1. Curriculum Vitae
Mohamed EL-Badawy
SENIOR CIVIL STRUCTURAL ENGINEER
Objective
Seeking a challenging career in a well-established, dynamic organization where
I can assist in achieving great organizational accomplishments, and acquire
personal actualization & development. Fully aware of the global codes (A.C.I.,
S.B.C., B.S., UBC1997, ASCE, IBC 2003 & IBC 2006 ...)
Personal Information
Full Name : Mohamed Abd-Allah Mohamed EL-Badawy.
Date of Birth : 22th
May 1984.
Nationality : Egyptian.
Gender : Male.
Marital Status: Married.
Address : El Zaher district, Makkah. Saudi Arabia. (Current address).
33 Baha El Din El-Ghatwary St., Smouha, Alexandria, Egypt.
Cell phone : (+966)597217425 Saudi – (+2012)26566642 Egypt.
Email : eng_mohammed_badawy@yahoo.com
Education
Bsc in civil engineering- Alexandria University-2006.
Computer Skills & Training
Computer Skills:
Word, Excel, Auto Cad 2000+
(2D), Surfer.
SAP 2000.(May.2007)
SAP 2000 v.16, SAFE v.14, ETAP v.9. (40hrs.) (Aug.2014).
Primavera v6.8. (24hrs.) (Aug.2014).
Training courses:
PMP Exam preparation course 4th
edition. (44hrs.) (Dec.2011).
PMP Exam preparation course 5th
edition. (35hrs.) (Jan.2016).
Negotiation Skills – Basics course.
2. Introduction to Operation Management course (Dec. 2015).
Completing the course SWOT Analysis.
Completing the course Professional Conduct in Project Management (Jan. 2016).
Attended 0ccupational safety comply with OSHA (10 hrs.) (Oct.2011).
Completing the Safety & Health in Construction course (Jan. 2016).
Design of Reinforced Concrete Structures due to ACI. using SAFE v.12. (Dec. 2014).
Languages
Arabic: Mother Tongue.
English: Very Good.
Experiences
Working at Saudi Binladin Group From Nov.2009 till Now:
Experience in Saudi Binladin Group.
Architecture & Building Construction Div.
From Nov.2014 till now:
Project: ABRAJ KUDAI Project (High Rise Building)
“ the largest hotel in the world (383.05m TALL) consisting of a ring of 12 towers 45
stories high, with more than 10,000 bedrooms, 70 restaurants, 5 rooftop helipads, 5
floors for the sole use of the Saudi royal family “
Designer: Dar Al – Handasah.
Owner: KSA Ministry of Finance.
Consultant: Dar Al – Handasah.
Estimated budget: 14.00 Billion SAR
Location: Makkah – Saudi Arabia.
Position: Senior Technical office engineer.
Main job duties:
Revise the shop drawing submitted from subcontractors.
Preparing shop drawing (excavation levels, foundations, pedestals, huge columns,
shear & retaining walls, cores, corbels, all slabs types & beams, ramps, sump-pits,
tanks) & bar bending schedule (BBS). According to A.C.I Code.
Quantity take-off for structural elements.
Tower & Mobile Cranes Management Plan.( selection of locations for cranes due
to miscellaneous design drawing, critical area loads, erection, climbing &
dismantling , handling, maneuvering, bracing system, access roads serve project).
Selection and follow up vertical elements which erecting by climbing formwork
system.
3. Check and Redesign for some structure elements due to arch. modification and
consultant requirement.
Design structural elements relative with escalators, elevators (Otis requirements)
and ensure implementation according to ACI.
Design temporary structural members which support construction steps and
mobilization plan.
Reviewing design calculations for formwork.
Participating in logistic plan.
Participate in preparing the construction method statements.
Technical support by anticipated standard solutions and take initiative and provide
suggestions for site field.
Preparation of R.F.I's (request for information) for any missing data or
contradictions in design drawings.
Managing the approval with the consultant.
Liaise with consultant and subcontractors.
Lead brainstorming meetings including most involved stakeholders.
From Feb.2011 up to Nov.2014
Project: Haramain High Speed Rail Project (Makkah Station)” Project
designed over 320.000 m2
closed area with the facility of Concourse Building, Train
platform with 5 tracks, VIP drop of area, short stay car park, long stay car park,
mosque, helipad, fire station and other facility buildings”
Designer: FOSTER+PARTNERS Buro Happold.
Owner: KSA Saudi Railways Organization.
Consultant: Dar Al – Handasah
Estimated budget: 3.60 Billion SAR.
Location: Makkah – Saudi Arabia.
Position (1): Technical office engineer.
Main job duties:
Quantity Survey for structural elements.
Estimate project’s needs & processing requirements of the Resources Plan (RC &
PC concrete, Rebar steel, formwork, backfill material, bearing pads …..)
Partially Preparation for subcontractor’s contract. (B.O.Q's- special conditions.)
Provide QC department by information (stages-construction ways-sketches) to
preparing Method of Statement.
Preparing logistic and mobilization plan.
4. Management plan for tower & mobile cranes layout. (Selection of locations for
cranes due to miscellaneous design drawing, critical area loads, erection, climbing
& dismantling, handling, maneuvering, access roads serve project).
Preparing construction joints plans & details for all project buildings.
Preparing shop drawing (excavation levels, foundations, pedestals, columns, shear
& retaining walls, cores, corbels, all slabs types & beams, ramps, sump-pits, tanks)
& bar bending schedule (BBS). According to B.S.
Preparing details drawing for infra-structure works as per specifications.
Technical support to find solution for site problems.
Preparation of TQ's (Technical query).
Managing the approval with the consultant.
Providing recommended ways to improve the efficiency of project operations.
Position (2): Site Sector Manager.
Main job duties:
Concourse building ( 26000 m
2
area ) all Civil & Structure site works.
Follow-up rock cutting works, blasting & earthworks.
follow-up dewatering system ( deep well points- shallow pumps)
Formwork (Doka, GHI, PERI, SGB scaffolding, Geoplast).
Reinforcement steel fixing, backfilling, insulation, precast installing, landscape
Concrete pouring, de-shuttering, curing treatment for white cement concrete.
Preparing plan for concrete cast by stationery pump with 100 m length pipeline or
crane or movable pump.
Check for workability of concrete by field tests.
Ensure of pouring concrete (self-compacted concrete - High Strength Concrete)
according to specifications.
Executing all civil works, Support for the implementation MEP works such as
storm (grade/forced), grey & foul water pipelines ,sand traps, manholes(ring
precast –cast in situ) , tanks , wet well whose conjunction with civil works.
Coordinate construction activities with all relevant parties.
Solving any unexpected technical difficulties and other problems that may arise.
Ensure that all products are delivered on-time within scope, budget and quality.
Support/coordinate with department managers to ensure resource availability and
allocation.
Lead & evaluate manpower more than 200 persons.
Put system to prevent material losses depend on daily consumption rate.
Responsible for safety of labors, equipments, tools & machineries to ensure that
end the project with less the number of incidents.
5. From Nov.2009 up to Feb.2011
Project: JABAL OMAR DEVELOPMENT PROJECT (MAKKAH) – High Rise
Building” The project is a mixed-use development that includes residential
apartments, hotels, commercial uses, public parking and associated support facilities
such as public assembly and prayer areas. The project with a land area of 230,000m2
and built-up floor area of approximately 2 million square meters is intended to be a
high-density development (1,500 persons/hectare).”
Conceptual Designer: Ateliers Lion & Ingerop International.
Project Manager: PSDC / KLCC Projecks SDN BHD.
Consultant: DIWI.
Estimated budget: 11.50 Billion SAR.
Location: Makkah – Saudi Arabia.
Position: Technical office engineer.
Main job duties:
Review, comments and agree the Subcontractors Baseline Schedules.
Develop the project schedule.
Preparing charts, diagrams, graphs and presentations to illustrate logistics issues.
Preparing progress reports ( monthly, bi-weekly reports)
Quantity Survey for structure elements.
Prepare shop drawing, as built drawing & bar bending schedule due to A.C.I.
Preparation of R.F.I's (request for information) for any missing data or
contradictions in design drawings.
From June.2007 till Nov.2009:
Experience in the Arab contractors company.
ALEXANDRIA BRANCH
From June.2007 up to Nov.2009
Project: Dekhela port Development (Agriculture , Electrical , Supplies, Sanitary &
drainage works, Sumps , telecommunication networks , Fire & potable water
networks ,Roads ( rigid – flexible ), service building , fences , VIP hall )
Owner : Alexandria port authority
Estimated budget: 389 million EGP
Location: Alexandria – Egypt.
Position (1): Technical office Manager.
Main job duties:
Manage Evaluate, Follow up & solving problems.
6. Current & Final Invoices with client.
Participating in Studying Prices Analysis.
Symmetrizing between client & sub-contractor invoices.
Ensure control of material losses (Reinforcement steel – cement, sand – stone –
pipes – paints ... etc).
Preparing Initial Handing over Documents.
Representative of the main Contractor for handling a client.
Resolve disputes in relation to client / subcontractor issues.
Coordinator for layout: shop drawings, as built drawings, proposal designed
drawings Analyzing project requirements and systems operations capacities.
Preparing analysis reports to track the progress of each phase of construction.
Pinpointing project possible risks.
Position (2): Technical office engineer:
Main job duties:
Sub-contractors contacts (Quantity Survey & Measurement, Making a Tender
,Preparing Time Schedule, Current & Final Invoices by excel, Evaluation of Sub
contractor, Submittal specimens)
Analysis Tender Documents received with the RFP's.
Comparing subcontractors offers to provide a clear image of whom to base the
price upon.
Negotiating sub-Contractors and suppliers for items costs and contract conditions.
Handling bidders Inquiries.
Preparation of procurement packages and RFQs.
Position (3): Site engineer to work infrastructure / landscape.
Main job duties:
Rapidly accomplishing road length of 2 km [Sanitary & drainage works, Roads
(rigid – flexible), concrete fences with 500 m length, flowers basins, paving,
afforestation, Irrigation systems]
Rehabilitation of building’s façade.
Implement VIP hall.
Experience in Engineering Consulting Corporation
From Jan.2007 up to May.2007
Project: Alex West (The project is a residential and commercial project for
accommodation, built on 600 acres)
Owner : Barons Court resort
Consultant: Engineering Consulting Corporation
7. Location : West of Alexandria – Egypt
Position: Site engineer.
Main job duties:
Supervision the executing for 20 Villa (concrete works).
Survey works (Total Station SOKKIA 3030 R)
Ensure quality and validity of structure site activities.
Give proper directions to sub-contractor to avoid future conflict.
Prepare daily report.
Experience in African Consultant Office
From Oct.2006 up to Jan.2007
Project(1): Zomorodt Al Saraya “2 Residential Buildings- land area 2000 m2 –
concrete work “
Designer/ Consultant: African Consultant Office
Owner: Alsaraya real estate investments
Location : Gleem- Alexandria – Egypt
Project(2): Residential Buildings (Concrete and finishing works).
Designer/ Consultant: African Consultant Office
Location : Maamora beach- Alexandria – Egypt
Position: supervision site engineer.
Main job duties:
Supervise the work to ensure quality and validity of structure site activities.
Obtain proper directions to contractor to avoid future conflict.
Review take-off sheets and invoices.
Prepare daily report.
Working at EL SARAYA for Construction (Dr.Zakaria Sheloma )
From June.2006 up to Oct.2006
Project: Hacienda beach (The project is a tourism village located at north coast-
Egypt).
Position: Site Engineer.
Main job duties:
Implementing Constructions for 4 VIP Villas.
Execute foundation (Piles CFA).
Reference