2. SENSATORI & NICKELODEON HOTELS AND RESORTS PUNTA CANA
PROJECT VISUALIZATION
3D VISUALIZATION CREATED IN BEXEL MANAGER
3. Visualizations was carried out in the
all design stages. Material used for
better understanding of the project,
design solutions, client
presentations etc.
3D BIM model used for advanced
visualisations and renderings. Approved
material was used in commercial
purpose.
Visualizations used for animations,
simulations, on site situations and
analysis.
SENSATORI & NICKELODEON HOTELS AND RESORTS PUNTA CANA
PROJECT VISUALIZATION
4. BIM Execution Plan is prepared explaining BIM
uses on the project and benefits of BIM
BEP includes procedures on how BIM services
implementation, analyses carried out and
deliverables produced – overall implementation
and strategy
Developing of BIM model includes careful
analysis and reviews of all original design
data.
Entire design is developed and reviewed in BIM
authoring tools
BIM data is exchanged in native and open BIM
file formats
QA/QC procedures and model validations are
done prior to IFC file export and its
consistency validated with BIM validation tools
Extracted BIM data compliancy is being
verified, with additional analyses if needed
BIM EXECUTION PLAN DEFINED BIM PROCESSES TRADITIONAL CAD DESIGN
3D BIM MODEL
SENSATORI & NICKELODEON HOTELS AND RESORTS PUNTA CANA
BIM DESIGN AUTHORING AND BRIEFING
5. BIM models frequently checked and reviewed to meet
client’s requirements
BIM model data analysed for scheduling and execution
issues
All BIM models exported into open BIM IFC files and
shared with all stakeholders
Proposed structural design options were analysed and
validated in BIM
Using open BIM formats allows for clients to be easily
included in the process
Some criteria: feasibility, easiness and speed of
execution, cost, local regulations
After reviews and analyses, approved design option was
almost 47% lighter in terms of concrete quantities
Additional BIM design review used on the project –
evaluation of specific design criteria
Developed BIM model was frequently used as a virtual
mock-up because of high level of detail.
Description
Area (m²) Volume (m³)
Structure concept BXL Opt 1 BXL Opt 2
Structure
concept
BXL Opt 1 BXL Opt 2
Reinforced Concrete Wall 37.24 938.75 871.55 5.59 205.06 195.22
Concrete Slabs 2,064.26 2,356.38 2,356.38 600.70 686.87 686.87
Wall Masonry 2,361.36 1,645.27 1,727.23 387.36 249.73 257.40
Concrete Beams 781.71 206.83
Concrete Columns 416.00 120.75
Originalstructuralconcept BXL.ProposedconceptOPT.2
SENSATORI & NICKELODEON HOTELS AND RESORTS PUNTA CANA
BIM DESIGN REVIEW
6. Over 1200 major clashes were detected
and over 18,000 minor
All clash detection report were
exchanged with stakeholders using BCF
format
All BCF data were gathered and used
for forming clear visual reports for
design and construction teams
All conflicts were resolved before
construction – no time wasted and no
additional works
1
2
2
3
SENSATORI & NICKELODEON HOTELS AND RESORTS PUNTA CANA
3D COORDINATION & CLASH DETECTION
7. Tendering packages and work assignment, with
local/available contractors
QTO Visual Reports – Part of tendering documentation.
Provided better insight of scope of work to contractors
that had to submit a bid
QTO Generation – custom selected elements, custom
breakdwon
SENSATORI & NICKELODEON HOTELS AND RESORTS PUNTA CANA
QUANTITY TAKE-OFF & TENDERING PACKAGES
QTO VISUAL REPORTS – exported from BEXEL MANAGERQTO GENERATION - BEXEL MANAGER
8. 5D Cost Database
Uniformat based work items classification
Cost data and resources productivity rates stored into Cost Items
Cost Items were assigned to corresponding model elements
Generation of model based Bill of quantities and financial project
monitoring were enabled
Construction Methodology Database
Predefined construction methodologies that are created using
Cost Items from 5D Cost database, with assigned relations and
dependencies between activities.
SENSATORI & NICKELODEON HOTELS AND RESORTS PUNTA CANA
5D COST & CONSTRUCTION METHODOLOGY DATABASE
5D COST DATABASE - BEXEL COST MANAGER
BILL OF QUANTITIES - BEXEL MANAGER
9. To create optimized construction
schedule, we used intelligent BIM
driven methodology and unique
software system
4 main construction phases
proposed, further divided into
different hotel complexes and
buildings
Detailed BIM construction
methodology items were based on
UniFormat structure
Developed baseline schedule is
intelligently linked with BIM model
elements generating 4D simulation
Simulation also contains not just
time/location information, but pricing
and cost information embedded as
well
Data also used for progress and cost
tracking and cost planning in order to
ensure just in time procurements and
payments
SCHEDULE INTELLIGENTLY
INTEGRATED IN BIM MODEL
SENSATORI & NICKELODEON HOTELS AND RESORTS PUNTA CANA
4D/5D CONSTRUCTION PLANNING, SCHEDULE ANALYSIS AND OPTIMIZATIONS
METHODOLOGY DRIVEN SCHEDULING
10. Data is fluently exchanged between
different programs and stakeholders,
reducing possible risks
4D & 5D simulations frequently
discussed and reviewed with the client
and main contractors
4D Simulations notably increased
overall efficiency and workforce
organisation on site (Up to 70% on
building Sensatori A3-A4)
All planned works completed as per
schedule, grand Hotel opening held
in June 2016
SENSATORI & NICKELODEON HOTELS AND RESORTS PUNTA CANA
4D/5D CONSTRUCTION PLANNING, SCHEDULE ANALYSIS AND OPTIMIZATIONS
11. SENSATORI & NICKELODEON HOTELS AND RESORTS PUNTA CANA
PROCUREMENT PLANNING
Just in Time Delivery
Model based histograms of materials, labor and equipment allocation
Resources quantification and calculation
Long Lead Procurement
Generation of accurate procurement plans that were updated according to
construction progress data
Product Library & Manufacturers Information
Library contains generic families, designer-made families and families of
specific manufacturers available on the market at the moment, each
element with a unique code.
12. SENSATORI & NICKELODEON HOTELS AND RESORTS PUNTA CANA
4D/5D PROGRESS TRACKING
Construction Progress Import
Interim Payment Certificates
Schedule Impact Analysis
Planned vs. Actual Analysis
Look Ahead Planning
13. Quality assurance was used to minimize
mistakes and avoid problems during the
construction phase
Clash detection was used in places in BIM model
where there was possibility of clashes due to
possible documentation omissions.
All building elements on site were analyzed by
using BIM model
All elements data was collected and stored inside
BIM model and used for on-site construction
check
Analysis showed that some of the elements were
not built according to project documentation
About 120 (from over 500 overall) openings in
were added in project documentation and more
than 400 instalation system clashes were
avoided
All potential conflicts were resolved before they
could harm construction and cause additional
costs to client
SENSATORI & NICKELODEON HOTELS AND RESORTS PUNTA CANA
QA/QC CONSISTENCY CONTROL
14. SENSATORI & NICKELODEON HOTELS AND RESORTS PUNTA CANA
COMMISSIONING
BIM Commissioning for transparent quality control based on
checklists and test, with attached documentation, to ensure
that building is ready for operation
At the end of the process, a complete asset
list, component registers, links to
procedures, operation manuals etc. delivered
to client in IFC format with respective COBie
sheets.