1
Combined Sewer System Issues
CHALLENGE: Areas of Hoboken lie below high tide. The combined sewer
system cannot empty out by gravity during high tide, overflowing and
causing flooding in the lowest elevation areas in the City.
2
Flooding From Rain Events
3
Storm Surge Risk
4
Coastal Flooding Threat Increases with Sea Level Rise
Sandy Impact 500 million gallons of water = $500+ million in damage
Major hurricane impacts NJ every 5-6 years
FEMA estimates a 26% chance of Sandy like flood in next 30 years
(That’s two coin flips over the lifetime of a mortgage) 5
2012 Superstorm Sandy
6
7
8
2012 Superstorm Sandy
9
Hoboken PATH – 2012 Superstorm Sandy
10
Hoboken PATH – 1992 Nor’easter
11
1959
12
October 2015 – Hurricane Joaquin
13
January 4, 2016 – Rain event
14
January 21, 2016
15
Rebuild By Design
16
Resist: Waterfront
17
Resist: Waterfront
18
Resist: Seating and Planter Feature
19
Resist: Parklets
20
Delay/Store/Discharge
Southwest Park
1 acre
200K gallons retention
21
Delay/Store/Discharge
BASF Property
6 acres
1M gallons retention
22
Delay/Store/Discharge
City Hall Demonstration Project
Rain gardens, cisterns, porous concrete
Retains all stormwater from 6-hour long 100-year storm
23
Delay/Store/Discharge
H-5 Wet Weather Pump Station
Will alleviate flooding in NW Hoboken
Can pump up to 40M gallons/day
24
Incorporating Delay/Store/Discharge into
Development
Delay: Green Roof Incentives
• Zoning Code changes incentivize green roofs
• Applications for more than 10,000 sf of green roofs
approved in 3 months
Delay: Rain Barrels
• Amended Code to allow rain barrels
• Hosted Rain Barrel Installation Workshops and
distributed 40 rain barrels to participants
25
Incorporating Delay/Store/Discharge into
Redevelopment Plans
Hoboken Yards Redevelopment Plan
Adopted December 2014
• Stormwater and sanitary sewer pumps to serve
this property will be installed by the redeveloper.
• Sanitary sewer and storm sewer for the site will
be separated.
• All elements of the project shall be in compliance
with the City’s Flood Damage Prevention
Ordinance. A varied mix of stairs, seating levels,
irrigated green walls may need to be incorporated
to tie the street and sidewalk grade to the
interface of the buildings on the project site due
to this compliance requirement.
Western Edge Redevelopment Plan
Adopted August 2015
• Rebuild by Design recommended for the Western
Edge area to have a linear park with flood storage.
This requirement has become the centerpiece of
the Western Edge Redevelopment Plan.
• All new construction and substantial
rehabilitation shall also comply with the Hoboken
Flood Damage Prevention Ordinance.
26
Incorporating Delay/Store/Discharge into
Redevelopment Plans
Neumann Leathers Redevelopment Plan
Adopted December 2015
• This Rehabilitation Area, covered entirely by
buildings, surface parking, roads and sidewalks, is
within the City’s most vulnerable flood zone and is
an old industrial site. It is unique in that the
buildings with substantial historical character will
be retained and improved as a part of this Plan.
• The Plan will mitigate against flooding by
incorporating green infrastructure as well as
vegetation to the greatest extent within and around
the development, including along sidewalks,
rooftop gardens, green roofs and walls, decks, and
in the courtyards and open spaces to be created.
• All new construction and substantial rehabilitation
shall comply with the Hoboken Flood Damage
Prevention Ordinance, Chapter 104 of the Hoboken
Municipal Code.
27
28
Incorporating Delay/Store/Discharge into
Redevelopment Plans
Southwest & North End
Redevelopment Plans
Initiating the Planning Process
Hoboken is embarking on the planning
process for redevelopment plans for both
the Southwest Rehabilitation Area and the
North End Rehabilitation Area. As these
plans are developed, the same principles
will be incorporated to address flood
damage prevention, stormwater
management, and flood mitigation.
Incorporating Delay/Store/Discharge into
Redevelopment Agreements
Lorien Lofts
Redevelopment Agreement
Delay/Store
• Passive House construction –
self sustaining electricity
production, building is fully
operational in power outage
and may eventually connect
to future City microgrid
• On-site storm water detention
• Low flow fixtures to reduce
amount of sanitary sewer in
system
• Green roofs and rainwater
capture and reuse
• Flood proofed building to
allow for rescue accessibility
during flooding
29
Bijou 7th and Jackson
Redevelopment Agreement
Delay/Store
• 2 acre park negotiated to be
constructed by redeveloper
• 300K gallons of
underground storm water
detention
• Low flow fixtures to reduce
amount of sanitary sewer in
system
• Green roofs to be installed
on building
Incorporating Delay/Store/Discharge into
Redevelopment Agreements
30
Incorporating Delay/Store/Discharge into
Development and Redevelopment
Infrastructure Trust Fund
Hoboken is pursuing an option with the State to
create an Infrastructure Trust Fund. The concept
is for contributions from redevelopers and
developers to be collected into this trust to be
used for designated infrastructure resiliency
projects.
• Protecting people that are closer to the
water that might not benefit from an in-land
Resist protection measure per Rebuild by
Design.
– Help elevate mechanicals in those
buildings.
– Install wet floodproofing/dry
floodproofing measures per the City’s
newly adopted Design Guidelines.
• Contributions from developers may go
toward additional Delay/Store components
such as rain garden construction and
underground storage measures.
31

Mais conteúdo relacionado

Mais procurados

Clean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben Gramling
Clean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben GramlingClean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben Gramling
Clean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben Gramling
Sweet Water
 

Mais procurados (20)

Elizabeth Hughes, Earth Conservancy, “Lessons Learned from 25 Years of Recove...
Elizabeth Hughes, Earth Conservancy, “Lessons Learned from 25 Years of Recove...Elizabeth Hughes, Earth Conservancy, “Lessons Learned from 25 Years of Recove...
Elizabeth Hughes, Earth Conservancy, “Lessons Learned from 25 Years of Recove...
 
Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_
 
Calbiga River Care
Calbiga River CareCalbiga River Care
Calbiga River Care
 
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
 
Making Connections Across Our Watersheds
Making Connections Across Our WatershedsMaking Connections Across Our Watersheds
Making Connections Across Our Watersheds
 
Berwyn Depot District Streetscape IGI Grant Application
Berwyn Depot District Streetscape IGI Grant ApplicationBerwyn Depot District Streetscape IGI Grant Application
Berwyn Depot District Streetscape IGI Grant Application
 
Rosehill Vision Committee May 31 2017 Meeting Presentation
Rosehill Vision Committee May 31 2017 Meeting PresentationRosehill Vision Committee May 31 2017 Meeting Presentation
Rosehill Vision Committee May 31 2017 Meeting Presentation
 
Clean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben Gramling
Clean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben GramlingClean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben Gramling
Clean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben Gramling
 
Andy Freifeld, Temple University, “Landscape Design and Reuse Planning in Min...
Andy Freifeld, Temple University, “Landscape Design and Reuse Planning in Min...Andy Freifeld, Temple University, “Landscape Design and Reuse Planning in Min...
Andy Freifeld, Temple University, “Landscape Design and Reuse Planning in Min...
 
Peyton Run at Longwood Knolls Stream Restoration
Peyton Run at Longwood Knolls Stream RestorationPeyton Run at Longwood Knolls Stream Restoration
Peyton Run at Longwood Knolls Stream Restoration
 
Renewables and crofts issues for hydro developments crofting law group - 20...
Renewables and crofts   issues for hydro developments crofting law group - 20...Renewables and crofts   issues for hydro developments crofting law group - 20...
Renewables and crofts issues for hydro developments crofting law group - 20...
 
Peyton Run at Longwood Knolls Community Meeting Oct 1, 2018
Peyton Run at Longwood Knolls Community Meeting Oct 1, 2018Peyton Run at Longwood Knolls Community Meeting Oct 1, 2018
Peyton Run at Longwood Knolls Community Meeting Oct 1, 2018
 
The Rainbow Drive Story
The Rainbow Drive  StoryThe Rainbow Drive  Story
The Rainbow Drive Story
 
Fairfax County Leigh Meadow Kickoff Presentation January 2016
Fairfax County Leigh Meadow Kickoff Presentation January 2016Fairfax County Leigh Meadow Kickoff Presentation January 2016
Fairfax County Leigh Meadow Kickoff Presentation January 2016
 
Boscastle (2004)
Boscastle (2004)Boscastle (2004)
Boscastle (2004)
 
Display boards
Display boardsDisplay boards
Display boards
 
Australia And Singapore - How are they dealing with water problems?
Australia And Singapore - How are they dealing with water problems?Australia And Singapore - How are they dealing with water problems?
Australia And Singapore - How are they dealing with water problems?
 
Leigh Meadow and Towlston Basin Pardon Our Dust October 2018
Leigh Meadow and Towlston Basin Pardon Our Dust October 2018Leigh Meadow and Towlston Basin Pardon Our Dust October 2018
Leigh Meadow and Towlston Basin Pardon Our Dust October 2018
 
Dead Run Stream Restoration Stream Team Kick Off August 18, 2015
Dead Run Stream Restoration Stream Team Kick Off August 18, 2015Dead Run Stream Restoration Stream Team Kick Off August 18, 2015
Dead Run Stream Restoration Stream Team Kick Off August 18, 2015
 
ccwcd bond public meeting
 ccwcd bond public meeting ccwcd bond public meeting
ccwcd bond public meeting
 

Semelhante a NJFuture Redevelopment Forum 2016 Forbes

RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
Rail~Volution
 
Urban Stormwater Conditions and the Multiple Benefits of Green Infrastructure...
Urban Stormwater Conditions and the Multiple Benefits of Green Infrastructure...Urban Stormwater Conditions and the Multiple Benefits of Green Infrastructure...
Urban Stormwater Conditions and the Multiple Benefits of Green Infrastructure...
RI_FMA
 
Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014
Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014
Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014
Joseph Merzlak
 

Semelhante a NJFuture Redevelopment Forum 2016 Forbes (20)

Green infrastructure foundation for climate resilience Mekong
Green infrastructure foundation for climate resilience MekongGreen infrastructure foundation for climate resilience Mekong
Green infrastructure foundation for climate resilience Mekong
 
Green infrastructure as a foundation for climate resilience and sustainabilit...
Green infrastructure as a foundation for climate resilience and sustainabilit...Green infrastructure as a foundation for climate resilience and sustainabilit...
Green infrastructure as a foundation for climate resilience and sustainabilit...
 
RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
 
Newsletter 4 - Planning for Futire Flood Risks
Newsletter 4 - Planning for Futire Flood RisksNewsletter 4 - Planning for Futire Flood Risks
Newsletter 4 - Planning for Futire Flood Risks
 
For slide share
For slide shareFor slide share
For slide share
 
SMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxSMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptx
 
SMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxSMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptx
 
Measure a foc 080713
Measure a foc 080713Measure a foc 080713
Measure a foc 080713
 
Urban Stormwater Conditions and the Multiple Benefits of Green Infrastructure...
Urban Stormwater Conditions and the Multiple Benefits of Green Infrastructure...Urban Stormwater Conditions and the Multiple Benefits of Green Infrastructure...
Urban Stormwater Conditions and the Multiple Benefits of Green Infrastructure...
 
Paul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectPaul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration Project
 
Sea Level Rise and Storm Surge Plans
Sea Level Rise and Storm Surge Plans Sea Level Rise and Storm Surge Plans
Sea Level Rise and Storm Surge Plans
 
Hydrology
HydrologyHydrology
Hydrology
 
Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14
 
Piney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter WayPiney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter Way
 
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry DockJen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
 
John Nemeth, Richmond Hill - Water & Cities
John Nemeth, Richmond Hill - Water & CitiesJohn Nemeth, Richmond Hill - Water & Cities
John Nemeth, Richmond Hill - Water & Cities
 
Piney Run Public Meeting 1 October 17, 2018
Piney Run Public Meeting 1 October 17, 2018Piney Run Public Meeting 1 October 17, 2018
Piney Run Public Meeting 1 October 17, 2018
 
Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014
Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014
Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014
 
Ccwf restoration apwa
Ccwf restoration apwaCcwf restoration apwa
Ccwf restoration apwa
 
Ccwf restoration apwa
Ccwf restoration apwaCcwf restoration apwa
Ccwf restoration apwa
 

Mais de New Jersey Future

Mais de New Jersey Future (20)

"We've got to do what now?" Webinar
"We've got to do what now?" Webinar"We've got to do what now?" Webinar
"We've got to do what now?" Webinar
 
NJ Redevelopment Forum 2020 - Morning Plenary - Mallya
NJ Redevelopment Forum 2020 - Morning Plenary - MallyaNJ Redevelopment Forum 2020 - Morning Plenary - Mallya
NJ Redevelopment Forum 2020 - Morning Plenary - Mallya
 
NJ Redevelopment Forum 2020 - Morning Plenary - Hollis
NJ Redevelopment Forum 2020 - Morning Plenary - HollisNJ Redevelopment Forum 2020 - Morning Plenary - Hollis
NJ Redevelopment Forum 2020 - Morning Plenary - Hollis
 
NJ Redevelopment Forum 2020 - Lunch Keynote - Gov. Glendening
NJ Redevelopment Forum 2020 - Lunch Keynote -  Gov. GlendeningNJ Redevelopment Forum 2020 - Lunch Keynote -  Gov. Glendening
NJ Redevelopment Forum 2020 - Lunch Keynote - Gov. Glendening
 
NJ Redevelopment Forum 2020 - Capita
NJ Redevelopment Forum 2020 - CapitaNJ Redevelopment Forum 2020 - Capita
NJ Redevelopment Forum 2020 - Capita
 
NJ Redevelopment Forum 2020 - Moriarity
NJ Redevelopment Forum 2020 - Moriarity NJ Redevelopment Forum 2020 - Moriarity
NJ Redevelopment Forum 2020 - Moriarity
 
NJ Redevelopment Forum 2020 - Salkin
NJ Redevelopment Forum 2020 - SalkinNJ Redevelopment Forum 2020 - Salkin
NJ Redevelopment Forum 2020 - Salkin
 
NJ Redevelopment Forum 2020 - Giannikopoulos
NJ Redevelopment Forum 2020 - Giannikopoulos NJ Redevelopment Forum 2020 - Giannikopoulos
NJ Redevelopment Forum 2020 - Giannikopoulos
 
NJ Redevelopment Forum 2020 - Adams and Dockwiller
NJ Redevelopment Forum 2020 - Adams and DockwillerNJ Redevelopment Forum 2020 - Adams and Dockwiller
NJ Redevelopment Forum 2020 - Adams and Dockwiller
 
NJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - MahonNJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - Mahon
 
NJ Redevelopment Forum 2020 - Hache
NJ Redevelopment Forum 2020 - HacheNJ Redevelopment Forum 2020 - Hache
NJ Redevelopment Forum 2020 - Hache
 
NJ Redevelopment Forum 2020 - Bucci-Carter
NJ Redevelopment Forum 2020 - Bucci-CarterNJ Redevelopment Forum 2020 - Bucci-Carter
NJ Redevelopment Forum 2020 - Bucci-Carter
 
NJ Redevelopment Forum 2020 - Kremer
NJ Redevelopment Forum 2020 - KremerNJ Redevelopment Forum 2020 - Kremer
NJ Redevelopment Forum 2020 - Kremer
 
NJ Redevelopment Forum 2020 - Hunsinger
NJ Redevelopment Forum 2020 - HunsingerNJ Redevelopment Forum 2020 - Hunsinger
NJ Redevelopment Forum 2020 - Hunsinger
 
NJ Redevelopment Forum 2020 - Dewey
NJ Redevelopment Forum 2020 - DeweyNJ Redevelopment Forum 2020 - Dewey
NJ Redevelopment Forum 2020 - Dewey
 
NJ Redevelopment Forum 2020 - Cialone
NJ Redevelopment Forum 2020 - CialoneNJ Redevelopment Forum 2020 - Cialone
NJ Redevelopment Forum 2020 - Cialone
 
NJ Redevelopment Forum 2020 - Paruta
NJ Redevelopment Forum 2020 - ParutaNJ Redevelopment Forum 2020 - Paruta
NJ Redevelopment Forum 2020 - Paruta
 
NJ Redevelopment Forum 2020 - Mlenak
NJ Redevelopment Forum 2020 - MlenakNJ Redevelopment Forum 2020 - Mlenak
NJ Redevelopment Forum 2020 - Mlenak
 
NJ Redevelopment Forum 2020 - Miller
NJ Redevelopment Forum 2020 - MillerNJ Redevelopment Forum 2020 - Miller
NJ Redevelopment Forum 2020 - Miller
 
NJ Redevelopment Forum 2020 - Moltosky
NJ Redevelopment Forum 2020 - Moltosky NJ Redevelopment Forum 2020 - Moltosky
NJ Redevelopment Forum 2020 - Moltosky
 

Último

Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Menggugurkan Kandungan 087776558899
 
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
MadhuKothuru
 
Unique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdfUnique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdf
ScottMeyers35
 
Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
ScottMeyers35
 
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 

Último (20)

Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
 
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
 
Kolkata Call Girls Halisahar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl ...
Kolkata Call Girls Halisahar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Girl ...Kolkata Call Girls Halisahar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Girl ...
Kolkata Call Girls Halisahar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl ...
 
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
 
sponsor for poor old age person food.pdf
sponsor for poor old age person food.pdfsponsor for poor old age person food.pdf
sponsor for poor old age person food.pdf
 
2024 UNESCO/Guillermo Cano World Press Freedom Prize
2024 UNESCO/Guillermo Cano World Press Freedom Prize2024 UNESCO/Guillermo Cano World Press Freedom Prize
2024 UNESCO/Guillermo Cano World Press Freedom Prize
 
Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7
Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7
Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7
 
Unique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdfUnique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdf
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - Poster
 
Make a difference in a girl's life by donating to her education!
Make a difference in a girl's life by donating to her education!Make a difference in a girl's life by donating to her education!
Make a difference in a girl's life by donating to her education!
 
Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
 
Honasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdfHonasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdf
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCC
 
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdfPeace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 
2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
 

NJFuture Redevelopment Forum 2016 Forbes

  • 1. Rebuilding Infrastructure, One Redevelopment Project at a Time Hoboken’s Perspective NJ Future Redevelopment Forum Friday, March 11, 2016 11:00 a.m. Presentation by Brandy Forbes, AICP, PP 1
  • 2. Combined Sewer System Issues CHALLENGE: Areas of Hoboken lie below high tide. The combined sewer system cannot empty out by gravity during high tide, overflowing and causing flooding in the lowest elevation areas in the City. 2
  • 5. Coastal Flooding Threat Increases with Sea Level Rise Sandy Impact 500 million gallons of water = $500+ million in damage Major hurricane impacts NJ every 5-6 years FEMA estimates a 26% chance of Sandy like flood in next 30 years (That’s two coin flips over the lifetime of a mortgage) 5
  • 7. 7
  • 8. 8
  • 10. Hoboken PATH – 2012 Superstorm Sandy 10
  • 11. Hoboken PATH – 1992 Nor’easter 11
  • 13. October 2015 – Hurricane Joaquin 13
  • 14. January 4, 2016 – Rain event 14
  • 19. Resist: Seating and Planter Feature 19
  • 23. Delay/Store/Discharge City Hall Demonstration Project Rain gardens, cisterns, porous concrete Retains all stormwater from 6-hour long 100-year storm 23
  • 24. Delay/Store/Discharge H-5 Wet Weather Pump Station Will alleviate flooding in NW Hoboken Can pump up to 40M gallons/day 24
  • 25. Incorporating Delay/Store/Discharge into Development Delay: Green Roof Incentives • Zoning Code changes incentivize green roofs • Applications for more than 10,000 sf of green roofs approved in 3 months Delay: Rain Barrels • Amended Code to allow rain barrels • Hosted Rain Barrel Installation Workshops and distributed 40 rain barrels to participants 25
  • 26. Incorporating Delay/Store/Discharge into Redevelopment Plans Hoboken Yards Redevelopment Plan Adopted December 2014 • Stormwater and sanitary sewer pumps to serve this property will be installed by the redeveloper. • Sanitary sewer and storm sewer for the site will be separated. • All elements of the project shall be in compliance with the City’s Flood Damage Prevention Ordinance. A varied mix of stairs, seating levels, irrigated green walls may need to be incorporated to tie the street and sidewalk grade to the interface of the buildings on the project site due to this compliance requirement. Western Edge Redevelopment Plan Adopted August 2015 • Rebuild by Design recommended for the Western Edge area to have a linear park with flood storage. This requirement has become the centerpiece of the Western Edge Redevelopment Plan. • All new construction and substantial rehabilitation shall also comply with the Hoboken Flood Damage Prevention Ordinance. 26
  • 27. Incorporating Delay/Store/Discharge into Redevelopment Plans Neumann Leathers Redevelopment Plan Adopted December 2015 • This Rehabilitation Area, covered entirely by buildings, surface parking, roads and sidewalks, is within the City’s most vulnerable flood zone and is an old industrial site. It is unique in that the buildings with substantial historical character will be retained and improved as a part of this Plan. • The Plan will mitigate against flooding by incorporating green infrastructure as well as vegetation to the greatest extent within and around the development, including along sidewalks, rooftop gardens, green roofs and walls, decks, and in the courtyards and open spaces to be created. • All new construction and substantial rehabilitation shall comply with the Hoboken Flood Damage Prevention Ordinance, Chapter 104 of the Hoboken Municipal Code. 27
  • 28. 28 Incorporating Delay/Store/Discharge into Redevelopment Plans Southwest & North End Redevelopment Plans Initiating the Planning Process Hoboken is embarking on the planning process for redevelopment plans for both the Southwest Rehabilitation Area and the North End Rehabilitation Area. As these plans are developed, the same principles will be incorporated to address flood damage prevention, stormwater management, and flood mitigation.
  • 29. Incorporating Delay/Store/Discharge into Redevelopment Agreements Lorien Lofts Redevelopment Agreement Delay/Store • Passive House construction – self sustaining electricity production, building is fully operational in power outage and may eventually connect to future City microgrid • On-site storm water detention • Low flow fixtures to reduce amount of sanitary sewer in system • Green roofs and rainwater capture and reuse • Flood proofed building to allow for rescue accessibility during flooding 29
  • 30. Bijou 7th and Jackson Redevelopment Agreement Delay/Store • 2 acre park negotiated to be constructed by redeveloper • 300K gallons of underground storm water detention • Low flow fixtures to reduce amount of sanitary sewer in system • Green roofs to be installed on building Incorporating Delay/Store/Discharge into Redevelopment Agreements 30
  • 31. Incorporating Delay/Store/Discharge into Development and Redevelopment Infrastructure Trust Fund Hoboken is pursuing an option with the State to create an Infrastructure Trust Fund. The concept is for contributions from redevelopers and developers to be collected into this trust to be used for designated infrastructure resiliency projects. • Protecting people that are closer to the water that might not benefit from an in-land Resist protection measure per Rebuild by Design. – Help elevate mechanicals in those buildings. – Install wet floodproofing/dry floodproofing measures per the City’s newly adopted Design Guidelines. • Contributions from developers may go toward additional Delay/Store components such as rain garden construction and underground storage measures. 31

Notas do Editor

  1. Thank you for having me here today. Hoboken is an urban community on the banks of the Hudson River across from Manhattan. We have a population of over 50,000 in just over one square mile.
  2. Hoboken’s has a combined sewer system, where both sanitary sewer and stormwater are collected in the same sewer mains. During dry weather all sewerage is collected and pumped to the North Hudson Sewerage Treatment Plant at the north end of the City. During heavy rainfall events at low tide, the sewer system has outfall pipes so the heavy flow in the sewer is screened and flows out to the Hudson River. The challenge is, during heavy rainfall events at high tide, those outfall pipes are underwater and the sewage backs up into the low lying areas in town.
  3. Hoboken, being right on the Hudson River is therefore particularly vulnerable to flooding. At this point 70% of Hoboken is in the floodplain. The flooding situation is commonly known and reported on regularly.
  4. Hoboken is not just at risk from rain events. Being on the Hudson River, the City is at risk of storm surge. Storm surge occurs when there are hurricane type conditions and the tidal waters from the river top over the waterfront with wave action. In Hoboken during Superstorm Sandy that occurred from breech points in the north and south and flooded the western side of the City with over 500 million gallons of water. 80% of Hoboken was under water. At that time, the City had one flood pump that could pump only 50 million gallons a day, so between that pump and the draining of the flooded area through the sewer pipes during low tide, it took days before all of the flood water was out of Hoboken.
  5. It was estimated that Sandy was a 100 year storm—basically a 1% likelihood that a storm of that magnitude could happen in a given year. But with sea level rise, and with major hurricanes impacting NJ every 5-6 years, the likelihood is going to be much greater of a similar devastating event happening.
  6. The Risk Is Real. As you can see in these Sandy related images.
  7. Sandy’s Impact included 500 million gallons of water flooding the western portion of Hoboken
  8. And over $500 million in damage in our City.
  9. Our critical Infrastructure is in the floodplain.
  10. Critical Transit is in the floodplain.
  11. We flood not only from Hurricanes. Sandy isn’t the only time our critical facilities and transit have been at risk.
  12. There is a long history of flooding in Southern and Northern Hoboken.
  13. Even with a near miss from Joaquin – Hoboken still experienced minor flooding .
  14. High Tide event at north end – we’re just a few feet away from flooding without a hurricane.
  15. Snowstorm surge. PATH has defense, but we don’t have a protection strategy in place.
  16. After Sandy, HUD held a competition for resiliency projects called Rebuild by Design. The international design firm OMA put forward a project for the Hoboken, Weehawken, Jersey City area that was one of 10 selected winners, awarded $230M to design and construct. This Rebuild by Design project is a 4 part strategy: Resist Delay Store Discharge We are currently working with HUD, the State of New Jersey, and the State’s consultant Dewberry on the feasibility and master planning phase of this project.
  17. Examples of the resist strategy being incorporated into the existing urban fabric.
  18. As part of the Delay and Store components, the City is designing parks and improving municipal sites. Southwest park.
  19. BASF.
  20. City Hall.
  21. For discharge, the City is working with North Hudson Sewerage Authority to construct a second pump to alleviate flooding in northwest Hoboken.
  22. Hoboken is incorporating delay and store strategies into development. Green Roofs. Rain Barrels.
  23. And Hoboken is incorporating these flood mitigation measures into new redevelopment plans. When Sandy hit, Hoboken was drafting the redevelopment plan for the Hoboken Yards area in southern Hoboken. This includes near the Hoboken Terminal and along Observer Highway. After the devastation that occurred as a result of storm surge coming into Hoboken from this area, the City realized the need to address flooding in more detail in the redevelopment plan. In December 2014 Hoboken adopted the Hoboken Yards Redevelopment Plan that incorporates: Stormwater and sanitary sewer pumps to serve this property will be installed by the redeveloper. Sanitary sewer and storm sewer for the site will be separated. All elements of the project shall be in compliance with the City’s Flood Damage Prevention Ordinance, requiring habitable space and building mechanicals to be elevated above the design flood elevation for the building. A varied mix of stairs, seating levels, irrigated green walls may need to be incorporated to tie the street and sidewalk grade to the interface of the buildings on the project site due to this compliance requirement. And in August 2015 the City adopted the Western Edge Redevelopment Plan. Rebuild by Design recommended for the Western Edge area to have a linear park with flood storage. This requirement has become the centerpiece of the Western Edge Redevelopment Plan. All new construction and substantial rehabilitation must also comply with the Hoboken Flood Damage Prevention Ordinance.
  24. In December 2015 Hoboken adopted the Neumann Leathers Redevelopment Plan This Rehabilitation Area is covered entirely by buildings, surface parking, roads and sidewalks, and is within the City’s most vulnerable flood zone. This is an old industrial site and is unique in that the buildings have substantial historical character. As well, the uses currently in those buildings include urban manufacturing and industrial arts, which the City wants to retain. Therefore, both the buildings and uses will be retained and improved as a part of this Plan. To offset the costs of those improvements, the plan allows for infill residential development on the existing parking lot on the site. The Plan will mitigate against flooding by incorporating green infrastructure as well as vegetation to the greatest extent within and around the development, including along sidewalks, rooftop gardens, green roofs and walls, decks, and in the courtyards and open spaces to be created. And as with the other plans, all new construction and substantial rehabilitation shall comply with the Hoboken Flood Damage Prevention Ordinance.
  25. Hoboken also has two rehabilitation areas—Southwest and North End—for which we are working on redevelopment plans currently. As these plans are developed, the same types of flood protection measures will be included. And as we have done in Hoboken Yards and Western Edge, a contribution toward infrastructure improvements may be required based on the review of the project pro forma during the negotiation of a redevelopment agreement.
  26. Hoboken has also included flood resiliency in negotiating redevelopment agreements, even when the redevelopment plans don’t specifically require such improvements. Lorien Lofts is one example. Passive House construction – self sustaining electricity production, building is fully operational in power outage and may eventually connect to future City microgrid On-site storm water detention Low flow fixtures to reduce amount of sanitary sewer in system Green roofs and rainwater capture and reuse Flood proofed building to allow for rescue accessibility during flooding
  27. A project at 7th and Jackson Streets in Hoboken under negotiations now would include: 2 acre park negotiated to be constructed by redeveloper 300K gallons of underground storm water detention Low flow fixtures to reduce amount of sanitary sewer in system Green roofs to be installed on building
  28. Hoboken is pursuing an option with the State to create an Infrastructure Trust Fund. The concept is for contributions from redevelopers and developers to be collected into this trust to be used for designated infrastructure resiliency projects. Protecting people that are closer to the water that might not benefit from an in-land Resist protection measure per Rebuild by Design. Help elevate mechanicals in those buildings. Install wet floodproofing/dry floodproofing measures per the City’s newly adopted Design Guidelines. Contributions from developers may go toward additional Delay/Store components such as rain garden construction and underground storage measures.