Accident at Russia’s Biggest Hydroelectric




  Sayano-Shushenskaya – 2009 August 17
By:

              Euler Cruz
      Consulting Engineer – Turbines


           Rafael Cesário
           Mechanical Engineer


           Brasil – 2009 Aug 24
Objetive

    This presentation aims to disseminate some
  technical and general aspects of the accident. A
   long and detailed work must be done in order to
   provide understanding about what happened, in
       order to help all Owners to prevent such
                       accidents.

                            Note
This is a preliminary analysis made based only on pictures
      and films, done no longer than one week after the
          accident. Only hypotheses are formulated.
1- Main Characteristics

   Number of Units: 10
   Turbine Type: Francis (16 blades)
   Rated Power: 650 MW each
   Rated Discharge per Unit: 358,5 m³/s
   Nominal Speed: 142,86 rpm
   Net Head: 194 m
   Operation Date: 1978
   Runner Weight: 156 ton
   Runner Diameter: 6,77 m
2 - Main Characteristics
One of the world's largest hydro-electric plants, its dam is
  245 m (800 ft) high and stretches 1 km (0.6 miles)
  across the Yenisei river.

Opened in 1978, the station provides a quarter of
  RusHydro output and is a major power supplier to at
  least two smelters owned by United Company RUSAL,
  the world's largest aluminium producer.

The hydroelectric power station is located on the Yenisei
  River, near Sayanogorsk in Khakassia, Russia. Before
  the accident, it was the largest power plant in Russia and
  the sixth-largest hydroelectric plant in the world.
Dam                  Penstocks
      Spillway           Units
                 10 9 8 7 6 5 4 3 2 1


                 Powerhouse
                                        Control
                                        Building
General View
Spillway



                                        Penstocks


Transformers
                                       Lines
               Powerhouse
The Accident – 2009 Aug 17
The accident
At 08:13 local time (00:13 GMT) on 17 August 2009, the station suffered a
   catastrophic "pressure surge" in turbine known as a water hammer. The
   sudden water pressure surge resulted in the ejection of turbine 2 with all
   equipment, a total weight some 900 tons, from its seat.
Turbines 7 and 9 also suffered from severe damage, while the turbine room
   roof fell on and damaged turbines 3, 4 and 5. Turbine 6, which was in
   scheduled repair at the time of accident, received only minor damage as it
   was the only one of the station's 10 turbines that did not receive electrical
   damage due to shorting of transformers, and it will be restarted as soon as
   possible.
Water immediately flooded the engine and turbine rooms and caused a
   transformer explosion.
On 23 August 2009, authorities said 69 people were found dead while 6 people
   are still listed as missing. Efforts to pump flood water from the engine room
   and complete a search for the missing workmen are expected to take 3 to 8
   days.

http://en.wikipedia.org/wiki/2009_Sayano%E2%80%93Shushenskaya_hydroelectric_power_station_accident
Before the Accident




                                 Crane

                                         Power Units


     Air-Oil Tanks




    Sump Tank         Governor
                      Pumps
                                    Generators floor
After the Accident



                  Sump Tank


  Air-Oil Tanks         Floor

                         Unit 2



                  Colector Ring
                                                Crosshead –
                                                   Unit 2

                                       Unit 1




                     Generator floor
Floor




        General View
General View
Before the Accident




                       Generator Rotor – Unit 5




                      The accident started
                             here


                             Generator Runner
Sump Tank
                (turned)


Air-Oil Tank




                           Crosshead
Unit 7: destroyed




Unit 9: destroyed
Unit 9




         Unit 7
The Powerhouse crane is
above the assembly area
Destroyed column

                                     Enclosed Bus


                                                    Generator Upper
                                                       Bearing




Generator rotor
The remains of the rotor spider
Water + Oil
Enclosed Bus
Crane



                                                  Assembly Area

Crosshead




                            Smaller Runner
                            Generator’s Poles



            Downstream crane rail
Transformer
              Roof Beams
Roof




Roof
Consequences
 76 people dead.

Question: By this number, maybe
  there was approx. 100 people
  in the Powerhouse. Normally,
  even during maintenance
  works, there aren't so many
  people. Why was there so
  many people?
Consequences

   It will cost at least $310 million.
   A long time to repair the damages.
   The production of more than
    500,000 tons of aluminum will be
    lost.
   Oil slick is travelling down the
    river.
Consequences
                                  • It is not clear how many people
                                  were potentially affected by the
                                  accident.




• The plant satisfied 10% of
  Siberia’s energy needs.
• Aluminum smelters consumed
  over 70% of the energy
  generated by the power plant.
1 - Causes
    Our main hypotheses about the sequence of the disaster:
         (Attention: Preliminary hypotheses based only on the pictures)
    Sudden closing of the Unit 2 wicket gates.
    Heavy waterhammer in the spiral case and penstock, causing their
     collapse.
    Upward force, resulted from the waterhammer, destroying the civil
     structure over the spiral case and penstock.
    Pressure of the upstream water causing elevation of structures and
     peaces.
    Heavy reverse waterhammer (draft tube) causing elevation of the
     turbine cover, shaft, etc.
    Rapid flooding of the Powerhouse.
    Units 7 and 9, without closing, in runaway speed with the generators
     inside the flood water.
2 - Causes
     Our main hypotheses about the cause of the sudden
                          closing:
   A large piece entered in the turbine runner and stuck in it (could not
    pass the exit of the blades, which is of smaller dimensions).
   This piece turned with the runner and hit all the wicket gates,
    causing their sudden closing, at a fraction of a second.
   This piece could be: a log (passed by an opening in the trashrack),
    stay vane or wicket gate broke.
                             Or (less probably):
   Rupture of the governor oil pipe in the closing side of the distributor
    servomotors (in this case, the orifice that controls the oil flow should
    be in the pipe and not in the body of the servomotors).
   Rupture in sequence of the wicket gates links; closing by hydraulic
    tendency.
Unit 2




Units 7
and 9
Flood   Flood
Seeking the victims
 Preliminary works
Situation on Saturday 2009 Aug 22
Aparently the
water is already
    drained
Some Next Steps
   Continuing the seeking of victims.

and

   Finishing the cleaning of the debris.
   Completing the drainage of the water.
   Constructing a temporary roof (one week) and then a better one
    (two months or less) to protect against the winter (this will prevent
    new photos…).
   Recover the columns and beams supporting the rails of the
    Powerhouse Crane, to allow its use.
News – August 21
   NOVOSIBIRSK, August 21 (Itar-Tass) - The water level in the inundated
    turbine room of Sayano-Shushenskaya hydropower plant where the water
    pumping out was started on Thursday, decreased by 2 meters by Friday
    morning
   A total of more than 30 thousand cubic meters of water have been pumped
    out. It is necessary to pump out a total of 250 thousand cubic meters of
    water.
   Minister Sergei Shoigu earlier set the task to install additional pumps and
    thereby increase the volume of pumped out water to 4 thousand cubic
    meters per hour. “By increasing the capacity we will fulfill this task (water
    pumping out) in 32 hours,” the minister said.
   Thirteen pumps have been put into operation in the water pumping efforts at
    the plant. The debris clearing operation continues. According to latest
    reports, 4,650 cubic meters of reinforced concrete structures have been
    moved out from the hydroelectric station.
   At present, about 2 thousand people and 116 machinery units are engaged
    in the Sayano-Shusehnskaya HPP catastrophe liquidation efforts.
http://itar-tass.com/eng/level2.html?NewsID=14255520&PageNum=0
Some References
   http://www.dailymail.co.uk/news/worldnews/article-1207093/Accident-
    Russias-biggest-hydroelectric-plant-leaves-seven-workers-dead.html

   http://www.newsdaily.com/stories/tre57h1qb-us-russia-dam/

   http://news.bbc.co.uk/2/hi/europe/8204860.stm

   http://englishrussia.com/?p=4853

   http:// www.1tv.ru

Mais conteúdo relacionado

Mais procurados

Accident at Russia's Biggest Hydroelectric - Rev 00
Accident at Russia's Biggest Hydroelectric - Rev 00Accident at Russia's Biggest Hydroelectric - Rev 00
Accident at Russia's Biggest Hydroelectric - Rev 00
drizzle11
 
Seawind Copenhagen Paper 20150310
Seawind Copenhagen Paper 20150310Seawind Copenhagen Paper 20150310
Seawind Copenhagen Paper 20150310
Ray Dackerman
 
NTPC Ramagundam Station Blackout and Action Plan
NTPC Ramagundam Station Blackout and Action PlanNTPC Ramagundam Station Blackout and Action Plan
NTPC Ramagundam Station Blackout and Action Plan
NTPC
 
Gearturbine - Atypical Inflow Thermodynamic Technology
Gearturbine - Atypical Inflow Thermodynamic Technology Gearturbine - Atypical Inflow Thermodynamic Technology
Gearturbine - Atypical Inflow Thermodynamic Technology
Carlos Barrera
 

Mais procurados (19)

Accident at Russia's Biggest Hydroelectric - Rev 00
Accident at Russia's Biggest Hydroelectric - Rev 00Accident at Russia's Biggest Hydroelectric - Rev 00
Accident at Russia's Biggest Hydroelectric - Rev 00
 
Instruction to marine propulsion systems
Instruction to marine propulsion systems Instruction to marine propulsion systems
Instruction to marine propulsion systems
 
Auxiliary marine machinery systems
Auxiliary marine machinery systemsAuxiliary marine machinery systems
Auxiliary marine machinery systems
 
Rps plant
Rps plantRps plant
Rps plant
 
SHIP PROPULSION SEMINAR report
SHIP PROPULSION SEMINAR reportSHIP PROPULSION SEMINAR report
SHIP PROPULSION SEMINAR report
 
Propulsion Systems Of Ships
Propulsion Systems Of ShipsPropulsion Systems Of Ships
Propulsion Systems Of Ships
 
Basic Civil And Mechanical Engineering Question Bank
Basic Civil And Mechanical Engineering Question BankBasic Civil And Mechanical Engineering Question Bank
Basic Civil And Mechanical Engineering Question Bank
 
Seawind Copenhagen Paper 20150310
Seawind Copenhagen Paper 20150310Seawind Copenhagen Paper 20150310
Seawind Copenhagen Paper 20150310
 
Lecture 14_PPE_Unit 5: Nuclear Power Plants
Lecture 14_PPE_Unit 5: Nuclear Power Plants Lecture 14_PPE_Unit 5: Nuclear Power Plants
Lecture 14_PPE_Unit 5: Nuclear Power Plants
 
Propulsion system
Propulsion systemPropulsion system
Propulsion system
 
Hydroelectricpowerplant 290916
Hydroelectricpowerplant 290916Hydroelectricpowerplant 290916
Hydroelectricpowerplant 290916
 
Presentation on NHPC (TLDP-III)
Presentation on NHPC (TLDP-III)Presentation on NHPC (TLDP-III)
Presentation on NHPC (TLDP-III)
 
Coal Handling Plant
Coal Handling PlantCoal Handling Plant
Coal Handling Plant
 
NTPC Ramagundam Station Blackout and Action Plan
NTPC Ramagundam Station Blackout and Action PlanNTPC Ramagundam Station Blackout and Action Plan
NTPC Ramagundam Station Blackout and Action Plan
 
Vocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR UttarakhandVocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR Uttarakhand
 
synchronous machine construction
synchronous machine construction synchronous machine construction
synchronous machine construction
 
Hydro p-s
Hydro p-sHydro p-s
Hydro p-s
 
Power system
Power systemPower system
Power system
 
Gearturbine - Atypical Inflow Thermodynamic Technology
Gearturbine - Atypical Inflow Thermodynamic Technology Gearturbine - Atypical Inflow Thermodynamic Technology
Gearturbine - Atypical Inflow Thermodynamic Technology
 

Destaque

Com conectar-se a una xarxa (Martí Caro)
Com conectar-se a una xarxa (Martí Caro)Com conectar-se a una xarxa (Martí Caro)
Com conectar-se a una xarxa (Martí Caro)
Marti_Caro
 
Curriculum Vitae Grandys Frieska P.
Curriculum Vitae Grandys Frieska P.Curriculum Vitae Grandys Frieska P.
Curriculum Vitae Grandys Frieska P.
grandys
 
Casa_Oggionni
Casa_OggionniCasa_Oggionni
Casa_Oggionni
robyoggio
 
Caro_Martí_Grau_Joan_treball_hardware
Caro_Martí_Grau_Joan_treball_hardwareCaro_Martí_Grau_Joan_treball_hardware
Caro_Martí_Grau_Joan_treball_hardware
Marti_Caro
 

Destaque (14)

Europäische Norm oder PEF
Europäische Norm oder PEFEuropäische Norm oder PEF
Europäische Norm oder PEF
 
Com conectar-se a una xarxa (Martí Caro)
Com conectar-se a una xarxa (Martí Caro)Com conectar-se a una xarxa (Martí Caro)
Com conectar-se a una xarxa (Martí Caro)
 
CEN TC350 prEN16309: methodology for the social performance assessment of bui...
CEN TC350 prEN16309: methodology for the social performance assessment of bui...CEN TC350 prEN16309: methodology for the social performance assessment of bui...
CEN TC350 prEN16309: methodology for the social performance assessment of bui...
 
Rmp hybrid plan by Naveen Giri (Delhi)
Rmp hybrid plan by Naveen Giri (Delhi)Rmp hybrid plan by Naveen Giri (Delhi)
Rmp hybrid plan by Naveen Giri (Delhi)
 
Programari
ProgramariProgramari
Programari
 
Curriculum Vitae Grandys Frieska P.
Curriculum Vitae Grandys Frieska P.Curriculum Vitae Grandys Frieska P.
Curriculum Vitae Grandys Frieska P.
 
Kii Cloud ホワイトペーパー
Kii Cloud ホワイトペーパーKii Cloud ホワイトペーパー
Kii Cloud ホワイトペーパー
 
Casa_Oggionni
Casa_OggionniCasa_Oggionni
Casa_Oggionni
 
Organise dop’s in the building chain
Organise dop’s in the building chainOrganise dop’s in the building chain
Organise dop’s in the building chain
 
[BaasMeetup] Kii Cloud の進化からみるBaaSの展開
[BaasMeetup] Kii Cloud の進化からみるBaaSの展開[BaasMeetup] Kii Cloud の進化からみるBaaSの展開
[BaasMeetup] Kii Cloud の進化からみるBaaSの展開
 
Caro_Martí_Grau_Joan_treball_hardware
Caro_Martí_Grau_Joan_treball_hardwareCaro_Martí_Grau_Joan_treball_hardware
Caro_Martí_Grau_Joan_treball_hardware
 
Thingsee Oneの紹介 (IoT縛りの勉強会 vol 5)
Thingsee Oneの紹介 (IoT縛りの勉強会 vol 5)Thingsee Oneの紹介 (IoT縛りの勉強会 vol 5)
Thingsee Oneの紹介 (IoT縛りの勉強会 vol 5)
 
Asma bronquial pediatria
Asma bronquial pediatriaAsma bronquial pediatria
Asma bronquial pediatria
 
Sustainability - standards, laws and regulations
Sustainability - standards, laws and regulationsSustainability - standards, laws and regulations
Sustainability - standards, laws and regulations
 

Semelhante a Accidentat russia'sbiggesthydroelectric rev00

Accident At Russias Biggest Hydroelectric Rev 00
Accident At Russias Biggest Hydroelectric   Rev 00Accident At Russias Biggest Hydroelectric   Rev 00
Accident At Russias Biggest Hydroelectric Rev 00
jaken98
 
Accident At Russias Biggest Hydroelectric Rev 00
Accident At Russias Biggest Hydroelectric   Rev 00Accident At Russias Biggest Hydroelectric   Rev 00
Accident At Russias Biggest Hydroelectric Rev 00
vtsiri
 
Three gorges project
Three gorges projectThree gorges project
Three gorges project
Endu Tesfa
 
Write about the following ethics case studies1. Hyatt Regency Walk.pdf
Write about the following ethics case studies1. Hyatt Regency Walk.pdfWrite about the following ethics case studies1. Hyatt Regency Walk.pdf
Write about the following ethics case studies1. Hyatt Regency Walk.pdf
arjuntelecom26
 

Semelhante a Accidentat russia'sbiggesthydroelectric rev00 (20)

Accident At Russias Biggest Hydroelectric Rev 00
Accident At Russias Biggest Hydroelectric   Rev 00Accident At Russias Biggest Hydroelectric   Rev 00
Accident At Russias Biggest Hydroelectric Rev 00
 
Accident At Russias Biggest Hydroelectric Rev 00
Accident At Russias Biggest Hydroelectric   Rev 00Accident At Russias Biggest Hydroelectric   Rev 00
Accident At Russias Biggest Hydroelectric Rev 00
 
1
11
1
 
1
11
1
 
Three gorges project
Three gorges projectThree gorges project
Three gorges project
 
Fukushima Daiichi Byu Presentation
Fukushima Daiichi Byu PresentationFukushima Daiichi Byu Presentation
Fukushima Daiichi Byu Presentation
 
NRC Meeting 512 - Power Uprate via Plutonium
NRC Meeting 512 - Power Uprate via PlutoniumNRC Meeting 512 - Power Uprate via Plutonium
NRC Meeting 512 - Power Uprate via Plutonium
 
Nuclear power plant kakarapar
Nuclear power plant kakaraparNuclear power plant kakarapar
Nuclear power plant kakarapar
 
Three Mile Island Nuclear Plant steam generator safety is suspect
Three Mile Island Nuclear Plant steam generator safety is suspectThree Mile Island Nuclear Plant steam generator safety is suspect
Three Mile Island Nuclear Plant steam generator safety is suspect
 
DVC Panchet Hydro Powerplant Project
DVC Panchet Hydro Powerplant ProjectDVC Panchet Hydro Powerplant Project
DVC Panchet Hydro Powerplant Project
 
Fukushima Daiichi Nuclear Power Station Accident April19 2011
Fukushima Daiichi Nuclear Power Station  Accident April19 2011Fukushima Daiichi Nuclear Power Station  Accident April19 2011
Fukushima Daiichi Nuclear Power Station Accident April19 2011
 
Introduction to power plant
Introduction to power plantIntroduction to power plant
Introduction to power plant
 
Study of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant reportStudy of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant report
 
IRJET- A Review on Under Water Windmill
IRJET-  A Review on Under Water WindmillIRJET-  A Review on Under Water Windmill
IRJET- A Review on Under Water Windmill
 
Hydropowerplant 160313180104
Hydropowerplant 160313180104Hydropowerplant 160313180104
Hydropowerplant 160313180104
 
Underwater "Hydro Electric Power Tower"
Underwater "Hydro Electric Power Tower"Underwater "Hydro Electric Power Tower"
Underwater "Hydro Electric Power Tower"
 
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputDrilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
 
Accident de fukushima
Accident de fukushimaAccident de fukushima
Accident de fukushima
 
Project report
Project reportProject report
Project report
 
Write about the following ethics case studies1. Hyatt Regency Walk.pdf
Write about the following ethics case studies1. Hyatt Regency Walk.pdfWrite about the following ethics case studies1. Hyatt Regency Walk.pdf
Write about the following ethics case studies1. Hyatt Regency Walk.pdf
 

Último

9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
Faga1939
 
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
The political system of the united kingdom
The political system of the united kingdomThe political system of the united kingdom
The political system of the united kingdom
lunadelior
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
hyt3577
 

Último (20)

04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 
422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf
 
10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdf10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdf
 
Job-Oriеntеd Courses That Will Boost Your Career in 2024
Job-Oriеntеd Courses That Will Boost Your Career in 2024Job-Oriеntеd Courses That Will Boost Your Career in 2024
Job-Oriеntеd Courses That Will Boost Your Career in 2024
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdf
 
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
Politician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full DetailsPolitician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full Details
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
 
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
 
The political system of the united kingdom
The political system of the united kingdomThe political system of the united kingdom
The political system of the united kingdom
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
 
Dubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In DubaiDubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In Dubai
 

Accidentat russia'sbiggesthydroelectric rev00

  • 1. Accident at Russia’s Biggest Hydroelectric Sayano-Shushenskaya – 2009 August 17
  • 2. By: Euler Cruz Consulting Engineer – Turbines Rafael Cesário Mechanical Engineer Brasil – 2009 Aug 24
  • 3. Objetive This presentation aims to disseminate some technical and general aspects of the accident. A long and detailed work must be done in order to provide understanding about what happened, in order to help all Owners to prevent such accidents. Note This is a preliminary analysis made based only on pictures and films, done no longer than one week after the accident. Only hypotheses are formulated.
  • 4. 1- Main Characteristics  Number of Units: 10  Turbine Type: Francis (16 blades)  Rated Power: 650 MW each  Rated Discharge per Unit: 358,5 m³/s  Nominal Speed: 142,86 rpm  Net Head: 194 m  Operation Date: 1978  Runner Weight: 156 ton  Runner Diameter: 6,77 m
  • 5. 2 - Main Characteristics One of the world's largest hydro-electric plants, its dam is 245 m (800 ft) high and stretches 1 km (0.6 miles) across the Yenisei river. Opened in 1978, the station provides a quarter of RusHydro output and is a major power supplier to at least two smelters owned by United Company RUSAL, the world's largest aluminium producer. The hydroelectric power station is located on the Yenisei River, near Sayanogorsk in Khakassia, Russia. Before the accident, it was the largest power plant in Russia and the sixth-largest hydroelectric plant in the world.
  • 6. Dam Penstocks Spillway Units 10 9 8 7 6 5 4 3 2 1 Powerhouse Control Building
  • 7.
  • 8.
  • 10. Spillway Penstocks Transformers Lines Powerhouse
  • 11.
  • 12. The Accident – 2009 Aug 17
  • 13. The accident At 08:13 local time (00:13 GMT) on 17 August 2009, the station suffered a catastrophic "pressure surge" in turbine known as a water hammer. The sudden water pressure surge resulted in the ejection of turbine 2 with all equipment, a total weight some 900 tons, from its seat. Turbines 7 and 9 also suffered from severe damage, while the turbine room roof fell on and damaged turbines 3, 4 and 5. Turbine 6, which was in scheduled repair at the time of accident, received only minor damage as it was the only one of the station's 10 turbines that did not receive electrical damage due to shorting of transformers, and it will be restarted as soon as possible. Water immediately flooded the engine and turbine rooms and caused a transformer explosion. On 23 August 2009, authorities said 69 people were found dead while 6 people are still listed as missing. Efforts to pump flood water from the engine room and complete a search for the missing workmen are expected to take 3 to 8 days. http://en.wikipedia.org/wiki/2009_Sayano%E2%80%93Shushenskaya_hydroelectric_power_station_accident
  • 14. Before the Accident Crane Power Units Air-Oil Tanks Sump Tank Governor Pumps Generators floor
  • 15. After the Accident Sump Tank Air-Oil Tanks Floor Unit 2 Colector Ring Crosshead – Unit 2 Unit 1 Generator floor
  • 16. Floor General View
  • 18. Before the Accident Generator Rotor – Unit 5 The accident started here Generator Runner
  • 19. Sump Tank (turned) Air-Oil Tank Crosshead
  • 20.
  • 21. Unit 7: destroyed Unit 9: destroyed
  • 22. Unit 9 Unit 7
  • 23. The Powerhouse crane is above the assembly area
  • 24. Destroyed column Enclosed Bus Generator Upper Bearing Generator rotor
  • 25. The remains of the rotor spider
  • 28. Crane Assembly Area Crosshead Smaller Runner Generator’s Poles Downstream crane rail
  • 29.
  • 30. Transformer Roof Beams
  • 31.
  • 33.
  • 34.
  • 35.
  • 36. Consequences  76 people dead. Question: By this number, maybe there was approx. 100 people in the Powerhouse. Normally, even during maintenance works, there aren't so many people. Why was there so many people?
  • 37. Consequences  It will cost at least $310 million.  A long time to repair the damages.  The production of more than 500,000 tons of aluminum will be lost.  Oil slick is travelling down the river.
  • 38. Consequences • It is not clear how many people were potentially affected by the accident. • The plant satisfied 10% of Siberia’s energy needs. • Aluminum smelters consumed over 70% of the energy generated by the power plant.
  • 39. 1 - Causes Our main hypotheses about the sequence of the disaster: (Attention: Preliminary hypotheses based only on the pictures)  Sudden closing of the Unit 2 wicket gates.  Heavy waterhammer in the spiral case and penstock, causing their collapse.  Upward force, resulted from the waterhammer, destroying the civil structure over the spiral case and penstock.  Pressure of the upstream water causing elevation of structures and peaces.  Heavy reverse waterhammer (draft tube) causing elevation of the turbine cover, shaft, etc.  Rapid flooding of the Powerhouse.  Units 7 and 9, without closing, in runaway speed with the generators inside the flood water.
  • 40. 2 - Causes Our main hypotheses about the cause of the sudden closing:  A large piece entered in the turbine runner and stuck in it (could not pass the exit of the blades, which is of smaller dimensions).  This piece turned with the runner and hit all the wicket gates, causing their sudden closing, at a fraction of a second.  This piece could be: a log (passed by an opening in the trashrack), stay vane or wicket gate broke. Or (less probably):  Rupture of the governor oil pipe in the closing side of the distributor servomotors (in this case, the orifice that controls the oil flow should be in the pipe and not in the body of the servomotors).  Rupture in sequence of the wicket gates links; closing by hydraulic tendency.
  • 41.
  • 42.
  • 44. Flood Flood
  • 45. Seeking the victims Preliminary works
  • 46.
  • 47.
  • 48.
  • 49. Situation on Saturday 2009 Aug 22
  • 50.
  • 51.
  • 52.
  • 53.
  • 54. Aparently the water is already drained
  • 55. Some Next Steps  Continuing the seeking of victims. and  Finishing the cleaning of the debris.  Completing the drainage of the water.  Constructing a temporary roof (one week) and then a better one (two months or less) to protect against the winter (this will prevent new photos…).  Recover the columns and beams supporting the rails of the Powerhouse Crane, to allow its use.
  • 56. News – August 21  NOVOSIBIRSK, August 21 (Itar-Tass) - The water level in the inundated turbine room of Sayano-Shushenskaya hydropower plant where the water pumping out was started on Thursday, decreased by 2 meters by Friday morning  A total of more than 30 thousand cubic meters of water have been pumped out. It is necessary to pump out a total of 250 thousand cubic meters of water.  Minister Sergei Shoigu earlier set the task to install additional pumps and thereby increase the volume of pumped out water to 4 thousand cubic meters per hour. “By increasing the capacity we will fulfill this task (water pumping out) in 32 hours,” the minister said.  Thirteen pumps have been put into operation in the water pumping efforts at the plant. The debris clearing operation continues. According to latest reports, 4,650 cubic meters of reinforced concrete structures have been moved out from the hydroelectric station.  At present, about 2 thousand people and 116 machinery units are engaged in the Sayano-Shusehnskaya HPP catastrophe liquidation efforts. http://itar-tass.com/eng/level2.html?NewsID=14255520&PageNum=0
  • 57. Some References  http://www.dailymail.co.uk/news/worldnews/article-1207093/Accident- Russias-biggest-hydroelectric-plant-leaves-seven-workers-dead.html  http://www.newsdaily.com/stories/tre57h1qb-us-russia-dam/  http://news.bbc.co.uk/2/hi/europe/8204860.stm  http://englishrussia.com/?p=4853  http:// www.1tv.ru