SlideShare uma empresa Scribd logo
1 de 33
Baixar para ler offline
By:
M.SIVARAMA KRISHNA, GM(O&M)
S.K.PRASAD,Sr.Mgr (O)
CH.PRADEEPKUMAR,Dy.Mgr(O)
EFFICIENTOPERATION &MAINTENANCEOFBOILERS
NATIONAL BOILER WORKSHOP-2015
NTPC SIMHADRI –WELCOME’s
FLOW OF PRESENTATION :
 Journey of NTPC
 O & M Best Practices
 Zero Boiler Tube leakage
 LATEST Technology adopted
 Conclusion
NTPC VISION
NTPC HAS TO BECOME A 1,28,000 MW COMPANY BY 2032
45,548 MW (Including JV’s)
COAL :38,654MW
HYDRO:5984 MW
GAS:1000MW
RENEWABLE:100MW
INSTALLED CAPACITY
NTPC GROUPACCOUNTSFOR16%OFINDIA’STOTAL
INSTALLEDCAPACITYAND25%OFALLINDIA
GENERATIONASON31.03.2015
SUSTAINABLE DEVELOPMENT:A LONG JOURNEY
TYPES OF BOILER‘s IN NTPC
 CC, RIFLED TUBE, RADIENT RH TOP SUPPORTED 500MW
SUB CRITICAL BOILER
 ONCE-THRU SUPER-CRITICAL, TWO-PASS, BALANCED DRAFT,
RADIANT RH, TOP SUPPORT 660MW
 TOWER TYPE(SINGLE PASS),ONCE-THROUGH
SINGLE RH BOILER 500MW
 ONCE THROUGH SUPER CRITICAL,
DOUBLRE PASS 800MW
FORCED OUTAGE : A MAJOR CHALLENGE
BTL
START UP
DEVIATIONS
OVERHEATING/
CORROSION
WELD
FAILURES
FLUE GAS
EROSION
CHEMICAL
PARAMETER
DEVIATIONS
O & M BEST PRACTICES
TO AVOID STARTUP DEVIATIONS
 Standardized all Operation procedures & reviewed
periodically for improvement.
 No SH/RH Spray till Synchronization.
 Proper choice of Mill/Oil gun elevations during start-up
 Maintaining proper Rate of rise of Pressure/Temperature - Avoid
over firing.
 Safety valve floating with oil guns only
 Passing of SH/RH spray valves attended regularly
TO AVOID STARTUP DEVIATIONS
 SH/RH Spray limiting interlock to limit temp at De-superheater
outlet falling below saturation temp – implemented in all units
 Monitoring of Economizer outlet temp w.r.t Saturation
temperature at eco I/l pressure during start-up
 Drum Level Control
 Low range FRS control kept in auto during unit start-up
DP across FRS maintained around 5-10 KSC
 CBD is kept open continuously till chemical parameters
are achieved
 Continuous flow of feed water through economizer
during startup is ensured
O & M BEST PRACTICES
CHEMISTRY IN STARTUPS
 Maintaining the chemical regime of boilers
Ensure CPU availability and putting both in service
during start-ups
 Frequent sampling of Steam / water at local and SWAS
availability
 PH maintained through Ammonia Dozing.
 Condensate Dumping
 Hot draining as per requirements
O & M BEST PRACTICES
WELD JOINT FAILURES
 100% Radiography of joints being done during overhauls
 Radiography of bends during OH for observing any blockages
or deposits
EROSION
 Tube leakage in BTT - Erosion of Burner transition bends
was observed due to Secondary air from wind box -
Application of plastic refractory over Burner transition tube
bends
 Visual Inspection of tubes in Burner zone for signs of
overheating like bulging etc. during OH
O & M BEST PRACTICES
 Cutting of Tubes by Grinding machine
 HP Jet cleaning boiler surfaces
 Use of Beveling machine for chamfering
 Plastic refractory over Burner transition tube bends
 Inspection of attemperation spray nozzles
 Economizer repair on maintenance beds outside
INITIATIVES TAKEN @ SIMHADRI
 Monitoring metal temperatures – deviations are discussed in DPM
 Monitoring Rate of rise of temp / pressure during startup &
shutdowns thru PI applications
 Pressure setting of wall blowers / LRSBs – Once in three months
 Operation of LRSBs in the presence of maintenance Personnel.
Incase of any mal-operation, blower can be retracted immediately
without any damage.
 Optimization of Wall blower / LRSB Operation
Regular checking of SADC/BT at local and remote positions. Defects
are attended regularly
OPERATION BEST PRACTICES
BOILER TUBE LEAKAGES AT SIMHADRI
Year Tube Leakage (No) Tube Leakage (%)
2011-12 3 0.64
2012-13 9 1.64
2013-14 10 1.37
2014-15 8 1.03
2015-16 0 0.00
Previous Financial year
same period
3 1.10
*No tube leakage in the first three months of the last overhauls
Area Cause / Mechanism Remedial actions based on past failures
1. S -Panel
EROSION Thickness survey & visual inspection of
all Z-Panel, intersection and all
manhole door tubes.
WELD DEFECT DPI of Peep hole door plates welds.
100% radiography of repair joints.
ATTACHMENT WELD
FAILURE
100% DPI in fin welding at repair
joints.
ACTION PLANS FOR ZERO BTL
Area Cause / Mechanism Remedial actions based on past failures
2
WATER
WALL &
HANGER
TUBES
EROSION
(SB Steam)
Thickness survey and visual inspection of
Tube & Burner bends.
Soot blower alignment checking.
Checking of hanger tube shielding and
replacement.
SHORT TERM OVER
HEATING
(Starvation)
Ensuring plugs during tube repair.
Flushing of bottom ring header by
draining at 10 Kg/Cm2.
ATTACH MENT
WELD
100% DPI in fin welding at repair joints.
Weld failure To take care while cutting the tube
ACTION PLANS FOR ZERO BTL
Area Cause / Mechanism Remedial actions based on past failures
3 ROOF
TUBES
EROSION Penthouse cleaning and seal plate
checking.
Inspection of roof tubes from furnace
side.
4 PLATEN
SH /
DIVISIONA
L PANEL /
SPACER
TUBES
WELD
FAILURE
100% radiography of repair joints,
Alignment of coils
Random DP and radiography of other
joints.
RUBBING
(coil)
Inspection of spacer tubes, girdling
loops and binding loops.
Inspection of tubes near cleats during
every O/H
Healthiness of Clamp & stopper.
ACTION PLANS FOR ZERO BTL
Area Cause /Mechanism Remedial actions based on past failures
5
RE-
HEATER
OVER
HEATING
(Starvation due to
blockage.)
Vertical tubes to be cut by
grinding and capping.
Steam cleaning of new tubes
before welding.
Oxide scale measurement.
Sponge ball checking of RH tubes for
identifying blockages
Use of Metal caps
WELD
FAILURE
Radiography of shop & erection joints
including DMW
100% DPT & RT in areas of degradation.
ATTACH MENT Cleat welding being done..
ACTION PLANS FOR ZERO BTL
Area Cause/Mechanism Remedial actions based on past
failures
6 RH VENT
/ DRAIN
STUB
WELD
FAILURE
DP of startup vent / drain stubs of
Re heater is being done.
7 ECONOMI
SER
FLUEGAS
EROSION
Thickness survey and visual
inspection.
Cassette baffles and shielding
inspection.
WELDFAILURE 100% radiography of repair joints.
Similar erection welds to be
inspected by DP & RT.
ACTION PLANS FOR ZERO BTL
Area Cause / Mechanism Remedial actions based on past
failures
8 LTSH
Flue Gas
Erosion
Visual inspection and thickness survey.
Shielding of manhole door bends &
bifurcation tubes.
Proper Refractory application.
Checking of cassette baffles.
weld
joint Failure
Random and RT of other welds.
100% radiography of repair welds.
Manhole door
attachment weld
failure
DP at manhole door bends.
Proper clamping of shield.
Visual inspection of fins in LRSB area.
ACTION PLANS FOR ZERO BTL
OTHER BEST PRACTICES
ENERGY & EFFICIENCY MAPPING OF
a) Draught systems
b) Compressed air systems
c) Milling system
d) CW system
e) Ash handling
f) Coal handling plant.
LATEST TECHNOLOGIES ADOPTED
 ASLD(ACOUSTIC STEAM LEAK DETECTORS)
 PADO
 PI SYSTEM
 SCADA
 FLAME CAMERAS
 ACOUSTIC PYROMETERS
BEVELING MACHINE
Boiler Operation and Maintenance Experiences
Boiler Operation and Maintenance Experiences
Boiler Operation and Maintenance Experiences
Boiler Operation and Maintenance Experiences

Mais conteúdo relacionado

Mais procurados

660 mw supercritical boiler
660 mw supercritical boiler660 mw supercritical boiler
660 mw supercritical boilerAshvani Shukla
 
Cooling towers
Cooling towersCooling towers
Cooling towersctlin5
 
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~iNtpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~ihaxxo24
 
Thermal Power Plant Boiler Efficiency Improvement
Thermal Power Plant Boiler Efficiency ImprovementThermal Power Plant Boiler Efficiency Improvement
Thermal Power Plant Boiler Efficiency ImprovementAnkur Gaikwad
 
BOILER OPERATION PPT.pptx
BOILER OPERATION PPT.pptxBOILER OPERATION PPT.pptx
BOILER OPERATION PPT.pptxSatwikSingh25
 
Cooling water system presentation
Cooling water system presentationCooling water system presentation
Cooling water system presentationumar farooq
 
Steam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsSteam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsHrishikesh Devan
 
Boiler commissioning procedure
Boiler commissioning procedureBoiler commissioning procedure
Boiler commissioning procedureABVSAI
 
Performance calculation for feed water heater
Performance calculation  for feed water heaterPerformance calculation  for feed water heater
Performance calculation for feed water heaterSHIVAJI CHOUDHURY
 
Hydrogen Purge and Fill
Hydrogen Purge and FillHydrogen Purge and Fill
Hydrogen Purge and FillShad Edwards
 
Condenser in thermal power plants
Condenser in thermal power plantsCondenser in thermal power plants
Condenser in thermal power plantsSHIVAJI CHOUDHURY
 
Coal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsCoal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsSHIVAJI CHOUDHURY
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerVaibhav Paydelwar
 
Boiler Efficiency Calculations
Boiler Efficiency CalculationsBoiler Efficiency Calculations
Boiler Efficiency CalculationsManohar Tatwawadi
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesBoben Anto Chemmannoor
 
Steam Condenser performance and loss diagnostic
Steam Condenser performance and loss diagnosticSteam Condenser performance and loss diagnostic
Steam Condenser performance and loss diagnosticPichai Chaibamrung
 

Mais procurados (20)

660 mw supercritical boiler
660 mw supercritical boiler660 mw supercritical boiler
660 mw supercritical boiler
 
Boiler Introduction
Boiler IntroductionBoiler Introduction
Boiler Introduction
 
Cooling towers
Cooling towersCooling towers
Cooling towers
 
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~iNtpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
 
Thermal Power Plant Boiler Efficiency Improvement
Thermal Power Plant Boiler Efficiency ImprovementThermal Power Plant Boiler Efficiency Improvement
Thermal Power Plant Boiler Efficiency Improvement
 
BOILER OPERATION PPT.pptx
BOILER OPERATION PPT.pptxBOILER OPERATION PPT.pptx
BOILER OPERATION PPT.pptx
 
Cooling water system presentation
Cooling water system presentationCooling water system presentation
Cooling water system presentation
 
Steam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsSteam Boilers OR Steam Generators
Steam Boilers OR Steam Generators
 
Boiler commissioning procedure
Boiler commissioning procedureBoiler commissioning procedure
Boiler commissioning procedure
 
Boiler turbe failores
Boiler turbe failoresBoiler turbe failores
Boiler turbe failores
 
Boiler safety protection
Boiler  safety protectionBoiler  safety protection
Boiler safety protection
 
Performance calculation for feed water heater
Performance calculation  for feed water heaterPerformance calculation  for feed water heater
Performance calculation for feed water heater
 
Hydrogen Purge and Fill
Hydrogen Purge and FillHydrogen Purge and Fill
Hydrogen Purge and Fill
 
Condenser in thermal power plants
Condenser in thermal power plantsCondenser in thermal power plants
Condenser in thermal power plants
 
Coal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsCoal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plants
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam Boiler
 
Revomax boiler (thermax)
Revomax boiler (thermax) Revomax boiler (thermax)
Revomax boiler (thermax)
 
Boiler Efficiency Calculations
Boiler Efficiency CalculationsBoiler Efficiency Calculations
Boiler Efficiency Calculations
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbines
 
Steam Condenser performance and loss diagnostic
Steam Condenser performance and loss diagnosticSteam Condenser performance and loss diagnostic
Steam Condenser performance and loss diagnostic
 

Semelhante a Boiler Operation and Maintenance Experiences

Artikel preventive maintenance
Artikel preventive maintenanceArtikel preventive maintenance
Artikel preventive maintenanceHamzah Hamzah
 
Thiết kế đường ống trên bờ
Thiết kế đường ống trên bờThiết kế đường ống trên bờ
Thiết kế đường ống trên bờVcoi Vit
 
ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc DRP Joint
 
Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Kamran Saeed
 
HDPE Pipes By Perfect Prime Piping & Agritech Private Limited, Rajasthan
HDPE Pipes By Perfect Prime Piping & Agritech Private Limited, RajasthanHDPE Pipes By Perfect Prime Piping & Agritech Private Limited, Rajasthan
HDPE Pipes By Perfect Prime Piping & Agritech Private Limited, RajasthanIndiaMART InterMESH Limited
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-systemAdeoye Okunoye
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-systemAdeoye Okunoye
 
Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs) Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs) Audubon Engineering Company
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Chandra ABS IV
 
269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdfmoumo1
 
Qa qc mech enggs or sr.qc inspector welding.piping.pipeline
Qa qc mech enggs or sr.qc inspector welding.piping.pipelineQa qc mech enggs or sr.qc inspector welding.piping.pipeline
Qa qc mech enggs or sr.qc inspector welding.piping.pipelineJOBY Joby.Stephan
 
AME POWER PLANT REFERENCES
AME POWER PLANT REFERENCESAME POWER PLANT REFERENCES
AME POWER PLANT REFERENCESCarlo Avanzini
 
Thiet ke duong_ong_tren_bo
Thiet ke duong_ong_tren_boThiet ke duong_ong_tren_bo
Thiet ke duong_ong_tren_boRobinking Boley
 
corrosion monitoring Algeria.pdf
corrosion monitoring Algeria.pdfcorrosion monitoring Algeria.pdf
corrosion monitoring Algeria.pdfFouadOudina2
 
QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEERnader rizq
 
Appraisal ppt ankur
Appraisal ppt ankurAppraisal ppt ankur
Appraisal ppt ankurAnkur Mishra
 
PPRC piping presentation
PPRC piping presentationPPRC piping presentation
PPRC piping presentationVinayak Abhale
 
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...BharathwajanTS
 

Semelhante a Boiler Operation and Maintenance Experiences (20)

Mithun Banjan CV
Mithun Banjan CVMithun Banjan CV
Mithun Banjan CV
 
PPT-on-false-air.ppt
PPT-on-false-air.pptPPT-on-false-air.ppt
PPT-on-false-air.ppt
 
Artikel preventive maintenance
Artikel preventive maintenanceArtikel preventive maintenance
Artikel preventive maintenance
 
Thiết kế đường ống trên bờ
Thiết kế đường ống trên bờThiết kế đường ống trên bờ
Thiết kế đường ống trên bờ
 
ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc
 
Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Hvac chiller Engineer Tech
Hvac chiller Engineer Tech
 
HDPE Pipes By Perfect Prime Piping & Agritech Private Limited, Rajasthan
HDPE Pipes By Perfect Prime Piping & Agritech Private Limited, RajasthanHDPE Pipes By Perfect Prime Piping & Agritech Private Limited, Rajasthan
HDPE Pipes By Perfect Prime Piping & Agritech Private Limited, Rajasthan
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
 
Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs) Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs)
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 
269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf
 
Qa qc mech enggs or sr.qc inspector welding.piping.pipeline
Qa qc mech enggs or sr.qc inspector welding.piping.pipelineQa qc mech enggs or sr.qc inspector welding.piping.pipeline
Qa qc mech enggs or sr.qc inspector welding.piping.pipeline
 
AME POWER PLANT REFERENCES
AME POWER PLANT REFERENCESAME POWER PLANT REFERENCES
AME POWER PLANT REFERENCES
 
Thiet ke duong_ong_tren_bo
Thiet ke duong_ong_tren_boThiet ke duong_ong_tren_bo
Thiet ke duong_ong_tren_bo
 
corrosion monitoring Algeria.pdf
corrosion monitoring Algeria.pdfcorrosion monitoring Algeria.pdf
corrosion monitoring Algeria.pdf
 
QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEER
 
Appraisal ppt ankur
Appraisal ppt ankurAppraisal ppt ankur
Appraisal ppt ankur
 
PPRC piping presentation
PPRC piping presentationPPRC piping presentation
PPRC piping presentation
 
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
 

Mais de National Productivity Council, Hyderabad, India

Mais de National Productivity Council, Hyderabad, India (16)

Boiler Water Treatment -
Boiler Water Treatment - Boiler Water Treatment -
Boiler Water Treatment -
 
Efficient Steam Systems -
Efficient Steam Systems -Efficient Steam Systems -
Efficient Steam Systems -
 
New Technologies in Process Heating
New Technologies in Process HeatingNew Technologies in Process Heating
New Technologies in Process Heating
 
Boiler Water Treatment for LP,MP and HP Boiler
Boiler Water Treatment for LP,MP and HP BoilerBoiler Water Treatment for LP,MP and HP Boiler
Boiler Water Treatment for LP,MP and HP Boiler
 
Efficient steam systems - Generation to WHR
Efficient steam systems - Generation to WHREfficient steam systems - Generation to WHR
Efficient steam systems - Generation to WHR
 
Case Studies on CFBC Boilers
Case Studies on CFBC BoilersCase Studies on CFBC Boilers
Case Studies on CFBC Boilers
 
Boiler Performance Monitoring
Boiler Performance MonitoringBoiler Performance Monitoring
Boiler Performance Monitoring
 
CFBC Boiler vs Pulverized Fired Boiler
CFBC Boiler vs Pulverized Fired BoilerCFBC Boiler vs Pulverized Fired Boiler
CFBC Boiler vs Pulverized Fired Boiler
 
Boiler Superheater Design Modification
Boiler Superheater Design ModificationBoiler Superheater Design Modification
Boiler Superheater Design Modification
 
Developments in Industrial Boilers, WHR and Power Boilers
Developments in Industrial Boilers, WHR and Power BoilersDevelopments in Industrial Boilers, WHR and Power Boilers
Developments in Industrial Boilers, WHR and Power Boilers
 
Indigenization of Russian Make WHR by Vizag Steel
Indigenization of Russian Make WHR by Vizag SteelIndigenization of Russian Make WHR by Vizag Steel
Indigenization of Russian Make WHR by Vizag Steel
 
Online Efficiency Monitoring and Diagnostics in Coal Fired Boiler
Online Efficiency Monitoring and Diagnostics in Coal Fired BoilerOnline Efficiency Monitoring and Diagnostics in Coal Fired Boiler
Online Efficiency Monitoring and Diagnostics in Coal Fired Boiler
 
Optimizing Combustion using a Flue Gas Analyser
Optimizing Combustion using a Flue Gas AnalyserOptimizing Combustion using a Flue Gas Analyser
Optimizing Combustion using a Flue Gas Analyser
 
Presentation on CFBC Boilers
Presentation on CFBC BoilersPresentation on CFBC Boilers
Presentation on CFBC Boilers
 
Safe Operation and Explosions in Boilers
Safe Operation and Explosions in BoilersSafe Operation and Explosions in Boilers
Safe Operation and Explosions in Boilers
 
Minimum Energy Performance Standards for Boilers in India
Minimum Energy Performance Standards for Boilers in IndiaMinimum Energy Performance Standards for Boilers in India
Minimum Energy Performance Standards for Boilers in India
 

Último

Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 

Último (20)

Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 

Boiler Operation and Maintenance Experiences

  • 1.
  • 2. By: M.SIVARAMA KRISHNA, GM(O&M) S.K.PRASAD,Sr.Mgr (O) CH.PRADEEPKUMAR,Dy.Mgr(O) EFFICIENTOPERATION &MAINTENANCEOFBOILERS NATIONAL BOILER WORKSHOP-2015 NTPC SIMHADRI –WELCOME’s
  • 3. FLOW OF PRESENTATION :  Journey of NTPC  O & M Best Practices  Zero Boiler Tube leakage  LATEST Technology adopted  Conclusion
  • 4. NTPC VISION NTPC HAS TO BECOME A 1,28,000 MW COMPANY BY 2032
  • 5. 45,548 MW (Including JV’s) COAL :38,654MW HYDRO:5984 MW GAS:1000MW RENEWABLE:100MW INSTALLED CAPACITY
  • 7. TYPES OF BOILER‘s IN NTPC  CC, RIFLED TUBE, RADIENT RH TOP SUPPORTED 500MW SUB CRITICAL BOILER  ONCE-THRU SUPER-CRITICAL, TWO-PASS, BALANCED DRAFT, RADIANT RH, TOP SUPPORT 660MW  TOWER TYPE(SINGLE PASS),ONCE-THROUGH SINGLE RH BOILER 500MW  ONCE THROUGH SUPER CRITICAL, DOUBLRE PASS 800MW
  • 8. FORCED OUTAGE : A MAJOR CHALLENGE BTL START UP DEVIATIONS OVERHEATING/ CORROSION WELD FAILURES FLUE GAS EROSION CHEMICAL PARAMETER DEVIATIONS
  • 9. O & M BEST PRACTICES TO AVOID STARTUP DEVIATIONS  Standardized all Operation procedures & reviewed periodically for improvement.  No SH/RH Spray till Synchronization.  Proper choice of Mill/Oil gun elevations during start-up  Maintaining proper Rate of rise of Pressure/Temperature - Avoid over firing.  Safety valve floating with oil guns only  Passing of SH/RH spray valves attended regularly
  • 10. TO AVOID STARTUP DEVIATIONS  SH/RH Spray limiting interlock to limit temp at De-superheater outlet falling below saturation temp – implemented in all units  Monitoring of Economizer outlet temp w.r.t Saturation temperature at eco I/l pressure during start-up  Drum Level Control  Low range FRS control kept in auto during unit start-up DP across FRS maintained around 5-10 KSC  CBD is kept open continuously till chemical parameters are achieved  Continuous flow of feed water through economizer during startup is ensured O & M BEST PRACTICES
  • 11. CHEMISTRY IN STARTUPS  Maintaining the chemical regime of boilers Ensure CPU availability and putting both in service during start-ups  Frequent sampling of Steam / water at local and SWAS availability  PH maintained through Ammonia Dozing.  Condensate Dumping  Hot draining as per requirements O & M BEST PRACTICES
  • 12. WELD JOINT FAILURES  100% Radiography of joints being done during overhauls  Radiography of bends during OH for observing any blockages or deposits EROSION  Tube leakage in BTT - Erosion of Burner transition bends was observed due to Secondary air from wind box - Application of plastic refractory over Burner transition tube bends  Visual Inspection of tubes in Burner zone for signs of overheating like bulging etc. during OH O & M BEST PRACTICES
  • 13.  Cutting of Tubes by Grinding machine  HP Jet cleaning boiler surfaces  Use of Beveling machine for chamfering  Plastic refractory over Burner transition tube bends  Inspection of attemperation spray nozzles  Economizer repair on maintenance beds outside INITIATIVES TAKEN @ SIMHADRI
  • 14.  Monitoring metal temperatures – deviations are discussed in DPM  Monitoring Rate of rise of temp / pressure during startup & shutdowns thru PI applications  Pressure setting of wall blowers / LRSBs – Once in three months  Operation of LRSBs in the presence of maintenance Personnel. Incase of any mal-operation, blower can be retracted immediately without any damage.  Optimization of Wall blower / LRSB Operation Regular checking of SADC/BT at local and remote positions. Defects are attended regularly OPERATION BEST PRACTICES
  • 15. BOILER TUBE LEAKAGES AT SIMHADRI Year Tube Leakage (No) Tube Leakage (%) 2011-12 3 0.64 2012-13 9 1.64 2013-14 10 1.37 2014-15 8 1.03 2015-16 0 0.00 Previous Financial year same period 3 1.10 *No tube leakage in the first three months of the last overhauls
  • 16. Area Cause / Mechanism Remedial actions based on past failures 1. S -Panel EROSION Thickness survey & visual inspection of all Z-Panel, intersection and all manhole door tubes. WELD DEFECT DPI of Peep hole door plates welds. 100% radiography of repair joints. ATTACHMENT WELD FAILURE 100% DPI in fin welding at repair joints. ACTION PLANS FOR ZERO BTL
  • 17. Area Cause / Mechanism Remedial actions based on past failures 2 WATER WALL & HANGER TUBES EROSION (SB Steam) Thickness survey and visual inspection of Tube & Burner bends. Soot blower alignment checking. Checking of hanger tube shielding and replacement. SHORT TERM OVER HEATING (Starvation) Ensuring plugs during tube repair. Flushing of bottom ring header by draining at 10 Kg/Cm2. ATTACH MENT WELD 100% DPI in fin welding at repair joints. Weld failure To take care while cutting the tube ACTION PLANS FOR ZERO BTL
  • 18. Area Cause / Mechanism Remedial actions based on past failures 3 ROOF TUBES EROSION Penthouse cleaning and seal plate checking. Inspection of roof tubes from furnace side. 4 PLATEN SH / DIVISIONA L PANEL / SPACER TUBES WELD FAILURE 100% radiography of repair joints, Alignment of coils Random DP and radiography of other joints. RUBBING (coil) Inspection of spacer tubes, girdling loops and binding loops. Inspection of tubes near cleats during every O/H Healthiness of Clamp & stopper. ACTION PLANS FOR ZERO BTL
  • 19. Area Cause /Mechanism Remedial actions based on past failures 5 RE- HEATER OVER HEATING (Starvation due to blockage.) Vertical tubes to be cut by grinding and capping. Steam cleaning of new tubes before welding. Oxide scale measurement. Sponge ball checking of RH tubes for identifying blockages Use of Metal caps WELD FAILURE Radiography of shop & erection joints including DMW 100% DPT & RT in areas of degradation. ATTACH MENT Cleat welding being done.. ACTION PLANS FOR ZERO BTL
  • 20. Area Cause/Mechanism Remedial actions based on past failures 6 RH VENT / DRAIN STUB WELD FAILURE DP of startup vent / drain stubs of Re heater is being done. 7 ECONOMI SER FLUEGAS EROSION Thickness survey and visual inspection. Cassette baffles and shielding inspection. WELDFAILURE 100% radiography of repair joints. Similar erection welds to be inspected by DP & RT. ACTION PLANS FOR ZERO BTL
  • 21. Area Cause / Mechanism Remedial actions based on past failures 8 LTSH Flue Gas Erosion Visual inspection and thickness survey. Shielding of manhole door bends & bifurcation tubes. Proper Refractory application. Checking of cassette baffles. weld joint Failure Random and RT of other welds. 100% radiography of repair welds. Manhole door attachment weld failure DP at manhole door bends. Proper clamping of shield. Visual inspection of fins in LRSB area. ACTION PLANS FOR ZERO BTL
  • 22. OTHER BEST PRACTICES ENERGY & EFFICIENCY MAPPING OF a) Draught systems b) Compressed air systems c) Milling system d) CW system e) Ash handling f) Coal handling plant.
  • 23. LATEST TECHNOLOGIES ADOPTED  ASLD(ACOUSTIC STEAM LEAK DETECTORS)  PADO  PI SYSTEM  SCADA  FLAME CAMERAS  ACOUSTIC PYROMETERS
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.