Please check out the latest slideshare of the 1st floor renovation project at TechTown - Detroit. This slideshare marks month no. 4 of the construction progress on this project designed by Centric Design Studio. You can view the previous three slide share months of progress (starting in May 2013) to see how far we have come. Come back next month and see the progress. Thanks for viewing.
Grateful 7 speech thanking everyone that has helped.pdf
Slide Show of Construction Progress at TechTown Detroit
1. Slide Show of Construction Progress at TechTown - Detroit
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
2. Rear Accent Wall At Conference Room 4
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
3. Painted Entry Wall At Conference Room 4
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
4. Ceiling Cloud Framing At Future Copy Center
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Ceiling Cloud Framing At Future Copy Center
5. Ceiling Cloud Grid + Lighting At Conference Room 2
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
6. Exterior View Of Conference Room 2 Progress
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
7. Retrofitting Of Existing Light Fixtures (Recycling)
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
8. Installation Of Retrofitted Light Fixtures (Reuse)
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
9. Aluminum Storefront System Ready For Installation
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
10. Storefront System Installed At Future Video Conf. Room
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
11. Storefront System Installed At Conf. Rooms 1 + 2
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
12. Storefront Glazing Ready For Installation
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
13. Storefront Glazing Installed At Conf. Rooms 1 + 2
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
14. Storefront Glazing Installed Inside Conf. Room 2
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
15. Construction Progress At Corridor 2
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
16. Ceiling + Lighting Installation At Future Video Conf. Room
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
17. Construction Progress At Event Spaces 1 + 2
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Construction Progress At Event Spaces 1 + 2
18. Construction Progress At Event Spaces 1 + 2
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Construction Progress At Event Spaces 1 + 2
19. Wall Panel Finish Mock-Up Outside Of Event + Conf. Room Area
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
20. Co-Working Kitchen Construction Progress
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
21. Co-Working Kitchen Construction Progress
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
22. Co-Working Kitchen Construction Progress
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
23. Construction Progress At TechTown Management Suite
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
24. Construction Progress At TechTown Management Suite
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
25. More Construction Progress Photos Will Be Posted Next Month
TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com