BASINÇ KAYBI FORMÜLÜ

 F ×L
 P ×V
+ K ×
ΔP= 
2
 D


K: f ×

L
D

2

Re=123,9 ×

SÜREKLİ KAYIPLAR:
d ×v × ρ

µ

d: internal diameter (inch)
v: velocity feet per second

ρ : weight density pound percubic feet

µ : absolute viscosity (dynamic) in centipoise
ρ : 62,116 pound per cublic feet

µ : 0,8 centipoise
A-B ARASI BASINÇ KAYBI
SÜRTÜNME FAKTÖRÜ:

K @ 24 "
d : 23, 2 ıı / v :
K @ 24" →
d : 23,2 ıı / v :

Q
A

Re @ 24 ıı =123,9 ×

→ Q=5422/2=2711

d × v × 62,116
0,8

m3 / h

A=π × r 2 = 3,14 × ( 0,295) m 2
= 0,273 m 2
2

v:

2711m 3 / h
= 9930m / h = 2,75m / s = 9 feet/second
0,273m 2

Re @ 24ıı = 123,9 ×
f ≅ 0,0135

23,2 ıı ×9 × 02,116
= 2008700 ≅ 2 ×10 6
0,8

Q
A
Δ

PAB

2
kg
2 m
995 3 × ( 2,75) 2
 0,0135 × 3,5m

m
s = Pa
=
+ K 1 + K 2 + K 3 + K entrance  ×
0,6m
2



K 1 → 0.05 bar (check valve) (from samsun machinery ind. Co.) will be added later
K 2 → 1,2 (90º miter) (according to Zurn Ind. Inc. Design engineering standarts )
K 3 → 0,3 (butterfly valve) (24” K=25Ft K=25x0.012=0.3 according to Crane)
K entrance →0,5 ( Entrance) (accordin to Zurn Ind. Inc. Design engineering standarts )

Δ PAB =

( 0,08 +1,2 +1,3 + 0,5) × 995 × 7,56 = 7823P

A

2

= 0,08bar

B-C ARASI BASINÇ KAYBI
SÜRTÜNME FAKTÖRÜ:

K @ 40 "
d : 39.25 ıı / v :
K @ 40" →
d : 39.25 ıı / v :

Q
A

Re @ 40 ıı =123,9 ×

→ Q=5422

d ×v ×62,116
0,8

m3 / h

A=π × r 2 = 3,14 × ( 0,498) m 2
= 0,273 m 2
2

5422m 3 / h
= 6951m / h = 1.93m / s = 6.33 feet/second
v:
0,78m 2

Re @ 40 ıı = 123,9 ×
f ≅ 0,0115

39.25 ıı ×6.33 ×02,116
= 2390166
0,8

Q
A
Δ

 0,0115 × 31

PBC = 
+ K 4 + K5 + K6 + K7 + K8  ×
1



0,0115 ×31
1

995

2
kg
2 m
× (1,93) 2
m3
s
2

→ 0,35

K4

→ 0,5

(Run) (According to Zurn Ind. Inc. Design engineering standarts )

K5

→ 0,5

(Run)

K 6 →0,3 (45º miter) (according to Zurn Ind. Inc. Design engineering standarts )
K7

→ 0,3

(45º miter)

K 8 → 0,5 (Entrance)

Δ PBC =

2,45 × 995 × 3,72
= 4534
2

Pa=0,045 bar

C-D ARASI BASINÇ KAYBI
SÜRTÜNME FAKTÖRÜ:

K @ 26 "
d : 25.35 ıı / v :
K @ 26" →
d : 25.35 ıı / v :

Q
A

Re @ 26 ıı =123,9 ×

d × v × 62,116
0,8

→ Q=5422/2=2711

m3 / h

A=π × r 2 = 3,14 × ( 0,326 ) m 2
= 0,333 m 2
2

5422m 3 / h
= 8141m / h = 2.26m / s = 7.41 feet/second
V=
0,333m 2

Re @ 26 ıı = 123,9 ×
f ≅ 0,0120

25.35 ıı ×7.41 ×62,116
= 21807094
0,8

Q
A
Δ

 0,012 × 20

PCD = 
+ K 9 + K10 + K condensar + K 11 + K 12 + K13  ×
 0,64


0,012 ×20
0,64

K9

K10

→ 1,2

2
kg
2 m
× ( 2,26) 2
m3
s
2

→ 0,4
(90º miter)

→ 1,2

K condensar

995

(90º miter)

→ 0,5 bar (according to CDP006655-R1_DATASHEET_CONDENSER)

K11

→ 1,2

(90º miter)

K12

→ 1,2

(90º miter)

K 13

→ 1,0

(Exit) (according to Zurn Ind. Inc. Design engineering standarts )

Δ PCD =

6.2 ×995 ×5.1
=15754
2

Pa=0,157 bar

Δ P =0.157+ 0.5 (condeser loss)=0.657 bar
CD
D-E ARASI BASINÇ KAYBI
SÜRTÜNME FAKTÖRÜ:
f ≅ 0,0115 daha önce 40” için bulunmuştu

Δ

 0,0115 × 26

PDE = 
+ K 14  ×
1



0,0115 × 26
1

K 14

→ 1,2

Δ PDE =

995

2
kg
2 m
× (1.93) 2
m3
s
2

→ 0,3

(90º miter)

1.5 ×995 ×3,72
= 2776
2

Pa=0,03 bar
E-F ARASI BASINÇ KAYBI
SÜRTÜNME FAKTÖRÜ:
f ≅ 0,0115 daha önce 40” için bulunmuştu

Δ

 0,0115 × 8.5

PEF = 
+ K15  ×
1



0,0115 ×8.5
1
K9

→ 0.5

Δ PEF =

995

2
kg
2 m
× (1.54 ) 2
m3
s
2

→ 0,1

(Run)

0.6 × 995 × 2.37
= 708
2

Pa=0,007 bar
F-G ARASI BASINÇ KAYBI
SÜRTÜNME FAKTÖRÜ:

f ≅ 0,012 daha önce 40” için bulunmuştu

Δ

 0,012 × 8.5

PFG = 
+ K 16  ×
1



0,012 ×8.5
1
K16

→ 0.5

Δ PFG =

995

2
kg
2 m
× (1.15) 2
m3
s
2

→ 0,1

(Run)

0.6 ×995 ×1.32
= 395
2

Pa=0,004 bar

G-H ARASI BASINÇ KAYBI
SÜRTÜNME FAKTÖRÜ:
f ≅ 0,0125 daha önce 40” için bulunmuştu
Δ

 0,012 × 8.5

PGH = 
+ K17  ×
1



0,0125 ×8.5
1
K17

→ 0.5

Δ PFG =

995

2
kg
2 m
× ( 0.77 ) 2
m3
s
2

→ 0,1

(Run)

0.6 ×995 × 0.6
=180 Pa=0,002 bar
2
H-I ARASI BASINÇ KAYBI
SÜRTÜNME FAKTÖRÜ:

f ≅ 0,013 daha önce 40” için bulunmuştu

Δ

 0,013 × 8.5

PHI = 
+ K18  ×
1



0,013 ×8.5
1
K 18

→ 0.5

Δ PHI =

995

2
kg
2 m
× ( 0.386 ) 2
m3
s
2

→ 0,1

(Run)

0.6 ×995 × 0.148
= 44 Pa=0,0005 bar
2

I-J ARASI BASINÇ KAYBI
SÜRTÜNME FAKTÖRÜ:
K @ 20 "
d : 19.5
→

Re @ 20 ıı =123,9 ×

d : 19.5 ıı / v :

Q
A

Q
/ v :
A

ıı

d ×v ×62,116
0,8

→ Q=5422/5=1085

K @ 20"

m3 / h

A=π × r 2 = 3,14 × ( 0,247 ) m 2
= 0,191 m 2
2

V=

1085m 3 / h
= 5680m / h = 1.58m / s = 5.17 feet/second
0,191m 2

Re @ 20ıı = 123,9 ×

19.5 ıı ×5.17 ×62,116
= 969862
0,8

f ≅ 0,0135

Δ

 0,0135 ×12

PIJ = 
+ K19 + K 20 + K 21 + K 22  ×
0,49



0,012 ×20
0,64

995

2
kg
2 m
× (1.58) 2
m3
s
2

→ 0,4

K19

→ 0,5

(Entrance)

K 20

→ 1,2

(90º miter)

K 21

→ 1,2

(90º miter)

K 22

→ 0,3

(butterfly valve) (24” K=25Ft K=25x0.012=0.3 according to Crane)

Δ PIJ =

3.53 ×995 × 2.5
= 4390
2

Pa=0,04 bar

J-A ARASI BASINÇ KAYBI
Δ PJA =5 Mss =0.5 bar (according to e-mail from cooling tower manufacturer dated 20,01,2009)
TOPLAM BASINÇ KAYBI

∑ Δ P =0,13+0,045+0,656+0,03+0,007+0,004+0,002+0,0005+0,04+0,5
=1,414 bar
Kuzey soğutma kulesi̇ basinç kaybi

Mais conteúdo relacionado

Mais procurados

calculo de espaciamiento de pozos petroleros por el método de Tozzini
calculo de espaciamiento de pozos petroleros por el método de Tozzinicalculo de espaciamiento de pozos petroleros por el método de Tozzini
calculo de espaciamiento de pozos petroleros por el método de TozziniLuis Saavedra
 
Heat transfer area and Heat transfer cofficient (U)
Heat transfer area and Heat transfer cofficient (U)Heat transfer area and Heat transfer cofficient (U)
Heat transfer area and Heat transfer cofficient (U)abdullahkhalid50
 
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING
Episode 40 :  DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYINGEpisode 40 :  DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYINGSAJJAD KHUDHUR ABBAS
 
Solution to-2nd-semester-soil-mechanics-2015-2016
Solution to-2nd-semester-soil-mechanics-2015-2016Solution to-2nd-semester-soil-mechanics-2015-2016
Solution to-2nd-semester-soil-mechanics-2015-2016chener Qadr
 
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)SAJJAD KHUDHUR ABBAS
 
Offshore well intermediate
Offshore well intermediateOffshore well intermediate
Offshore well intermediateG.Balachandran
 
Calculos del mallado del puente
Calculos del mallado del puenteCalculos del mallado del puente
Calculos del mallado del puenteSecurtel d.o.o.
 
W3 Example 1 Answers
W3 Example 1 AnswersW3 Example 1 Answers
W3 Example 1 Answersjcocks
 
Diseno y-calculo-de-puentes
Diseno y-calculo-de-puentesDiseno y-calculo-de-puentes
Diseno y-calculo-de-puentescarlos
 
Solution to first semester soil 2015 16
Solution to first semester soil 2015 16Solution to first semester soil 2015 16
Solution to first semester soil 2015 16chener Qadr
 
Acueducto calculo de potencia
Acueducto calculo de potencia Acueducto calculo de potencia
Acueducto calculo de potencia JeisonCepeda4
 
Slids of intellegent assignment
Slids of intellegent assignmentSlids of intellegent assignment
Slids of intellegent assignmentengrasha
 
Math cad prime ncees excercise 444 solution
Math cad prime   ncees excercise 444 solutionMath cad prime   ncees excercise 444 solution
Math cad prime ncees excercise 444 solutionJulio Banks
 
Solution to 2nd semeter eng. statistics 2015 2016
Solution to 2nd semeter eng. statistics 2015 2016Solution to 2nd semeter eng. statistics 2015 2016
Solution to 2nd semeter eng. statistics 2015 2016chener Qadr
 

Mais procurados (19)

calculo de espaciamiento de pozos petroleros por el método de Tozzini
calculo de espaciamiento de pozos petroleros por el método de Tozzinicalculo de espaciamiento de pozos petroleros por el método de Tozzini
calculo de espaciamiento de pozos petroleros por el método de Tozzini
 
Heat transfer area and Heat transfer cofficient (U)
Heat transfer area and Heat transfer cofficient (U)Heat transfer area and Heat transfer cofficient (U)
Heat transfer area and Heat transfer cofficient (U)
 
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING
Episode 40 :  DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYINGEpisode 40 :  DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING
 
Solution to-2nd-semester-soil-mechanics-2015-2016
Solution to-2nd-semester-soil-mechanics-2015-2016Solution to-2nd-semester-soil-mechanics-2015-2016
Solution to-2nd-semester-soil-mechanics-2015-2016
 
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)
 
Capítulo 08 parafusos
Capítulo 08   parafusosCapítulo 08   parafusos
Capítulo 08 parafusos
 
Offshore well intermediate
Offshore well intermediateOffshore well intermediate
Offshore well intermediate
 
Calculos
CalculosCalculos
Calculos
 
Capítulo 13 engrenagens
Capítulo 13   engrenagensCapítulo 13   engrenagens
Capítulo 13 engrenagens
 
Calculos del mallado del puente
Calculos del mallado del puenteCalculos del mallado del puente
Calculos del mallado del puente
 
W3 Example 1 Answers
W3 Example 1 AnswersW3 Example 1 Answers
W3 Example 1 Answers
 
Micro blower design
Micro blower designMicro blower design
Micro blower design
 
Diseno y-calculo-de-puentes
Diseno y-calculo-de-puentesDiseno y-calculo-de-puentes
Diseno y-calculo-de-puentes
 
Solution to first semester soil 2015 16
Solution to first semester soil 2015 16Solution to first semester soil 2015 16
Solution to first semester soil 2015 16
 
Acueducto calculo de potencia
Acueducto calculo de potencia Acueducto calculo de potencia
Acueducto calculo de potencia
 
Slids of intellegent assignment
Slids of intellegent assignmentSlids of intellegent assignment
Slids of intellegent assignment
 
Capítulo 16 embreagens
Capítulo 16   embreagensCapítulo 16   embreagens
Capítulo 16 embreagens
 
Math cad prime ncees excercise 444 solution
Math cad prime   ncees excercise 444 solutionMath cad prime   ncees excercise 444 solution
Math cad prime ncees excercise 444 solution
 
Solution to 2nd semeter eng. statistics 2015 2016
Solution to 2nd semeter eng. statistics 2015 2016Solution to 2nd semeter eng. statistics 2015 2016
Solution to 2nd semeter eng. statistics 2015 2016
 

Semelhante a Kuzey soğutma kulesi̇ basinç kaybi

Modern power system analysis. By D.P. and Nagrath, I.J., 2003. Tata McGraw-Hi...
Modern power system analysis. By D.P. and Nagrath, I.J., 2003. Tata McGraw-Hi...Modern power system analysis. By D.P. and Nagrath, I.J., 2003. Tata McGraw-Hi...
Modern power system analysis. By D.P. and Nagrath, I.J., 2003. Tata McGraw-Hi...4bh7qsqvyb
 
Solution manual for water resources engineering 3rd edition - david a. chin
Solution manual for water resources engineering 3rd edition - david a. chinSolution manual for water resources engineering 3rd edition - david a. chin
Solution manual for water resources engineering 3rd edition - david a. chinSalehkhanovic
 
Mecánica de Fluidos_Merle C. Potter, David C. Wiggert_3ed Solucionario
Mecánica de Fluidos_Merle C. Potter, David C. Wiggert_3ed SolucionarioMecánica de Fluidos_Merle C. Potter, David C. Wiggert_3ed Solucionario
Mecánica de Fluidos_Merle C. Potter, David C. Wiggert_3ed SolucionarioEdgar Ortiz Sánchez
 
Capítulo 12 lubrificação e mancais de munhão
Capítulo 12   lubrificação e mancais de munhãoCapítulo 12   lubrificação e mancais de munhão
Capítulo 12 lubrificação e mancais de munhãoJhayson Carvalho
 
Design and analysis of school building
Design and analysis of school buildingDesign and analysis of school building
Design and analysis of school buildingRaghav Sankar
 
Trigonometry a unit circle approach 10th edition sullivan solutions manual
Trigonometry a unit circle approach 10th edition sullivan solutions manualTrigonometry a unit circle approach 10th edition sullivan solutions manual
Trigonometry a unit circle approach 10th edition sullivan solutions manualbrakket
 
Chapter 12 solutions
Chapter 12 solutionsChapter 12 solutions
Chapter 12 solutionsLK Education
 
Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Hamza Waheed
 
Shallow Foundations ( Combined, Strap, Raft foundation)
Shallow Foundations ( Combined, Strap, Raft foundation)Shallow Foundations ( Combined, Strap, Raft foundation)
Shallow Foundations ( Combined, Strap, Raft foundation)Mohammed Zakaria
 
H c verma part2 pdf solution
H c verma  part2 pdf solutionH c verma  part2 pdf solution
H c verma part2 pdf solutionSystem of Avinash
 
Shallow and Deep Founation Design Calucations
Shallow and Deep Founation Design CalucationsShallow and Deep Founation Design Calucations
Shallow and Deep Founation Design CalucationsTyler Edgington
 

Semelhante a Kuzey soğutma kulesi̇ basinç kaybi (20)

Modern power system analysis. By D.P. and Nagrath, I.J., 2003. Tata McGraw-Hi...
Modern power system analysis. By D.P. and Nagrath, I.J., 2003. Tata McGraw-Hi...Modern power system analysis. By D.P. and Nagrath, I.J., 2003. Tata McGraw-Hi...
Modern power system analysis. By D.P. and Nagrath, I.J., 2003. Tata McGraw-Hi...
 
Solution manual for water resources engineering 3rd edition - david a. chin
Solution manual for water resources engineering 3rd edition - david a. chinSolution manual for water resources engineering 3rd edition - david a. chin
Solution manual for water resources engineering 3rd edition - david a. chin
 
Mecánica de Fluidos_Merle C. Potter, David C. Wiggert_3ed Solucionario
Mecánica de Fluidos_Merle C. Potter, David C. Wiggert_3ed SolucionarioMecánica de Fluidos_Merle C. Potter, David C. Wiggert_3ed Solucionario
Mecánica de Fluidos_Merle C. Potter, David C. Wiggert_3ed Solucionario
 
Concreto armado
Concreto armadoConcreto armado
Concreto armado
 
Shi20396 ch12
Shi20396 ch12Shi20396 ch12
Shi20396 ch12
 
Solucionario_Felder.pdf
Solucionario_Felder.pdfSolucionario_Felder.pdf
Solucionario_Felder.pdf
 
problemas resueltos
problemas resueltosproblemas resueltos
problemas resueltos
 
Capítulo 12 lubrificação e mancais de munhão
Capítulo 12   lubrificação e mancais de munhãoCapítulo 12   lubrificação e mancais de munhão
Capítulo 12 lubrificação e mancais de munhão
 
134877079 manual-gtz
134877079 manual-gtz134877079 manual-gtz
134877079 manual-gtz
 
Design and analysis of school building
Design and analysis of school buildingDesign and analysis of school building
Design and analysis of school building
 
Appendix b
Appendix bAppendix b
Appendix b
 
Shi20396 ch08
Shi20396 ch08Shi20396 ch08
Shi20396 ch08
 
Trigonometry a unit circle approach 10th edition sullivan solutions manual
Trigonometry a unit circle approach 10th edition sullivan solutions manualTrigonometry a unit circle approach 10th edition sullivan solutions manual
Trigonometry a unit circle approach 10th edition sullivan solutions manual
 
Chapter 12 solutions
Chapter 12 solutionsChapter 12 solutions
Chapter 12 solutions
 
Deber corte
Deber corteDeber corte
Deber corte
 
Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )
 
Shallow Foundations ( Combined, Strap, Raft foundation)
Shallow Foundations ( Combined, Strap, Raft foundation)Shallow Foundations ( Combined, Strap, Raft foundation)
Shallow Foundations ( Combined, Strap, Raft foundation)
 
MOVIMIENTO_alonso_acosta.pdf
MOVIMIENTO_alonso_acosta.pdfMOVIMIENTO_alonso_acosta.pdf
MOVIMIENTO_alonso_acosta.pdf
 
H c verma part2 pdf solution
H c verma  part2 pdf solutionH c verma  part2 pdf solution
H c verma part2 pdf solution
 
Shallow and Deep Founation Design Calucations
Shallow and Deep Founation Design CalucationsShallow and Deep Founation Design Calucations
Shallow and Deep Founation Design Calucations
 

Último

會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文中 央社
 
Application of Matrices in real life. Presentation on application of matrices
Application of Matrices in real life. Presentation on application of matricesApplication of Matrices in real life. Presentation on application of matrices
Application of Matrices in real life. Presentation on application of matricesRased Khan
 
An Overview of the Odoo 17 Discuss App.pptx
An Overview of the Odoo 17 Discuss App.pptxAn Overview of the Odoo 17 Discuss App.pptx
An Overview of the Odoo 17 Discuss App.pptxCeline George
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfmstarkes24
 
The Last Leaf, a short story by O. Henry
The Last Leaf, a short story by O. HenryThe Last Leaf, a short story by O. Henry
The Last Leaf, a short story by O. HenryEugene Lysak
 
Post Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdf
Post Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdfPost Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdf
Post Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdfPragya - UEM Kolkata Quiz Club
 
2024_Student Session 2_ Set Plan Preparation.pptx
2024_Student Session 2_ Set Plan Preparation.pptx2024_Student Session 2_ Set Plan Preparation.pptx
2024_Student Session 2_ Set Plan Preparation.pptxmansk2
 
How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17Celine George
 
REPRODUCTIVE TOXICITY STUDIE OF MALE AND FEMALEpptx
REPRODUCTIVE TOXICITY  STUDIE OF MALE AND FEMALEpptxREPRODUCTIVE TOXICITY  STUDIE OF MALE AND FEMALEpptx
REPRODUCTIVE TOXICITY STUDIE OF MALE AND FEMALEpptxmanishaJyala2
 
Behavioral-sciences-dr-mowadat rana (1).pdf
Behavioral-sciences-dr-mowadat rana (1).pdfBehavioral-sciences-dr-mowadat rana (1).pdf
Behavioral-sciences-dr-mowadat rana (1).pdfaedhbteg
 
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdfINU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdfbu07226
 
Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment
 Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment
Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatmentsaipooja36
 
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdfDanh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdfQucHHunhnh
 
IATP How-to Foreign Travel May 2024.pdff
IATP How-to Foreign Travel May 2024.pdffIATP How-to Foreign Travel May 2024.pdff
IATP How-to Foreign Travel May 2024.pdff17thcssbs2
 
Open Educational Resources Primer PowerPoint
Open Educational Resources Primer PowerPointOpen Educational Resources Primer PowerPoint
Open Educational Resources Primer PowerPointELaRue0
 
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjStl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjMohammed Sikander
 
Features of Video Calls in the Discuss Module in Odoo 17
Features of Video Calls in the Discuss Module in Odoo 17Features of Video Calls in the Discuss Module in Odoo 17
Features of Video Calls in the Discuss Module in Odoo 17Celine George
 
factors influencing drug absorption-final-2.pptx
factors influencing drug absorption-final-2.pptxfactors influencing drug absorption-final-2.pptx
factors influencing drug absorption-final-2.pptxSanjay Shekar
 
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptxslides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptxCapitolTechU
 

Último (20)

會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
 
Application of Matrices in real life. Presentation on application of matrices
Application of Matrices in real life. Presentation on application of matricesApplication of Matrices in real life. Presentation on application of matrices
Application of Matrices in real life. Presentation on application of matrices
 
An Overview of the Odoo 17 Discuss App.pptx
An Overview of the Odoo 17 Discuss App.pptxAn Overview of the Odoo 17 Discuss App.pptx
An Overview of the Odoo 17 Discuss App.pptx
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdf
 
The Last Leaf, a short story by O. Henry
The Last Leaf, a short story by O. HenryThe Last Leaf, a short story by O. Henry
The Last Leaf, a short story by O. Henry
 
Post Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdf
Post Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdfPost Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdf
Post Exam Fun(da) Intra UEM General Quiz 2024 - Prelims q&a.pdf
 
2024_Student Session 2_ Set Plan Preparation.pptx
2024_Student Session 2_ Set Plan Preparation.pptx2024_Student Session 2_ Set Plan Preparation.pptx
2024_Student Session 2_ Set Plan Preparation.pptx
 
How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17
 
REPRODUCTIVE TOXICITY STUDIE OF MALE AND FEMALEpptx
REPRODUCTIVE TOXICITY  STUDIE OF MALE AND FEMALEpptxREPRODUCTIVE TOXICITY  STUDIE OF MALE AND FEMALEpptx
REPRODUCTIVE TOXICITY STUDIE OF MALE AND FEMALEpptx
 
Behavioral-sciences-dr-mowadat rana (1).pdf
Behavioral-sciences-dr-mowadat rana (1).pdfBehavioral-sciences-dr-mowadat rana (1).pdf
Behavioral-sciences-dr-mowadat rana (1).pdf
 
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdfINU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
 
Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment
 Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment
Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment
 
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdfDanh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
 
IATP How-to Foreign Travel May 2024.pdff
IATP How-to Foreign Travel May 2024.pdffIATP How-to Foreign Travel May 2024.pdff
IATP How-to Foreign Travel May 2024.pdff
 
Open Educational Resources Primer PowerPoint
Open Educational Resources Primer PowerPointOpen Educational Resources Primer PowerPoint
Open Educational Resources Primer PowerPoint
 
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjStl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
 
Word Stress rules esl .pptx
Word Stress rules esl               .pptxWord Stress rules esl               .pptx
Word Stress rules esl .pptx
 
Features of Video Calls in the Discuss Module in Odoo 17
Features of Video Calls in the Discuss Module in Odoo 17Features of Video Calls in the Discuss Module in Odoo 17
Features of Video Calls in the Discuss Module in Odoo 17
 
factors influencing drug absorption-final-2.pptx
factors influencing drug absorption-final-2.pptxfactors influencing drug absorption-final-2.pptx
factors influencing drug absorption-final-2.pptx
 
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptxslides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
 

Kuzey soğutma kulesi̇ basinç kaybi

  • 1. BASINÇ KAYBI FORMÜLÜ  F ×L  P ×V + K × ΔP=  2  D  K: f × L D 2 Re=123,9 × SÜREKLİ KAYIPLAR: d ×v × ρ µ d: internal diameter (inch) v: velocity feet per second ρ : weight density pound percubic feet µ : absolute viscosity (dynamic) in centipoise ρ : 62,116 pound per cublic feet µ : 0,8 centipoise A-B ARASI BASINÇ KAYBI SÜRTÜNME FAKTÖRÜ: K @ 24 " d : 23, 2 ıı / v : K @ 24" → d : 23,2 ıı / v : Q A Re @ 24 ıı =123,9 × → Q=5422/2=2711 d × v × 62,116 0,8 m3 / h A=π × r 2 = 3,14 × ( 0,295) m 2 = 0,273 m 2 2 v: 2711m 3 / h = 9930m / h = 2,75m / s = 9 feet/second 0,273m 2 Re @ 24ıı = 123,9 × f ≅ 0,0135 23,2 ıı ×9 × 02,116 = 2008700 ≅ 2 ×10 6 0,8 Q A
  • 2. Δ PAB 2 kg 2 m 995 3 × ( 2,75) 2  0,0135 × 3,5m  m s = Pa = + K 1 + K 2 + K 3 + K entrance  × 0,6m 2   K 1 → 0.05 bar (check valve) (from samsun machinery ind. Co.) will be added later K 2 → 1,2 (90º miter) (according to Zurn Ind. Inc. Design engineering standarts ) K 3 → 0,3 (butterfly valve) (24” K=25Ft K=25x0.012=0.3 according to Crane) K entrance →0,5 ( Entrance) (accordin to Zurn Ind. Inc. Design engineering standarts ) Δ PAB = ( 0,08 +1,2 +1,3 + 0,5) × 995 × 7,56 = 7823P A 2 = 0,08bar B-C ARASI BASINÇ KAYBI SÜRTÜNME FAKTÖRÜ: K @ 40 " d : 39.25 ıı / v : K @ 40" → d : 39.25 ıı / v : Q A Re @ 40 ıı =123,9 × → Q=5422 d ×v ×62,116 0,8 m3 / h A=π × r 2 = 3,14 × ( 0,498) m 2 = 0,273 m 2 2 5422m 3 / h = 6951m / h = 1.93m / s = 6.33 feet/second v: 0,78m 2 Re @ 40 ıı = 123,9 × f ≅ 0,0115 39.25 ıı ×6.33 ×02,116 = 2390166 0,8 Q A
  • 3. Δ  0,0115 × 31  PBC =  + K 4 + K5 + K6 + K7 + K8  × 1   0,0115 ×31 1 995 2 kg 2 m × (1,93) 2 m3 s 2 → 0,35 K4 → 0,5 (Run) (According to Zurn Ind. Inc. Design engineering standarts ) K5 → 0,5 (Run) K 6 →0,3 (45º miter) (according to Zurn Ind. Inc. Design engineering standarts ) K7 → 0,3 (45º miter) K 8 → 0,5 (Entrance) Δ PBC = 2,45 × 995 × 3,72 = 4534 2 Pa=0,045 bar C-D ARASI BASINÇ KAYBI SÜRTÜNME FAKTÖRÜ: K @ 26 " d : 25.35 ıı / v : K @ 26" → d : 25.35 ıı / v : Q A Re @ 26 ıı =123,9 × d × v × 62,116 0,8 → Q=5422/2=2711 m3 / h A=π × r 2 = 3,14 × ( 0,326 ) m 2 = 0,333 m 2 2 5422m 3 / h = 8141m / h = 2.26m / s = 7.41 feet/second V= 0,333m 2 Re @ 26 ıı = 123,9 × f ≅ 0,0120 25.35 ıı ×7.41 ×62,116 = 21807094 0,8 Q A
  • 4. Δ  0,012 × 20  PCD =  + K 9 + K10 + K condensar + K 11 + K 12 + K13  ×  0,64  0,012 ×20 0,64 K9 K10 → 1,2 2 kg 2 m × ( 2,26) 2 m3 s 2 → 0,4 (90º miter) → 1,2 K condensar 995 (90º miter) → 0,5 bar (according to CDP006655-R1_DATASHEET_CONDENSER) K11 → 1,2 (90º miter) K12 → 1,2 (90º miter) K 13 → 1,0 (Exit) (according to Zurn Ind. Inc. Design engineering standarts ) Δ PCD = 6.2 ×995 ×5.1 =15754 2 Pa=0,157 bar Δ P =0.157+ 0.5 (condeser loss)=0.657 bar CD D-E ARASI BASINÇ KAYBI SÜRTÜNME FAKTÖRÜ: f ≅ 0,0115 daha önce 40” için bulunmuştu Δ  0,0115 × 26  PDE =  + K 14  × 1   0,0115 × 26 1 K 14 → 1,2 Δ PDE = 995 2 kg 2 m × (1.93) 2 m3 s 2 → 0,3 (90º miter) 1.5 ×995 ×3,72 = 2776 2 Pa=0,03 bar E-F ARASI BASINÇ KAYBI SÜRTÜNME FAKTÖRÜ:
  • 5. f ≅ 0,0115 daha önce 40” için bulunmuştu Δ  0,0115 × 8.5  PEF =  + K15  × 1   0,0115 ×8.5 1 K9 → 0.5 Δ PEF = 995 2 kg 2 m × (1.54 ) 2 m3 s 2 → 0,1 (Run) 0.6 × 995 × 2.37 = 708 2 Pa=0,007 bar F-G ARASI BASINÇ KAYBI SÜRTÜNME FAKTÖRÜ: f ≅ 0,012 daha önce 40” için bulunmuştu Δ  0,012 × 8.5  PFG =  + K 16  × 1   0,012 ×8.5 1 K16 → 0.5 Δ PFG = 995 2 kg 2 m × (1.15) 2 m3 s 2 → 0,1 (Run) 0.6 ×995 ×1.32 = 395 2 Pa=0,004 bar G-H ARASI BASINÇ KAYBI SÜRTÜNME FAKTÖRÜ: f ≅ 0,0125 daha önce 40” için bulunmuştu
  • 6. Δ  0,012 × 8.5  PGH =  + K17  × 1   0,0125 ×8.5 1 K17 → 0.5 Δ PFG = 995 2 kg 2 m × ( 0.77 ) 2 m3 s 2 → 0,1 (Run) 0.6 ×995 × 0.6 =180 Pa=0,002 bar 2 H-I ARASI BASINÇ KAYBI SÜRTÜNME FAKTÖRÜ: f ≅ 0,013 daha önce 40” için bulunmuştu Δ  0,013 × 8.5  PHI =  + K18  × 1   0,013 ×8.5 1 K 18 → 0.5 Δ PHI = 995 2 kg 2 m × ( 0.386 ) 2 m3 s 2 → 0,1 (Run) 0.6 ×995 × 0.148 = 44 Pa=0,0005 bar 2 I-J ARASI BASINÇ KAYBI SÜRTÜNME FAKTÖRÜ:
  • 7. K @ 20 " d : 19.5 → Re @ 20 ıı =123,9 × d : 19.5 ıı / v : Q A Q / v : A ıı d ×v ×62,116 0,8 → Q=5422/5=1085 K @ 20" m3 / h A=π × r 2 = 3,14 × ( 0,247 ) m 2 = 0,191 m 2 2 V= 1085m 3 / h = 5680m / h = 1.58m / s = 5.17 feet/second 0,191m 2 Re @ 20ıı = 123,9 × 19.5 ıı ×5.17 ×62,116 = 969862 0,8 f ≅ 0,0135 Δ  0,0135 ×12  PIJ =  + K19 + K 20 + K 21 + K 22  × 0,49   0,012 ×20 0,64 995 2 kg 2 m × (1.58) 2 m3 s 2 → 0,4 K19 → 0,5 (Entrance) K 20 → 1,2 (90º miter) K 21 → 1,2 (90º miter) K 22 → 0,3 (butterfly valve) (24” K=25Ft K=25x0.012=0.3 according to Crane) Δ PIJ = 3.53 ×995 × 2.5 = 4390 2 Pa=0,04 bar J-A ARASI BASINÇ KAYBI Δ PJA =5 Mss =0.5 bar (according to e-mail from cooling tower manufacturer dated 20,01,2009) TOPLAM BASINÇ KAYBI ∑ Δ P =0,13+0,045+0,656+0,03+0,007+0,004+0,002+0,0005+0,04+0,5 =1,414 bar