SlideShare uma empresa Scribd logo
1 de 12
The Status of  Capitol Lake Planning Washington State Capitol CommitteeOctober 12, 2010
CAPITOL LAKE Setting the Context 1856: U.S. Coast SurveyDepartment of the Navy1911: State Capitol CommissionHires Olmsted Brothers and Wilder and White.1912: Olmsteds write to Gov. Hay suggesting improvements to the inner harbor which “may be accomplished from time to time as opportunity arises”.
  CAPITOL LAKESetting the Context 1927: Correspondence from Wilder & White to the Capitol Committee: “Improvement of the water front…has been given very little study on the Olmsted Plan and we believe it would be unfortunate to leave it at this stage.”  Wilder & White - undated 1937: The Legislature appropriated $150,000 to create Capitol Lake. The “Des Chutes Water Basin” project would acquire land, construct a parkway, and dam the river. The affected area would become part of the capitol campus.  3
CAPITOL LAKESetting the Context 1951: Project completed.   Since 1951 more than 2,000,000 cubic yards have accumulated in the basin.  Maintenance dredges have not removed sediment, but simply changed the lake’s shape. 1995: GA prepared proposal for a maintenance dredge. 1997: Dredge proposal withdrawn and CLAMP Committee formed to advise GA on management of the basin. TRPC
CLAMP Process 1997 through 2002: Capitol Lake Planning Studies ,[object Object]
  Aquatic Weed Management Plan
  10-year Lake Management Plan
  Community Involvement 2003 through 2009: Estuary Feasibility Studies      ,[object Object]
Reference Estuary Survey
Bathymetric Study
Hydraulic &Sediment Transport Model
Biological Conditions Report

Mais conteúdo relacionado

Mais procurados

Water–Demand Management in the Kingdom of Saudi Arabia for Enhancement Enviro...
Water–Demand Management in the Kingdom of Saudi Arabia for Enhancement Enviro...Water–Demand Management in the Kingdom of Saudi Arabia for Enhancement Enviro...
Water–Demand Management in the Kingdom of Saudi Arabia for Enhancement Enviro...IOSR Journals
 
Desalination & membrane technologies 2015...dr. nicole carter
Desalination & membrane technologies 2015...dr. nicole carterDesalination & membrane technologies 2015...dr. nicole carter
Desalination & membrane technologies 2015...dr. nicole carterJeffrey Pickett
 
Addressing Hydrology at the Watershed Scale: A Novel Approach to Stormwater M...
Addressing Hydrology at the Watershed Scale: A Novel Approach to Stormwater M...Addressing Hydrology at the Watershed Scale: A Novel Approach to Stormwater M...
Addressing Hydrology at the Watershed Scale: A Novel Approach to Stormwater M...TWCA
 
USACE Galveston: Coastal Project Updates - Sharon Manzella Tirpak
USACE Galveston: Coastal Project Updates - Sharon Manzella TirpakUSACE Galveston: Coastal Project Updates - Sharon Manzella Tirpak
USACE Galveston: Coastal Project Updates - Sharon Manzella TirpakTWCA
 
Tina ecology dams
Tina ecology damsTina ecology dams
Tina ecology damsMrJewett
 
Planning for the future_Integrated Water Management in the Ord TRiver Catchment
Planning for the future_Integrated Water Management in the Ord TRiver CatchmentPlanning for the future_Integrated Water Management in the Ord TRiver Catchment
Planning for the future_Integrated Water Management in the Ord TRiver CatchmentAdam Turville
 
2017 Greater Mekong Forum - Session 34 - Towards more effective river basin m...
2017 Greater Mekong Forum - Session 34 - Towards more effective river basin m...2017 Greater Mekong Forum - Session 34 - Towards more effective river basin m...
2017 Greater Mekong Forum - Session 34 - Towards more effective river basin m...Water, Land and Ecosystems (WLE)
 
Flood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt MachielseFlood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt MachielseYourAlberta
 
Flood management in Pakistan ppt
Flood management in Pakistan pptFlood management in Pakistan ppt
Flood management in Pakistan pptPari Doll
 
Two global transboundary water conventions: a catalyst for cooperation on sha...
Two global transboundary water conventions: a catalyst for cooperation on sha...Two global transboundary water conventions: a catalyst for cooperation on sha...
Two global transboundary water conventions: a catalyst for cooperation on sha...Iwl Pcu
 
Water conservation guidelines and plans
Water conservation guidelines and plansWater conservation guidelines and plans
Water conservation guidelines and plansCharles Bwalya
 
Kamisato, U.S. Army Corps of Engineers
Kamisato, U.S. Army Corps of EngineersKamisato, U.S. Army Corps of Engineers
Kamisato, U.S. Army Corps of EngineersTWCA
 
Deltanet Project - Final Report
Deltanet Project - Final ReportDeltanet Project - Final Report
Deltanet Project - Final ReportGwilym Owen
 
TWCA Annual Convention: Economic Impacts and Implications of Waterborne Litte...
TWCA Annual Convention: Economic Impacts and Implications of Waterborne Litte...TWCA Annual Convention: Economic Impacts and Implications of Waterborne Litte...
TWCA Annual Convention: Economic Impacts and Implications of Waterborne Litte...TWCA
 
Lesotho - Land & Water management for good IWRM
Lesotho - Land & Water management for good IWRMLesotho - Land & Water management for good IWRM
Lesotho - Land & Water management for good IWRMShammy Puri
 
Aggregateact 120611192330-phpapp02
Aggregateact 120611192330-phpapp02Aggregateact 120611192330-phpapp02
Aggregateact 120611192330-phpapp02Louisette Lanteigne
 

Mais procurados (20)

Water–Demand Management in the Kingdom of Saudi Arabia for Enhancement Enviro...
Water–Demand Management in the Kingdom of Saudi Arabia for Enhancement Enviro...Water–Demand Management in the Kingdom of Saudi Arabia for Enhancement Enviro...
Water–Demand Management in the Kingdom of Saudi Arabia for Enhancement Enviro...
 
Desalination & membrane technologies 2015...dr. nicole carter
Desalination & membrane technologies 2015...dr. nicole carterDesalination & membrane technologies 2015...dr. nicole carter
Desalination & membrane technologies 2015...dr. nicole carter
 
Addressing Hydrology at the Watershed Scale: A Novel Approach to Stormwater M...
Addressing Hydrology at the Watershed Scale: A Novel Approach to Stormwater M...Addressing Hydrology at the Watershed Scale: A Novel Approach to Stormwater M...
Addressing Hydrology at the Watershed Scale: A Novel Approach to Stormwater M...
 
USACE Galveston: Coastal Project Updates - Sharon Manzella Tirpak
USACE Galveston: Coastal Project Updates - Sharon Manzella TirpakUSACE Galveston: Coastal Project Updates - Sharon Manzella Tirpak
USACE Galveston: Coastal Project Updates - Sharon Manzella Tirpak
 
Tina ecology dams
Tina ecology damsTina ecology dams
Tina ecology dams
 
Planning for the future_Integrated Water Management in the Ord TRiver Catchment
Planning for the future_Integrated Water Management in the Ord TRiver CatchmentPlanning for the future_Integrated Water Management in the Ord TRiver Catchment
Planning for the future_Integrated Water Management in the Ord TRiver Catchment
 
2017 Greater Mekong Forum - Session 34 - Towards more effective river basin m...
2017 Greater Mekong Forum - Session 34 - Towards more effective river basin m...2017 Greater Mekong Forum - Session 34 - Towards more effective river basin m...
2017 Greater Mekong Forum - Session 34 - Towards more effective river basin m...
 
Impacts Of Floods
Impacts Of FloodsImpacts Of Floods
Impacts Of Floods
 
Flood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt MachielseFlood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt Machielse
 
Flood management in Pakistan ppt
Flood management in Pakistan pptFlood management in Pakistan ppt
Flood management in Pakistan ppt
 
Two global transboundary water conventions: a catalyst for cooperation on sha...
Two global transboundary water conventions: a catalyst for cooperation on sha...Two global transboundary water conventions: a catalyst for cooperation on sha...
Two global transboundary water conventions: a catalyst for cooperation on sha...
 
Dam engineering i 1
Dam engineering i 1Dam engineering i 1
Dam engineering i 1
 
Aggregateact
AggregateactAggregateact
Aggregateact
 
Water conservation guidelines and plans
Water conservation guidelines and plansWater conservation guidelines and plans
Water conservation guidelines and plans
 
Kamisato, U.S. Army Corps of Engineers
Kamisato, U.S. Army Corps of EngineersKamisato, U.S. Army Corps of Engineers
Kamisato, U.S. Army Corps of Engineers
 
Deltanet Project - Final Report
Deltanet Project - Final ReportDeltanet Project - Final Report
Deltanet Project - Final Report
 
TWCA Annual Convention: Economic Impacts and Implications of Waterborne Litte...
TWCA Annual Convention: Economic Impacts and Implications of Waterborne Litte...TWCA Annual Convention: Economic Impacts and Implications of Waterborne Litte...
TWCA Annual Convention: Economic Impacts and Implications of Waterborne Litte...
 
Lesotho - Land & Water management for good IWRM
Lesotho - Land & Water management for good IWRMLesotho - Land & Water management for good IWRM
Lesotho - Land & Water management for good IWRM
 
Aggregateact 120611192330-phpapp02
Aggregateact 120611192330-phpapp02Aggregateact 120611192330-phpapp02
Aggregateact 120611192330-phpapp02
 
Great Lakes Compact Challenges and Opportunities
Great Lakes Compact Challenges and OpportunitiesGreat Lakes Compact Challenges and Opportunities
Great Lakes Compact Challenges and Opportunities
 

Destaque (8)

1 swensson south sound science symposium - swensson forecast oct 2010
1 swensson south sound science symposium - swensson forecast oct 20101 swensson south sound science symposium - swensson forecast oct 2010
1 swensson south sound science symposium - swensson forecast oct 2010
 
NWIFC Magazine Winter 2008
NWIFC Magazine Winter 2008NWIFC Magazine Winter 2008
NWIFC Magazine Winter 2008
 
NWIFC Magazine Spring 2008
NWIFC Magazine Spring 2008NWIFC Magazine Spring 2008
NWIFC Magazine Spring 2008
 
Day2 jeanette dorner-tribal habitat conference 2010 sal rec presentation
Day2 jeanette dorner-tribal habitat conference 2010 sal rec presentationDay2 jeanette dorner-tribal habitat conference 2010 sal rec presentation
Day2 jeanette dorner-tribal habitat conference 2010 sal rec presentation
 
7 peabody s4 oa presentation2 - peabody 10-27-10
7 peabody s4 oa presentation2 - peabody 10-27-107 peabody s4 oa presentation2 - peabody 10-27-10
7 peabody s4 oa presentation2 - peabody 10-27-10
 
Nisqually chinook habitat strategy and actions
Nisqually chinook habitat strategy and actionsNisqually chinook habitat strategy and actions
Nisqually chinook habitat strategy and actions
 
2012 State of the Watersheds Report
2012 State of the Watersheds Report2012 State of the Watersheds Report
2012 State of the Watersheds Report
 
Nisqually chinook natural production
Nisqually chinook natural productionNisqually chinook natural production
Nisqually chinook natural production
 

Semelhante a Ga presentation - scc capitol lake 10-12-10a

Clamp study - updated feb. 2005
Clamp study - updated feb. 2005 Clamp study - updated feb. 2005
Clamp study - updated feb. 2005 olydert
 
Buzzards Bay Coalition 2015 Annual Report
Buzzards Bay Coalition 2015 Annual ReportBuzzards Bay Coalition 2015 Annual Report
Buzzards Bay Coalition 2015 Annual ReportBuzzards Bay Coalition
 
Jamaica bay resiliency
Jamaica bay resiliencyJamaica bay resiliency
Jamaica bay resiliencyecowatchers
 
Buzzards Bay Coalition 2012 Annual Report
Buzzards Bay Coalition 2012 Annual ReportBuzzards Bay Coalition 2012 Annual Report
Buzzards Bay Coalition 2012 Annual ReportBuzzards Bay Coalition
 
Bay-Delta Conservation Plan: Background & Options to Review August 8, 2013
Bay-Delta Conservation Plan: Background & Options to Review August 8, 2013Bay-Delta Conservation Plan: Background & Options to Review August 8, 2013
Bay-Delta Conservation Plan: Background & Options to Review August 8, 2013San Diego County Water Authority
 
Nisqually River Basin Plan Update - Pierce County
Nisqually River Basin Plan Update - Pierce CountyNisqually River Basin Plan Update - Pierce County
Nisqually River Basin Plan Update - Pierce CountyNisqually River Council
 
Puget Puget sound restoration 424 final
Puget Puget sound restoration 424 finalPuget Puget sound restoration 424 final
Puget Puget sound restoration 424 finaljketchu
 
Climate Change
Climate ChangeClimate Change
Climate Changesneapa
 
Introduction and Background of "The River, the Bay and the Strait" public forum
Introduction and Background of "The River, the Bay and the Strait" public forumIntroduction and Background of "The River, the Bay and the Strait" public forum
Introduction and Background of "The River, the Bay and the Strait" public forumgreatermary
 
Healthy Coastal Ecosystems
Healthy Coastal EcosystemsHealthy Coastal Ecosystems
Healthy Coastal EcosystemsOregon Sea Grant
 
Herring River Restoration Project
Herring River Restoration ProjectHerring River Restoration Project
Herring River Restoration ProjectMary Lou Roberts
 
Final Form
Final FormFinal Form
Final Formssg5034
 
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Fairfax County
 

Semelhante a Ga presentation - scc capitol lake 10-12-10a (20)

Deschutes Estuary Restoration Team presentation 4-28-11
Deschutes Estuary Restoration Team presentation 4-28-11Deschutes Estuary Restoration Team presentation 4-28-11
Deschutes Estuary Restoration Team presentation 4-28-11
 
Clamp study - updated feb. 2005
Clamp study - updated feb. 2005 Clamp study - updated feb. 2005
Clamp study - updated feb. 2005
 
Buzzards Bay Coalition 2015 Annual Report
Buzzards Bay Coalition 2015 Annual ReportBuzzards Bay Coalition 2015 Annual Report
Buzzards Bay Coalition 2015 Annual Report
 
Jamaica bay resiliency
Jamaica bay resiliencyJamaica bay resiliency
Jamaica bay resiliency
 
Buzzards Bay Coalition 2012 Annual Report
Buzzards Bay Coalition 2012 Annual ReportBuzzards Bay Coalition 2012 Annual Report
Buzzards Bay Coalition 2012 Annual Report
 
Bay-Delta Conservation Plan: Background & Options to Review August 8, 2013
Bay-Delta Conservation Plan: Background & Options to Review August 8, 2013Bay-Delta Conservation Plan: Background & Options to Review August 8, 2013
Bay-Delta Conservation Plan: Background & Options to Review August 8, 2013
 
Nisqually River Basin Plan Update - Pierce County
Nisqually River Basin Plan Update - Pierce CountyNisqually River Basin Plan Update - Pierce County
Nisqually River Basin Plan Update - Pierce County
 
Puget Puget sound restoration 424 final
Puget Puget sound restoration 424 finalPuget Puget sound restoration 424 final
Puget Puget sound restoration 424 final
 
Climate Change
Climate ChangeClimate Change
Climate Change
 
Introduction and Background of "The River, the Bay and the Strait" public forum
Introduction and Background of "The River, the Bay and the Strait" public forumIntroduction and Background of "The River, the Bay and the Strait" public forum
Introduction and Background of "The River, the Bay and the Strait" public forum
 
Conservation Efforts in Ash Creek 2022.pdf
Conservation Efforts in Ash Creek 2022.pdfConservation Efforts in Ash Creek 2022.pdf
Conservation Efforts in Ash Creek 2022.pdf
 
Healthy Coastal Ecosystems
Healthy Coastal EcosystemsHealthy Coastal Ecosystems
Healthy Coastal Ecosystems
 
Herring River Restoration Project
Herring River Restoration ProjectHerring River Restoration Project
Herring River Restoration Project
 
Bay-Delta Activities Update - Aug. 25, 2011
Bay-Delta Activities Update - Aug. 25, 2011Bay-Delta Activities Update - Aug. 25, 2011
Bay-Delta Activities Update - Aug. 25, 2011
 
Final Form
Final FormFinal Form
Final Form
 
Muskegon Lake Restoration: A Success Story
Muskegon Lake Restoration: A Success StoryMuskegon Lake Restoration: A Success Story
Muskegon Lake Restoration: A Success Story
 
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
 
Nerrs research for web
Nerrs research for webNerrs research for web
Nerrs research for web
 
Tim randle dam removal in the united states
Tim randle   dam removal in the united statesTim randle   dam removal in the united states
Tim randle dam removal in the united states
 
Tim randle dam removal in the united states
Tim randle   dam removal in the united statesTim randle   dam removal in the united states
Tim randle dam removal in the united states
 

Mais de Northwest Indian Fisheries Commission

Beyond GAP/Walking Together: Advancing Tribal-EPA Partnerships for the 21st C...
Beyond GAP/Walking Together: Advancing Tribal-EPA Partnerships for the 21st C...Beyond GAP/Walking Together: Advancing Tribal-EPA Partnerships for the 21st C...
Beyond GAP/Walking Together: Advancing Tribal-EPA Partnerships for the 21st C...Northwest Indian Fisheries Commission
 

Mais de Northwest Indian Fisheries Commission (20)

NWIFC Annual Report 2023
NWIFC Annual Report 2023NWIFC Annual Report 2023
NWIFC Annual Report 2023
 
Tribal Natural Resources Management Annual Report for 2022
Tribal Natural Resources Management Annual Report for 2022Tribal Natural Resources Management Annual Report for 2022
Tribal Natural Resources Management Annual Report for 2022
 
Tribal Natural Resources Management 2021 Annual Report
Tribal Natural Resources Management 2021 Annual ReportTribal Natural Resources Management 2021 Annual Report
Tribal Natural Resources Management 2021 Annual Report
 
Tribal Natural Resources Management 2020 Annual Report
Tribal Natural Resources Management 2020 Annual ReportTribal Natural Resources Management 2020 Annual Report
Tribal Natural Resources Management 2020 Annual Report
 
Northwest Indian Fisheries Commission Annual Report 2019
Northwest Indian Fisheries Commission Annual Report 2019Northwest Indian Fisheries Commission Annual Report 2019
Northwest Indian Fisheries Commission Annual Report 2019
 
NW Treaty Tribes Summer 2018 Magazine
NW Treaty Tribes Summer 2018 MagazineNW Treaty Tribes Summer 2018 Magazine
NW Treaty Tribes Summer 2018 Magazine
 
Tribal Natural Resources Management 2016
Tribal Natural Resources Management 2016Tribal Natural Resources Management 2016
Tribal Natural Resources Management 2016
 
Beyond GAP/Walking Together: Advancing Tribal-EPA Partnerships for the 21st C...
Beyond GAP/Walking Together: Advancing Tribal-EPA Partnerships for the 21st C...Beyond GAP/Walking Together: Advancing Tribal-EPA Partnerships for the 21st C...
Beyond GAP/Walking Together: Advancing Tribal-EPA Partnerships for the 21st C...
 
Northwest Indian Fisheries Commission Annual Report 2015
Northwest Indian Fisheries Commission Annual Report 2015Northwest Indian Fisheries Commission Annual Report 2015
Northwest Indian Fisheries Commission Annual Report 2015
 
Boldt40 Agenda
Boldt40 AgendaBoldt40 Agenda
Boldt40 Agenda
 
NWIFC Winter 2014 Magazine
NWIFC Winter 2014 MagazineNWIFC Winter 2014 Magazine
NWIFC Winter 2014 Magazine
 
NWIFC Annual Report 2014
NWIFC Annual Report 2014NWIFC Annual Report 2014
NWIFC Annual Report 2014
 
752 memorandum-and-order-granting-perm-injunction
752 memorandum-and-order-granting-perm-injunction752 memorandum-and-order-granting-perm-injunction
752 memorandum-and-order-granting-perm-injunction
 
Nwifc annual report 2013
Nwifc annual report 2013Nwifc annual report 2013
Nwifc annual report 2013
 
Nisqually Partnerships and the Nisqually Land Trust
Nisqually Partnerships and the Nisqually Land TrustNisqually Partnerships and the Nisqually Land Trust
Nisqually Partnerships and the Nisqually Land Trust
 
First Stewards Panelist Bios Alphabetical
First Stewards Panelist Bios AlphabeticalFirst Stewards Panelist Bios Alphabetical
First Stewards Panelist Bios Alphabetical
 
First Stewards Panelist Biographies
First Stewards Panelist BiographiesFirst Stewards Panelist Biographies
First Stewards Panelist Biographies
 
First Stewards Symposium Agenda
First Stewards Symposium AgendaFirst Stewards Symposium Agenda
First Stewards Symposium Agenda
 
Comprehensive Tribal Natural Resources Management 2012
Comprehensive Tribal Natural Resources Management 2012Comprehensive Tribal Natural Resources Management 2012
Comprehensive Tribal Natural Resources Management 2012
 
Nisqually chinook hatchery management
Nisqually chinook hatchery managementNisqually chinook hatchery management
Nisqually chinook hatchery management
 

Ga presentation - scc capitol lake 10-12-10a

Notas do Editor

  1. Basin management discussions remain highly polarized between lake and estuary advocates. A constituent group, the Capitol Lake Improvement and Protection Association (CLIPA), issued a report at the end of June 2010 critiquing the CLAMP analyses and providing further support for lake management. Another constituent group, the Deschutes Estuary Restoration Team, has also formed, to support the estuary recommendation. 
  2. Managed LakePros: Little change in infrastructure is required. The operation of the dam provides greater protection against the initial effects of sea-level rise on downtown flood risk.Cons: A large initial dredge is required in addition to regular maintenance dredging. Dredging inside the lake is more difficult than in Budd Inlet.EstuaryPros: Initial and maintenance dredging are lessened; most sediment is moved to the shoreline, reducing costs and permitting complexity. May improve transportation flow.Cons: Significant infrastructure changes are required early in implementation (including building a new 5th Avenue bridge and reinforcement of Deschutes Parkway).Dual Basin EstuaryPros: Same as estuary alternative.Cons: In addition to estuary alternative considerations, constructing a north basin barrier involves considerable engineering uncertainties and may not provide an environmentally self-sustaining system.Remaining Technical Uncertainties:Limited Options – CLAMP’s process focused on the lake/estuary options.
  3. Costs for any of the studied options are projected to exceed $100 million over 50 years and may be much higher, depending on assumptions. Further, CLAMP’s process did not analyze effects on the local economy. Creation of the lake established a significant economic benefit to downstream marine interests by reducing sedimentation in lower Budd Inlet. [EXPAND/CLIPA]Managed LakePros: Relatively little cost required for infrastructure. Preserves significant cost benefits to downstream marine economic interests. Cons: Greater initial dredge is required, in addition to greater regular maintenance dredging. EstuaryPros: Initial dredging and maintenance dredging quantities and unit costs are lower. Cons: Significant infrastructure renewal is required early in implementation.Dual Basin EstuaryPros: Same as estuary.Cons: Same as estuary, except for added costs and impacts of north basin barrier work.Remaining Economic Uncertainties:Dredge Costs – Dredging is necessary in any option and is the largest cost element. The presence of invasive New Zealand mudsnails will likely increase disposal costs. Downstream economic impacts – Economic impacts to the local economy from changes in lake management have not been evaluated. [EXPAND/CLIPA]Construction in estuary scenarios will likely impact downtown economic activity (similar to Fourth Avenue Bridge project).
  4. Portions of the Deschutes River, Capitol Lake, and Budd Inlet do not meet federal water quality standards and are on the Clean Water Act Section 303(d) list for one or more of the following parameters: fecal coliform bacteria, temperature, dissolved oxygen, pH, or fine sediment. Budd Inlet suffers from very low dissolved oxygen levels. Improved flushing in the Inlet and the associated reduction in dissolved oxygen concerns is cited by some parties as the most compelling argument for estuary restoration. Ecology estimates that estuary restoration may resolve dissolved oxygen concerns for about one-half of the affected area in the Inlet (~650 acres resolved). Most other water quality issues originate in the watershed above the lake basin, which is a concern since changed lake management strategies will have no effect on upland inputs.[EXPAND/CLIPA/NZMS]Managed LakePros: Supports insects that are an important food source for foraging birds and bats.Cons: Would continue to support several invasive and non-native species, including exotic amphibians and mammals. Dam increases risk of predation for migrating salmon. Is expected to make efforts to improve water quality in Budd Inlet more difficult.Estuary or Dual Basin EstuaryPros: Increased tidal flushing is expected to improve water quality in the basin and Budd Inlet. Would improve habitat for anadromous and marine fish. Would restore 260 acres of an ecosystem type that has been significantly reduced throughout Puget Sound.Cons: Loss of nearly all habitat used by freshwater species. Reduced forage insects for bats and some birds. Potential for all 16 lake-dependent freshwater fish to be eliminated.Remaining Environmental Uncertainties:Total Maximum Daily Load (TMDL) Planning – Ecology’s ongoing water quality study required under the federal Clean Water Act will deliver a Deschutes watershed cleanup plan, and the lake management decision may affect, and be affected by, the TMDL process.Puget Sound Near-Shore Restoration Projects – For several years, theUSDFW and the US Army Corps of Engineers have been identifying and evaluating potential projects for near shore restoration. Deschutes Estuary restoration has been identified as one of 47 candidate projects for their consideration.
  5. (Joyce)The 2010 Legislature ended CLAMP committee funding. The CLAMP process identified some critical shared interests and objectives among all members. However, lake and estuary advocates remain polarized, and disputes persist over the CLAMP analyses and conclusions. The State Capitol Committee and Legislature still must act before any long-term management can begin. Permitting for such a strategy is projected to take four to six years and involve more than 20 different federal, state, local, and tribal authorities. As a result of these factors, the permanence of any decision and the ongoing care of the basin have become major considerations. While these deliberations are continuing, GA has also submitted a capital project request to begin the process for seeking a permit to conduct a limited dredge of Capitol Lake for flood risk mitigation purposes.  Permitting is expected to take 4-5 years.  Such a dredge will not constrain consideration of any of the long-term management strategies currently under evaluation.