PROJECT LIFECYCLE
• During each phase, the federated BIM
model can get updated
• Updates are usually more frequent in
earlier stages of project development
• BIM elements can be added, modified
or even removed
• It is important to maintain BIM analysis
data regardless of changes in the
model
PROJECT STRUCTURE
Super Project
• Represents a group of Project Versions
• Contains only basic information (name,
description, ID)
• Does not contain BIM model itself
Project Version
• Represents one instance of the project
• Identified by ID and Version Name
(description is optional)
• Contains entire federated BIM model and
associated analysis data
Example of Super Project and Project Version in Bexel Manager
PROJECT UPDATE OVERVIEW
 User can choose which part of the federated BIM model gets updated
 User can control what happens with removed elements during the update
 All affected smart selection sets get automatically updated
 All affected QTO and custom breakdown structures get automatically updated
 All affected clash jobs get automatically marked for reevaluation
 All affected cost assignments get automatically adjusted for changes
 All affected schedules and tasks with link rules get automatically updated
PROJECT UPDATE
• Project can be updated with one or multiple IFC or
BX3 files simultaneously (batch)
• User can choose whether to keep or delete the
elements that have been removed
• Once updated, a new project version is created
• The previous project version is left intact and can be
accessed at any time
PROJECT UPDATE - ELEMENTS
• Elements are matched using their unique
IDs
• Additional element data such as
properties, materials and relations are
updated as well
• Newly added, removed or updated
elements are grouped in dedicated
selection sets and can be easily isolated
• All groups, breakdowns and other element
dependent BIM analysis data such as cost,
schedule and BOQ are automatically
updated to reflect the changes in the
model
PROJECT UPDATE – SELECTION SETS
• Smart selection sets are automatically updated
to reflect the changed BIM model
• E.g. 1 If a selection set is targeting all Walls
on the project, and a new wall is added in
the project, it will be automatically added to
that selection set as well
• E.g. 2 If a selection set is targeting all
elements with Area > 100m2 and an
element got its Area increased from 90m2
to 110m2, it will automatically be added to
that selection set
• If an element is deleted, it will be removed from
all associated selection sets
• Changes in selection sets will automatically
trigger changes in all BIM modules which depend
on it (QTO, clash detection, schedule etc.)
MODELUPDATE
PROJECT UPDATE – QTO/CBS
• Newly added elements will be automatically distributed in Quantity Takeoff (QTO) and Custom
Breakdowns (CBS) based on their rules
• Updated element quantities will be automatically reflected in associated QTO/CBS
• Deleted elements will be removed from all associated QTO/CBS automatically
MODEL UPDATE
QTOs are
automatically
updated
PROJECT UPDATE – CLASH DETECTION
• Clashes which contain elements with changed
geometry will automatically be flagged and clash
warning will be raised inside a clash job
• Clash job needs to be run again manually due to
potential time complexity of reevaluating the
clashes again
• Once reevaluated, the specific clash warning will be
cleared
• The updated clashes can now either be resolved, in
which case they automatically get the status
Resolved, or they can stay Active
• Deleted elements will cause all associated clashes
to be removed automatically
MODEL UPDATE
UPDATEOF
CLASHES
PROJECT UPDATE – COST ASSIGNMENTS
• Elements with changed quantities will automatically update associated cost assignment’s quantities and
cost
• Changes in cost assignments will automatically trigger changes in all BIM modules which depend on it
(schedule etc.)
• Deleted elements will be removed from all associated cost assignments
• If user decided to preserve deleted elements, they can be easily located in dedicated selection set which
can then be used to filter out associated cost assignments before actually deleting elements
MODELUPDATE
Round concrete columns size was changed
from 45cm to 60cm. All cost assignments were
automatically updated.
PROJECT UPDATE - SCHEDULE
• Newly added elements will automatically be
distributed in associated tasks and activities if
task link rules are specified
• Elements with changed quantities will
automatically reflect in tasks either directly or
indirectly (through changes in selection sets,
cost assignments etc.)
• Deleted elements will be removed from all
associated tasks automatically
• If user decided to preserve deleted elements,
they can be easily located in dedicated
selection set which can then be used to filter
out associated tasks before actually deleting
elements
• Schedule progress entries will remain
unaffected by changes in BIM model as they
represent work that is already completed
Schedule and cost comparison

Mais conteúdo relacionado

Semelhante a BEXEL Manager - Atualização do projeto

Software Application presentation slides
Software Application presentation slidesSoftware Application presentation slides
Software Application presentation slidesDoreen Yeo
 
SBS5411_1819_02_basics.pdf
SBS5411_1819_02_basics.pdfSBS5411_1819_02_basics.pdf
SBS5411_1819_02_basics.pdfssuser91d50e
 
Software archiecture lecture08
Software archiecture   lecture08Software archiecture   lecture08
Software archiecture lecture08Luktalja
 
Digital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryDigital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryCCT International
 
Optimizing Parameters
Optimizing ParametersOptimizing Parameters
Optimizing ParametersAlan Smith
 
Lect6 life cycle phases
Lect6 life cycle phasesLect6 life cycle phases
Lect6 life cycle phasesmeena466141
 
2.Basic Introduction of SDLC Phases and explanation of SDLC Models (1).ppt
2.Basic Introduction of SDLC Phases and explanation of SDLC Models (1).ppt2.Basic Introduction of SDLC Phases and explanation of SDLC Models (1).ppt
2.Basic Introduction of SDLC Phases and explanation of SDLC Models (1).pptabhishekgoyal29250
 
2.Basic Introduction of SDLC Phases and explanation of SDLC Models.ppt
2.Basic Introduction of SDLC Phases and explanation of SDLC Models.ppt2.Basic Introduction of SDLC Phases and explanation of SDLC Models.ppt
2.Basic Introduction of SDLC Phases and explanation of SDLC Models.pptTanuYadav844527
 
Software Configuration Management.pptx
Software Configuration Management.pptxSoftware Configuration Management.pptx
Software Configuration Management.pptxShanmugapriyaSenthil3
 
assit policy development slide.pptx
assit policy development slide.pptxassit policy development slide.pptx
assit policy development slide.pptx123mengie
 
What is the Digital Thread and Why Is It Important to Me? with Scott Thompson...
What is the Digital Thread and Why Is It Important to Me? with Scott Thompson...What is the Digital Thread and Why Is It Important to Me? with Scott Thompson...
What is the Digital Thread and Why Is It Important to Me? with Scott Thompson...LavaConConference
 
Software engineering.pptx
Software engineering.pptxSoftware engineering.pptx
Software engineering.pptxProvatMajhi
 
COCOMO Modal In Software Engineering By NADEEM AHMED
COCOMO Modal In Software Engineering By NADEEM AHMED COCOMO Modal In Software Engineering By NADEEM AHMED
COCOMO Modal In Software Engineering By NADEEM AHMED NA000000
 

Semelhante a BEXEL Manager - Atualização do projeto (20)

Chapter Three.pptx
Chapter Three.pptxChapter Three.pptx
Chapter Three.pptx
 
Software Application presentation slides
Software Application presentation slidesSoftware Application presentation slides
Software Application presentation slides
 
Paul Nunn
Paul NunnPaul Nunn
Paul Nunn
 
Paul Nunn v2
Paul Nunn v2Paul Nunn v2
Paul Nunn v2
 
SBS5411_1819_02_basics.pdf
SBS5411_1819_02_basics.pdfSBS5411_1819_02_basics.pdf
SBS5411_1819_02_basics.pdf
 
Software archiecture lecture08
Software archiecture   lecture08Software archiecture   lecture08
Software archiecture lecture08
 
Digital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryDigital Transformation of the Construction Industry
Digital Transformation of the Construction Industry
 
Optimizing Parameters
Optimizing ParametersOptimizing Parameters
Optimizing Parameters
 
Lect6 life cycle phases
Lect6 life cycle phasesLect6 life cycle phases
Lect6 life cycle phases
 
Bim adoption
Bim adoptionBim adoption
Bim adoption
 
2.Basic Introduction of SDLC Phases and explanation of SDLC Models (1).ppt
2.Basic Introduction of SDLC Phases and explanation of SDLC Models (1).ppt2.Basic Introduction of SDLC Phases and explanation of SDLC Models (1).ppt
2.Basic Introduction of SDLC Phases and explanation of SDLC Models (1).ppt
 
2.Basic Introduction of SDLC Phases and explanation of SDLC Models.ppt
2.Basic Introduction of SDLC Phases and explanation of SDLC Models.ppt2.Basic Introduction of SDLC Phases and explanation of SDLC Models.ppt
2.Basic Introduction of SDLC Phases and explanation of SDLC Models.ppt
 
Quy trình BIM
Quy trình BIMQuy trình BIM
Quy trình BIM
 
Software Configuration Management.pptx
Software Configuration Management.pptxSoftware Configuration Management.pptx
Software Configuration Management.pptx
 
assit policy development slide.pptx
assit policy development slide.pptxassit policy development slide.pptx
assit policy development slide.pptx
 
AVEVA PDMS 12.0
AVEVA PDMS 12.0AVEVA PDMS 12.0
AVEVA PDMS 12.0
 
Innovative BIM Solution For Project Management And Quantity Surveying Mr. Ken...
Innovative BIM Solution For Project Management And Quantity Surveying Mr. Ken...Innovative BIM Solution For Project Management And Quantity Surveying Mr. Ken...
Innovative BIM Solution For Project Management And Quantity Surveying Mr. Ken...
 
What is the Digital Thread and Why Is It Important to Me? with Scott Thompson...
What is the Digital Thread and Why Is It Important to Me? with Scott Thompson...What is the Digital Thread and Why Is It Important to Me? with Scott Thompson...
What is the Digital Thread and Why Is It Important to Me? with Scott Thompson...
 
Software engineering.pptx
Software engineering.pptxSoftware engineering.pptx
Software engineering.pptx
 
COCOMO Modal In Software Engineering By NADEEM AHMED
COCOMO Modal In Software Engineering By NADEEM AHMED COCOMO Modal In Software Engineering By NADEEM AHMED
COCOMO Modal In Software Engineering By NADEEM AHMED
 

Mais de N.A. Tecnologia

AFT Impulse 7 - Ficha de dados
AFT Impulse 7 - Ficha de dadosAFT Impulse 7 - Ficha de dados
AFT Impulse 7 - Ficha de dadosN.A. Tecnologia
 
AFT Impulse 7 - Ficha de dados
AFT Impulse 7 - Ficha de dadosAFT Impulse 7 - Ficha de dados
AFT Impulse 7 - Ficha de dadosN.A. Tecnologia
 
AFT Fathom 11 - Ficha de dados
AFT Fathom 11 - Ficha de dadosAFT Fathom 11 - Ficha de dados
AFT Fathom 11 - Ficha de dadosN.A. Tecnologia
 
AFT Arrow 8 - Ficha de dados
AFT Arrow 8 - Ficha de dadosAFT Arrow 8 - Ficha de dados
AFT Arrow 8 - Ficha de dadosN.A. Tecnologia
 
AFT Fathom 11 - Recursos
AFT Fathom 11 - RecursosAFT Fathom 11 - Recursos
AFT Fathom 11 - RecursosN.A. Tecnologia
 
Navistools Model Browser and Model Publisher
Navistools Model Browser and Model PublisherNavistools Model Browser and Model Publisher
Navistools Model Browser and Model PublisherN.A. Tecnologia
 
Navistools IFC Extension
Navistools IFC ExtensionNavistools IFC Extension
Navistools IFC ExtensionN.A. Tecnologia
 
Navistools Clash Manager
Navistools Clash ManagerNavistools Clash Manager
Navistools Clash ManagerN.A. Tecnologia
 
BEXEL Manager - Informações gerais
BEXEL Manager - Informações geraisBEXEL Manager - Informações gerais
BEXEL Manager - Informações geraisN.A. Tecnologia
 
BEXEL Manager - Facility & Maintenance
BEXEL Manager - Facility & MaintenanceBEXEL Manager - Facility & Maintenance
BEXEL Manager - Facility & MaintenanceN.A. Tecnologia
 
BEXEL Manager - BEXEL Consulting
BEXEL Manager - BEXEL ConsultingBEXEL Manager - BEXEL Consulting
BEXEL Manager - BEXEL ConsultingN.A. Tecnologia
 
BEXEL Manager - Estudo de caso
BEXEL Manager - Estudo de casoBEXEL Manager - Estudo de caso
BEXEL Manager - Estudo de casoN.A. Tecnologia
 
BEXEL Manager - Designer BIM integrado
BEXEL Manager - Designer BIM integradoBEXEL Manager - Designer BIM integrado
BEXEL Manager - Designer BIM integradoN.A. Tecnologia
 

Mais de N.A. Tecnologia (20)

AFT Impulse 7 - Ficha de dados
AFT Impulse 7 - Ficha de dadosAFT Impulse 7 - Ficha de dados
AFT Impulse 7 - Ficha de dados
 
AFT Impulse 7 - Ficha de dados
AFT Impulse 7 - Ficha de dadosAFT Impulse 7 - Ficha de dados
AFT Impulse 7 - Ficha de dados
 
AFT Fathom 11 - Ficha de dados
AFT Fathom 11 - Ficha de dadosAFT Fathom 11 - Ficha de dados
AFT Fathom 11 - Ficha de dados
 
AFT Arrow 8 - Ficha de dados
AFT Arrow 8 - Ficha de dadosAFT Arrow 8 - Ficha de dados
AFT Arrow 8 - Ficha de dados
 
AFT Fathom 11 - Recursos
AFT Fathom 11 - RecursosAFT Fathom 11 - Recursos
AFT Fathom 11 - Recursos
 
AFT Arrow 8 - Recursos
AFT Arrow 8 - RecursosAFT Arrow 8 - Recursos
AFT Arrow 8 - Recursos
 
Navistools Standard
Navistools StandardNavistools Standard
Navistools Standard
 
Navistools Model Browser and Model Publisher
Navistools Model Browser and Model PublisherNavistools Model Browser and Model Publisher
Navistools Model Browser and Model Publisher
 
Navistools IFC Extension
Navistools IFC ExtensionNavistools IFC Extension
Navistools IFC Extension
 
Navistools IFC Exporter
Navistools IFC ExporterNavistools IFC Exporter
Navistools IFC Exporter
 
Navistools Clash Manager
Navistools Clash ManagerNavistools Clash Manager
Navistools Clash Manager
 
CAESAR II
CAESAR IICAESAR II
CAESAR II
 
GT STRUDL
GT STRUDLGT STRUDL
GT STRUDL
 
PV Elite
PV ElitePV Elite
PV Elite
 
TANK
TANKTANK
TANK
 
BEXEL Manager - Informações gerais
BEXEL Manager - Informações geraisBEXEL Manager - Informações gerais
BEXEL Manager - Informações gerais
 
BEXEL Manager - Facility & Maintenance
BEXEL Manager - Facility & MaintenanceBEXEL Manager - Facility & Maintenance
BEXEL Manager - Facility & Maintenance
 
BEXEL Manager - BEXEL Consulting
BEXEL Manager - BEXEL ConsultingBEXEL Manager - BEXEL Consulting
BEXEL Manager - BEXEL Consulting
 
BEXEL Manager - Estudo de caso
BEXEL Manager - Estudo de casoBEXEL Manager - Estudo de caso
BEXEL Manager - Estudo de caso
 
BEXEL Manager - Designer BIM integrado
BEXEL Manager - Designer BIM integradoBEXEL Manager - Designer BIM integrado
BEXEL Manager - Designer BIM integrado
 

Último

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 

Último (20)

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 

BEXEL Manager - Atualização do projeto

  • 1.
  • 2. PROJECT LIFECYCLE • During each phase, the federated BIM model can get updated • Updates are usually more frequent in earlier stages of project development • BIM elements can be added, modified or even removed • It is important to maintain BIM analysis data regardless of changes in the model
  • 3. PROJECT STRUCTURE Super Project • Represents a group of Project Versions • Contains only basic information (name, description, ID) • Does not contain BIM model itself Project Version • Represents one instance of the project • Identified by ID and Version Name (description is optional) • Contains entire federated BIM model and associated analysis data Example of Super Project and Project Version in Bexel Manager
  • 4. PROJECT UPDATE OVERVIEW  User can choose which part of the federated BIM model gets updated  User can control what happens with removed elements during the update  All affected smart selection sets get automatically updated  All affected QTO and custom breakdown structures get automatically updated  All affected clash jobs get automatically marked for reevaluation  All affected cost assignments get automatically adjusted for changes  All affected schedules and tasks with link rules get automatically updated
  • 5. PROJECT UPDATE • Project can be updated with one or multiple IFC or BX3 files simultaneously (batch) • User can choose whether to keep or delete the elements that have been removed • Once updated, a new project version is created • The previous project version is left intact and can be accessed at any time
  • 6. PROJECT UPDATE - ELEMENTS • Elements are matched using their unique IDs • Additional element data such as properties, materials and relations are updated as well • Newly added, removed or updated elements are grouped in dedicated selection sets and can be easily isolated • All groups, breakdowns and other element dependent BIM analysis data such as cost, schedule and BOQ are automatically updated to reflect the changes in the model
  • 7. PROJECT UPDATE – SELECTION SETS • Smart selection sets are automatically updated to reflect the changed BIM model • E.g. 1 If a selection set is targeting all Walls on the project, and a new wall is added in the project, it will be automatically added to that selection set as well • E.g. 2 If a selection set is targeting all elements with Area > 100m2 and an element got its Area increased from 90m2 to 110m2, it will automatically be added to that selection set • If an element is deleted, it will be removed from all associated selection sets • Changes in selection sets will automatically trigger changes in all BIM modules which depend on it (QTO, clash detection, schedule etc.) MODELUPDATE
  • 8. PROJECT UPDATE – QTO/CBS • Newly added elements will be automatically distributed in Quantity Takeoff (QTO) and Custom Breakdowns (CBS) based on their rules • Updated element quantities will be automatically reflected in associated QTO/CBS • Deleted elements will be removed from all associated QTO/CBS automatically MODEL UPDATE QTOs are automatically updated
  • 9. PROJECT UPDATE – CLASH DETECTION • Clashes which contain elements with changed geometry will automatically be flagged and clash warning will be raised inside a clash job • Clash job needs to be run again manually due to potential time complexity of reevaluating the clashes again • Once reevaluated, the specific clash warning will be cleared • The updated clashes can now either be resolved, in which case they automatically get the status Resolved, or they can stay Active • Deleted elements will cause all associated clashes to be removed automatically MODEL UPDATE UPDATEOF CLASHES
  • 10. PROJECT UPDATE – COST ASSIGNMENTS • Elements with changed quantities will automatically update associated cost assignment’s quantities and cost • Changes in cost assignments will automatically trigger changes in all BIM modules which depend on it (schedule etc.) • Deleted elements will be removed from all associated cost assignments • If user decided to preserve deleted elements, they can be easily located in dedicated selection set which can then be used to filter out associated cost assignments before actually deleting elements MODELUPDATE Round concrete columns size was changed from 45cm to 60cm. All cost assignments were automatically updated.
  • 11. PROJECT UPDATE - SCHEDULE • Newly added elements will automatically be distributed in associated tasks and activities if task link rules are specified • Elements with changed quantities will automatically reflect in tasks either directly or indirectly (through changes in selection sets, cost assignments etc.) • Deleted elements will be removed from all associated tasks automatically • If user decided to preserve deleted elements, they can be easily located in dedicated selection set which can then be used to filter out associated tasks before actually deleting elements • Schedule progress entries will remain unaffected by changes in BIM model as they represent work that is already completed Schedule and cost comparison