2. Content
1. Company profile
2. Organization structure
3. Architectural Service
4. Completed project
5. Personal Details
6. Financial Information
7. Building and Process
3. Company Profile
Company Name: Architect of Nature Sdn Bhd
Office Location: Block2-02-1,Taman Tun Ismail,
Jalan Ampang,55100, KL
Telephone: 012-3456987
Fax: 03-98761234
E-mail: archinature@gmail.com
Website: archinature.com.my
Director: Nicholas Yap
4. Organization Structure
Architect
(LAM Part III)
Project Manager Accountant
Assistant
Architect
Clerk
Site Manager
Supervisor
Assistant Accountant
Clerk
Secretary Chua Kong Sean
Director Yap Wei Tyng
5. Architectural Service
Pre-Design
Assisting with formulation of a brief; bulk and location studies;
evaluation of properties; feasibility studies; resource consent
applications; encroachment license applications; arranging
land surveys and geotechnical reports.
Sketch Design
Space planning; architectural design; engaging consultants;
preliminary estimates of cost.
Documentation
Coordination of consultants; detailed construction documentation;
comprehensive specifications; color schemes; building consent
applications.
6. Completed Project
Project name: Subang street Apartment
Building type: Residential
Project cost: RM 100,000
Project name: Ampang street Apartment
Building type: Residential
Project cost: RM 120,000
Project name: Happy Marketing Office Fitout
Building type: Commercial
Project cost: RM 300,000
7. Personal Detail:
Name: Yap Wei Tyng
Address: Block2-02-1,Taman Tun Ismail, Jalan Ampang,
55100,Kuala Lumpur
Telephone: 012-3456987
Fax: 03-98761234
E-mail: archinature@gmail.com
Website: archinature.com.my
Date of Birth: 15 March 1995
Nationality: Malaysia
Academic Qualification
Bachelor of Architecture ( Taylor’s University, School of Architecture, Malaysia )
PROFESSIONAL ASSOCIATIONS:
Associate of Malaysia Hijjas Kasturi Associates Sdn Bhd
8. Financial Information
Registration Company Number: SA0094065-W
Authorized Capital: RM 100,000
Paid up Capital: RM20,000
Registered Bank: Maybank
_______________________ ______________________
Director Secretary
Yap Wei Tyng Adrean Chua Kong Sean
9.
10.
11.
12.
13.
14. Building and Process
Role of an Architect
•Architect is the one who came out the design of the Smart.
•Determine the materials needed for the Smart’s roof, wall, floors and more to suit the weather, the
condition in the environment.
•Submit modification of the design of Smart during construction to contractor.
•Closely supervise the construction company to ensure the building is built according to building
plans.
•Give advices to the client on the cost of the Smart building.
•Architect recommends alternative solution to resolve any variations to original budgets.
•Conduct an assessment of the site for the owner.
•Consider the operations and performance of the facilities and make recommendations for
maintenance and improvement.
•Assign the building for approval of authorities.
15. Standard Service for Architect
Stage1: Inception
•Meet up with client to receive client’s requirement for the project
Stage2: Concept
•Prepare initial design and suitable material for the project building
•Availability for the cost
Stage3: Design Development
•Review the costing, design and programme with the consultant
Stage4: Documentation
•Prepare documentation for the local authority
•Complete construction documentation
Stage5 :Construction
•Handover site to the contractor
Stage6: Close out
•Project done and finalize the project