2. Strategies considered here
• Flood Storage at Holme Head [Denton
Holme
• Building floodwalls atop existing
embankments [Carlisle United]
• Flood plain maximisation on the Peterill
3. Holme Head Storage Scheme
The new
bridge at the
lower end of
an extended
flood plain
storage
scheme
14. The path up and over the realigned embankment and down into the wider flood plain
Below monitoring station [already grafittied] and drainage culvert
15. Line of the river
Original left bank [East]
Down stream of the
bridge flood walls
exist on both sides
– gate is closed
16. New Sewer Carlisle United
Peterill Bridge
and the widened
Flood Plain