Geosystems at HxGN LIVE
Increasing accuracy in high precision survey with
DMT GYROMAT 5000 in combination with LEICA
high-end total station
Volker Schäpe, Volker Schultheiß, Norbert Benecke
Version Date: 04.06.14
Please insert a picture
(Insert, Picture, from file).
Size according to grey field
(10 cm x 25.4 cm).
Scale picture: highlight, pull corner point
Cut picture: highlight, choose the cutting icon from the picture tool bar, click on a
side point and cut
DMT GmbH & Co. KG
Company profile
DMT is an international technology service provider in the fields of natural
resources, safety and infrastructure
 DMT was founded in 1990 as a merger of 3 companies founded in 1864
 In the year 2007 DMT joint the TÜV NORD Group
 TÜV Nord Group
 Headquarters in Hannover, Germany
 ~1.056 Mio. € annual turnover in 2013
 ~9.925 Employees in 70 countries
 DMT Group
 Headquarters in Essen, Germany
 ~113 Mio. € annual turnover in 2013
 ~720 employees
 Development department for geo-instruments like GYROMAT 5000
 Service department for surveying tasks
1. Introduction of GYROMAT 5000
2. Application for GYROMAT 5000: high accuracy tunnel survey
3. Examples and case studies
Content
DMT GYROMAT 5000 + LEICA total station
High precision north finding gyroscope
1. Introduction of GYROMAT 5000
2. Application for GYROMAT 5000: high accuracy tunnel survey
3. Examples and case studies
Content
DMT GYROMAT 5000 + LEICA total station
High precision north finding gyroscope
DIN 18723 Teil 7 (1990)
(German Standard for Industry
18723 Part 7 from 1990)
A gyroscope (northseeking
gyro) is a pendulous
suspended, electronic driven
gyro, which spin vector is
influenced by gravity and
earth rotation. It will directed
to astronomic north.
Implementation of gyro into
the GYROMAT
Gyro axis
Suspension tape
ω
Introduction of GYROMAT 5000
Principle of a gyroscope
 Highest measuring accuracy.. 0,8 mgon
(= 1,2 cm / 1 km)
 Short measuring time ………. 6 – 9 minutes
 Weight without total station …11,5 kg
 Fully automatic measuring sequence
 Preorientation-free measuring method
 Individual theodolite equipping with LEICA
high-end total stations like
TPS1100, TPS1200, TS11, TS15, TS30, TM30
TS50, MS50, TM6100A
and others with accuracy better than 1”
GYROMAT 5000
The most accurate precision-surveying gyroscope in the world
1. Introduction of GYROMAT 5000
2. Application for GYROMAT 5000: high accuracy tunnel survey
3. Examples and case studies
Content
DMT GYROMAT 5000 + LEICA total station
High precision north finding gyroscope
Requirements on accuracy of tunnel/roadway position depend on:
 Used tunneling method (e.g. TBM or blasting )
 Use of the tunnel in operation (e.g. high speed railway tunnel / roadway tunnel)
Examples for challenging requirements in accuracy:
 Predefined demounting construction position with 5 cm variance for the TBM
 Required alignment accuracy better than 5 cm at each tunnel position for high
speed railway tunnels
 Required accuracy of 10 cm for cut-through of two underground roadways
High accuracy tunnel survey
Requirements on position measurement in tunnels
 Establishment of an efficient Survey System including:
 Surface network, created e.g. by GNSS
 Transfer of surface network into the tunnel via open traverse lines:
 Survey point distances in the tunnel range between 50 m and > 200 m
 Survey points are mostly located at flanks, rarely in the middle of the tunnel
 Deviations and errors propagate with every survey point
 Failures in positioning increase with tunnel length
Deviations are unavoidable!
In particular:
 refraction error
 plumbing error
 error propagation
will lead into lateral deviation
High accuracy tunnel survey
Surveying and directions in tunneling, some considerations
Target building
Plumbing Error
α
β1
β2
β3
q
B S
QL
Real direction with plumbing error q
Theoretical direction without plumbing error
Tunnel
length [m]
Lateral deflection
Plumb error: 1 mm
Base length: 10 m
Lateral deflection
Plumb error: 1,5 mm
Base length: 8 m
300 4,2 cm 8,0 cm
1.000 14,1 cm 26,5 cm
10.000 141,4 cm 265,2 cm
β1
β2
β3
Start shaft
High accuracy tunnel survey
Improvement of accuracy by the use of GYROMAT 5000
Refraction in a tunnel
Theoretical straight-lined beam
Real tunnel situation: different
layers of temperatures between
the tunnel walls and tunnel
centre lead into refraction
In reality: curved beam
Disregard of refraction leads
into position error QR
Start shaft
Influence of refraction
Theoretical position
QR
A1
A2
A‘2A‘1
Δ Δ
North North
Solution: GYROMAT 5000
delivers the absolute north
direction for every point.
The refraction can be identified
High accuracy tunnel survey
Improvement of accuracy by the use of GYROMAT 5000
Gyro supported traverse line in the tunnel
Error propagation
Survey points
Traverse line
Gyro surveyed polygon side
50 – 200 m 500 – 1.000 m
High accuracy tunnel survey
Improvement of accuracy by the use of GYROMAT 5000
1. Introduction of GYROMAT 5000
2. Application for GYROMAT 5000: high accuracy tunnel survey
3. Examples and case studies
Content
DMT GYROMAT 5000 + LEICA total station
High precision north finding gyroscope
Water supply tunnel for a 420 MW hydropower plant
Length: 25,8 km, diameter: 7 – 8 m
Driven by two TBM from two sites: intake and outlet
 1 Gyro campaign 1 km before planned cut-through
 Driving status while survey: intake tunnel: 7,5 km
outlet tunnel:17,5 km
 Extreme environmental conditions while survey:
temperature up to 42
О
C; air humidity: 99%
 Result: determination of significant lateral deviation in
both tunnels of up to 2,5 m at calculated cut-through
position
By the way: in consideration of the environmental conditions,
2,5 m lateral deviation is good result for open traverses over
these large distances.
Gilgel Gibe II tunnel in Ethiopia
Case study: water supply tunnel
Achieved lateral deviation: < 5 cm
Scenario without correction:
Lateral deviation of > 2,5 m which
corresponds to a third of total tunnel width
Possible consequence of scenario above:
Additional construction efforts to correct the
direction which would had exceeded
multiple the costs and time for gyro
campaign
Result of cut-through after correction of driving direction:
Gilgel Gibe II tunnel in Ethiopia
Case study: water supply tunnel
690 MW hydropower plant,
supplied by two different water
reservoirs in the sub-arctic east
part of Island mountain region.
 Total tunnel length: 72 km
 Driving with 3 TBM from different
starting points
 Allowance of horizontal deviation
at cut-through positions: < 20 cm
 Allowance of deviation from the
target direction for every section
of 100 m: < 15 cm
Kárahnjúkar Hydro-Electric Project (Island)
Case study: water supply tunnel
Challenges for this survey
 Extreme length of single tunnel sections
 Complex geometry with curves and branches leads
to sightings close to the tunnel wall
 Extreme environmental conditions:
- Outside temperatures below -20
О
C
- Inside temperature range from 0О
C to > 40О
C
 High variation of air temperature at tunnel
entrances or ventilation holes
 Air humidity nearly 100 %
 Partly water suddenly flows in with temperatures
up to 51О
C
 Facing considerable, unpredictable and
unavoidable refractions at the traverse
Kárahnjúkar Hydro-Electric Project (Island)
Case study: water supply tunnel
Challenges in
surveying and
alignment
Kárahnjúkar Hydro-Electric Project (Island)
Case study: water supply tunnel
Kárahnjúkar Hydro-Electric Project (Island)
Case study: water supply tunnel
Challenges in
surveying and
alignment
Kárahnjúkar Hydro-Electric Project (Island)
Case study: water supply tunnel
Challenges in
surveying and
alignment
Kárahnjúkar Hydro-Electric Project (Island)
Case study: water supply tunnel
Challenges in
surveying and
alignment
 Faultless operation of GYROMAT 3000 and Leica total
stations TCA1800 and TS30 even with the extreme
weather conditions
 Keeping the required accuracy for all cut-through so that
extensive rework could be avoided.
20 cm was allowed, 5 cm was achieved
Results:
Kárahnjúkar Hydro-Electric Project (Island)
Case study: water supply tunnel
Challenges for this survey
 Extreme total length of 57 km
 High demands on accuracy of
max. 10 cm lateral deviation at
every point
 Tunnel work with TBMs from 5
access points. Entrance
Sedrun via 800 m deep shaft
Gotthard Basistunnel (Switzerland)
High speed railway tunnel
Quelle: R. Stengele (Swissphoto AG)
Gyro campaign in the driving
Bodio (15,7 km)
 8 Gyro campaigns in
December 2003 and August
2006 with GYROMAT
 624 single azimuth surveys in
total with only 22 outliers;
3,5% which were eliminated
 Determination of 44 reference
azimuths on the surface
network and 38 azimuths in
the underground network with
602 single survey results
Gotthard Basistunnel (Switzerland)
High speed railway tunnel
Gotthard Basistunnel (Switzerland)
High speed railway tunnel
Gotthard Basistunnel (Switzerland)
High speed railway tunnel
Gotthard Basistunnel (Switzerland)
High speed railway tunnel
Cut-through Bodio – Faido
on 26.10.2006
Gotthard Basistunnel (Switzerland)
High speed railway tunnel
Achieved deviation at cut-through
Bodio – Faido (15,7 km)
Lateral: 9,1 cm
Vertical: 2,3 cm
Cut-through Bodio – Faido on 26.10.2006
Different voices about the result:
Building engineering:
This deviation can be compensated
by optimizing the interior work
Railway engineering:
This deviation can be compensated
by minimal track moving over 300 m
Surveyor:
Considerable result
Insurance:
Risks remain under control
Gotthard Basistunnel (Switzerland)
High speed railway tunnel
 Sewer tunnel project of the City of
Portland (Oregon/USA) constructed
by TBM (Herrenknecht)
 Length of 5,5 km with no remarkable
incline or curves, diameter: 5 m
 After the short distance of only 500 m
tunneling two different survey
campaigns
 one by contractor’s surveyor
 one by client’s surveyor
showed lateral differences of more
than 25 cm
Combined Sewer Overflows Tunnel, Portland, USA
West side CSO tunnel project
 Problem:
 Tunneling starts from a haulage shaft of
50 m depth and 18 m diameter
 Start-up baseline for survey of only 11 m
length
 Plumbing error of only 2 mm causes
large lateral errors
 Feared result without measurements:
breakthrough disaster
 Measurements:
 Turning the traverse into right orientation
by only two GYROMAT campaigns
 Reached result: successful breakthrough
with an accuracy of a few millimeters
Combined Sewer Overflows Tunnel, Protland, USA
West side CSO tunnel project
Guidance system for TBM
Source: VMT GmbH
Tunnel survey System
Efficient survey system
Resume
 Every tunneling project signifies an investment of several million Euro/Dollars
 Tunnel survey take place under difficult environmental conditions
 Small errors have a great impact on the technical and economical success of
the project
 The nightmare of a tunnel driver can be avoided by three steps:
High accuracy tunnel construction
QR
Gyro control survey as insurance
α
β1
β2
β3
q QL
β1
β2
β3
DMT GmbH & Co. KG
Exploration & Geosurvey
Contact: Norbert Benecke
Am Technologiepark 1
45307 Essen, Germany
Phone: +49 201 172 2012
Fax: +49 201 172 1791
E-mail: norbert.benecke@dmt.de
Internet: www.dmt.de
Thank you for your attention

Mais conteúdo relacionado

Mais procurados

Application of GPS in mining
Application of GPS in miningApplication of GPS in mining
Application of GPS in miningVansajRaj2
 
Statutory provisions for the preaparation of mine plans and sections
Statutory provisions for the preaparation of mine plans and sectionsStatutory provisions for the preaparation of mine plans and sections
Statutory provisions for the preaparation of mine plans and sectionsSafdar Ali
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with DraglineVR M
 
The continuous surface miner
The continuous surface minerThe continuous surface miner
The continuous surface minerVIJAY KUMAR
 
Ug mine planning
Ug mine planningUg mine planning
Ug mine planningOgala Oscar
 
Mine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersMine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersVR M
 
Develpoment and extraction of coal pillar by continuous
Develpoment and extraction of coal pillar by continuousDevelpoment and extraction of coal pillar by continuous
Develpoment and extraction of coal pillar by continuousShubham Agrawal
 

Mais procurados (20)

Application of GPS in mining
Application of GPS in miningApplication of GPS in mining
Application of GPS in mining
 
Highwall mining – a new approach in india
Highwall mining – a new approach in indiaHighwall mining – a new approach in india
Highwall mining – a new approach in india
 
Statutory provisions for the preaparation of mine plans and sections
Statutory provisions for the preaparation of mine plans and sectionsStatutory provisions for the preaparation of mine plans and sections
Statutory provisions for the preaparation of mine plans and sections
 
Continuous miner
Continuous minerContinuous miner
Continuous miner
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with Dragline
 
Mine surveying 981 (1)
Mine surveying 981 (1)Mine surveying 981 (1)
Mine surveying 981 (1)
 
Caving Underground Mining Methods (longwall, Sublevel caving, & Block caving)
Caving Underground Mining Methods (longwall, Sublevel caving, &  Block caving)Caving Underground Mining Methods (longwall, Sublevel caving, &  Block caving)
Caving Underground Mining Methods (longwall, Sublevel caving, & Block caving)
 
Mine cars
Mine carsMine cars
Mine cars
 
Aerial ropeway
Aerial ropewayAerial ropeway
Aerial ropeway
 
Gyrotheodolite
GyrotheodoliteGyrotheodolite
Gyrotheodolite
 
Blasting Gallery Method
Blasting Gallery MethodBlasting Gallery Method
Blasting Gallery Method
 
The continuous surface miner
The continuous surface minerThe continuous surface miner
The continuous surface miner
 
Ventilation of underground mine
Ventilation of underground mineVentilation of underground mine
Ventilation of underground mine
 
Ug mine planning
Ug mine planningUg mine planning
Ug mine planning
 
Room and Pillar Mining Method
Room and Pillar Mining MethodRoom and Pillar Mining Method
Room and Pillar Mining Method
 
Road Header and Bolter Miner
Road Header and Bolter MinerRoad Header and Bolter Miner
Road Header and Bolter Miner
 
Mine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersMine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of Papers
 
Pillar design
Pillar designPillar design
Pillar design
 
Develpoment and extraction of coal pillar by continuous
Develpoment and extraction of coal pillar by continuousDevelpoment and extraction of coal pillar by continuous
Develpoment and extraction of coal pillar by continuous
 
Shrinkage and Vertical Crater Retreat Stoping
Shrinkage and Vertical Crater Retreat StopingShrinkage and Vertical Crater Retreat Stoping
Shrinkage and Vertical Crater Retreat Stoping
 

Destaque

Vytahy_Mustek_MCE_MVI_LSP_20 EN_LME
Vytahy_Mustek_MCE_MVI_LSP_20 EN_LMEVytahy_Mustek_MCE_MVI_LSP_20 EN_LME
Vytahy_Mustek_MCE_MVI_LSP_20 EN_LMEMartin Vinter
 
Application of mems gyroscope in navigation of tunnel boring machine
Application of mems gyroscope in navigation of tunnel boring machineApplication of mems gyroscope in navigation of tunnel boring machine
Application of mems gyroscope in navigation of tunnel boring machinekhalil fathi
 
numerical study and analytical solution of P-wave attenuation insensitive und...
numerical study and analytical solution of P-wave attenuation insensitive und...numerical study and analytical solution of P-wave attenuation insensitive und...
numerical study and analytical solution of P-wave attenuation insensitive und...Hamed Zarei
 
Mobility management 2
Mobility management 2Mobility management 2
Mobility management 2Koos Oldhoff
 
Real Time Monitoring Systems for Tunnels & Deep Excavation Projects
Real Time Monitoring Systems for Tunnels & Deep Excavation ProjectsReal Time Monitoring Systems for Tunnels & Deep Excavation Projects
Real Time Monitoring Systems for Tunnels & Deep Excavation ProjectsRekaNext Capital
 
MEMS gyroscope sensor application for navigation tunnel boring machine(TBM) m...
MEMS gyroscope sensor application for navigation tunnel boring machine(TBM) m...MEMS gyroscope sensor application for navigation tunnel boring machine(TBM) m...
MEMS gyroscope sensor application for navigation tunnel boring machine(TBM) m...khalil fathi
 
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Hitesh Khanna
 
gps system and application in mining
gps system and application in mininggps system and application in mining
gps system and application in miningSATYABRATA NAYAK
 
Because i believe i can
Because i believe i canBecause i believe i can
Because i believe i cansaurabh gupta
 
Lookbook "The ballet of the Tsars"
Lookbook "The ballet of the Tsars"Lookbook "The ballet of the Tsars"
Lookbook "The ballet of the Tsars"Patricia Rosales
 
MDD and modeling tools research
MDD and modeling tools researchMDD and modeling tools research
MDD and modeling tools researchRoger Xia
 
Biopharma Production and Development China 2015
Biopharma Production and Development China 2015 Biopharma Production and Development China 2015
Biopharma Production and Development China 2015 Rita Barry
 

Destaque (20)

Gyroscope
GyroscopeGyroscope
Gyroscope
 
Theory of Gyrocompass
Theory of GyrocompassTheory of Gyrocompass
Theory of Gyrocompass
 
Vytahy_Mustek_MCE_MVI_LSP_20 EN_LME
Vytahy_Mustek_MCE_MVI_LSP_20 EN_LMEVytahy_Mustek_MCE_MVI_LSP_20 EN_LME
Vytahy_Mustek_MCE_MVI_LSP_20 EN_LME
 
Application of mems gyroscope in navigation of tunnel boring machine
Application of mems gyroscope in navigation of tunnel boring machineApplication of mems gyroscope in navigation of tunnel boring machine
Application of mems gyroscope in navigation of tunnel boring machine
 
numerical study and analytical solution of P-wave attenuation insensitive und...
numerical study and analytical solution of P-wave attenuation insensitive und...numerical study and analytical solution of P-wave attenuation insensitive und...
numerical study and analytical solution of P-wave attenuation insensitive und...
 
Tbm
TbmTbm
Tbm
 
Mobility management 2
Mobility management 2Mobility management 2
Mobility management 2
 
Real Time Monitoring Systems for Tunnels & Deep Excavation Projects
Real Time Monitoring Systems for Tunnels & Deep Excavation ProjectsReal Time Monitoring Systems for Tunnels & Deep Excavation Projects
Real Time Monitoring Systems for Tunnels & Deep Excavation Projects
 
Minnesota High Tunnel Disease Survey
Minnesota High Tunnel Disease SurveyMinnesota High Tunnel Disease Survey
Minnesota High Tunnel Disease Survey
 
MEMS gyroscope sensor application for navigation tunnel boring machine(TBM) m...
MEMS gyroscope sensor application for navigation tunnel boring machine(TBM) m...MEMS gyroscope sensor application for navigation tunnel boring machine(TBM) m...
MEMS gyroscope sensor application for navigation tunnel boring machine(TBM) m...
 
Lining in tunnels
Lining in tunnelsLining in tunnels
Lining in tunnels
 
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
 
gps system and application in mining
gps system and application in mininggps system and application in mining
gps system and application in mining
 
Be project report template
Be project report templateBe project report template
Be project report template
 
Because i believe i can
Because i believe i canBecause i believe i can
Because i believe i can
 
Lookbook "The ballet of the Tsars"
Lookbook "The ballet of the Tsars"Lookbook "The ballet of the Tsars"
Lookbook "The ballet of the Tsars"
 
MDD and modeling tools research
MDD and modeling tools researchMDD and modeling tools research
MDD and modeling tools research
 
Propuesta de malla curricular
Propuesta de malla curricularPropuesta de malla curricular
Propuesta de malla curricular
 
Biopharma Production and Development China 2015
Biopharma Production and Development China 2015 Biopharma Production and Development China 2015
Biopharma Production and Development China 2015
 
Pemerintahan Daendeles di Indonesia
Pemerintahan  Daendeles di IndonesiaPemerintahan  Daendeles di Indonesia
Pemerintahan Daendeles di Indonesia
 

Semelhante a Gyromat in tunnelling practice

Metro Torino Extension - Design and construction problems
Metro Torino Extension - Design and construction problemsMetro Torino Extension - Design and construction problems
Metro Torino Extension - Design and construction problemsgifanta
 
THE VERTICAL APPROACH – TRANSITIONING FROM SAMPLING TO SUSTAINABLE MINING
THE VERTICAL APPROACH – TRANSITIONING FROM SAMPLING TO SUSTAINABLE MININGTHE VERTICAL APPROACH – TRANSITIONING FROM SAMPLING TO SUSTAINABLE MINING
THE VERTICAL APPROACH – TRANSITIONING FROM SAMPLING TO SUSTAINABLE MININGiQHub
 
coal mining training report
coal mining training report coal mining training report
coal mining training report VIKRAMSINGH1231
 
ZDY12000LD Directional Drill Rig
ZDY12000LD Directional Drill RigZDY12000LD Directional Drill Rig
ZDY12000LD Directional Drill RigOwen Ji
 
Design of pulse jet engine for UAV - 2
Design of pulse jet engine for UAV - 2Design of pulse jet engine for UAV - 2
Design of pulse jet engine for UAV - 2ROSHAN SAH
 
TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014
TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014
TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014Hitesh Khanna
 
ZDY4300LF serial drill rig
ZDY4300LF serial drill rigZDY4300LF serial drill rig
ZDY4300LF serial drill rigOwen Ji
 
SERVICE MAINS.pdf
SERVICE MAINS.pdfSERVICE MAINS.pdf
SERVICE MAINS.pdfvaasuchetu
 
Lesson3 tunnel design
Lesson3 tunnel designLesson3 tunnel design
Lesson3 tunnel designhaziq42
 
Lesson3 tunnel design
Lesson3 tunnel designLesson3 tunnel design
Lesson3 tunnel designkhan510459
 
Case history doha linea red line north en
Case history   doha linea red line north enCase history   doha linea red line north en
Case history doha linea red line north enstefanolupifamaspa
 
3 tunnels tunnel sous la manche c
3 tunnels tunnel sous la manche c 3 tunnels tunnel sous la manche c
3 tunnels tunnel sous la manche c Junaida Wally
 

Semelhante a Gyromat in tunnelling practice (20)

Metro Torino Extension - Design and construction problems
Metro Torino Extension - Design and construction problemsMetro Torino Extension - Design and construction problems
Metro Torino Extension - Design and construction problems
 
THE VERTICAL APPROACH – TRANSITIONING FROM SAMPLING TO SUSTAINABLE MINING
THE VERTICAL APPROACH – TRANSITIONING FROM SAMPLING TO SUSTAINABLE MININGTHE VERTICAL APPROACH – TRANSITIONING FROM SAMPLING TO SUSTAINABLE MINING
THE VERTICAL APPROACH – TRANSITIONING FROM SAMPLING TO SUSTAINABLE MINING
 
coal mining training report
coal mining training report coal mining training report
coal mining training report
 
Trenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe InstallationsTrenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe Installations
 
Gunther koller
Gunther kollerGunther koller
Gunther koller
 
Highwall mining
Highwall miningHighwall mining
Highwall mining
 
AMAN PPT 4985 Assignment-1.pptx
AMAN PPT 4985 Assignment-1.pptxAMAN PPT 4985 Assignment-1.pptx
AMAN PPT 4985 Assignment-1.pptx
 
ZDY12000LD Directional Drill Rig
ZDY12000LD Directional Drill RigZDY12000LD Directional Drill Rig
ZDY12000LD Directional Drill Rig
 
Design of pulse jet engine for UAV - 2
Design of pulse jet engine for UAV - 2Design of pulse jet engine for UAV - 2
Design of pulse jet engine for UAV - 2
 
Silviu Livescu
Silviu LivescuSilviu Livescu
Silviu Livescu
 
TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014
TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014
TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014
 
ZDY4300LF serial drill rig
ZDY4300LF serial drill rigZDY4300LF serial drill rig
ZDY4300LF serial drill rig
 
SERVICE MAINS.pdf
SERVICE MAINS.pdfSERVICE MAINS.pdf
SERVICE MAINS.pdf
 
Lesson3 tunnel design
Lesson3 tunnel designLesson3 tunnel design
Lesson3 tunnel design
 
Lesson3 tunnel design
Lesson3 tunnel designLesson3 tunnel design
Lesson3 tunnel design
 
Case history doha linea red line north en
Case history   doha linea red line north enCase history   doha linea red line north en
Case history doha linea red line north en
 
Jumbo boart longyear
Jumbo boart longyearJumbo boart longyear
Jumbo boart longyear
 
3 tunnels tunnel sous la manche c
3 tunnels tunnel sous la manche c 3 tunnels tunnel sous la manche c
3 tunnels tunnel sous la manche c
 
ES3_Simpson
ES3_SimpsonES3_Simpson
ES3_Simpson
 
MobileMT airborne surveys
MobileMT airborne surveysMobileMT airborne surveys
MobileMT airborne surveys
 

Último

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 

Último (20)

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 

Gyromat in tunnelling practice

  • 1. Geosystems at HxGN LIVE Increasing accuracy in high precision survey with DMT GYROMAT 5000 in combination with LEICA high-end total station Volker Schäpe, Volker Schultheiß, Norbert Benecke Version Date: 04.06.14 Please insert a picture (Insert, Picture, from file). Size according to grey field (10 cm x 25.4 cm). Scale picture: highlight, pull corner point Cut picture: highlight, choose the cutting icon from the picture tool bar, click on a side point and cut
  • 2. DMT GmbH & Co. KG Company profile DMT is an international technology service provider in the fields of natural resources, safety and infrastructure  DMT was founded in 1990 as a merger of 3 companies founded in 1864  In the year 2007 DMT joint the TÜV NORD Group  TÜV Nord Group  Headquarters in Hannover, Germany  ~1.056 Mio. € annual turnover in 2013  ~9.925 Employees in 70 countries  DMT Group  Headquarters in Essen, Germany  ~113 Mio. € annual turnover in 2013  ~720 employees  Development department for geo-instruments like GYROMAT 5000  Service department for surveying tasks
  • 3. 1. Introduction of GYROMAT 5000 2. Application for GYROMAT 5000: high accuracy tunnel survey 3. Examples and case studies Content DMT GYROMAT 5000 + LEICA total station High precision north finding gyroscope
  • 4. 1. Introduction of GYROMAT 5000 2. Application for GYROMAT 5000: high accuracy tunnel survey 3. Examples and case studies Content DMT GYROMAT 5000 + LEICA total station High precision north finding gyroscope
  • 5. DIN 18723 Teil 7 (1990) (German Standard for Industry 18723 Part 7 from 1990) A gyroscope (northseeking gyro) is a pendulous suspended, electronic driven gyro, which spin vector is influenced by gravity and earth rotation. It will directed to astronomic north. Implementation of gyro into the GYROMAT Gyro axis Suspension tape ω Introduction of GYROMAT 5000 Principle of a gyroscope
  • 6.  Highest measuring accuracy.. 0,8 mgon (= 1,2 cm / 1 km)  Short measuring time ………. 6 – 9 minutes  Weight without total station …11,5 kg  Fully automatic measuring sequence  Preorientation-free measuring method  Individual theodolite equipping with LEICA high-end total stations like TPS1100, TPS1200, TS11, TS15, TS30, TM30 TS50, MS50, TM6100A and others with accuracy better than 1” GYROMAT 5000 The most accurate precision-surveying gyroscope in the world
  • 7. 1. Introduction of GYROMAT 5000 2. Application for GYROMAT 5000: high accuracy tunnel survey 3. Examples and case studies Content DMT GYROMAT 5000 + LEICA total station High precision north finding gyroscope
  • 8. Requirements on accuracy of tunnel/roadway position depend on:  Used tunneling method (e.g. TBM or blasting )  Use of the tunnel in operation (e.g. high speed railway tunnel / roadway tunnel) Examples for challenging requirements in accuracy:  Predefined demounting construction position with 5 cm variance for the TBM  Required alignment accuracy better than 5 cm at each tunnel position for high speed railway tunnels  Required accuracy of 10 cm for cut-through of two underground roadways High accuracy tunnel survey Requirements on position measurement in tunnels
  • 9.  Establishment of an efficient Survey System including:  Surface network, created e.g. by GNSS  Transfer of surface network into the tunnel via open traverse lines:  Survey point distances in the tunnel range between 50 m and > 200 m  Survey points are mostly located at flanks, rarely in the middle of the tunnel  Deviations and errors propagate with every survey point  Failures in positioning increase with tunnel length Deviations are unavoidable! In particular:  refraction error  plumbing error  error propagation will lead into lateral deviation High accuracy tunnel survey Surveying and directions in tunneling, some considerations
  • 10. Target building Plumbing Error α β1 β2 β3 q B S QL Real direction with plumbing error q Theoretical direction without plumbing error Tunnel length [m] Lateral deflection Plumb error: 1 mm Base length: 10 m Lateral deflection Plumb error: 1,5 mm Base length: 8 m 300 4,2 cm 8,0 cm 1.000 14,1 cm 26,5 cm 10.000 141,4 cm 265,2 cm β1 β2 β3 Start shaft High accuracy tunnel survey Improvement of accuracy by the use of GYROMAT 5000
  • 11. Refraction in a tunnel Theoretical straight-lined beam Real tunnel situation: different layers of temperatures between the tunnel walls and tunnel centre lead into refraction In reality: curved beam Disregard of refraction leads into position error QR Start shaft Influence of refraction Theoretical position QR A1 A2 A‘2A‘1 Δ Δ North North Solution: GYROMAT 5000 delivers the absolute north direction for every point. The refraction can be identified High accuracy tunnel survey Improvement of accuracy by the use of GYROMAT 5000
  • 12. Gyro supported traverse line in the tunnel Error propagation Survey points Traverse line Gyro surveyed polygon side 50 – 200 m 500 – 1.000 m High accuracy tunnel survey Improvement of accuracy by the use of GYROMAT 5000
  • 13. 1. Introduction of GYROMAT 5000 2. Application for GYROMAT 5000: high accuracy tunnel survey 3. Examples and case studies Content DMT GYROMAT 5000 + LEICA total station High precision north finding gyroscope
  • 14. Water supply tunnel for a 420 MW hydropower plant Length: 25,8 km, diameter: 7 – 8 m Driven by two TBM from two sites: intake and outlet  1 Gyro campaign 1 km before planned cut-through  Driving status while survey: intake tunnel: 7,5 km outlet tunnel:17,5 km  Extreme environmental conditions while survey: temperature up to 42 О C; air humidity: 99%  Result: determination of significant lateral deviation in both tunnels of up to 2,5 m at calculated cut-through position By the way: in consideration of the environmental conditions, 2,5 m lateral deviation is good result for open traverses over these large distances. Gilgel Gibe II tunnel in Ethiopia Case study: water supply tunnel
  • 15. Achieved lateral deviation: < 5 cm Scenario without correction: Lateral deviation of > 2,5 m which corresponds to a third of total tunnel width Possible consequence of scenario above: Additional construction efforts to correct the direction which would had exceeded multiple the costs and time for gyro campaign Result of cut-through after correction of driving direction: Gilgel Gibe II tunnel in Ethiopia Case study: water supply tunnel
  • 16. 690 MW hydropower plant, supplied by two different water reservoirs in the sub-arctic east part of Island mountain region.  Total tunnel length: 72 km  Driving with 3 TBM from different starting points  Allowance of horizontal deviation at cut-through positions: < 20 cm  Allowance of deviation from the target direction for every section of 100 m: < 15 cm Kárahnjúkar Hydro-Electric Project (Island) Case study: water supply tunnel
  • 17. Challenges for this survey  Extreme length of single tunnel sections  Complex geometry with curves and branches leads to sightings close to the tunnel wall  Extreme environmental conditions: - Outside temperatures below -20 О C - Inside temperature range from 0О C to > 40О C  High variation of air temperature at tunnel entrances or ventilation holes  Air humidity nearly 100 %  Partly water suddenly flows in with temperatures up to 51О C  Facing considerable, unpredictable and unavoidable refractions at the traverse Kárahnjúkar Hydro-Electric Project (Island) Case study: water supply tunnel
  • 18. Challenges in surveying and alignment Kárahnjúkar Hydro-Electric Project (Island) Case study: water supply tunnel
  • 19. Kárahnjúkar Hydro-Electric Project (Island) Case study: water supply tunnel Challenges in surveying and alignment
  • 20. Kárahnjúkar Hydro-Electric Project (Island) Case study: water supply tunnel Challenges in surveying and alignment
  • 21. Kárahnjúkar Hydro-Electric Project (Island) Case study: water supply tunnel Challenges in surveying and alignment
  • 22.  Faultless operation of GYROMAT 3000 and Leica total stations TCA1800 and TS30 even with the extreme weather conditions  Keeping the required accuracy for all cut-through so that extensive rework could be avoided. 20 cm was allowed, 5 cm was achieved Results: Kárahnjúkar Hydro-Electric Project (Island) Case study: water supply tunnel
  • 23. Challenges for this survey  Extreme total length of 57 km  High demands on accuracy of max. 10 cm lateral deviation at every point  Tunnel work with TBMs from 5 access points. Entrance Sedrun via 800 m deep shaft Gotthard Basistunnel (Switzerland) High speed railway tunnel
  • 24. Quelle: R. Stengele (Swissphoto AG) Gyro campaign in the driving Bodio (15,7 km)  8 Gyro campaigns in December 2003 and August 2006 with GYROMAT  624 single azimuth surveys in total with only 22 outliers; 3,5% which were eliminated  Determination of 44 reference azimuths on the surface network and 38 azimuths in the underground network with 602 single survey results Gotthard Basistunnel (Switzerland) High speed railway tunnel
  • 28. Cut-through Bodio – Faido on 26.10.2006 Gotthard Basistunnel (Switzerland) High speed railway tunnel
  • 29. Achieved deviation at cut-through Bodio – Faido (15,7 km) Lateral: 9,1 cm Vertical: 2,3 cm Cut-through Bodio – Faido on 26.10.2006 Different voices about the result: Building engineering: This deviation can be compensated by optimizing the interior work Railway engineering: This deviation can be compensated by minimal track moving over 300 m Surveyor: Considerable result Insurance: Risks remain under control Gotthard Basistunnel (Switzerland) High speed railway tunnel
  • 30.  Sewer tunnel project of the City of Portland (Oregon/USA) constructed by TBM (Herrenknecht)  Length of 5,5 km with no remarkable incline or curves, diameter: 5 m  After the short distance of only 500 m tunneling two different survey campaigns  one by contractor’s surveyor  one by client’s surveyor showed lateral differences of more than 25 cm Combined Sewer Overflows Tunnel, Portland, USA West side CSO tunnel project
  • 31.  Problem:  Tunneling starts from a haulage shaft of 50 m depth and 18 m diameter  Start-up baseline for survey of only 11 m length  Plumbing error of only 2 mm causes large lateral errors  Feared result without measurements: breakthrough disaster  Measurements:  Turning the traverse into right orientation by only two GYROMAT campaigns  Reached result: successful breakthrough with an accuracy of a few millimeters Combined Sewer Overflows Tunnel, Protland, USA West side CSO tunnel project
  • 32. Guidance system for TBM Source: VMT GmbH Tunnel survey System Efficient survey system Resume  Every tunneling project signifies an investment of several million Euro/Dollars  Tunnel survey take place under difficult environmental conditions  Small errors have a great impact on the technical and economical success of the project  The nightmare of a tunnel driver can be avoided by three steps: High accuracy tunnel construction QR Gyro control survey as insurance α β1 β2 β3 q QL β1 β2 β3
  • 33. DMT GmbH & Co. KG Exploration & Geosurvey Contact: Norbert Benecke Am Technologiepark 1 45307 Essen, Germany Phone: +49 201 172 2012 Fax: +49 201 172 1791 E-mail: norbert.benecke@dmt.de Internet: www.dmt.de Thank you for your attention