SlideShare uma empresa Scribd logo
1 de 50
Baixar para ler offline
Investor               May, 2011
               William J. Biggar
PRESENTATION      President & CEO
Forward Looking
STATEMENTS
Certain information included in this presentation, including any information as to our future production,
exploration, financial or operating performance and other statements that express management's
expectations or estimates of future performance, constitute „forward-looking statements‟ within the meaning
of the „safe harbor‟ provisions of the United States Private Securities Litigation Reform Act of 1995 and
Canadian securities laws. The words „expect‟, „believe‟, „will‟, „intend‟, „estimate‟ and similar expressions
identify forward-looking statements. Forward-looking statements, including future-oriented financial
information, are necessarily based upon a number of estimates and assumptions that, while considered
reasonable by management, are inherently subject to significant business, economic and competitive
uncertainties, risks and contingencies, including the possibility that operations at the Lac des Iles and Sleeping
Giant mines may not proceed as planned, that other properties may not be successfully developed, and that
metal prices, foreign exchange assumptions and operating costs may differ from management‟s
expectations. The Company cautions the reader that such forward-looking statements involve known and
unknown risks, uncertainties and other factors that may cause the actual financial results, performance or
achievements of North American Palladium to be materially different from the Company‟s estimated future
results, performance or achievements expressed or implied by those forward-looking statements and that the
forward-looking statements are not guarantees of future performance. For more details on these estimates,
risks, assumptions and factors, see the Company‟s most recent Form 40-F/Annual Information Form on file with
the U.S. Securities and Exchange Commission and Canadian provincial securities regulatory authorities. The
Company disclaims any obligation to update or revise any forward-looking statements, whether as a result of
new information, events or otherwise, except as expressly required by law. Readers are cautioned not to put
undue reliance on these forward-looking statements.

All dollar amounts in Canadian currency unless otherwise stated, all references to production refer to payable
production, and all reference to tonnes refer to metric tonnes.

U.S. investors are encouraged to refer to the “Cautionary Note to U.S. Investors Concerning Estimates of
Measured, Indicated and Inferred Resources” in the appendix.
                                                                                                                1
Investment Case
FOR NAP

• Growth-oriented precious metals producer in mining-friendly jurisdictions:
     • LAC DES ILES, one of only two primary palladium mines in the world,
       transitioning into a long-life, low-cost operation
     • SLEEPING GIANT gold mine provides foundation for growth
• Robust pipeline of projects to increase palladium and gold production

• Significant commitment to palladium and gold exploration

• Experienced senior management and operating teams

• Strong balance sheet, $163.3 M in working capital (including $100.1 M in cash) and
  no long-term debt*




* As at Mar. 31, 2011

                                                                                       2
Diversified Precious Metals
PRODUCER

                                                     LDI (ONTARIO):
                                                     • One of only two primary palladium mines
                                                       in the world
                                                     • Producing palladium since 1993
                                                     • Transitioning into a long life, low cost mine
                                                     • Significant exploration upside


                                  QUEBEC
    ONTARIO                                                     Sleeping Giant (QUEBEC):
                               SLEEPING GIANT                   • Producing gold for over 20 years
                                  Gold Mine
     LAC DES ILES
    Palladium Mine
                                                                • Growth potential at depth
                                                                • Underutilized mill has potential to
                               Val d‟Or                           serve NAP‟s nearby projects in
                     Timmins
       Thunder                                                    Abitibi
         Bay
                     Sudbury
                                          Montreal


                                Toronto




                                                                                                       3
Market Statistics:
A VERY LIQUID STOCK
                                             STOCK SYMBOLS (NYSE Amex / TSX)                PAL / PDL

                                                             MARKET CAPITALIZATION          US $633 M

                                                                              SHARE PRICE   US $3.90

                                               SHARES/WARRANTS OUTSTANDING                  162.4 M / 8.8 M

              3-MONTH AVERAGE TRADING VOLUME (NYSE Amex / TSX)                              2,934,041 / 885,894

  Information as at May 13, 2011, Thomson One.
  Series B warrants (TSX:PDL.WT.B) expire on Oct. 28, 2011, $6.50 exercise price.




 ANALYST COVERAGE:
 Bank of America Merrill Lynch                          GMP Securities                           Macquarie
 Michael Parkin                                         Andrew Mikitchook                        Daniel Greenspan
 Cormark Securities                                     Haywood Securities                       RBC Capital Markets
 Rajiv Chail                                            Chris Thompson                           Leon Esterhuizen
 Credit Suisse                                          Octagon Capital                          Stifel Nicolaus
 Alex Terentiew                                         Ted Yew                                  George Topping


                                                                                                                    4
Investment Case for
      PALLADIUM


                      5
Palladium Market:
MINE SUPPLY


                                                                RUSSIA
         NORTH
        AMERICA                                                 43%
          11%


   ONLY 6.3 M oz. ANNUAL PRODUCTION WORLDWIDE



                                                 SOUTH AFRICA
                                                    41%
 Source: CPM Group, June 2010
 Note: Excludes secondary supply of 1.34 M oz.                           6
Palladium Market:
SUPPLY

     Constrained Mine Supply
     (000‟s ounces)


      3500
                                                  Russia   South Africa
      3000

      2500

      2000

      1500

      1000

       500

          0
                      2006          2007   2008   2009        2010



     Source: CPM Group, Jan. 2011


                                                                          7
Palladium Market:
DEMAND

            2009 Fabrication Demand
                                Dental
      Automotive                 11%
         53%
                                             Other
                                             11%

                                               Chinese
                                              Jewellery
                                                  10%

                                         Electronics
                                          15%



Source: CPM Group, June 2010

Notes: Other includes chemical and petroleum catalysts, jewellery (excluding China), and other
minor uses of palladium
                                                                                                 8
Palladium Market:
DEMAND

     Global Light Vehicle Production
     (000‟s)
                                                                         95M        97M
     100,000                                                    91M
                                            81M       87M
                                                                                           Other1
      90,000
                                   76M
      80,000             72M
      70,000                                                                               Europe
      60,000   57M

      50,000                                                                               North
                                                                                           America
      40,000
      30,000
      20,000                                                                               BRIC
                                                                                           Economies2
      10,000
           0
                 2009     2010      2011     2012      2013     2014      2015      2016


        Source: CSM Worldwide Inc. (IHS Global Insight Automotive), February 2011

        1. Other includes: Japan, Korea, Middle East and Africa
        2. BRIC Economies include: Greater China, South America and South Asia


                                                                                                        9
Palladium Market:
DEMAND
 Exchange Traded Funds' Physical Palladium Holdings
 (000‟s ounces)                                                                                               (000‟s ounces)
 2,500                                                                                                                  2,500
               WITE                 GLTR
               Julius Baer          MSL (Australia)
 2,000                                                                                                                  2,000
               PALL       NYSE      Palladium ZKB
               PHPD           LSE
 1,500                -                                                                                                 1,500


                          -
 1,000                                                                                                                  1,000



  500                                                                                                                   500



     0                                                                                                                  0
    20   - Apr - 07 20 - Oct - 07 20 - Apr - 08 20 - Oct - 08 20 - Apr - 09 20 - Oct - 09 20 - Apr - 10 20 - Oct - 10




 Source: CPM Group, as of March 1, 2011

                                                                                                                                10
Palladium Market:
DEMAND
Adoption of Stricter Emission Control Standards
                           2005        2006      2007        2008      2009        2010    2011   2012   2013   2014      2015
  Europe                   Euro IV                                     Euro V                                   Euro VI

             Beijing       Euro III              Euro IV
  China
           Nationwide      Euro II               Euro III                       Euro IV

           Select Cities   Euro III                                             Euro IV
   India
           Nationwide      Euro II                                              Euro III

  Russia                   Euro I      Euro II              Euro III            Euro IV                         Euro V

   USA                      Tier 2 and LEV II

  Brazil                   Prconve 3             Prconve 4             Prconve 5

  Japan                     Japan 05                                                                       Source: CPM Group


 • Emerging economies have adopted emission control standards that mandate the use of
   catalytic converters
 • Advancing to a higher level of emission controls results in higher PGM loadings in the
   catalytic converter
      • Each time China increases to higher standard, it adds approximately 10% to the
        loadings of palladium to autocatalysts
 • Tightening emission control regulations for heavy-duty trucks
                                                                                                                                 11
Use of Palladium in
CATALYTIC CONVERTERS
Gasoline Engines                                        Hybrids & Other New Forms
• Use +90% palladium                                    • Neutral impact on PGM use
                                                        • Gasoline hybrids tend to use as much palladium as
                                                          normal gasoline engines
Diesel Engines
                                                        • Currently account for only 1% of global cars sales1
• Historically used platinum due to
  technical requirements                                • Forecasted to be 14% of overall market by 20202

• Now 25% palladium, with scope to
  increase to 50% due to advent of                      Electric
  low sulphur diesel fuel
                                                        • No requirement for catalytic converters
                                                        • Challenged by lack of infrastructure to recharge,
                                                          high costs, long charging periods and short driving
                                                          range
                                                        • Forecasted to account for only 2% of global car
                                                          sales by 20202



 1. CPM Group, June 2010
 2. Stefan Bratzel, director of the Centre of Automotive Management in Germany;
    as reported in Mitsui Global Precious Metals “Pole Position” Report, June 2010

                                                                                                            12
Palladium Market:
INCREASING PRICE

    Recent performance of Palladium (US$/oz)                           Average Annual Price Forecast (US$/oz)

$900.00                                                                                                 2011    2012
$800.00                                                                  RBC Capital Markets            $900    $1,000
$700.00                                                                  BNP Paribas                    $860    $990
$600.00                                                                  CPM Group                      $849    $908
$500.00
                                                                         JP Morgan                      $838    $773
$400.00
$300.00                                                                  Credit Suisse                  $830    $950
$200.00                                                                  Barclays                       $820    $850
$100.00                                                                  UBS                            $800    $825
  $0.00
   02/01/2008       02/01/2009        02/01/2010       02/01/2011      Historic High: US $1,090 (2001)
                                                                       Recent Price: US $713 (May 5, 2011)



             Best performing metal of 2010

     Sources: Thomson One; RBC Capital Market (Dec. 9, 2010); JP Morgan (Jan. 24, 2011); UBS (Dec. 15, 2010);
              Barclays PLC (Mar. 24, 2011); Credit Suisse (Mar. 18, 2011); CPM Group (Mar. 4, 2011).
                                                                                                                         13
Palladium Operations
LAC DES ILES MINE


                   14
LDI:
A WORLD CLASS MINE




 • One of only two primary palladium mines in the world
 • Open pit commenced operations in 1993
 • Underground mining from the Roby Zone (via ramp) began in 2006
 • Mine expansion underway with production from the Offset Zone (via shaft)
   targeted for Q4 2012
 • 15,000 tpd underutilized mill
                                                                              15
LDI:
ORE BODY
                                                                                                    Surface
                                                                                                     215 m    5,495 Mine Level



                                                                                                              5,280 Mine Level
                                                           Open Pit
                                                           (Exhausted)




                                                       Roby Zone
                                                       Mined via ramp access                          595 m



                                                                                                              4,900 Mine Level
                                            Offset Zone
                                            Commercial production via shaft targeted for Q4 2012




                                                                                     N

                Offset Zone remains open in all directions                                         1,300 m    4,180 Mine Level



       Note: Updated reserve & resource report including 2010 drilling is expected in Q2, 2011
                                                                                                                                 16
LDI:
OPERATING METRICS

                                                                             2010                  2011 Forecast

  Payable Palladium Production (oz)                                         95,057               145,000 - 155,000

  Total Ore Milled (000’s tonnes)                                       649 @ 6.1 g/t              1,460 @ 4.2 g/t

  Underground Mining Rate                                                 2,600 tpd                   2,700 tpd

  Palladium Mill Recovery                                                     81%                         80%

  Cash Costs1 ($US/oz)                                                       $283                        $450




  Note: 2010 production consisted entirely of underground ore. Reduced 2011 head grade is due to
  blending of lower grade surface stockpiles with higher grade underground ore. Surface stockpiles will
  be exhausted at the end of 2011.

  1. Total cash costs per ounce is a non-IFRS measure. For reconciliation of historical total cash costs per ounce to production
     costs, please refer to the Company‟s financial statements. Cash costs per ounce are presented net of byproduct credits
     and can be materially affected by changes in byproduct metal prices, as well as the Canadian/US dollar exchange rate.




                                                                                                                                   17
2012
MINING OPERATIONS

• Will consist entirely of underground production from three sources:
   – Remaining Roby Zone ore (including potential extensions)
   – Upper Offset Zone ore
   – Development Offset Zone ore
• Head grades expected to average 5.5 - 6.0 g/t
• Detailed guidance for production and cash costs will be released in January
  2012
• Cash costs per ounce are expected to be considerably lower than 2011 as
  higher grade underground ore will not be diluted by blending lower grade
  surface stockpiles




                                                                                18
LDI:
MINE EXPANSION PLAN
• Transitioning from mining via ramp
  to mining via shaft
• Currently raiseboring a shaft to surface
  from the 4,815 level (700 m from surface)
• Subsequently sink the shaft to below to
  4180 level (1,300 m from surface)
• Large scale bulk mining method
• Shaft is being sized for 7,000 tpd
• Target shaft mining rate:
   – 3,500 tpd (Q4 2012)

   – 5,500 tpd (Q1 2015)

• Once mining at 5,500 tpd:
   – Production is expected to exceed
     250,000 oz/yr

   – Cash costs are expected to significantly
     decline                                    19
LDI:
MINE EXPANSION – CAPEX
 • Pre-commercial production (Q4, 2012) capital expenditures estimated at $204 M
         • 2010 expenditures amounted to $26 M
         • 2011 expenditures estimated at $147 M (see table)
 • Capital expenditures post commercial production to increase mining rate to
   5,500 tpd in Q1 2015 estimated at $72 M

       Capital Expenditures                                         2011
       Definition drilling                                        $2.3 M
       Ramp, infrastructure & service development                $22.4 M
       Surface, shaft and service facilities                     $64.9 M
       Mining & surface equipment                                $14.3 M
       Engineering, services & project management                $25.4 M
       Subtotal                                                 $129.3 M
       Contingency (13.7%)                                       $17.7 M
       Total                                                    $147.0 M



Strong balance sheet provides liquidity for mine expansion
                                                                                20
LDI:
MINE EXPANSION – IN PROGRESS

2011 Development work to focus on:
• Constructing the head frame, hoist room
  and electrical substation
• Installing the service cage and
  production hoists (already purchased)
• Completing the shaft raise bore &
  ventilation raise bore
• Installing adequate ventilation at surface
  & underground
• Advancing the ramp towards the 4570
  mine level
• Developing the 4790 mine level in
  preparation for production




                                               21
LDI:
MINE EXPANSION – LOW EXECUTION RISK

 • Over 17 years of mining experience at LDI with a solid track record of
   underground development
 • Experienced 20-person development team on site overseeing all aspects of the
   expansion
 • Brownfield expansion vs. greenfield project
     • Underutilized mill and tailings facilities in place
     • No long lead items
     • No capex currency risk (all expenditures are in C$)




                                                                             22
LDI:
NEW UNDERGROUND ZONES
                                                                                                  Roby Zone
                                                          Offset Zone

                                        Cowboy Zone                              Offset Zone
                                                                        Cowboy    Extension
                           Outlaw Zone                                   Zone
   Cross Section View




                           Mineralization
                              Trend




                                                                                                      Other


                        Cowboy & Outlaw Zones discovered in 2009


                                              Sheriff Zone
                                             Mineralization
          Plan View




                                                 Trend




                                                                                        Offset Zone

                        Sheriff Zone discovered in 2010


                            New zones have potential to increase production                                   23
LDI:
CONTINUING FOCUS ON EXPLORATION

Significant 2011 Exploration Program
• Budget: $8.8M


• 32,000 m of drilling
   – 25,000 m at LDI
   – 3,000 m at Legris Lake
   – 4,000 m at NAP‟s other nearby properties



• Program objectives:
   – Infill drilling in the bottom portion of the Offset
     Zone
   – Defining the upper extension of the Offset Zone
   – Underground exploration targeting the Offset,
     Cowboy, Outlaw & Sheriff zones

                                                           24
LDI:
EXPLORATION UPSIDE NEAR MINE
                    North VT       North VT Rim
                      Rim          Mineralized
                                      Trend


        North Pit
         Target




                                                  +30,000-acre PGM land package



                                                  LDI PROPERTY



                                                                    Legris Lake

                    Sheriff Zone                  LDI Mine & Mill
                                                                           Legris Lake
       South Pit Target
                                          N


                                                                                         25
Gold
OPERATIONS


         26
Gold
STRATEGY

OBJECTIVE: Achieve scale in the gold division through organic
growth, thereby creating value for shareholders

                 STEPS                     Target Completion         Anticipated
                                                                       Result
 1.    Deepen the Sleeping Giant        Q2, 2011 (shaft)       Increased production and
       mine shaft by 200 m to allow for Q4, 2011               profitability commencing
       development of 3 new mining      (development)          Q1, 2012
       levels of higher grade ore

 2.    Expand the mill capacity at      Q3, 2011               Capacity increased from
       Sleeping Giant to process                               900 tpd to 1,250 tpd
       ore from other wholly-owned
       nearby projects




                                                                                     27
Gold
STRATEGY (CONTINUED)

                STEPS                      Target                Anticipated
                                         Completion                Result
 3.   Complete the development          Q4, 2011      With a positive production
      of the Vezza project                            decision, 39,000 oz of annual
                                                      production commencing Q1,
                                                      2012

 4.   Complete exploration drilling     Q3, 2011      With a positive scoping study,
      at Flordin and assess open pit                  potential production
      potential and operating metrics                 commencing in Q1, 2014 at an
                                                      annual rate to be determined

 5.   Advance permitting of Discovery Q4, 2011        Confirm annual production
      project and update scoping                      potential of 44,000 oz/yr and
      study                                           related capital and operating
                                                      metrics




                                                                                       28
Sleeping Giant
MINE




• 2011 transition year while shaft deepening and development is completed
• Operations and cost structure revised to focus on quality (grade) vs. quantity
  (tonnage) to improve profitability
• 2011 gold production guidance: 15,000 – 20,000 oz.

                                                                                   29
Sleeping Giant:
ECONOMICS TO IMPROVE AT DEPTH

• 2011 mining focused on the areas
  around the 975 m elevation & above
• Currently deepening the Sleeping Giant
  mine shaft by 200 metres to 1175 metres
  to gain access to 3 new higher grade
  mining levels – target completion in Q2,
  2011
• Development of new mining levels
  to commence in Q3 2011 – target
  completion in Q4, 2011
• Expect to produce from the new mining
  levels at the start of 2012 resulting in
  higher production and lower cash costs
  per ounce
                                             200 m Deepening

                                                Longitudinal Section

                                                All depth references are in metres


                                                                                     30
Sleeping Giant:
UNDERUTILIZED MILL

Strategic Asset
• Ability to serve NAP‟s other gold projects in
  Abitibi region
• 900 tpd mill currently operating at
  ½ capacity
• Expanding mill capacity to 1,250 tpd at a
  cost of $7 M
• Target completion Q4, 2011
• Will be engineered to accommodate
  further expansion to 1,750 tpd for
  approximately $3 M




                                                  31
Vezza Gold Project
DEVELOPMENT

• 85 km by paved road to SG mill
• Advanced-stage project:
   – Extensive historic drilling (82,000 m)

   – Permitted & power at site

   – Hoist & 3-compartment shaft

   – 4 underground levels down to a depth of 741 m

   – Surface & pollution control infrastructure in place
                                                           Production Potential: 39,000 oz/yr
• 2011 exploration & development expenditures              Mining Rate: 750 tpd
  $26M                                                     Mine Life: 9 years
                                                           Cash Costs: US$700
   – Will be reduced by estimated pre-production
     revenue of $8M, for a net expenditure of $18M

• Being advanced towards a production
  decision in Q4 2011
   – Production could begin in Q1 2012

                                                                                           32
Other Gold Properties:
GROWTH POTENTIAL

                                                               2011             Trucking
                                                                                                    Au Production
          Project                Resources**                Exploration        Distance to
                                                                                                      Potential
                                                             Program             SG Mill

                         Measured & Indicated:
                         92,000 oz Au (4.25 g/t)                                                          TBD
          FLORDIN*                                             4,500 m             70 Km
                         Inferred:                                                                (potential open pit)
                         169,000 oz Au (3.6 g/t)
                         Measured & Indicated:
                         237,000 oz Au (5.74 g/t)                                                      44,000 oz /yr
      DISCOVERY*                                               8,000 m             80 Km
                         Inferred:                                                                      (over 4 yrs)
                         294,000 oz Au (5.93 g/t)
                                                                                                           TBD
          DORMEX                       TBD                     2,400 m           Adjacent           (potential fold of
                                                                                                     Sleeping Giant)


          Potential to produce in the range of 125,000 oz per year
                     from expanded Sleeping Giant mill
     *     Resources to be updated Q2, 2011 to include 2010 drilling
     **    See Cautionary Note to U.S. Investors Concerning Estimates of Measured, Indicated and Inferred
           Resources. Report sources can be found in the appendix.


                                                                                                                       33
Gold Division
VALUE CREATION POTENTIAL

                                                               2011 Production            Market Cap
                                    180 oz                                                                                       $1,600
                                                                                                       164 oz
                                    160 oz                                                                                       $1,400
2011 Estimated Gold Production(2)




                                                                                                                                          Market Capitalization(1) ($MM)
                                    140 oz
                                                                                                                                 $1,200
                                    120 oz                                                 116 oz                  116 oz
                                                                                                                                 $1,000
                                    100 oz                                     91 oz
             oz (000)




                                                                   79 oz                                                         $800
                                     80 oz             69 oz
                                             55 oz                                                                               $600
                                     60 oz
                                                                                                                                 $400
                                     40 oz

                                     20 oz                                                                                       $200

                                       oz                                                                                        $0
                                             Claude   Wesdome     Richmont   St. Andrew   Lake Shore   Aurizon   Kirkland Lake




1. Based on fully-diluted shares outstanding (March 2011)
2. RBC Equity Research when available, otherwise Consensus Broker Estimates

                                                                                                                                                                           34
2011 Gold
EXPLORATION
• 70 km land package surrounding Sleeping Giant mill
• Budget: $9.1 M for 49,000 m of drilling
         • 26,500 m at Sleeping Giant

         • 22,500 m at NAP‟s other gold properties




                                                                Vezza

                                                    Discovery
                                                 Cameron Shear JV
                                                    Florence
                                                     Flordin
                                 Harricana
                                   North
                                                          Dormex


                                Sleeping Giant
                                  Mine & Mill
                                                          Laflamme



                                                     Abitibi region, Quebec, Canada
                                                                                      35
2011
PRIORITIES

• Progressing the LDI mine expansion

• Completing the LDI reserve and resource update (Q2)

• Updating the LDI mine expansion plan (Q3)

• Completing the shaft deepening and mill expansion at
  Sleeping Giant (Q3)

• Advancing the Vezza gold project towards a production
  decision (year-end)
• Continuing exploration programs aimed at increasing reserves
  and resources at LDI and in the gold division




                                                                 36
Why
INVEST?

                        PIPELINE OF PROJECTS TO
      STRONG                INCREASE
  MANAGEMENT TEAM            PRODUCTION

  INVESTING IN FUTURE         FINANCIAL
      GROWTH               STRENGTH


                                                  37
Shareholder
INFORMATION
North American Palladium‟s vision is to build a mid-tier diversified precious metals company operating in mining
friendly jurisdictions. Highly leveraged to palladium, the Company is also building its exposure to gold, and is
focused on investing in its current operations to grow its production of palladium and gold. NAP‟s experienced
management and technical teams have a significant commitment to exploration and are dedicated to
building shareholder value.



                 Corporate Office:        Royal Bank Plaza, South Tower
                                          200 Bay St., Suite 2350
                                          Toronto, ON M5J 2J2


                     Stock Symbols:       NYSE Amex – PAL
                                          TSX – PDL, PDL.WT.B

                              Website:    www.nap.com

                 Investor Relations:      Camilla Bartosiewicz
                                          Manager, Investor Relations & Corporate Communications
                                          camilla@nap.com
                                          416-360-7590 ext. 7226

                                                                                                               38
Appendices &
FURTHER INFORMATION


                   39
Senior
MANAGEMENT

    William J. Biggar – President and CEO
    An accomplished businessman with extensive experience in mining and in a broad range of industries. Mr. Biggar has held
    senior positions with Barrick Gold Corporation, Horsham Corporation and Magna International. He also has over 12 years of
    experience as an investment banker and private equity investor. A Chartered Accountant, he holds Master of Business
    Administration and Bachelor of Commerce (with distinction) degrees from the University of Toronto.

    Greg Struble – Vice President and COO
    A mine engineer with over 30 years of experience in underground mining. Most recently, he served as Executive Vice
    President and COO of Stillwater Mining Company, where he was responsible for two underground palladium mines as well as
    smelter and refinery operations. Prior to this, he worked as underground project manager for Barrick Gold‟s Cortez Hills Joint
    Venture. Mr. Struble has also worked internationally at a number of large gold mines.


    Michel Bouchard – Vice President, Exploration and Development
    Mr. Bouchard has been involved in exploration, development, and operations in the mining industry for the past 25 years. He
    is credited with contributing to the discovery of the Bouchard Hebert Mine in northwest Quebec. Previously Mr. Bouchard
    held senior positions with Audrey Resources, Lyon Lake Mines and SOQUEM. Mr. Bouchard was formerly President and CEO of
    Cadiscor Resources Inc.


    Jeff Swinoga – Vice President, Finance and CFO
    Eighteen years of experience in the resource, mining and finance industries. Mr. Swinoga has held CFO positions with HudBay
    Minerals and MagIndustries, and was Director, Treasury Finance of Barrick Gold Corporation for seven years. A Chartered
    Accountant, he also has an MBA from University of Toronto and an honours economics degree from University of Western
    Ontario.

    Trent Mell – Vice President, Corporate Development and General Counsel
    Mr. Mell has previously worked at the corporate head offices of Barrick Gold Corporation and Sherritt International. Prior to
    joining the mining industry, Mr. Mell worked with Stikeman Elliott LLP, where he practiced securities law. Mr. Mell has published
    papers on NI 43-101, and holds a B.A., a B.C.L. (with distinction) and a LL.B. (with distinction), all from McGill University, as well
    as a Masters degree in Securities Law from Osgoode Hall Law School.

                                                                                                                                    40
2012
TRANSITION

                          • Continue infill drilling on the upper
                            Roby Zone parameter to extend both
                            north & south on known geologic
                            trends


                          • Defer lower Roby Zone production into
                            Q1 2012

                          • Integrate all upper Offset Zone from
             4765 level     above the 4765 mine level

                          • Utilize new extensions in Offset Zone
                            adjacent to the Roby Zone decline

                          • Prioritize the development effort for the
                            shaft mining and manage production
                            at lower levels to reduce congestion of
                            activities in the Offset Zone decline




                                                                    41
Mineral
RESERVES & RESOURCES
• Cautionary Note to U.S. Investors Concerning Mineral Reserves and Mineral
  Resources
• Lac des Iles Mine
      – Roby Zone Underground Reserves – November 2010 (report date; effective dates are variable)

• Lac des Iles Mine
      – Mineral Resource Summary – November 2010 (report date; effective dates are variable)

• Sleeping Giant Mine
      – Mineral Reserves and Resources – December 31, 2010 (effective date)

• Discovery Project
      – Mineral Resources – August 1, 2008 (effective date)

• Flordin Property
      – Mineral Resources – February 23, 2010 (effective date)

• Vezza Project
      – Mineral Resources – December 31, 2010 (effective date)


 Michel Bouchard, P. Geo, Vice President, Exploration & Development, for North American Palladium Ltd., is the Qualified Person
 who supervised the preparation of the technical data in this presentation.

 Please refer to North American Palladium’s Annual Information Form for the year ended December 31, 2009 and applicable
 technical reports available on www.sedar.com, www.sec.gov and www.nap.com for further information.

                                                                                                                                  42
Cautionary Note to U.S. Investors Concerning
MINERAL RESERVES AND MINERAL RESOURCE

Mineral reserves and mineral resources have been calculated in accordance with National
Instrument 43-101 as required by Canadian securities regulatory authorities. For United States
reporting purposes, Industry Guide 7, (under the Securities and Exchange Act of 1934), as
interpreted by Staff of the Securities Exchange Commission (SEC), applies different standards
in order to classify mineralization as a reserve. In addition, while the terms “measured”,
“indicated” and “inferred” mineral resources are required pursuant to National Instrument 43-
101, the U.S. Securities and Exchange Commission does not recognize such terms. Canadian
standards differ significantly from the requirements of the SEC, and mineral resource
information contained herein is not comparable to similar information regarding mineral
reserves disclosed in accordance with the requirements of the U.S. Securities and Exchange
Commission. U.S. investors should understand that “inferred” mineral resources have a great
amount of uncertainty as to their existence and great uncertainty as to their economic and
legal feasibility. In addition, U.S. investors are cautioned not to assume that any part or all of
NAP's mineral resources constitute or will be converted into reserves. For a more detailed
description of the key assumptions, parameters and methods used in calculating NAP‟s
mineral reserves and mineral resources, see NAP‟s most recent Annual Information Form/Form
40-F on file with Canadian provincial securities regulatory authorities and the SEC.




                                                                                                43
LDI Mine -
ROBY ZONE RESERVES

                                   Tonnes        Pd          Pt          Au         Cu          Ni
               Location
                                   (000’s)      (g/t)       (g/t)       (g/t)       (%)        (%)
        RESERVES

           Proven                     480        5.80        0.33       0.20       0.041       0.052

           Probable                  1,209       6.43        0.38       0.30       0.065       0.074

        Proven & Probable            1,689       6.25        0.37       0.27       0.058       0.068


  NOTES:
  1. Prepared by Richard Routledge, M.Sc., P.Geo., Principal Geologist for URS/Scott Wilson, an independent
     Qualified Person within the meaning of NI 43-101.
  2. CIM definitions were followed for the estimation of Mineral Reserves.
  3. Mineral Reserves for the underground Roby Zone were estimated at a cut-off grade of 4.5 g/t Pd.
  4. Metal price assumptions of US$375/oz palladium, US$1,500/oz platinum, US$900/oz gold,US$7.00/lb nickel, and
     US$2.50/lb copper were used in the estimation of cut-off grade. A US$/C$ exchange rate of 1.11 was used.
  5. Variable dilution has been applied according to anticipated over-break on footwall or hanging wall, and to
     the location of stopes with respect to hanging wall structures that affect over-break.
  6. Mining extraction for the crown pillar is 100%. For Roby Zone stopes, extraction is 95%.

  Please refer to North American Palladium‟s Annual Information Form for the year ended December 31, 2010 and
     applicable technical reports filed on www.sedar.com, www.sec.gov and www.nap.com for further
     information.

                                                                                                                   44
LDI -
MINERAL RESOURCE SUMMARY
                                                         Tonnes                 Pd                 Pt                Au                 Cu                 Ni
        Location                                         (000’s)              (g/t)              (g/t)             (g/t)               (%)                (%)
        MEASURED RESOURCES
          Open Pit                                         3,722               1.99              0.23               0.17              0.08               0.07
          Stockpiles                                         747               1.89              0.19               0.16              0.06               0.08
        Total Measured                                     4,469               1.97              0.22               0.17              0.07                .07
        INDICATED RESOURCES
          Open Pit                                         2,565               2.20              0.24               0.18              0.08               0.07
          RGO Stockpiles                                  13,365               0.97              0.12               0.08              0.03               0.06

          Roby Zone Underground                            3,144               7.62              0.44               0.33              0.06               0.08

          Offset Zone Underground                          8,628               6.29              0.42               0.40              0.11               0.14

        Total Indicated                                   27,702               3.50              0.26               0.22              0.06               0.09

        Total M&I Resources                               32,171               3.28              0.26               0.21              0.06               0.08

        INFERRED RESOURCES

          Offset Zone Underground                          3,322               5.70              0.35               0.23              0.07               0.10


        NOTES:
        1. Prepared by Jason Cox, P.Eng., Supervisor of Mine Engineering for URS/Scot Wilson, an independent Qualified Person within the meaning of NI 43-101.
        2. CIM definitions were followed for the estimation of Mineral Resources.
        3. Mineral Resources are inclusive of Mineral Reserves, which are contained in the Roby Zone underground mine.
        4. Mineral Resource cut-off grades were estimated for a 14,000 tpd production scenario. Open pit and RGO stockpile resources are not economic at the current production rate.
        5. Open Pit Mineral Resources were estimated at a pit discard cut-off grade of 1.8 g/t palladium equivalent (PdEq), within an optimized pit shell. Additional mineralization is present
            outside of the pit shell.
        6. Mineral Resources in stockpiles were estimated at a cut-off grade of 1.9 g/t PdEq.
        7. Mineral Resources for the Roby Zone underground mine were estimated at a cut-off grade of 5.8 g/t PdEq. Resources include sill, rib, and crown pillars.
        8. Mineral Resources for the underground Offset Zone were estimated at a cut-off grade of 4.0 g/t Pd (6.0 g/t PdEq).
        9. PdEq factors were calculated separately for each area, based on operating cost and metallurgical performance estimates appropriate for those areas.
        10. Metal price assumptions of US$350/oz palladium, US$1,400/oz platinum, US$850/oz gold, US$6.50/lb nickel, and US$2.00/lb copper were used in the estimation
            of PdEq and cut-off grade. A US$/C$ exchange rate of 1.11 was used. For the Offset Zone, metal price basis is: US$400/oz Pd; US$1,400/oz Pt;US$1,000/oz Au; US$3.00/lb Cu;
            US$8.50/lb Ni; US$20/lb Co. Exchange rate is 1.11 US$/C$.
        11. Effective dates are variable for the various areas of Mineral Resources.
                                                                                                                                                                                       45
        Next update expected in Q2 2011
Sleeping Giant Mine
MINERAL RESERVES & RESOURCES
December 31, 2010

                                                                                                               Au
                                                                                        Au             (Contained
         Type                                                 Tonnes                  (g/t)               ounces)
         RESERVES

             Proven                                             36,800                    7.7                     9,100
             Probable                                          154,200                    8.6                    42,600
             Proven & Probable                                 191,000                    8.4                    51,700
         RESOURCES
             Measured                                           15,400                    5.9                     2,900
             Indicated                                         589,500                    6.5                  123,000
             Measured & Indicated                              604,900                    6.5                  125,800
             Inferred                                          146,000                    8.2                    38,700


    NOTES:
    1. The mineral reserve and mineral resource estimate for the Sleeping Giant mine was prepared by Mr. Vincent Jourdain, P.Eng.,
       Ph.D, Donald Trudel, P.Geo. and Marc-André Lavergne P.Eng., qualified persons under NI 43-101.
    2. Mineral resources are exclusive of mineral reserves.
    3. Mineral Resources are estimated at varying cut-off grades depending on the type of mining method contemplated.
    4. This updated mineral resource estimate assumes a long-term gold price of US $1,100.
    5. CIM definitions were followed for Mineral Resources. See Cautionary Note to U.S. Investors Concerning Estimates of Measured,
       Indicated and Inferred Resources.

                                                                                                                                      46
Discovery Project
MINERAL RESOURCES
August 1, 2008
                                                                                                                       Au
                                                                                                   Au          (Contained
            Type                                                         Tonnes                  (g/t)            ounces)
            RESERVES
                Measured                                                     3,000                 8.95                      900
                Indicated                                              1,279,000                   5.74                236,000
                Inferred                                               1,546,000                   5.93                294,000


 NOTES:
 1. Source: NI 43-101 Technical Report, August 1, 2008
 2. The mineral resource estimate for the Discovery Project was prepared by Mr, Carl Pelletier, B.Sc., P.Geo. of InnovExplo, an independent qualified
    person under NI 43-101, assuming a gold price of U.S.$850 in the first 5 years, and U.S.$750 thereafter. Applied varying cut-off grades depending on
    the type of mining method contemplated.
 3. The effective date of the estimate is June 17, 2008.
 4. This estimate conforms with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (NI 43-101). U.S. investors should refer to the
    company’s most recent 40F/Annual Information Form for an overview on how Canadian standards differ significantly from U.S. requirements. Mineral
    Resources, having demonstrated economic viability, are not Mineral Reserves.

    For further information, please refer to the report titled “Technical Report on the Scoping Study and Mineral Resource Estimate
    for the Discovery Project (according to Regulation 43-101 and Form 43-101F1) dated August 1, 2008 and prepared by InnovExplo Inc.
    It is filed on www.sedar.com under Cadiscor Resources Inc.




    Next update expected in Q2 2011
                                                                                                                                                      47
Flordin Property
MINERAL RESOURCES
February 12, 2010

                                                                                                            Au
                                                                                     Au             (Contained
         Type                                               Tonnes                 (g/t)               ounces)
         RESOURCES

             Measured                                         30,000                4.60                      4,000

             Indicated                                       649,000                4.24                     88,000

             Inferred                                      1,451,000                3.63                   169,000



    NOTES:
    1. Source: NI 43-101 Technical Report, March 31, 2010
    2. The mineral resource estimate for the Flordin property was prepared by Mr, Carl Pelletier, B.Sc., P.Geo. and Mr. Bruno
       Turcotte, M.Sc., P.Geo. of InnovExplo, both of whom are independent qualified persons under NI 43-101, using a cut-off
       grade of 2 g/t.
    3. The effective date of the estimate is February 23, 2010.
    4. This estimate conforms with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (NI 43-101). U.S.
       investors should refer to the company’s most recent 40F/Annual Information Form for an overview on how Canadian
       standards differ significantly from U.S. requirements. Mineral Resources, having demonstrated economic viability, are not
       Mineral Reserves


       Next update expected in Q2 2011
                                                                                                                                   48
Vezza Project
MINERAL RESOURCES
December 31, 2010

                                                                                                               Au
                                                                                           Au          (Contained
         Type                                                   Tonnes                   (g/t)            ounces)
         RESOURCES

         Measured                                                190,000                    6.1                 37,100

         Indicated                                             1,524,000                    5.8                283,800
         Total M&I                                             1,714,000                    5.8                320,900
         Inferred                                                633,000                    5.0                102,100


   NOTES FOR UPDATED RESOURCE ESTIMATE:
   1. This updated mineral resource estimate was prepared as of April 11, 2011 by M. Bernard Salmon, B.Sc., Eng., an independent
      Qualified Person within the meaning of NI 43-101.
   2. CIM definitions were followed for the estimation of Mineral Resources.
   3. Mineral Resources are estimated at a cut-off grade of 3 g/t, using an average long-term gold price of US$1,200 per ounce and a
      US$/C$ exchange rate of 1:1.
   4. Minimum mining width of two metres was used.
   5. Totals may not represent the sum of the parts due to rounding.
   6. See Cautionary Note to U.S. Investors Concerning Estimates of Measured, Indicated and Inferred Resources.



   Next update expected in Q2 2011
                                                                                                                                       49

Mais conteúdo relacionado

Mais procurados

Nap investor presentation_feb._2012
Nap investor presentation_feb._2012Nap investor presentation_feb._2012
Nap investor presentation_feb._2012
FirstQuantum
 
Corporate presentation april 2011
Corporate presentation   april 2011Corporate presentation   april 2011
Corporate presentation april 2011
mmxriweb
 
Corporate presentation march 2011 corporate presentation - march 2011
Corporate presentation   march 2011 corporate presentation - march 2011Corporate presentation   march 2011 corporate presentation - march 2011
Corporate presentation march 2011 corporate presentation - march 2011
mmxriweb
 
Corporate presentation october 2010
Corporate presentation   october 2010Corporate presentation   october 2010
Corporate presentation october 2010
mmxriweb
 
Almos Gold Presentation
Almos Gold PresentationAlmos Gold Presentation
Almos Gold Presentation
Umesh
 
Corporate presentation – september 2010
Corporate presentation – september 2010Corporate presentation – september 2010
Corporate presentation – september 2010
mmxriweb
 

Mais procurados (20)

Nap investor presentation_feb._2012
Nap investor presentation_feb._2012Nap investor presentation_feb._2012
Nap investor presentation_feb._2012
 
Nap inves present_21sep2009
Nap inves present_21sep2009Nap inves present_21sep2009
Nap inves present_21sep2009
 
Nap investor presentation mar 2012
Nap investor presentation mar  2012Nap investor presentation mar  2012
Nap investor presentation mar 2012
 
Nap investor presentation apr. 2012
Nap investor presentation apr. 2012Nap investor presentation apr. 2012
Nap investor presentation apr. 2012
 
Nap investor presentation_may_2012
Nap investor presentation_may_2012Nap investor presentation_may_2012
Nap investor presentation_may_2012
 
Nap inves pres_16nov2009
Nap inves pres_16nov2009Nap inves pres_16nov2009
Nap inves pres_16nov2009
 
Nap inves pres_09oct2009
Nap inves pres_09oct2009Nap inves pres_09oct2009
Nap inves pres_09oct2009
 
Nap investor presentation august 2012
Nap investor presentation august 2012Nap investor presentation august 2012
Nap investor presentation august 2012
 
Nap investor presentation_nov.29
Nap investor presentation_nov.29Nap investor presentation_nov.29
Nap investor presentation_nov.29
 
Western Copper and Gold Presentation
Western Copper and Gold PresentationWestern Copper and Gold Presentation
Western Copper and Gold Presentation
 
TMX Buyside Program Presentation
TMX Buyside Program PresentationTMX Buyside Program Presentation
TMX Buyside Program Presentation
 
20120802 diggers v0
20120802 diggers v020120802 diggers v0
20120802 diggers v0
 
Nap investor presentation march 2013
Nap investor presentation march 2013Nap investor presentation march 2013
Nap investor presentation march 2013
 
Corporate presentation april 2011
Corporate presentation   april 2011Corporate presentation   april 2011
Corporate presentation april 2011
 
Corporate presentation march 2011 corporate presentation - march 2011
Corporate presentation   march 2011 corporate presentation - march 2011Corporate presentation   march 2011 corporate presentation - march 2011
Corporate presentation march 2011 corporate presentation - march 2011
 
Corporate presentation october 2010
Corporate presentation   october 2010Corporate presentation   october 2010
Corporate presentation october 2010
 
Almos Gold Presentation
Almos Gold PresentationAlmos Gold Presentation
Almos Gold Presentation
 
Corporate presentation – september 2010
Corporate presentation – september 2010Corporate presentation – september 2010
Corporate presentation – september 2010
 
South American Silver Corp December 2011 Corporate Presentation
South American Silver Corp December 2011 Corporate PresentationSouth American Silver Corp December 2011 Corporate Presentation
South American Silver Corp December 2011 Corporate Presentation
 
WTR TZMI Conference
WTR TZMI ConferenceWTR TZMI Conference
WTR TZMI Conference
 

Semelhante a Nap investor presentation may 13 2011

1 nap investor presentation march 2013 website
1 nap investor presentation march 2013 website1 nap investor presentation march 2013 website
1 nap investor presentation march 2013 website
North American Palladium
 
Crk marketing pres european gold forum 2011
Crk marketing pres   european gold forum 2011Crk marketing pres   european gold forum 2011
Crk marketing pres european gold forum 2011
Crocodile Gold
 
Nap investor presentation january 15, 2013
Nap investor presentation january 15, 2013Nap investor presentation january 15, 2013
Nap investor presentation january 15, 2013
North American Palladium
 
Augusta Investor Presentation
Augusta Investor PresentationAugusta Investor Presentation
Augusta Investor Presentation
AugustaResources
 
Crocodile Gold: Up and Coming Australian Gold Producer
Crocodile Gold: Up and Coming Australian Gold ProducerCrocodile Gold: Up and Coming Australian Gold Producer
Crocodile Gold: Up and Coming Australian Gold Producer
Crocodile Gold
 

Semelhante a Nap investor presentation may 13 2011 (19)

Nap Investor Presentation
Nap Investor PresentationNap Investor Presentation
Nap Investor Presentation
 
Nap investor presentation_feb2011
Nap investor presentation_feb2011Nap investor presentation_feb2011
Nap investor presentation_feb2011
 
Nap investor presentation november 2011
Nap investor presentation november 2011Nap investor presentation november 2011
Nap investor presentation november 2011
 
Nap investor presentation_2010dec
Nap investor presentation_2010decNap investor presentation_2010dec
Nap investor presentation_2010dec
 
Nap investor presentation feb. 2012
Nap investor presentation feb. 2012Nap investor presentation feb. 2012
Nap investor presentation feb. 2012
 
Nap investor presentation august 2012
Nap investor presentation august 2012Nap investor presentation august 2012
Nap investor presentation august 2012
 
Nap investor presentation_june_2012
Nap investor presentation_june_2012Nap investor presentation_june_2012
Nap investor presentation_june_2012
 
Investor Presentation March 2013
Investor Presentation March 2013Investor Presentation March 2013
Investor Presentation March 2013
 
Investor Presentation March 2013
Investor Presentation March 2013Investor Presentation March 2013
Investor Presentation March 2013
 
1 nap investor presentation march 2013 website
1 nap investor presentation march 2013 website1 nap investor presentation march 2013 website
1 nap investor presentation march 2013 website
 
Nap investor presentation april 2013
Nap investor presentation april 2013Nap investor presentation april 2013
Nap investor presentation april 2013
 
Nap investor presentation april 2013
Nap investor presentation april 2013Nap investor presentation april 2013
Nap investor presentation april 2013
 
Investor Presentation January 2013
Investor Presentation January 2013Investor Presentation January 2013
Investor Presentation January 2013
 
Crk marketing pres european gold forum 2011
Crk marketing pres   european gold forum 2011Crk marketing pres   european gold forum 2011
Crk marketing pres european gold forum 2011
 
Nap investor presentation january 15, 2013
Nap investor presentation january 15, 2013Nap investor presentation january 15, 2013
Nap investor presentation january 15, 2013
 
Augusta Investor Presentation
Augusta Investor PresentationAugusta Investor Presentation
Augusta Investor Presentation
 
Dacha, Corporate Presentation
Dacha, Corporate PresentationDacha, Corporate Presentation
Dacha, Corporate Presentation
 
Presentation: Commerce Resources (May 2011)
Presentation: Commerce Resources (May 2011)Presentation: Commerce Resources (May 2011)
Presentation: Commerce Resources (May 2011)
 
Crocodile Gold: Up and Coming Australian Gold Producer
Crocodile Gold: Up and Coming Australian Gold ProducerCrocodile Gold: Up and Coming Australian Gold Producer
Crocodile Gold: Up and Coming Australian Gold Producer
 

Mais de North American Palladium

Nap investor presentation april 2014 updated
Nap investor presentation april 2014 updatedNap investor presentation april 2014 updated
Nap investor presentation april 2014 updated
North American Palladium
 

Mais de North American Palladium (20)

Nap investor presentation march 2015
Nap investor presentation march 2015Nap investor presentation march 2015
Nap investor presentation march 2015
 
Investor Presentation November 2014
Investor Presentation November 2014Investor Presentation November 2014
Investor Presentation November 2014
 
September Investor Presentation
September Investor PresentationSeptember Investor Presentation
September Investor Presentation
 
NAP Investor Presentation August 2014
NAP Investor Presentation August 2014NAP Investor Presentation August 2014
NAP Investor Presentation August 2014
 
NAP Investor Presentation June 2014
NAP Investor Presentation June 2014NAP Investor Presentation June 2014
NAP Investor Presentation June 2014
 
Nap investor presentation may 2014 final
Nap investor presentation may 2014 finalNap investor presentation may 2014 final
Nap investor presentation may 2014 final
 
Nap investor presentation april 2014 updated
Nap investor presentation april 2014 updatedNap investor presentation april 2014 updated
Nap investor presentation april 2014 updated
 
Nap investor presentation march 2014
Nap investor presentation march 2014Nap investor presentation march 2014
Nap investor presentation march 2014
 
Nap investor presentation january 2014
Nap investor presentation january 2014Nap investor presentation january 2014
Nap investor presentation january 2014
 
Nap investor presentation december 2013
Nap investor presentation december 2013Nap investor presentation december 2013
Nap investor presentation december 2013
 
Investor Presentation - October 2013
Investor Presentation - October 2013Investor Presentation - October 2013
Investor Presentation - October 2013
 
Investor Presentation - September 2013
Investor Presentation - September 2013Investor Presentation - September 2013
Investor Presentation - September 2013
 
Investor Presentation - August 2013
Investor Presentation - August 2013Investor Presentation - August 2013
Investor Presentation - August 2013
 
Investor Presentation - June 2013
Investor Presentation - June 2013Investor Presentation - June 2013
Investor Presentation - June 2013
 
Nap investor presentation may 15 2013
Nap investor presentation may 15 2013Nap investor presentation may 15 2013
Nap investor presentation may 15 2013
 
Investor Presentation
Investor PresentationInvestor Presentation
Investor Presentation
 
Nap investor presentation november 2012
Nap investor presentation november 2012Nap investor presentation november 2012
Nap investor presentation november 2012
 
Nap investor presentation oct. 2012
Nap investor presentation oct. 2012Nap investor presentation oct. 2012
Nap investor presentation oct. 2012
 
NAP Investor Presentation October 2012
NAP Investor Presentation October 2012NAP Investor Presentation October 2012
NAP Investor Presentation October 2012
 
NAP Investor Presentation September 2012
NAP Investor Presentation September 2012NAP Investor Presentation September 2012
NAP Investor Presentation September 2012
 

Último

Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Dipal Arora
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 

Último (20)

A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 

Nap investor presentation may 13 2011

  • 1. Investor May, 2011 William J. Biggar PRESENTATION President & CEO
  • 2. Forward Looking STATEMENTS Certain information included in this presentation, including any information as to our future production, exploration, financial or operating performance and other statements that express management's expectations or estimates of future performance, constitute „forward-looking statements‟ within the meaning of the „safe harbor‟ provisions of the United States Private Securities Litigation Reform Act of 1995 and Canadian securities laws. The words „expect‟, „believe‟, „will‟, „intend‟, „estimate‟ and similar expressions identify forward-looking statements. Forward-looking statements, including future-oriented financial information, are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties, risks and contingencies, including the possibility that operations at the Lac des Iles and Sleeping Giant mines may not proceed as planned, that other properties may not be successfully developed, and that metal prices, foreign exchange assumptions and operating costs may differ from management‟s expectations. The Company cautions the reader that such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause the actual financial results, performance or achievements of North American Palladium to be materially different from the Company‟s estimated future results, performance or achievements expressed or implied by those forward-looking statements and that the forward-looking statements are not guarantees of future performance. For more details on these estimates, risks, assumptions and factors, see the Company‟s most recent Form 40-F/Annual Information Form on file with the U.S. Securities and Exchange Commission and Canadian provincial securities regulatory authorities. The Company disclaims any obligation to update or revise any forward-looking statements, whether as a result of new information, events or otherwise, except as expressly required by law. Readers are cautioned not to put undue reliance on these forward-looking statements. All dollar amounts in Canadian currency unless otherwise stated, all references to production refer to payable production, and all reference to tonnes refer to metric tonnes. U.S. investors are encouraged to refer to the “Cautionary Note to U.S. Investors Concerning Estimates of Measured, Indicated and Inferred Resources” in the appendix. 1
  • 3. Investment Case FOR NAP • Growth-oriented precious metals producer in mining-friendly jurisdictions: • LAC DES ILES, one of only two primary palladium mines in the world, transitioning into a long-life, low-cost operation • SLEEPING GIANT gold mine provides foundation for growth • Robust pipeline of projects to increase palladium and gold production • Significant commitment to palladium and gold exploration • Experienced senior management and operating teams • Strong balance sheet, $163.3 M in working capital (including $100.1 M in cash) and no long-term debt* * As at Mar. 31, 2011 2
  • 4. Diversified Precious Metals PRODUCER LDI (ONTARIO): • One of only two primary palladium mines in the world • Producing palladium since 1993 • Transitioning into a long life, low cost mine • Significant exploration upside QUEBEC ONTARIO Sleeping Giant (QUEBEC): SLEEPING GIANT • Producing gold for over 20 years Gold Mine LAC DES ILES Palladium Mine • Growth potential at depth • Underutilized mill has potential to Val d‟Or serve NAP‟s nearby projects in Timmins Thunder Abitibi Bay Sudbury Montreal Toronto 3
  • 5. Market Statistics: A VERY LIQUID STOCK STOCK SYMBOLS (NYSE Amex / TSX) PAL / PDL MARKET CAPITALIZATION US $633 M SHARE PRICE US $3.90 SHARES/WARRANTS OUTSTANDING 162.4 M / 8.8 M 3-MONTH AVERAGE TRADING VOLUME (NYSE Amex / TSX) 2,934,041 / 885,894 Information as at May 13, 2011, Thomson One. Series B warrants (TSX:PDL.WT.B) expire on Oct. 28, 2011, $6.50 exercise price. ANALYST COVERAGE: Bank of America Merrill Lynch GMP Securities Macquarie Michael Parkin Andrew Mikitchook Daniel Greenspan Cormark Securities Haywood Securities RBC Capital Markets Rajiv Chail Chris Thompson Leon Esterhuizen Credit Suisse Octagon Capital Stifel Nicolaus Alex Terentiew Ted Yew George Topping 4
  • 6. Investment Case for PALLADIUM 5
  • 7. Palladium Market: MINE SUPPLY RUSSIA NORTH AMERICA 43% 11% ONLY 6.3 M oz. ANNUAL PRODUCTION WORLDWIDE SOUTH AFRICA 41% Source: CPM Group, June 2010 Note: Excludes secondary supply of 1.34 M oz. 6
  • 8. Palladium Market: SUPPLY Constrained Mine Supply (000‟s ounces) 3500 Russia South Africa 3000 2500 2000 1500 1000 500 0 2006 2007 2008 2009 2010 Source: CPM Group, Jan. 2011 7
  • 9. Palladium Market: DEMAND 2009 Fabrication Demand Dental Automotive 11% 53% Other 11% Chinese Jewellery 10% Electronics 15% Source: CPM Group, June 2010 Notes: Other includes chemical and petroleum catalysts, jewellery (excluding China), and other minor uses of palladium 8
  • 10. Palladium Market: DEMAND Global Light Vehicle Production (000‟s) 95M 97M 100,000 91M 81M 87M Other1 90,000 76M 80,000 72M 70,000 Europe 60,000 57M 50,000 North America 40,000 30,000 20,000 BRIC Economies2 10,000 0 2009 2010 2011 2012 2013 2014 2015 2016 Source: CSM Worldwide Inc. (IHS Global Insight Automotive), February 2011 1. Other includes: Japan, Korea, Middle East and Africa 2. BRIC Economies include: Greater China, South America and South Asia 9
  • 11. Palladium Market: DEMAND Exchange Traded Funds' Physical Palladium Holdings (000‟s ounces) (000‟s ounces) 2,500 2,500 WITE GLTR Julius Baer MSL (Australia) 2,000 2,000 PALL NYSE Palladium ZKB PHPD LSE 1,500 - 1,500 - 1,000 1,000 500 500 0 0 20 - Apr - 07 20 - Oct - 07 20 - Apr - 08 20 - Oct - 08 20 - Apr - 09 20 - Oct - 09 20 - Apr - 10 20 - Oct - 10 Source: CPM Group, as of March 1, 2011 10
  • 12. Palladium Market: DEMAND Adoption of Stricter Emission Control Standards 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Europe Euro IV Euro V Euro VI Beijing Euro III Euro IV China Nationwide Euro II Euro III Euro IV Select Cities Euro III Euro IV India Nationwide Euro II Euro III Russia Euro I Euro II Euro III Euro IV Euro V USA Tier 2 and LEV II Brazil Prconve 3 Prconve 4 Prconve 5 Japan Japan 05 Source: CPM Group • Emerging economies have adopted emission control standards that mandate the use of catalytic converters • Advancing to a higher level of emission controls results in higher PGM loadings in the catalytic converter • Each time China increases to higher standard, it adds approximately 10% to the loadings of palladium to autocatalysts • Tightening emission control regulations for heavy-duty trucks 11
  • 13. Use of Palladium in CATALYTIC CONVERTERS Gasoline Engines Hybrids & Other New Forms • Use +90% palladium • Neutral impact on PGM use • Gasoline hybrids tend to use as much palladium as normal gasoline engines Diesel Engines • Currently account for only 1% of global cars sales1 • Historically used platinum due to technical requirements • Forecasted to be 14% of overall market by 20202 • Now 25% palladium, with scope to increase to 50% due to advent of Electric low sulphur diesel fuel • No requirement for catalytic converters • Challenged by lack of infrastructure to recharge, high costs, long charging periods and short driving range • Forecasted to account for only 2% of global car sales by 20202 1. CPM Group, June 2010 2. Stefan Bratzel, director of the Centre of Automotive Management in Germany; as reported in Mitsui Global Precious Metals “Pole Position” Report, June 2010 12
  • 14. Palladium Market: INCREASING PRICE Recent performance of Palladium (US$/oz) Average Annual Price Forecast (US$/oz) $900.00 2011 2012 $800.00 RBC Capital Markets $900 $1,000 $700.00 BNP Paribas $860 $990 $600.00 CPM Group $849 $908 $500.00 JP Morgan $838 $773 $400.00 $300.00 Credit Suisse $830 $950 $200.00 Barclays $820 $850 $100.00 UBS $800 $825 $0.00 02/01/2008 02/01/2009 02/01/2010 02/01/2011 Historic High: US $1,090 (2001) Recent Price: US $713 (May 5, 2011) Best performing metal of 2010 Sources: Thomson One; RBC Capital Market (Dec. 9, 2010); JP Morgan (Jan. 24, 2011); UBS (Dec. 15, 2010); Barclays PLC (Mar. 24, 2011); Credit Suisse (Mar. 18, 2011); CPM Group (Mar. 4, 2011). 13
  • 16. LDI: A WORLD CLASS MINE • One of only two primary palladium mines in the world • Open pit commenced operations in 1993 • Underground mining from the Roby Zone (via ramp) began in 2006 • Mine expansion underway with production from the Offset Zone (via shaft) targeted for Q4 2012 • 15,000 tpd underutilized mill 15
  • 17. LDI: ORE BODY Surface 215 m 5,495 Mine Level 5,280 Mine Level Open Pit (Exhausted) Roby Zone Mined via ramp access 595 m 4,900 Mine Level Offset Zone Commercial production via shaft targeted for Q4 2012 N Offset Zone remains open in all directions 1,300 m 4,180 Mine Level Note: Updated reserve & resource report including 2010 drilling is expected in Q2, 2011 16
  • 18. LDI: OPERATING METRICS 2010 2011 Forecast Payable Palladium Production (oz) 95,057 145,000 - 155,000 Total Ore Milled (000’s tonnes) 649 @ 6.1 g/t 1,460 @ 4.2 g/t Underground Mining Rate 2,600 tpd 2,700 tpd Palladium Mill Recovery 81% 80% Cash Costs1 ($US/oz) $283 $450 Note: 2010 production consisted entirely of underground ore. Reduced 2011 head grade is due to blending of lower grade surface stockpiles with higher grade underground ore. Surface stockpiles will be exhausted at the end of 2011. 1. Total cash costs per ounce is a non-IFRS measure. For reconciliation of historical total cash costs per ounce to production costs, please refer to the Company‟s financial statements. Cash costs per ounce are presented net of byproduct credits and can be materially affected by changes in byproduct metal prices, as well as the Canadian/US dollar exchange rate. 17
  • 19. 2012 MINING OPERATIONS • Will consist entirely of underground production from three sources: – Remaining Roby Zone ore (including potential extensions) – Upper Offset Zone ore – Development Offset Zone ore • Head grades expected to average 5.5 - 6.0 g/t • Detailed guidance for production and cash costs will be released in January 2012 • Cash costs per ounce are expected to be considerably lower than 2011 as higher grade underground ore will not be diluted by blending lower grade surface stockpiles 18
  • 20. LDI: MINE EXPANSION PLAN • Transitioning from mining via ramp to mining via shaft • Currently raiseboring a shaft to surface from the 4,815 level (700 m from surface) • Subsequently sink the shaft to below to 4180 level (1,300 m from surface) • Large scale bulk mining method • Shaft is being sized for 7,000 tpd • Target shaft mining rate: – 3,500 tpd (Q4 2012) – 5,500 tpd (Q1 2015) • Once mining at 5,500 tpd: – Production is expected to exceed 250,000 oz/yr – Cash costs are expected to significantly decline 19
  • 21. LDI: MINE EXPANSION – CAPEX • Pre-commercial production (Q4, 2012) capital expenditures estimated at $204 M • 2010 expenditures amounted to $26 M • 2011 expenditures estimated at $147 M (see table) • Capital expenditures post commercial production to increase mining rate to 5,500 tpd in Q1 2015 estimated at $72 M Capital Expenditures 2011 Definition drilling $2.3 M Ramp, infrastructure & service development $22.4 M Surface, shaft and service facilities $64.9 M Mining & surface equipment $14.3 M Engineering, services & project management $25.4 M Subtotal $129.3 M Contingency (13.7%) $17.7 M Total $147.0 M Strong balance sheet provides liquidity for mine expansion 20
  • 22. LDI: MINE EXPANSION – IN PROGRESS 2011 Development work to focus on: • Constructing the head frame, hoist room and electrical substation • Installing the service cage and production hoists (already purchased) • Completing the shaft raise bore & ventilation raise bore • Installing adequate ventilation at surface & underground • Advancing the ramp towards the 4570 mine level • Developing the 4790 mine level in preparation for production 21
  • 23. LDI: MINE EXPANSION – LOW EXECUTION RISK • Over 17 years of mining experience at LDI with a solid track record of underground development • Experienced 20-person development team on site overseeing all aspects of the expansion • Brownfield expansion vs. greenfield project • Underutilized mill and tailings facilities in place • No long lead items • No capex currency risk (all expenditures are in C$) 22
  • 24. LDI: NEW UNDERGROUND ZONES Roby Zone Offset Zone Cowboy Zone Offset Zone Cowboy Extension Outlaw Zone Zone Cross Section View Mineralization Trend Other Cowboy & Outlaw Zones discovered in 2009 Sheriff Zone Mineralization Plan View Trend Offset Zone Sheriff Zone discovered in 2010 New zones have potential to increase production 23
  • 25. LDI: CONTINUING FOCUS ON EXPLORATION Significant 2011 Exploration Program • Budget: $8.8M • 32,000 m of drilling – 25,000 m at LDI – 3,000 m at Legris Lake – 4,000 m at NAP‟s other nearby properties • Program objectives: – Infill drilling in the bottom portion of the Offset Zone – Defining the upper extension of the Offset Zone – Underground exploration targeting the Offset, Cowboy, Outlaw & Sheriff zones 24
  • 26. LDI: EXPLORATION UPSIDE NEAR MINE North VT North VT Rim Rim Mineralized Trend North Pit Target +30,000-acre PGM land package LDI PROPERTY Legris Lake Sheriff Zone LDI Mine & Mill Legris Lake South Pit Target N 25
  • 28. Gold STRATEGY OBJECTIVE: Achieve scale in the gold division through organic growth, thereby creating value for shareholders STEPS Target Completion Anticipated Result 1. Deepen the Sleeping Giant Q2, 2011 (shaft) Increased production and mine shaft by 200 m to allow for Q4, 2011 profitability commencing development of 3 new mining (development) Q1, 2012 levels of higher grade ore 2. Expand the mill capacity at Q3, 2011 Capacity increased from Sleeping Giant to process 900 tpd to 1,250 tpd ore from other wholly-owned nearby projects 27
  • 29. Gold STRATEGY (CONTINUED) STEPS Target Anticipated Completion Result 3. Complete the development Q4, 2011 With a positive production of the Vezza project decision, 39,000 oz of annual production commencing Q1, 2012 4. Complete exploration drilling Q3, 2011 With a positive scoping study, at Flordin and assess open pit potential production potential and operating metrics commencing in Q1, 2014 at an annual rate to be determined 5. Advance permitting of Discovery Q4, 2011 Confirm annual production project and update scoping potential of 44,000 oz/yr and study related capital and operating metrics 28
  • 30. Sleeping Giant MINE • 2011 transition year while shaft deepening and development is completed • Operations and cost structure revised to focus on quality (grade) vs. quantity (tonnage) to improve profitability • 2011 gold production guidance: 15,000 – 20,000 oz. 29
  • 31. Sleeping Giant: ECONOMICS TO IMPROVE AT DEPTH • 2011 mining focused on the areas around the 975 m elevation & above • Currently deepening the Sleeping Giant mine shaft by 200 metres to 1175 metres to gain access to 3 new higher grade mining levels – target completion in Q2, 2011 • Development of new mining levels to commence in Q3 2011 – target completion in Q4, 2011 • Expect to produce from the new mining levels at the start of 2012 resulting in higher production and lower cash costs per ounce 200 m Deepening Longitudinal Section All depth references are in metres 30
  • 32. Sleeping Giant: UNDERUTILIZED MILL Strategic Asset • Ability to serve NAP‟s other gold projects in Abitibi region • 900 tpd mill currently operating at ½ capacity • Expanding mill capacity to 1,250 tpd at a cost of $7 M • Target completion Q4, 2011 • Will be engineered to accommodate further expansion to 1,750 tpd for approximately $3 M 31
  • 33. Vezza Gold Project DEVELOPMENT • 85 km by paved road to SG mill • Advanced-stage project: – Extensive historic drilling (82,000 m) – Permitted & power at site – Hoist & 3-compartment shaft – 4 underground levels down to a depth of 741 m – Surface & pollution control infrastructure in place Production Potential: 39,000 oz/yr • 2011 exploration & development expenditures Mining Rate: 750 tpd $26M Mine Life: 9 years Cash Costs: US$700 – Will be reduced by estimated pre-production revenue of $8M, for a net expenditure of $18M • Being advanced towards a production decision in Q4 2011 – Production could begin in Q1 2012 32
  • 34. Other Gold Properties: GROWTH POTENTIAL 2011 Trucking Au Production Project Resources** Exploration Distance to Potential Program SG Mill Measured & Indicated: 92,000 oz Au (4.25 g/t) TBD FLORDIN* 4,500 m 70 Km Inferred: (potential open pit) 169,000 oz Au (3.6 g/t) Measured & Indicated: 237,000 oz Au (5.74 g/t) 44,000 oz /yr DISCOVERY* 8,000 m 80 Km Inferred: (over 4 yrs) 294,000 oz Au (5.93 g/t) TBD DORMEX TBD 2,400 m Adjacent (potential fold of Sleeping Giant) Potential to produce in the range of 125,000 oz per year from expanded Sleeping Giant mill * Resources to be updated Q2, 2011 to include 2010 drilling ** See Cautionary Note to U.S. Investors Concerning Estimates of Measured, Indicated and Inferred Resources. Report sources can be found in the appendix. 33
  • 35. Gold Division VALUE CREATION POTENTIAL 2011 Production Market Cap 180 oz $1,600 164 oz 160 oz $1,400 2011 Estimated Gold Production(2) Market Capitalization(1) ($MM) 140 oz $1,200 120 oz 116 oz 116 oz $1,000 100 oz 91 oz oz (000) 79 oz $800 80 oz 69 oz 55 oz $600 60 oz $400 40 oz 20 oz $200 oz $0 Claude Wesdome Richmont St. Andrew Lake Shore Aurizon Kirkland Lake 1. Based on fully-diluted shares outstanding (March 2011) 2. RBC Equity Research when available, otherwise Consensus Broker Estimates 34
  • 36. 2011 Gold EXPLORATION • 70 km land package surrounding Sleeping Giant mill • Budget: $9.1 M for 49,000 m of drilling • 26,500 m at Sleeping Giant • 22,500 m at NAP‟s other gold properties Vezza Discovery Cameron Shear JV Florence Flordin Harricana North Dormex Sleeping Giant Mine & Mill Laflamme Abitibi region, Quebec, Canada 35
  • 37. 2011 PRIORITIES • Progressing the LDI mine expansion • Completing the LDI reserve and resource update (Q2) • Updating the LDI mine expansion plan (Q3) • Completing the shaft deepening and mill expansion at Sleeping Giant (Q3) • Advancing the Vezza gold project towards a production decision (year-end) • Continuing exploration programs aimed at increasing reserves and resources at LDI and in the gold division 36
  • 38. Why INVEST? PIPELINE OF PROJECTS TO STRONG INCREASE MANAGEMENT TEAM PRODUCTION INVESTING IN FUTURE FINANCIAL GROWTH STRENGTH 37
  • 39. Shareholder INFORMATION North American Palladium‟s vision is to build a mid-tier diversified precious metals company operating in mining friendly jurisdictions. Highly leveraged to palladium, the Company is also building its exposure to gold, and is focused on investing in its current operations to grow its production of palladium and gold. NAP‟s experienced management and technical teams have a significant commitment to exploration and are dedicated to building shareholder value. Corporate Office: Royal Bank Plaza, South Tower 200 Bay St., Suite 2350 Toronto, ON M5J 2J2 Stock Symbols: NYSE Amex – PAL TSX – PDL, PDL.WT.B Website: www.nap.com Investor Relations: Camilla Bartosiewicz Manager, Investor Relations & Corporate Communications camilla@nap.com 416-360-7590 ext. 7226 38
  • 41. Senior MANAGEMENT William J. Biggar – President and CEO An accomplished businessman with extensive experience in mining and in a broad range of industries. Mr. Biggar has held senior positions with Barrick Gold Corporation, Horsham Corporation and Magna International. He also has over 12 years of experience as an investment banker and private equity investor. A Chartered Accountant, he holds Master of Business Administration and Bachelor of Commerce (with distinction) degrees from the University of Toronto. Greg Struble – Vice President and COO A mine engineer with over 30 years of experience in underground mining. Most recently, he served as Executive Vice President and COO of Stillwater Mining Company, where he was responsible for two underground palladium mines as well as smelter and refinery operations. Prior to this, he worked as underground project manager for Barrick Gold‟s Cortez Hills Joint Venture. Mr. Struble has also worked internationally at a number of large gold mines. Michel Bouchard – Vice President, Exploration and Development Mr. Bouchard has been involved in exploration, development, and operations in the mining industry for the past 25 years. He is credited with contributing to the discovery of the Bouchard Hebert Mine in northwest Quebec. Previously Mr. Bouchard held senior positions with Audrey Resources, Lyon Lake Mines and SOQUEM. Mr. Bouchard was formerly President and CEO of Cadiscor Resources Inc. Jeff Swinoga – Vice President, Finance and CFO Eighteen years of experience in the resource, mining and finance industries. Mr. Swinoga has held CFO positions with HudBay Minerals and MagIndustries, and was Director, Treasury Finance of Barrick Gold Corporation for seven years. A Chartered Accountant, he also has an MBA from University of Toronto and an honours economics degree from University of Western Ontario. Trent Mell – Vice President, Corporate Development and General Counsel Mr. Mell has previously worked at the corporate head offices of Barrick Gold Corporation and Sherritt International. Prior to joining the mining industry, Mr. Mell worked with Stikeman Elliott LLP, where he practiced securities law. Mr. Mell has published papers on NI 43-101, and holds a B.A., a B.C.L. (with distinction) and a LL.B. (with distinction), all from McGill University, as well as a Masters degree in Securities Law from Osgoode Hall Law School. 40
  • 42. 2012 TRANSITION • Continue infill drilling on the upper Roby Zone parameter to extend both north & south on known geologic trends • Defer lower Roby Zone production into Q1 2012 • Integrate all upper Offset Zone from 4765 level above the 4765 mine level • Utilize new extensions in Offset Zone adjacent to the Roby Zone decline • Prioritize the development effort for the shaft mining and manage production at lower levels to reduce congestion of activities in the Offset Zone decline 41
  • 43. Mineral RESERVES & RESOURCES • Cautionary Note to U.S. Investors Concerning Mineral Reserves and Mineral Resources • Lac des Iles Mine – Roby Zone Underground Reserves – November 2010 (report date; effective dates are variable) • Lac des Iles Mine – Mineral Resource Summary – November 2010 (report date; effective dates are variable) • Sleeping Giant Mine – Mineral Reserves and Resources – December 31, 2010 (effective date) • Discovery Project – Mineral Resources – August 1, 2008 (effective date) • Flordin Property – Mineral Resources – February 23, 2010 (effective date) • Vezza Project – Mineral Resources – December 31, 2010 (effective date) Michel Bouchard, P. Geo, Vice President, Exploration & Development, for North American Palladium Ltd., is the Qualified Person who supervised the preparation of the technical data in this presentation. Please refer to North American Palladium’s Annual Information Form for the year ended December 31, 2009 and applicable technical reports available on www.sedar.com, www.sec.gov and www.nap.com for further information. 42
  • 44. Cautionary Note to U.S. Investors Concerning MINERAL RESERVES AND MINERAL RESOURCE Mineral reserves and mineral resources have been calculated in accordance with National Instrument 43-101 as required by Canadian securities regulatory authorities. For United States reporting purposes, Industry Guide 7, (under the Securities and Exchange Act of 1934), as interpreted by Staff of the Securities Exchange Commission (SEC), applies different standards in order to classify mineralization as a reserve. In addition, while the terms “measured”, “indicated” and “inferred” mineral resources are required pursuant to National Instrument 43- 101, the U.S. Securities and Exchange Commission does not recognize such terms. Canadian standards differ significantly from the requirements of the SEC, and mineral resource information contained herein is not comparable to similar information regarding mineral reserves disclosed in accordance with the requirements of the U.S. Securities and Exchange Commission. U.S. investors should understand that “inferred” mineral resources have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. In addition, U.S. investors are cautioned not to assume that any part or all of NAP's mineral resources constitute or will be converted into reserves. For a more detailed description of the key assumptions, parameters and methods used in calculating NAP‟s mineral reserves and mineral resources, see NAP‟s most recent Annual Information Form/Form 40-F on file with Canadian provincial securities regulatory authorities and the SEC. 43
  • 45. LDI Mine - ROBY ZONE RESERVES Tonnes Pd Pt Au Cu Ni Location (000’s) (g/t) (g/t) (g/t) (%) (%) RESERVES Proven 480 5.80 0.33 0.20 0.041 0.052 Probable 1,209 6.43 0.38 0.30 0.065 0.074 Proven & Probable 1,689 6.25 0.37 0.27 0.058 0.068 NOTES: 1. Prepared by Richard Routledge, M.Sc., P.Geo., Principal Geologist for URS/Scott Wilson, an independent Qualified Person within the meaning of NI 43-101. 2. CIM definitions were followed for the estimation of Mineral Reserves. 3. Mineral Reserves for the underground Roby Zone were estimated at a cut-off grade of 4.5 g/t Pd. 4. Metal price assumptions of US$375/oz palladium, US$1,500/oz platinum, US$900/oz gold,US$7.00/lb nickel, and US$2.50/lb copper were used in the estimation of cut-off grade. A US$/C$ exchange rate of 1.11 was used. 5. Variable dilution has been applied according to anticipated over-break on footwall or hanging wall, and to the location of stopes with respect to hanging wall structures that affect over-break. 6. Mining extraction for the crown pillar is 100%. For Roby Zone stopes, extraction is 95%. Please refer to North American Palladium‟s Annual Information Form for the year ended December 31, 2010 and applicable technical reports filed on www.sedar.com, www.sec.gov and www.nap.com for further information. 44
  • 46. LDI - MINERAL RESOURCE SUMMARY Tonnes Pd Pt Au Cu Ni Location (000’s) (g/t) (g/t) (g/t) (%) (%) MEASURED RESOURCES Open Pit 3,722 1.99 0.23 0.17 0.08 0.07 Stockpiles 747 1.89 0.19 0.16 0.06 0.08 Total Measured 4,469 1.97 0.22 0.17 0.07 .07 INDICATED RESOURCES Open Pit 2,565 2.20 0.24 0.18 0.08 0.07 RGO Stockpiles 13,365 0.97 0.12 0.08 0.03 0.06 Roby Zone Underground 3,144 7.62 0.44 0.33 0.06 0.08 Offset Zone Underground 8,628 6.29 0.42 0.40 0.11 0.14 Total Indicated 27,702 3.50 0.26 0.22 0.06 0.09 Total M&I Resources 32,171 3.28 0.26 0.21 0.06 0.08 INFERRED RESOURCES Offset Zone Underground 3,322 5.70 0.35 0.23 0.07 0.10 NOTES: 1. Prepared by Jason Cox, P.Eng., Supervisor of Mine Engineering for URS/Scot Wilson, an independent Qualified Person within the meaning of NI 43-101. 2. CIM definitions were followed for the estimation of Mineral Resources. 3. Mineral Resources are inclusive of Mineral Reserves, which are contained in the Roby Zone underground mine. 4. Mineral Resource cut-off grades were estimated for a 14,000 tpd production scenario. Open pit and RGO stockpile resources are not economic at the current production rate. 5. Open Pit Mineral Resources were estimated at a pit discard cut-off grade of 1.8 g/t palladium equivalent (PdEq), within an optimized pit shell. Additional mineralization is present outside of the pit shell. 6. Mineral Resources in stockpiles were estimated at a cut-off grade of 1.9 g/t PdEq. 7. Mineral Resources for the Roby Zone underground mine were estimated at a cut-off grade of 5.8 g/t PdEq. Resources include sill, rib, and crown pillars. 8. Mineral Resources for the underground Offset Zone were estimated at a cut-off grade of 4.0 g/t Pd (6.0 g/t PdEq). 9. PdEq factors were calculated separately for each area, based on operating cost and metallurgical performance estimates appropriate for those areas. 10. Metal price assumptions of US$350/oz palladium, US$1,400/oz platinum, US$850/oz gold, US$6.50/lb nickel, and US$2.00/lb copper were used in the estimation of PdEq and cut-off grade. A US$/C$ exchange rate of 1.11 was used. For the Offset Zone, metal price basis is: US$400/oz Pd; US$1,400/oz Pt;US$1,000/oz Au; US$3.00/lb Cu; US$8.50/lb Ni; US$20/lb Co. Exchange rate is 1.11 US$/C$. 11. Effective dates are variable for the various areas of Mineral Resources. 45 Next update expected in Q2 2011
  • 47. Sleeping Giant Mine MINERAL RESERVES & RESOURCES December 31, 2010 Au Au (Contained Type Tonnes (g/t) ounces) RESERVES Proven 36,800 7.7 9,100 Probable 154,200 8.6 42,600 Proven & Probable 191,000 8.4 51,700 RESOURCES Measured 15,400 5.9 2,900 Indicated 589,500 6.5 123,000 Measured & Indicated 604,900 6.5 125,800 Inferred 146,000 8.2 38,700 NOTES: 1. The mineral reserve and mineral resource estimate for the Sleeping Giant mine was prepared by Mr. Vincent Jourdain, P.Eng., Ph.D, Donald Trudel, P.Geo. and Marc-André Lavergne P.Eng., qualified persons under NI 43-101. 2. Mineral resources are exclusive of mineral reserves. 3. Mineral Resources are estimated at varying cut-off grades depending on the type of mining method contemplated. 4. This updated mineral resource estimate assumes a long-term gold price of US $1,100. 5. CIM definitions were followed for Mineral Resources. See Cautionary Note to U.S. Investors Concerning Estimates of Measured, Indicated and Inferred Resources. 46
  • 48. Discovery Project MINERAL RESOURCES August 1, 2008 Au Au (Contained Type Tonnes (g/t) ounces) RESERVES Measured 3,000 8.95 900 Indicated 1,279,000 5.74 236,000 Inferred 1,546,000 5.93 294,000 NOTES: 1. Source: NI 43-101 Technical Report, August 1, 2008 2. The mineral resource estimate for the Discovery Project was prepared by Mr, Carl Pelletier, B.Sc., P.Geo. of InnovExplo, an independent qualified person under NI 43-101, assuming a gold price of U.S.$850 in the first 5 years, and U.S.$750 thereafter. Applied varying cut-off grades depending on the type of mining method contemplated. 3. The effective date of the estimate is June 17, 2008. 4. This estimate conforms with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (NI 43-101). U.S. investors should refer to the company’s most recent 40F/Annual Information Form for an overview on how Canadian standards differ significantly from U.S. requirements. Mineral Resources, having demonstrated economic viability, are not Mineral Reserves. For further information, please refer to the report titled “Technical Report on the Scoping Study and Mineral Resource Estimate for the Discovery Project (according to Regulation 43-101 and Form 43-101F1) dated August 1, 2008 and prepared by InnovExplo Inc. It is filed on www.sedar.com under Cadiscor Resources Inc. Next update expected in Q2 2011 47
  • 49. Flordin Property MINERAL RESOURCES February 12, 2010 Au Au (Contained Type Tonnes (g/t) ounces) RESOURCES Measured 30,000 4.60 4,000 Indicated 649,000 4.24 88,000 Inferred 1,451,000 3.63 169,000 NOTES: 1. Source: NI 43-101 Technical Report, March 31, 2010 2. The mineral resource estimate for the Flordin property was prepared by Mr, Carl Pelletier, B.Sc., P.Geo. and Mr. Bruno Turcotte, M.Sc., P.Geo. of InnovExplo, both of whom are independent qualified persons under NI 43-101, using a cut-off grade of 2 g/t. 3. The effective date of the estimate is February 23, 2010. 4. This estimate conforms with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (NI 43-101). U.S. investors should refer to the company’s most recent 40F/Annual Information Form for an overview on how Canadian standards differ significantly from U.S. requirements. Mineral Resources, having demonstrated economic viability, are not Mineral Reserves Next update expected in Q2 2011 48
  • 50. Vezza Project MINERAL RESOURCES December 31, 2010 Au Au (Contained Type Tonnes (g/t) ounces) RESOURCES Measured 190,000 6.1 37,100 Indicated 1,524,000 5.8 283,800 Total M&I 1,714,000 5.8 320,900 Inferred 633,000 5.0 102,100 NOTES FOR UPDATED RESOURCE ESTIMATE: 1. This updated mineral resource estimate was prepared as of April 11, 2011 by M. Bernard Salmon, B.Sc., Eng., an independent Qualified Person within the meaning of NI 43-101. 2. CIM definitions were followed for the estimation of Mineral Resources. 3. Mineral Resources are estimated at a cut-off grade of 3 g/t, using an average long-term gold price of US$1,200 per ounce and a US$/C$ exchange rate of 1:1. 4. Minimum mining width of two metres was used. 5. Totals may not represent the sum of the parts due to rounding. 6. See Cautionary Note to U.S. Investors Concerning Estimates of Measured, Indicated and Inferred Resources. Next update expected in Q2 2011 49