6. Scheduling…
• UML:
1
week
(05/03/12
-‐
12/03/12)
• Coding:
3
weeks
(23/04/12
–
14/05/12)
• Pilot:
1
week
(14/05/12
–
21/05/12)
• Debugging:
“There
has
never
been
an
unexpectedly
short
debugging
period
in
the
history
of
computers.”
-‐
Steven
Levy.
• Chris:
Algorithm
Design
/
Core
code
• Leon:
UML
/
Front-‐end
system