR.090 – Confirm Integrated Business Solution (O) 
Secure approval for proposed business alternatives. 
Output: Confirmed Business Solution 
BR.100 – Define Application Set-up (C) 
Capture the setup decisions and implement them in the appropriate environment. 
Output: Application Setup Document 
BR.110 – Define Security Profile (O) 
Gather role and function information and relate them to application security and 
responsibilities. As business requirements are established and mapped to application features, you also begin 
to define the user security necessary to support the selected alternative in a controlled environment. 
Output: Security Profile 
Regintala Chandra Sekhar Page 7 ora17hr@gmail.com
4. Creation of Application and Technical architecture 
System Installation and Environment 
Creation 
TA.010 – Define Architecture Requirements and Strategy (C) 
Identify the application and technical architecture requirements and strategy that 
would be used for the design and development of the system being implemented. This includes support for 
both the final production environment and interim development and project support requirements. 
Output: Architecture Requirements and Strategy 
TA.120 – Define Platform and Network Architecture (C) 
Define the physical platform and network configuration to support your final platform 
and network architecture. You map the physical application and database server architecture onto specific 
computing platforms. This task focuses on the future production environment and not interim environments to 
support the project activities. This includes ongoing production supporting testing and learning environments. 
Output: Platform and Network Architecture 
TA.140 – Assess Performance Risk (C) 
Identify any performance risks that are apparent based on the proposed architecture 
and suggest techniques to mitigate the risks. This task focuses on the future production environment and not 
interim environments to support the project activities. This includes ongoing production supporting testing 
and learning environments. 
Output: Performance Risk Assessment 
TA.150 – Define System Management Procedures (O) 
Design the procedures and specify the tools that the client staff will need to manage 
the new system. After you design the procedures in this task, you need to test and refine them later in the 
project, prior to incorporating them into the System Management Guide (DO.090) and conducting learning 
events for the system support staff. This task focuses on the future production environment and not interim 
environments to support the project activities. This includes ongoing production supporting testing and 
learning environments. 
Output: System Management Procedure 
Regintala Chandra Sekhar Page 8 ora17hr@gmail.com
5. Gaps and Interfaces Resolution 
GAP Resolution 
MD.050 – Create Application Extension Functional Design (O) 
Document the functional features, use, and behavior of required customizations. The 
Application Extensions Functional Design confirms that you understand user requirements, and allows users to 
evaluate and approve the resulting features that the new modules will provide. 
Output: Application Extension Functional Design 
MD.070 – Create Application Extension Technical Design (O) 
Document the technical specifications for modifications, extensions, and configurable 
extensions. 
Output: Application Extension Technical Design 
MD.080 – Review Application Extension Functional and Technical Designs (O) 
Set up a design review meeting between business analysts, key users, technical 
analysts, and developers. The goal is to secure final acceptance of the complete designs. 
Output: Approved Designs 
MD.090 – Prepare Development Environments (C) 
Establish a platform and software environment that supports custom development. 
Output: Development Environments 
MD.110 – Create Application Extension Modules (O) 
Produce the modules to support customizations to the Applications. You also perform 
the first round of testing as part of this task. 
Output: Module Source Code 
MD.120 – Create Installation Routines (C) 
In this task, you develop automated functions and detailed instructions to install 
customizations in the testing and production environments. 
Output: Installation Routines 
Regintala Chandra Sekhar Page 9 ora17hr@gmail.com
6. Business System Testing 
CRP and Module Testing 
TE.020/070 – Develop/Perform Unit Test Scripts (C) 
TE.020 - Develop the script to test individual application extension components. The tests 
validate that the application extension inputs, outputs, and processing logic function as designed. 
Output: Unit Test Scripts 
TE.070 - Test application extension components on an individual basis to verify that the inputs, outputs, and 
processing logic of each application extension component functions without errors. Unit testing is performed in 
either the development environment or a testing environment. The goal is to find errors in the smallest unit of 
software before you logically link it into larger units. If successful, subsequent link testing should only reveal 
errors related to the integration between application extensions. 
Output: Unit-Tested Modules 
TE.030/080 – Develop/Perform Integrated Test Scripts (C) 
TE.030 - Develop scripts to test modifications to standard Oracle Applications as well as new 
application extensions as part of a business flow. This uncovers any integration problems with other 
application extension components that provide or use the data manipulated by the target modules. 
Output: Integrated Test Scripts 
TE.080 - Test several application extension components together as part of a business flow to uncover any 
integration problems with other application extension components that provide or use the data manipulated by 
the target component. Link testing is performed in either the development environment or a testing 
environment. The scope of each link test typically includes the set of components that support or are affected 
by a single application extension. An application extension is defined for each gap identified during 
requirements mapping and is described by a functional design and corresponding technical design document. 
Output: Link-Tested Modules 
TE.100 – Prepare Key Users for Testing (C) 
Provide basic training to key users participating in Business System Testing. A test 
environment is used to prepare key users for testing. 
Output: Prepared Key Users 
TE.040/110 – Develop/ Perform System Test Scripts (C) 
TE.040 - Develop the script to test the integration of application extensions with Oracle 
Applications modules. A system test script contains detailed steps which testers follow to verify the system 
setup and the integrity of custom application extensions for supporting business processes. 
Output: System Test Scripts 
TE.110 - Test the integration of all business system flows within the target application system, including all 
standard and custom processes and reports. This task is equivalent to a full conference room pilot (CRP) where 
the environment simulates the future production environment. The system test is performed in a test 
environment. 
Output: System Tested Applications 
Regintala Chandra Sekhar Page 10 ora17hr@gmail.com
TE.050/120 – Develop/ Perform System Integration Test Scripts (O) 
TE.050 - Develop the test script that validates the integration between your new application 
system and other third-party and legacy systems. 
Output: System Integration Test Scripts 
TE.120 - Test system’s integration with other application systems in a production-like environment. The 
systems integration test is performed in a test environment. 
Output: Integration Tested System 
TE.060 – Develop Testing Environments (C) 
Install and configure one or more testing environments to support all testing activities. 
Output: Testing Environments 
TE.130 – Perform Acceptance Testing (C) 
Support users in performing their acceptance test of the new production system. The 
acceptance test is performed in the Production Environment. This task also involves scheduling the acceptance 
test team, support staff, and user facilities. 
Output: Acceptance Test Results 
7. Data Migration 
Migration 
CV.010 – Define Data Conversion (Migration) Strategy (C) 
Define the scope of the conversion project, conversion objectives and approach, and 
prepare a strategy for converting information from the legacy systems to the new application 
environment. Part of defining the scope is documenting your conversion requirements at the 
application and business object level. Additionally, this task provides a roadmap for performing the 
conversion of data from the legacy system to the new Oracle system and defines the task steps and 
resources needed to fulfill this strategy. 
Output: Data Conversion Requirements and Strategy 
CV.050 – Define Manual Data Conversion (Migration) Procedures (C) 
Define the plan to convert the business objects that require manual conversion. The 
resulting procedure provides a detailed guide for manually converting data to successfully meet 
conversion project milestones. 
Output: Manual Conversion Procedures 
CV.060/070/080 – Design/ Prepare/ Develop Conversion Programs (O) 
CV.060 - Design and document the conversion programs. Completion of this task provides the 
developer with the necessary information for writing an accurate conversion program. 
Output: Conversion Program Designs 
Regintala Chandra Sekhar Page 11 ora17hr@gmail.com
CV.070 - Outline the testing plans for the unit, business object, and validation testing for 
conversion. The unit tests confirm that each module successfully completes the task it is designed to 
perform. For example, a unit test should verify that the download program has extracted the expected 
number of records from the legacy system. The business object test verifies that the quality of the data 
converted to the Oracle system is accurate and a function properly in the individual Oracle Application 
to which it has been converted. Validation testing verifies that the converted legacy data performs 
accurately within the entire suite of Oracle Applications. 
Output: Conversion Test Plans 
CV.080 - Create the conversion programs that perform all of the functions required to convert legacy 
business objects to the target Oracle Applications. The conversion of each business object typically 
involves the creation of five types of programs, including a download program, interface table 
creation program, upload program, translation program, and an interface and validation program. The 
download program is used to extract the data from the legacy system and create an ASCII flat file that 
can be uploaded to the Oracle tables. The interface table creation program creates tables that store the 
legacy data before the data is validated and inserted into the production tables of the Oracle 
Application. The upload program uploads the legacy ASCII flat file data to the interface tables, while 
the translation program performs any data-required translation, transformation, or manipulation 
required before moving the data to the production tables. Finally, the interface and validation 
program performs validation of the data in the interface tables and updates the data into the Oracle 
production tables. 
Output: Conversion Programs 
CV.090/100/110 – Perform Conversion Unit/ Business Object / Validation Tests (C) 
CV.090 - Test the conversion programs to verify that all programs work without errors 
and according to the conversion testing specifications pre-defined in the conversion unit testing 
components of the Conversion Test Plans (CV.070). 
Output: Unit Tested Conversion Programs 
CV.100 - Test the complete conversion of each business object by executing all conversion modules 
for the business object in the appropriate sequence and verify that the resulting data is correct. 
Output: Business-Object Tested Conversion Programs 
CV.110 - Validate that the target applications function correctly with the converted business objects. 
Output: Validation Tested Conversion Programs 
CV.130 – Convert and Verify Data (C) 
Convert and migrate the production data from the old system to the new Oracle 
production environment. Completion of this task provides data that is ready for production use. 
Output: Converted and Verified Data 
Regintala Chandra Sekhar Page 12 ora17hr@gmail.com
8. Documentation 
Documentation 
DO.050 – Produce Documentation Prototypes and Templates 
Build and review a single prototype for each type of documentation deliverable. The results 
conform to the look and feel of each documentation deliverable, as well as present a clear expectation 
of what will be delivered. You also create templates for later use. 
Output: Documentation Prototypes and Templates 
DO.070 – Publish User Guide 
Publish a User Guide that defines a set of detailed procedures for using the applications. This 
task is often performed in parallel with Perform System Test (TE.110). 
Output: User Guides 
DO.090 – Publish System Management Guide 
Gather material for the System Management Guide and publish the final version. Perform this 
task in parallel with the execution of the business system test. 
Output: System Management Guide 
Thank you....... 
Regintala Chandra Sekhar 
You can get more documents on my blogger: http://ora17hr.blogspot.com 
Facebook Group: www.facebook.com/groups/ora17hr 
Regintala Chandra Sekhar Page 13 ora17hr@gmail.com

Mais conteúdo relacionado

Mais procurados

Oracle HRMS Payroll Table Overview
Oracle HRMS Payroll Table OverviewOracle HRMS Payroll Table Overview
Oracle HRMS Payroll Table Overview
Chris Martin
 
Oracle General Ledger
Oracle General LedgerOracle General Ledger
Oracle General Ledger
Dock Den
 
177687855 fico-tcs-blueprint
177687855 fico-tcs-blueprint177687855 fico-tcs-blueprint
177687855 fico-tcs-blueprint
SOWJANYASUJATHA
 

Mais procurados (20)

19 creating employee_directory_part_19
19 creating employee_directory_part_1919 creating employee_directory_part_19
19 creating employee_directory_part_19
 
20.1 creating functions_part_20.1
20.1 creating functions_part_20.120.1 creating functions_part_20.1
20.1 creating functions_part_20.1
 
115payug
115payug115payug
115payug
 
21.1 personalization changing-the_field_name_part_21.1
21.1 personalization changing-the_field_name_part_21.121.1 personalization changing-the_field_name_part_21.1
21.1 personalization changing-the_field_name_part_21.1
 
Oracle HRMS Fast Formula
Oracle HRMS Fast FormulaOracle HRMS Fast Formula
Oracle HRMS Fast Formula
 
32 payroll setup_part_32_(skylark_group_pvt_ltd)
32 payroll setup_part_32_(skylark_group_pvt_ltd)32 payroll setup_part_32_(skylark_group_pvt_ltd)
32 payroll setup_part_32_(skylark_group_pvt_ltd)
 
Admm crp oracle hr
Admm crp oracle hrAdmm crp oracle hr
Admm crp oracle hr
 
Oracle HRMS Payroll Table Overview
Oracle HRMS Payroll Table OverviewOracle HRMS Payroll Table Overview
Oracle HRMS Payroll Table Overview
 
Oracle hrms bg setup examples
Oracle hrms bg setup examplesOracle hrms bg setup examples
Oracle hrms bg setup examples
 
Oracle EBS R12 Payroll user manual
Oracle EBS R12 Payroll user manualOracle EBS R12 Payroll user manual
Oracle EBS R12 Payroll user manual
 
Hrms
HrmsHrms
Hrms
 
BR100 Oracle AP Setup
BR100 Oracle AP SetupBR100 Oracle AP Setup
BR100 Oracle AP Setup
 
Oracle General Ledger
Oracle General LedgerOracle General Ledger
Oracle General Ledger
 
Inspection of Software Requirements Specifications (srs)
Inspection of Software Requirements Specifications (srs)Inspection of Software Requirements Specifications (srs)
Inspection of Software Requirements Specifications (srs)
 
Data migration blueprint legacy to sap
Data migration blueprint  legacy to sapData migration blueprint  legacy to sap
Data migration blueprint legacy to sap
 
HRMS Windows and their Navigation Paths.doc
HRMS Windows and their Navigation Paths.docHRMS Windows and their Navigation Paths.doc
HRMS Windows and their Navigation Paths.doc
 
Fujcci self service user_manual
Fujcci self service user_manualFujcci self service user_manual
Fujcci self service user_manual
 
Bp010 payroll hr_v3
Bp010 payroll hr_v3Bp010 payroll hr_v3
Bp010 payroll hr_v3
 
177687855 fico-tcs-blueprint
177687855 fico-tcs-blueprint177687855 fico-tcs-blueprint
177687855 fico-tcs-blueprint
 
Accrual plan set up in oracle hrms
Accrual plan set up in oracle hrmsAccrual plan set up in oracle hrms
Accrual plan set up in oracle hrms
 

Destaque

ASAP methodology overview
ASAP methodology overviewASAP methodology overview
ASAP methodology overview
Bogdan Gorka
 

Destaque (16)

Oracle A.I.M. Methodology Documentation
Oracle A.I.M. Methodology Documentation Oracle A.I.M. Methodology Documentation
Oracle A.I.M. Methodology Documentation
 
Production_Deployment_CM_Updated
Production_Deployment_CM_UpdatedProduction_Deployment_CM_Updated
Production_Deployment_CM_Updated
 
Oracle AIM Methodology
Oracle AIM MethodologyOracle AIM Methodology
Oracle AIM Methodology
 
Oracle aim-project-management-methodology
Oracle aim-project-management-methodologyOracle aim-project-management-methodology
Oracle aim-project-management-methodology
 
Communication during system rollouts
Communication during system rolloutsCommunication during system rollouts
Communication during system rollouts
 
Aim vs oum documents
Aim vs oum documentsAim vs oum documents
Aim vs oum documents
 
Rd 050 otl_hr_v3
Rd 050 otl_hr_v3Rd 050 otl_hr_v3
Rd 050 otl_hr_v3
 
WMS Overview
WMS OverviewWMS Overview
WMS Overview
 
ASAP methodology overview
ASAP methodology overviewASAP methodology overview
ASAP methodology overview
 
Oracle Implementation Project Template
Oracle Implementation Project TemplateOracle Implementation Project Template
Oracle Implementation Project Template
 
Webinar: Oracle R12 Warehouse Management System (WMS) Overview
Webinar: Oracle R12 Warehouse Management System (WMS) OverviewWebinar: Oracle R12 Warehouse Management System (WMS) Overview
Webinar: Oracle R12 Warehouse Management System (WMS) Overview
 
Oracle Aim Methodology
Oracle Aim MethodologyOracle Aim Methodology
Oracle Aim Methodology
 
Oracle AP Cycle
Oracle AP CycleOracle AP Cycle
Oracle AP Cycle
 
Oracle unified method ver1.0
Oracle unified method ver1.0Oracle unified method ver1.0
Oracle unified method ver1.0
 
Cutover plan template Tool
Cutover plan template ToolCutover plan template Tool
Cutover plan template Tool
 
Cutover Plan V2
Cutover Plan V2Cutover Plan V2
Cutover Plan V2
 

Semelhante a 0.3 aim phases_and_documentations

architecture-instances-integrations-data-flow-plan.pptx
architecture-instances-integrations-data-flow-plan.pptxarchitecture-instances-integrations-data-flow-plan.pptx
architecture-instances-integrations-data-flow-plan.pptx
AngeloAlmonte5
 
(Worthy & Heatley Networking Kimberly N. WorthyCIS 4.docx
(Worthy & Heatley Networking Kimberly N. WorthyCIS 4.docx(Worthy & Heatley Networking Kimberly N. WorthyCIS 4.docx
(Worthy & Heatley Networking Kimberly N. WorthyCIS 4.docx
mercysuttle
 

Semelhante a 0.3 aim phases_and_documentations (20)

Aim crisp handout
Aim crisp handoutAim crisp handout
Aim crisp handout
 
Sow p9
Sow p9Sow p9
Sow p9
 
19701759 Project Report On Railway Reservation System By Amit Mittal
19701759 Project Report On Railway Reservation System By Amit Mittal19701759 Project Report On Railway Reservation System By Amit Mittal
19701759 Project Report On Railway Reservation System By Amit Mittal
 
architecture-instances-integrations-data-flow-plan.pptx
architecture-instances-integrations-data-flow-plan.pptxarchitecture-instances-integrations-data-flow-plan.pptx
architecture-instances-integrations-data-flow-plan.pptx
 
Sdlc1
Sdlc1Sdlc1
Sdlc1
 
PPT.pptx
PPT.pptxPPT.pptx
PPT.pptx
 
PPT.pptx
PPT.pptxPPT.pptx
PPT.pptx
 
Issue Management System
Issue Management SystemIssue Management System
Issue Management System
 
System analysis and design
System analysis and designSystem analysis and design
System analysis and design
 
(Worthy & Heatley Networking Kimberly N. WorthyCIS 4.docx
(Worthy & Heatley Networking Kimberly N. WorthyCIS 4.docx(Worthy & Heatley Networking Kimberly N. WorthyCIS 4.docx
(Worthy & Heatley Networking Kimberly N. WorthyCIS 4.docx
 
SDLC
SDLCSDLC
SDLC
 
Anil K Vasireddy
Anil K  VasireddyAnil K  Vasireddy
Anil K Vasireddy
 
Softwareenggineering lab manual
Softwareenggineering lab manualSoftwareenggineering lab manual
Softwareenggineering lab manual
 
Data Warehouse 102
Data Warehouse 102Data Warehouse 102
Data Warehouse 102
 
]project-open[ Roll Out Plan
]project-open[ Roll Out Plan]project-open[ Roll Out Plan
]project-open[ Roll Out Plan
 
PAC Fast Track Implementation Program
PAC Fast Track Implementation ProgramPAC Fast Track Implementation Program
PAC Fast Track Implementation Program
 
Enterprise Architecture Verification Validation
Enterprise Architecture Verification Validation Enterprise Architecture Verification Validation
Enterprise Architecture Verification Validation
 
IRJET- Efficient Student Faculty Management System
IRJET- Efficient Student Faculty Management SystemIRJET- Efficient Student Faculty Management System
IRJET- Efficient Student Faculty Management System
 
Project-fit Blueprint.docx
Project-fit Blueprint.docxProject-fit Blueprint.docx
Project-fit Blueprint.docx
 
Employee Management System
Employee Management SystemEmployee Management System
Employee Management System
 

Último

1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Último (20)

psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptx
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 

0.3 aim phases_and_documentations

  • 1. Menu, Functions and Security Profile Oracle HRMS Functional Document AIM Phases and Documentations Part 0.3 Note: This Document is created only for Class Room Training Purpose By Regintala Chandra Sekhar ora17hr@gmail.com Regintala Chandra Sekhar Page 1 ora17hr@gmail.com
  • 2. Menu, Functions and Security Profile Table of Contents Oracle Project AIM ....................................................................................................................................................................... 3 AIM Phases: .................................................................................................................................................................................... 3 1. Project Definition ........................................................................................................................................................... 3 2. Operation Analysis ......................................................................................................................................................... 4 3. Solution Design ................................................................................................................................................................ 4 4. Build .................................................................................................................................................................................... 4 5. Transition .......................................................................................................................................................................... 5 6. Production ......................................................................................................................................................................... 5 Trying to understand AIM (Application Implementation Methodology): ............................................................... 6 1. Understand the Existing Business Processes and current business baseline .............................................. 6 2. Creating Future Business Model .................................................................................................................................... 6 3. Business Mapping and Gap Resolution ....................................................................................................................... 7 4. Creation of Application and Technical architecture .............................................................................................. 8 5. Gaps and Interfaces Resolution ..................................................................................................................................... 9 6. Business System Testing ............................................................................................................................................... 10 7. Data Migration .................................................................................................................................................................. 11 8. Documentation ................................................................................................................................................................. 13 Regintala Chandra Sekhar Page 2 ora17hr@gmail.com
  • 3. Oracle Project AIM Documents which are Prepared at the time of Implementation Documents BR Business Mapping and Gap Resolution 10 30 50 90 100 110 MD Gaps and Interface Resolutions 50 70 80 90 110 120 TE Business System Testing 20 30 40 50 60 70 80 100 110 120 130 BP Business Process Document 40 70 80 CF CV Data Migration 10 50 60 70 80 90 100 110 130 RD Business Requirement Document 20 50 80 TA Creation of Application and Technical Architecture 10 120 140 150 DO Documentation 50 70 90 AIM Phases: 1. Project Definition This is the phase of project scoping; project planning, resource planning, phase planning, budgeting and defining constraints and facilitate crucial informed project startup decisions. This is also the phase to lay down the communication channel, design an effective infrastructure for delegation and ensure project executive team is in place. In this phase executive team is engaged in interactive sessions and project team is organized and oriented. In case, business process change is applicable, then high-level process scenarios are developed. The main tasks in this phase are:  Understanding the current business process and baseline current business process.  Develop the Preliminary Conceptual Architecture (TA.030).  Develop TO-BE process model, i.e. determine the high-level architectural, technological, and configuration requirements to support the functional and information needs of the application system (BP.080).  Design improved high-level business processes (BP.070). Regintala Chandra Sekhar Page 3 ora17hr@gmail.com
  • 4. 2. Operation Analysis This phase is mainly to drill down to the next levels of details from where it was in the previous phase. In this phase flow of information, function and process models are captured and detailed with all possible variants. This is also the phase to define the detailed function, data, and operational requirements that the new application system must support and map business requirements to application capabilities and propose solutions to gaps. This will demonstrate that the proposed business process design is feasible for the organization. The technical architecture of hardware and software is refined and a transition strategy is for moving from the current system to the new application system is drawn. Performance testing models and scenarios should be developed and proposed. 3. Solution Design The objectives of Solution Design are to produce a design that meets functional requirements within business, technical, and financial constraints and document the design specifications in a way that facilitates and supports future maintenance of the system. In this phase functional and technical designs for custom extensions, interfaces, conversion programs and database extensions are developed along with security architecture and application set-up and test plans. Also unit, link, system, and system integration test scripts are developed. Test scripts, test transaction programs and test data load programs are prepared for taking up system performance testing. User-learning needs and User Learning Plans are developed in this phase. 4. Build The objectives of the Build phase is to Develop, test, and accept custom software, including application extensions, interface programs, data conversion software, custom application subsystems integrated with Oracle Applications, temporary bridge subsystems which transaction data between legacy and new systems during multiple Deployments. The Application and Database Server Architecture (TA.090), Platform and Network Architecture (TA.120) and Development Environment (MD.090) are defined prior to start the development work. In this phase, all documentation deliverables are developed and delivered to customer. They may be User Reference Manual (DO.060), User Guide (DO.070), Technical Reference Manual (DO.080) and System Management Guide (DO.090). The database extension and installation routines are created, tested, and accepted along with performance testing and reports. Regintala Chandra Sekhar Page 4 ora17hr@gmail.com
  • 5. 5. Transition The transition phase is to plan cut-over and actual scheduling of cut-over. This phase calls for preparation of going live in terms of application, operating environment, user readiness and cut-over plans. This is the period of end-user training, users learning and adoption plans is executed. After the application environment is prepared for production instance and all application, database extensions are in place, the application is loaded with initial configuration set-ups. Once the initial configuration set-up is ready, the environment is prepared to load application set-ups for individual modules and master data files are loaded either using loading scripts are using manual process. The master data is then verified with users and legacy files to assess data accuracy and ensure that masters are loaded error-free. The dynamic data files are then extracted from the legacy and verified for their correctness and then loaded inside application tables using loading scripts or manual process. All these data are cut-off data on a given date. Generally, the amount of legacy data to be loaded in the new system is as per the agreed migration strategy. However, the dynamic data needs to be validated to ensure accuracy and its reliability. By this time all jobs and routines must have been set. Once the migration process is successful, the system is handed over to production support. 6. Production This is the period of hand-holding support for the system newly gone live and devote attention to post-implementation issues like user acceptance Regintala Chandra Sekhar Page 5 ora17hr@gmail.com
  • 6. Trying to understand AIM (Application Implementation Methodology): 1. Understand the Existing Business Processes and current business baseline AS-IS Business Model RD.020 – Conduct Current Business Baseline (C) Understand current processes and practices and document the main activities that keep the organization operating today. Output: Current Business Baseline BP.040 – Develop Current Process Model (O) Examine current business processes and practices and to identify how the existing business system meets current business requirements. Output: Current Process Model 2. Creating Future Business Model TO-BE Business Model RD.050 – Gather Business Requirements (C) Define detailed business requirements and perform an initial assessment of application fit to these requirements. Output: Business Requirement Scenarios BP.070 – Develop High-Level Process Designs (C) Produce high-level designs, documenting how the new organization will operate after the applications are implemented. Output: High Level Process Design BP.080 – Develop Future Process Model (C) Defining the future business model in the form of integrated process flows built on the business processes supported by the new applications. Output: Future Process Model RD.080 – Identify Reporting and Information Access Requirements (C) Identify organization’s future reporting requirements. Output: Master Report Tracking List Regintala Chandra Sekhar Page 6 ora17hr@gmail.com
  • 7. 3. Business Mapping and Gap Resolution Mapping and Gap Identification BR.030 – Map Business Requirements (C) Assess the fit of standard application and system features to detailed business requirements. Output: Mapped Business Requirements BR.010 – Analyze High Level Gaps (C) Compare the process as envisioned in the High-Level Process Designs (BP.070) with the processes supported by Oracle Applications. The differences (gaps) revealed by this analysis need to be resolved by producing alternatives that balance change in the application against change in processes and organization. Output: High Level Gap Analysis BR.050 – Conduct Integration Fit Analysis (O) Identify the new integration points that you require, based on your conceptual architecture and the mapping of the new applications onto the existing architecture. Output: Integration Fit Analysis BR.090 – Confirm Integrated Business Solution (O) Secure approval for proposed business alternatives. Output: Confirmed Business Solution BR.100 – Define Application Set-up (C) Capture the setup decisions and implement them in the appropriate environment. Output: Application Setup Document BR.110 – Define Security Profile (O) Gather role and function information and relate them to application security and responsibilities. As business requirements are established and mapped to application features, you also begin to define the user security necessary to support the selected alternative in a controlled environment. Output: Security Profile Regintala Chandra Sekhar Page 7 ora17hr@gmail.com
  • 8. 4. Creation of Application and Technical architecture System Installation and Environment Creation TA.010 – Define Architecture Requirements and Strategy (C) Identify the application and technical architecture requirements and strategy that would be used for the design and development of the system being implemented. This includes support for both the final production environment and interim development and project support requirements. Output: Architecture Requirements and Strategy TA.120 – Define Platform and Network Architecture (C) Define the physical platform and network configuration to support your final platform and network architecture. You map the physical application and database server architecture onto specific computing platforms. This task focuses on the future production environment and not interim environments to support the project activities. This includes ongoing production supporting testing and learning environments. Output: Platform and Network Architecture TA.140 – Assess Performance Risk (C) Identify any performance risks that are apparent based on the proposed architecture and suggest techniques to mitigate the risks. This task focuses on the future production environment and not interim environments to support the project activities. This includes ongoing production supporting testing and learning environments. Output: Performance Risk Assessment TA.150 – Define System Management Procedures (O) Design the procedures and specify the tools that the client staff will need to manage the new system. After you design the procedures in this task, you need to test and refine them later in the project, prior to incorporating them into the System Management Guide (DO.090) and conducting learning events for the system support staff. This task focuses on the future production environment and not interim environments to support the project activities. This includes ongoing production supporting testing and learning environments. Output: System Management Procedure Regintala Chandra Sekhar Page 8 ora17hr@gmail.com
  • 9. 5. Gaps and Interfaces Resolution GAP Resolution MD.050 – Create Application Extension Functional Design (O) Document the functional features, use, and behavior of required customizations. The Application Extensions Functional Design confirms that you understand user requirements, and allows users to evaluate and approve the resulting features that the new modules will provide. Output: Application Extension Functional Design MD.070 – Create Application Extension Technical Design (O) Document the technical specifications for modifications, extensions, and configurable extensions. Output: Application Extension Technical Design MD.080 – Review Application Extension Functional and Technical Designs (O) Set up a design review meeting between business analysts, key users, technical analysts, and developers. The goal is to secure final acceptance of the complete designs. Output: Approved Designs MD.090 – Prepare Development Environments (C) Establish a platform and software environment that supports custom development. Output: Development Environments MD.110 – Create Application Extension Modules (O) Produce the modules to support customizations to the Applications. You also perform the first round of testing as part of this task. Output: Module Source Code MD.120 – Create Installation Routines (C) In this task, you develop automated functions and detailed instructions to install customizations in the testing and production environments. Output: Installation Routines Regintala Chandra Sekhar Page 9 ora17hr@gmail.com
  • 10. 6. Business System Testing CRP and Module Testing TE.020/070 – Develop/Perform Unit Test Scripts (C) TE.020 - Develop the script to test individual application extension components. The tests validate that the application extension inputs, outputs, and processing logic function as designed. Output: Unit Test Scripts TE.070 - Test application extension components on an individual basis to verify that the inputs, outputs, and processing logic of each application extension component functions without errors. Unit testing is performed in either the development environment or a testing environment. The goal is to find errors in the smallest unit of software before you logically link it into larger units. If successful, subsequent link testing should only reveal errors related to the integration between application extensions. Output: Unit-Tested Modules TE.030/080 – Develop/Perform Integrated Test Scripts (C) TE.030 - Develop scripts to test modifications to standard Oracle Applications as well as new application extensions as part of a business flow. This uncovers any integration problems with other application extension components that provide or use the data manipulated by the target modules. Output: Integrated Test Scripts TE.080 - Test several application extension components together as part of a business flow to uncover any integration problems with other application extension components that provide or use the data manipulated by the target component. Link testing is performed in either the development environment or a testing environment. The scope of each link test typically includes the set of components that support or are affected by a single application extension. An application extension is defined for each gap identified during requirements mapping and is described by a functional design and corresponding technical design document. Output: Link-Tested Modules TE.100 – Prepare Key Users for Testing (C) Provide basic training to key users participating in Business System Testing. A test environment is used to prepare key users for testing. Output: Prepared Key Users TE.040/110 – Develop/ Perform System Test Scripts (C) TE.040 - Develop the script to test the integration of application extensions with Oracle Applications modules. A system test script contains detailed steps which testers follow to verify the system setup and the integrity of custom application extensions for supporting business processes. Output: System Test Scripts TE.110 - Test the integration of all business system flows within the target application system, including all standard and custom processes and reports. This task is equivalent to a full conference room pilot (CRP) where the environment simulates the future production environment. The system test is performed in a test environment. Output: System Tested Applications Regintala Chandra Sekhar Page 10 ora17hr@gmail.com
  • 11. TE.050/120 – Develop/ Perform System Integration Test Scripts (O) TE.050 - Develop the test script that validates the integration between your new application system and other third-party and legacy systems. Output: System Integration Test Scripts TE.120 - Test system’s integration with other application systems in a production-like environment. The systems integration test is performed in a test environment. Output: Integration Tested System TE.060 – Develop Testing Environments (C) Install and configure one or more testing environments to support all testing activities. Output: Testing Environments TE.130 – Perform Acceptance Testing (C) Support users in performing their acceptance test of the new production system. The acceptance test is performed in the Production Environment. This task also involves scheduling the acceptance test team, support staff, and user facilities. Output: Acceptance Test Results 7. Data Migration Migration CV.010 – Define Data Conversion (Migration) Strategy (C) Define the scope of the conversion project, conversion objectives and approach, and prepare a strategy for converting information from the legacy systems to the new application environment. Part of defining the scope is documenting your conversion requirements at the application and business object level. Additionally, this task provides a roadmap for performing the conversion of data from the legacy system to the new Oracle system and defines the task steps and resources needed to fulfill this strategy. Output: Data Conversion Requirements and Strategy CV.050 – Define Manual Data Conversion (Migration) Procedures (C) Define the plan to convert the business objects that require manual conversion. The resulting procedure provides a detailed guide for manually converting data to successfully meet conversion project milestones. Output: Manual Conversion Procedures CV.060/070/080 – Design/ Prepare/ Develop Conversion Programs (O) CV.060 - Design and document the conversion programs. Completion of this task provides the developer with the necessary information for writing an accurate conversion program. Output: Conversion Program Designs Regintala Chandra Sekhar Page 11 ora17hr@gmail.com
  • 12. CV.070 - Outline the testing plans for the unit, business object, and validation testing for conversion. The unit tests confirm that each module successfully completes the task it is designed to perform. For example, a unit test should verify that the download program has extracted the expected number of records from the legacy system. The business object test verifies that the quality of the data converted to the Oracle system is accurate and a function properly in the individual Oracle Application to which it has been converted. Validation testing verifies that the converted legacy data performs accurately within the entire suite of Oracle Applications. Output: Conversion Test Plans CV.080 - Create the conversion programs that perform all of the functions required to convert legacy business objects to the target Oracle Applications. The conversion of each business object typically involves the creation of five types of programs, including a download program, interface table creation program, upload program, translation program, and an interface and validation program. The download program is used to extract the data from the legacy system and create an ASCII flat file that can be uploaded to the Oracle tables. The interface table creation program creates tables that store the legacy data before the data is validated and inserted into the production tables of the Oracle Application. The upload program uploads the legacy ASCII flat file data to the interface tables, while the translation program performs any data-required translation, transformation, or manipulation required before moving the data to the production tables. Finally, the interface and validation program performs validation of the data in the interface tables and updates the data into the Oracle production tables. Output: Conversion Programs CV.090/100/110 – Perform Conversion Unit/ Business Object / Validation Tests (C) CV.090 - Test the conversion programs to verify that all programs work without errors and according to the conversion testing specifications pre-defined in the conversion unit testing components of the Conversion Test Plans (CV.070). Output: Unit Tested Conversion Programs CV.100 - Test the complete conversion of each business object by executing all conversion modules for the business object in the appropriate sequence and verify that the resulting data is correct. Output: Business-Object Tested Conversion Programs CV.110 - Validate that the target applications function correctly with the converted business objects. Output: Validation Tested Conversion Programs CV.130 – Convert and Verify Data (C) Convert and migrate the production data from the old system to the new Oracle production environment. Completion of this task provides data that is ready for production use. Output: Converted and Verified Data Regintala Chandra Sekhar Page 12 ora17hr@gmail.com
  • 13. 8. Documentation Documentation DO.050 – Produce Documentation Prototypes and Templates Build and review a single prototype for each type of documentation deliverable. The results conform to the look and feel of each documentation deliverable, as well as present a clear expectation of what will be delivered. You also create templates for later use. Output: Documentation Prototypes and Templates DO.070 – Publish User Guide Publish a User Guide that defines a set of detailed procedures for using the applications. This task is often performed in parallel with Perform System Test (TE.110). Output: User Guides DO.090 – Publish System Management Guide Gather material for the System Management Guide and publish the final version. Perform this task in parallel with the execution of the business system test. Output: System Management Guide Thank you....... Regintala Chandra Sekhar You can get more documents on my blogger: http://ora17hr.blogspot.com Facebook Group: www.facebook.com/groups/ora17hr Regintala Chandra Sekhar Page 13 ora17hr@gmail.com