1. Lean Design Workshop
Learn how to facilitate an integrated design Target Value Design to deliver
projects like the Mosaic Center Living Building Challenge/NetZero Mosaic Center
at significantly less cost.
This workshop will also help prepare you to write the exam & become certified by
LCI-Canada as a Lean Project Coordinator
Arrange for a workshop mguy@i-designs.ca or more info www.leanlab.ca
3. Lean Design Workshop Part 1
1. Business Case
• Busted Budgets
• Inefficiency & Bad Behavior
• There is a Better Way
2. How Lean Creates Value
• Customer
• Flow
• Stop to Solve Problems & Eliminate Waste
4. After Lean
• Save $1.6M plus used $600k of contingency
• Key: Wood to concrete structure
• Amazing results: Still delivering LEED Gold 50% less
energy with a $100k contingency
Lesson Learned … No more project without the Whole TEAM on Board
Before Lean
5. Demonstrate that triple bottom line economics work
On target to deliver the highest level of sustainability for the same cost as a traditional build.
The return on investment will be in the productivity of our people, recognition as good stewards of the planet and
having no energy bills.
Dennis Cuku
Net Zero projects at no extra cost
@ Lean_tobe_Green
7. Lean Design Workshop Part 2
1. Getting Started with Lean Design
• Assemble the TEAM
• Define the Target
• Build a Team
2. Lean Design System
• Develop a Plan
• Collaborate to create value
• Design to Target
3. Collaboration Tools
• Defining Value (OPR, 3P & VSM)
• Best value decisions (CBA, IDP & Prototyping
• Work Environments (Physical, Virtual & Visual
• Checklists
15. Hitting the Target with Lean Design
Hey you Made it to the End!
Let us know what you think about taking this or other
Lean Lab Workshops
mguy@i-designs.ca or more info www.leanlab.ca
Notas do Editor
Our first project where we turned a traditional project that came in way over budget into a successful collaborative project that set a new standard for projects in Saskatchewan
The first project where we turned a traditional project around that came in way over budget into a successful collaborative project
Amazing project NetZero build at the same cost as a traditional project.
Our first project where we turned a traditional project that came in way over budget into a successful collaborative project that set a new standard for projects in Saskatchewan
Billy Bean recently spoke at LCI in San Francisco and it promoted me to write an article about how performance TEAM can deliver much higher levels of performance at less cost.
Similar to the Oakland A’s the win over much higher payroll teams.
LPD significantly improves Owner Value. The Last Planner system is provided the discipline to meet schedule.
How does IDI participate on our projects to define value and why is that REALLY important?