a) is the botlenock b) The bolteneck time is minutet per unt (round your responte to tao ofcimal pleces). c) The throughput time of the everali sytem is mindes (round your response fo two decimal places). a) it the finm operates 11 hour per day, 20 days per month, the monthly cagacily of the manulacturing process is 39 b? unils (enher your re iponse as a ahole humbec) A production process at Kenneth Day Monufocturing is shown in the figure below. The driling operation ocours separately from, and timultaneounly werh, the saving and sanding. Which are independent spovential operetiore. A product neede to go through only one of the three assertbly operations (the operations are in parallel). ) is the bottleneck..