- 2. The Problem: Space Debris
Definition:
"Space debris are all man-made objects including fragments
and elements thereof, in Earth orbit or re-entering the
atmosphere, that are not functional“
Source: Inter-Agency Debris Coordination Committee (IADC)
Introduction to RetroSpace
© SpaceTech 12. Do not reproduce and distribute without permission 2/71
- 3. Agenda
Introduction into RetroSpace
The Scope
The Opportunity
The Solution
The Legal Framework
Market
System Solution
Business Case
Conclusion
Agenda
© SpaceTech 12. Do not reproduce and distribute without permission 3/76
- 4. RetroSpace Scope
• $2.2 B return on a $90 M investment
• Revenues exceeding $400 M per year
• Protecting space assets valued over $500 B
Introduction to RetroSpace
• Providing public benefit
© SpaceTech 12. Do not reproduce and distribute without permission 4/76
- 5. The Opportunity
• Space is valuable for everybody
• Value is threatened
• Threat is collision with orbital debris
Loss of assets
Introduction to RetroSpace
Creation of new fragments
Cascading collision
Restricted access to space
© SpaceTech 12. Do not reproduce and distribute without permission 5/76
- 6. Historical Growth of Objects
Number of Objects in Earth Orbit by Object Type (SSN Catalog)
Growth rate 300 objects/year
Introduction to RetroSpace
Year
Source: NASA Orbital Debris Office
SSN: Space Surveillance Network
ASAT: Anti-Satellite Test
© SpaceTech 12. Do not reproduce and distribute without permission 6/76
- 7. “Kessler Syndrome”
Introduction to RetroSpace
Source: NASA Orbital Debris Office
Source: NASA Orbital Debris Office
LEO: Low Earth Orbit
MEO: Medium Earth Orbit
GEO: Geostationary Earth Orbit
© SpaceTech 12. Do not reproduce and distribute without permission 7/76
- 8. Future Growth of Collisions
Introduction to RetroSpace
Source: NASA Orbital Debris Office
PMD: Post-Mission Disposal
© SpaceTech 12. Do not reproduce and distribute without permission 8/76
- 9. The Opportunity
• Need: Active removal of 10-15 large objects (6-7 total
tons) annually from most crowded LEO to stabilize
satellite population at existing level!
• No comprehensive solution
• Momentum to act is building
Introduction to RetroSpace
LEO: Low Earth Orbit
© SpaceTech 12. Do not reproduce and distribute without permission 9/76
- 10. The Mission
Remove Hazardous Space Debris Using Robotics!
Remove Hazardous Space Debris Using Robotics!
Introduction to RetroSpace
© SpaceTech 12. Do not reproduce and distribute without permission 10/76
- 11. What is RetroSpace?
Profitable End-to-End System for Active Debris Removal
Profitable End-to-End System for Active Debris Removal
Objectives
Objectives
Introduction to RetroSpace
Remove more than 15 large debris per year
Remove more than 15 large debris per year
In a safe manner
In a safe manner
With the consent of debris owner
With the consent of debris owner
© SpaceTech 12. Do not reproduce and distribute without permission 11/76
- 12. The RetroSpace Solution
A fleet of spacecraft pushing debris
A fleet of spacecraft pushing debris
to a lower disposal orbit
to a lower disposal orbit
Using a vision system and
Using a vision system and
robotic arm for capture
robotic arm for capture
Introduction to RetroSpace
Spiralling up and down by
Spiralling up and down by
electrical propulsion
electrical propulsion
© SpaceTech 12. Do not reproduce and distribute without permission 12/76
- 13. Debris and Orbits
Selected debris are large objects
Selected debris are large objects
• defunct spacecraft
• defunct spacecraft
• rocket bodies
• rocket bodies
ADEOS, 25 m, 3500 kg
Regions of interest are Low Earth Orbits
Regions of interest are Low Earth Orbits
Introduction to RetroSpace
H10 rocket body,10 m, 1200 kg
Disposal orbit altitude is 430 km
Disposal orbit altitude is 430 km
© SpaceTech 12. Do not reproduce and distribute without permission 13/76
- 14. Performances
Each RetroSat de-orbits 2 to 3 debris/year
Each RetroSat de-orbits 2 to 3 debris/year We meet
Fleet of 7 will remove 18 debris/year
Fleet of 7 will remove 18 debris/year the need
Revenues exceeding $400 M per year
Revenues exceeding $400 M per year
Introduction to RetroSpace
Ready for operations in 2016
Ready for operations in 2016
Break-even in 2020
Break-even in 2020
© SpaceTech 12. Do not reproduce and distribute without permission 14/76
- 15. The Legal Framework
Perceived Problems
Perceived Problems
•• Treaties not explicitly addressing debris
Treaties not explicitly addressing debris
•• Control and jurisdiction stay with owners
Control and jurisdiction stay with owners
•• Liability stays with launching States
Liability stays with launching States
States/owners are allowed to
States/owners are allowed to
clean up their own debris
Introduction to RetroSpace
clean up their own debris
Therefore, no prohibitions to
Therefore, no prohibitions to
start with active debris
start with active debris
removal
removal
© SpaceTech 12. Do not reproduce and distribute without permission 15/76
- 16. Implications for RetroSpace
Within current framework
Within current framework
•• Seek cooperation with States and owners
Seek cooperation with States and owners
•• Perform safe operations
Perform safe operations
•• Ensure openness and visibility of activities
Ensure openness and visibility of activities
Potential future framework
Potential future framework
•• Modeled on Nairobi Convention on Wreck
Modeled on Nairobi Convention on Wreck
Introduction to RetroSpace
Removal
Removal
•• Removal by external party
Removal by external party
•• Obligatory insurance to cover cost
Obligatory insurance to cover cost
Augmented with coordinating international body
Augmented with coordinating international body
© SpaceTech 12. Do not reproduce and distribute without permission 16/76
- 17. Agenda
Introduction into RetroSpace
Market
Space Market
Primary Source Research
Target Market
System Solution
Business Case
Conclusion
Agenda
© SpaceTech 12. Do not reproduce and distribute without permission 17/76
- 18. The Space Market
[Sources: State of the satellite Industry Report, SIA, 2009]
Public Sector Spending The Space Report 2010
– NASA 5.3%
– US DOD 2.2%
– ESA 18%
– Russia 200% $144 M
$261 Billion
End-User
Segment
Included
Private Sector Growth
Led by remote sensing with 12%
Market
NASA: National Aeronautics & Space Administration
US DOD: Unites States, Department of Defence
ESA: European Space Agency
© SpaceTech 12. Do not reproduce and distribute without permission 18/76
- 19. Primary Source Research
60 questionnaires NASA/DARPA Debris Workshop:
– Debris is an issue
– Timeframe to act is now
– Large debris should be removed first
– Governments even willing to pay
Personal Interviews with Representatives of:
– National Governments
Most pressing need for – Space Agencies public sector
de-orbit services:
– Public & Private Operators
This manifests in: – Human Space Flight
• Increasing international Insurers
– coordination
• National implementation of IADC guidelines
– Manufacturers
• Public sector spending on debris removal studies
– Debris Specialists
– Legal Specialists
Market
NASA: National Aeronautics & Space Administration
DARPA: Defense Advanced Research Projects Agency
IADC: Inter-Agency Debris Coordination Committee
© SpaceTech 12. Do not reproduce and distribute without permission 19/76
- 20. Primary Market: Risk Driven
Cost
- Shielding
- Development
- Launch
ISS
Community
Commercial
Impacts of Small Fragments Operators
Threat to Astronaut Lives
Negative Reputation
States - “Orbital” Polluter
Space
Value of Assets Agencies
Economic Prosperity
Market
ISS : International Space Station
MMOD : Micrometeorites & Orbital Debris
ADR: Active Debris Removal
© SpaceTech 12. Do not reproduce and distribute without permission 20/76
- 21. Orbital Regimes in LEO at Risk
Inclination Altitude Active Inactive Rocket TOTAL
[km] Satellites Satellites Bodies Debris
Regime A (SSO) 99° ± 1° 800 ± 100 71 91 48 139
Regime B 82° ± 1° 1000 ± 100 3 160 157 317
Regime C 71° ± 1° 850 ± 100 1 40 23 63
Source: Heiner Klinkrad, Space Debris Office, ESA
Active Satellites in SSO
Debris in SSO
LEO: Low Earth Orbit
Market
SSO: Sun-Synchronous
CIS: Confederation of Independent States
USSR: Union of Soviet Socialist Republics
PPP: Public Private Partnerships
© SpaceTech 12. Do not reproduce and distribute without permission 21/76
- 22. Market Projection Assumptions
• Conservative Launch Projection Scenario
• Stagnation at a Yearly Average of 22 Launches
• Rapidly Increasing Implementation of Debris Mitigation Guidelines
(up to 95% in the next 10 years), for:
• Satellites
• Rocket Bodies
• Satellite Lifetime: 7 Years on Average
Projected Launches into Sun-Synchronous Regimes
30
Satellite Launches / Year
25
20
15
Trend
10
Assessment of
Planned
5 Launches [DLR]
0
Market
27
29
33
35
99
01
03
05
07
09
11
13
15
17
19
21
23
25
31
20
20
20
20
19
20
20
20
20
20
20
20
20
20
20
20
20
20
20
DLR: German Aerospace Center
© SpaceTech 12. Do not reproduce and distribute without permission 22/76
- 23. Market Projection
500
Total Number of Debris in Sun-Synchronous Regimes
450
Nummber of Objects
400 No Active Debris Removal
350
300
250
200 15 Objects / Year 10 / Year
150
100
50
0
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
• Conservative Scenarios
• Removal of 15 debris per year
• Many years of work for RetroSpace
• Huge Market
Market
© SpaceTech 12. Do not reproduce and distribute without permission 23/76
- 24. Agenda
Introduction into RetroSpace
Market
System Solution
System Architecture
Mission Scenario
Platform
Launch System
Business Case
Conclusion
Agenda
© SpaceTech 12. Do not reproduce and distribute without permission 24/76
- 25. System Architecture
DEBRIS
RetroSat
System Solution
POC: Payload Operations Center
MOC: Mission Operations Center
GSS: Ground Station System
TT&C: Telemetry, Tracking and Command
© SpaceTech 12. Do not reproduce and distribute without permission 25/76
- 26. Ground Station System
• Single Ground Station
Typical contact times during
passes between 3 and 15
minutes.
• Strip of Multiple Ground
Stations
Fairbanks, Svalbard, Kiruna and
Fucino can provide every day at
least 4 continuous contacts
longer than 20 minutes.
System Solution
© SpaceTech 12. Do not reproduce and distribute without permission 26/76
- 27. Concept of Operations
Operational phases
• Command from mission
planning
• Rendezvous with selected
debris and inspection (15 days)
• Command of robotic arm and
capture debris (14 minutes)
• Analyze and stabilize the
newly formed composite and
move to the disposal orbit (80
days)
• Release the debris, wait for
next debris opportunity and
System Solution
return to the region of interest
(65 days)
• Debris orbit decays over time Total: 160 days
and burns up on re-entry
© SpaceTech 12. Do not reproduce and distribute without permission 27/76
- 28. Mission Planning
• A service to provide characterization of
the selected debris:
• Regularly updated orbital elements
and attitude
• Size, shape and end-of-life mass
• Available info from manufacturer
• Possible service providers:
• US Space Surveillance Network
• ESA – Space Situational Awareness
System Solution
• Commercial providers (e.g. Center
for Space Standards & Innovation) Third stage of Ariane 4 (H10): a common debris in
the Sun-Synchronous orbit region.
US: United States Source: Arianespace
ESA: European Space Agency
© SpaceTech 12. Do not reproduce and distribute without permission 28/76
- 29. Debris Orbital Parameters Analysis
• Inclination [98o – 100o]
• Altitude [700 km - 900 km]
• Right Ascension of Ascending Node (RAAN) [0o - 360o]
RAAN distribution in the selected region
14
12
Number of objects
10
8
6
4
2
0
0 30 60 90 120 150 180 210 240 270 300 330 360
RAAN [deg]
System Solution
• Propellant to go from one debris to the following depends
mainly on RAAN change required
• Removal sequence must be designed accordingly
RAAN: Right Ascension of Ascending Node
© SpaceTech 12. Do not reproduce and distribute without permission 29/76
- 30. From Launch to Orbit Injection
• The orbit plane of the first debris in the sequence is reached by direct
injection by the launcher
• Launch takes place when
the launch site crosses the
first debris orbital plane:
twice per day
• An acceptable deviation of
±1.12 deg in RAAN results
in a daily 9 minute launch
window
System Solution
Launch and orbit injection sequence [Source: Jet Propulsion Laboratory]
RAAN: Right Ascension of Ascending Node
© SpaceTech 12. Do not reproduce and distribute without permission 30/76
- 31. Phasing Strategy
• Injection of RetroSat into an orbit 20 km below the debris orbit
• Reduction of the phase angle between RetroSat and the debris (1 deg/hour)
• All maneuvers controlled from the ground
• Phasing ends with the acquisition of the Hold Point 0 (HP0)
System Solution
© SpaceTech 12. Do not reproduce and distribute without permission 31/76
- 32. Debris Spin Status
• Still or very low tumble rates
• Theory: Magnetic drag stops residual tumble within a year
• Visual observations from PPAS databse agree
• Possible orbital resonance with Lorentz force (low relative tumble rate <0.1deg/s)
System Solution
COSPAR: Committee on Space Research
PPAS: Database of Photometric Periods of Artificial Satellites
Note: Numbers represent the time in seconds between flashes or peaks in magnitude.
© SpaceTech 12. Do not reproduce and distribute without permission 32/76
- 33. Rendezvous
Hold Point 1 (HP1) Hold Point 0 (HP0)
Debris location
•Transition to medium range sensors •Transition to relative navigation
error ≈ 1km
•Verify location and state •Verify heading and range
HP2 2 HP1 4 HP0 6
V-bar (km)
0.5
Location error
Hold Point 2 (HP2)
reducing
1 •Transition to close range sensors
•Inspect debris
•Verify ID & State
System Solution
•Determine final approach plan
R-bar (km)
© SpaceTech 12. Do not reproduce and distribute without permission 33/76
- 34. Capture
L
• Manual Capture:
– Cameras systems
• Visual
• Infrared
– LIDAR
– GPS
• Rocket Body Capture
– Rocket nozzle
– Inter-stage
System Solution
mounting ring
– Launch adapter
LIDAR: Light Detection And Ranging
GPS: Global Positioning System
© SpaceTech 12. Do not reproduce and distribute without permission 34/76
- 35. Robotic Arm
DLR DEOS Robotic Arm Capabilities
Length 3m
Mass 45kg
Degrees of Freedom 7 joints system
Max. Joint Rate 180°/sec
Max. Bearing Torque 120Nm
Grasping Torque / Joint 10Nm
Simulated Spin Rate 6° / sec
Simulated Grasp Mass 7 tons
System Solution
Source: DLR Dimensions in mm
DLR: German Aerospace Center
DEOS: Deutsche Orbitale Servicing Mission
© SpaceTech 12. Do not reproduce and distribute without permission 35/76
- 36. Capture & Stabilization
System Solution
Clip courtesy of DLR Institute of Robotics and Mechatronics
DLR: German Aerospace Center
© SpaceTech 12. Do not reproduce and distribute without permission 36/76
- 37. Composite Operations
• Re-orient for
retro burn
• Calibrate
• Orientate for
composite
pitch over
response to
• Spin rate • Pitch over for
test burn
• Center of mass retro burn
• Lock arm
• Thrust line • Verify
• Velocity vector orientation
• Dynamic De-Orbiting
responses
Test
Orientate
Control
Capture
System Solution
18 h
18 h
18 h
12 h
24 h
24 h
12 h
24 h
12 h
6h
6h
6h
DAY 1 DAY 2 DAY 3
© SpaceTech 12. Do not reproduce and distribute without permission 37/76
- 38. Disposal Orbit Trade-Off
Constraints
1. The decay time shall be
less than 25 years
2. No risk to human space Area-Mass ratio
flights
3. The debris shall leave the
region within 1 year Computation obtained using NASA Debris Assessment Software (DAS)
ISS altitude
Disposal Orbit Altitude Lifetime Area to Mass ratio
System Solution
(km) (years) (m2/kg)
430 <10 0.001 (Worst case)
NASA: National Aeronautics and Space Administration
ISS: International Space Station
© SpaceTech 12. Do not reproduce and distribute without permission 38/76
- 39. Composite De-Orbiting
• Using electric propulsion RetroSat spirals down the composite to the
circular 430 km disposal orbit
• Typical time to de-orbit a debris object of 500 kg is approximately 80
days, consuming nearly 32 kg of Xenon propellant
• The electric propulsion is switched off
during the eclipse periods for power
budget reasons
• Eclipse duration is never higher than 39%
of orbital period
System Solution
© SpaceTech 12. Do not reproduce and distribute without permission 39/76
- 40. Release Strategy
• The release is operated from the ground
• RetroSat controls the composite attitude so that the debris is in
nadir direction
• After the end-effectors opening, dynamics naturally separates
RetroSat from the object
System Solution
© SpaceTech 12. Do not reproduce and distribute without permission 40/76
- 41. …To the Next Debris
• The next debris RAAN is reached taking advantage of the differential
nodal regression due to the two different altitudes
• Typical waiting time before starting a new transfer is 25 days …
Ronf
• The low thrust propulsion … RAAN … Ronf
is started again when the … RAAN
RAAN difference can be
covered during the transfer
System Solution
RAAN: Right Ascension of Ascending Node
Ronf: Onomatopoetic word that imitates the sound of a snoring lion
© SpaceTech 12. Do not reproduce and distribute without permission 41/76
- 42. RetroSat
RetroSat Technical Details
Lifetime 7 years
Payload Robotic arm, cameras and LIDAR
Configuration 3-axis stabilized satellite
2 m x 1.8 m x 2 m
Dry Mass 680 kg
Wet Mass 1,296 kg
Propulsion Electric Propulsion
5 thrusters mounted on gimbals
Electrical 50V regulated bus
Power Gallium Arsenide (GaAs) solar array 9m2
Lithium-Ion battery
2.3 kW (Beginning of Life)
Attitude control Pitch, roll and yaw maneuvers
System Solution
Precise orbit determination
Thermal control Passive with heaters
Telemetry & S-band up and down links
Command Telecommand Data Rate: 256 kbps
Telemetry Data Rate: 3.6 Mbps
© SpaceTech 12. Do not reproduce and distribute without permission 42/76
- 43. Satellite Configuration
Robotic Arm GPS antenna
EP Thrusters
‐Z
LIDAR +X
‐Y
Cameras
System Solution
S-band Antennas
GPS: Global Positioning System
EP: Electrical Propulsion
Solar Array
LIDAR: Light Detection And Ranging
© SpaceTech 12. Do not reproduce and distribute without permission 43/76
- 44. RetroSat Functional Diagram
Internal Redundancy
Non Redundant
Cold/Hot Redundant
Power lines
Can Bus
System Solution
AOCS: Attitude and Orbit Control System
GPS: Global Positioning System
© SpaceTech 12. Do not reproduce and distribute without permission 44/76
- 45. Launcher Selection
Drivers Flexible Launch Strategy
• Up to 2 tons Single Dual Triple
• Direct launch into SSO
• Low cost
• Available in 2016
System Solution
LM-4B Soyuz Falcon 9
Cluster launch of 2-3 RetroSats and/or dedicated single launch
Cluster launch of 2-3 RetroSats and/or dedicated single launch
SSO: Sun Synchronous Orbit
LM-4B: Long March 4B
© SpaceTech 12. Do not reproduce and distribute without permission 45/76
- 46. Design and Development Plan (1/2)
PDR: Preliminary Design Review
RetroSat Design & Development Plan CDR: Critical Design Review
QR: Qualification Review
AR: Acceptance Review
ORR: Operational Readiness Review
PDR FRR: Flight Readiness Review
CRR: Commissioning Result Review
CDR
Phase A/BPreliminary Definition
QR AR ORR
RetroSat
Phase C Detailed Definition Disposal
FRR CRR
Qualification/Production
Phase D / Verification
Phase E Operational Phase
Phase F Launch Demonstrator
System Solution
2013
2015
2016
2011
2021
2023
2022
2024
2014
2010
2018
2020
2012
2017
2019
© SpaceTech 12. Do not reproduce and distribute without permission 46/76
- 47. Design and Development Plan (2/2)
• Design based on flight proven technology
• Robotic arm – TRL level 8, in flight demonstration in 2015
(DEOS current launch date)
DLR EPOS Facility – DEOS configuration
Spacecraft Model Philosophy
• Avionics Test bench
• PFM (Proto Flight Model)
• FM (Flight Model)
Critical Rendezvous & Capturing
Operations Test and Verification
System Solution
• DLR EPOS (*) Facility
TRL: Technology Readiness Level
DLR: Deutsches Zentrum für Luft- und Raumfahrt
EPOS: European Proximity Operations Simulator
DEOS: Deutsche Orbitale Servicing Mission
© SpaceTech 12. Do not reproduce and distribute without permission 47/76
- 48. Agenda
Introduction into RetroSpace
Market
System Solution
Business Case
Business Environment
Revenue
Financing
Conclusion
Agenda
© SpaceTech 12. Do not reproduce and distribute without permission 48/76
- 49. Business Environment
Financiers Suppliers
• Private investors / founders • Satellite providers
• Strategic partner • Operation service providers
(satellite manufacturer) • Facility & service leasing
• Guaranteed public bond
Customers Operational Interfaces
Business Case
• Intergovernmental body • Support services
• Commercial • Debris owner
© SpaceTech 12. Do not reproduce and distribute without permission 49/76
- 50. Phased Business Approach – (1/4)
Completion of:
• Strategic partnering
• Lobbying for bond and fund implementation
• Acquisition of flagship customer
• Preparation of service level agreements (with service providers)
Funding:
• Private investors / founders
• Strategic partner (satellite manufacturer)
• Guaranteed public bond
Development
& Production
Business Case
2013
2015
2021
2023
2029
2031
2011
2017
2019
2025
2027
2033
2035
2014
2022
2030
2032
2016
2018
2020
2024
2026
2028
2034
2012
© SpaceTech 12. Do not reproduce and distribute without permission 50/76
- 51. Phased Business Approach – (2/4)
• Establishment of dedicated fund
• First space debris removals
• Initial operations
Proof-of-
Concept
Development
& Production
Business Case
2013
2015
2021
2023
2029
2031
2011
2017
2019
2025
2027
2033
2035
2014
2022
2030
2032
2016
2018
2020
2024
2026
2028
2034
2012
© SpaceTech 12. Do not reproduce and distribute without permission 51/76
- 52. Phased Business Approach – (3/4)
• Full deployment of RetroSat satellite fleet
• Gradual increase of capabilities up to 18 debris / year
• Routine debris removal operations
• Extension of customer basis towards commercial
• Preparation for new business lines
Proof-of-
Concept Operational Phase
Development
& Production
Business Case
2013
2015
2021
2023
2029
2031
2011
2017
2019
2025
2027
2033
2035
2014
2022
2030
2032
2016
2018
2020
2024
2026
2028
2034
2012
© SpaceTech 12. Do not reproduce and distribute without permission 52/76
- 53. Phased Business Approach – (4/4)
• Sales of RetroSat satellites
• Damage inspection missions
• Space-tug service
• Provision of secondary payload hosting capabilities
Service Extension Phase
Proof-of-
Concept Operational Phase
Development
& Production
Business Case
2013
2015
2021
2023
2029
2031
2011
2017
2019
2025
2027
2033
2035
2014
2022
2030
2032
2016
2018
2020
2024
2026
2028
2034
2012
© SpaceTech 12. Do not reproduce and distribute without permission 53/76
- 54. Deployment Scenario
Dual launch Single launch Primary satellite Replacement satellite
Extended Services
Orbital Region B
85
s
altitude=1000 km
lite
i=82° debris
removed
tel
Sa
Orbital Region A
altitude=800km 218
t
i=99° debris
en
removed
cem
pla
Re
RetroSat Demonstrator
Business Case
2020
2022
2024
2026
2028
2030
2034
2012
2014
2016
2032
2018
YEAR
24 satellites in 20 years
© SpaceTech 12. Do not reproduce and distribute without permission 54/76
- 55. Space Debris Removal Fund (SDRF)
• International Governance
Launch
• RetroSpace proposes and will lobby for the Provider
creation of a Space Debris Removal Fund (SDRF)
Launch
• Source of funding for space debris removal Levy
Launcher State
• RetroSpace is uniquely positioned to become
the preferred de-orbit service provider
– First to market Contributions
International
– End-to-end solution SDRF
Organization Fund
– High TRL supervision
Debris
removal
fee
Business Case
SDRF: Space Debris Removal Fund
TRL: Technical Readiness Level
© SpaceTech 12. Do not reproduce and distribute without permission 55/76
- 56. Sources of Funding for the SDRF
• Governments will pay Government Owners of Debris
– $100 M to $200 M per year Satellite Box Score
Rocket
– Contributions proportional Bodies &
to ownership of debris Country Payloads Debris Total
China 78 2695 2773
• Levy on launch fees
CIS 1379 3036 4415
– $500 / kg ESA 38 36 74
• Less than 0.5% of the annual France 49 331 380
India 36 111 147
global public space budgets
Japan 105 69 174
US 1098 3161 4259
Other 425 96 521
Source: The Orbital Debris Quarterly News, Vol. 13,
Issue 1 January 2009
Business Case
SDRF: Space Debris Removal Fund
© SpaceTech 12. Do not reproduce and distribute without permission 56/76
- 57. Pricing - Space Debris Removal
• Price per piece of debris removed
– Fee charged for successful debris removal
– $15 M / piece of debris
• Primary source of revenue for RetroSpace will be the
debris removal service
Business Case
© SpaceTech 12. Do not reproduce and distribute without permission 57/76
- 58. Additional Sources of Revenue
• Sale of RetroSat Satellites
– Sell units to selected customers to conduct de-orbit of their own
satellites
• “Space Tug” Service
– Use robotic arm to capture and relocate other satellites
• Damage Inspection Service
– Use visualization system to inspect other satellites
• Extend Services to GEO
• Secondary Payload
Business Case
GEO: Geostationary Earth Orbit
© SpaceTech 12. Do not reproduce and distribute without permission 58/76
- 59. Revenue Projection
500
Further Growth
450 Potential
Other
400 RetroSat Sales
Debris Removal
350
Revenue [M$]
300
250
200
150
100
50
0
Business Case
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
Year
© SpaceTech 12. Do not reproduce and distribute without permission 59/76
- 60. Financing Strategy
350 Public Bond
Total financing need:
Total financing need: 300
Equity (Investors)
2011 2020: $390 M
2011 --2020: $390 M
Equity (Strategic Partner)
250
Investment [M$]
Investment Need
•• CAPEX //OPEX: $250 M
CAPEX OPEX: $250 M 200
•• Liquidity:
Liquidity: $140 M
$140 M 150 300
100
Satellite Unit Cost 50
70
[M$] 0
20
Satellite 2011 2012 2013 2014 2015 2016 2017
135.5
Development Year
1st Unit Cost 66.5 2011:
2011: $20 M --Founders //Financial Investor
$20 M Founders Financial Investor
2012:
2012: $70 M --Strategic Investor
$70 M Strategic Investor
Additional Units 52.7 2013:
2013: $300 M --“Clean Skies Bond”:
$300 M “Clean Skies Bond”:
•• 10-year public bond (5% p.a.)
10-year public bond (5% p.a.)
Business Case
Launch Cost 18.0
•• Issued by financial institution
Issued by financial institution
•• Guaranteed by international
Guaranteed by international
Insurance Cost 13.7 governments
governments
CAPEX: Capital Expenditures
OPEX: Operating Expenditures
© SpaceTech 12. Do not reproduce and distribute without permission 60/76
- 61. Cash Flow
500
Total Revenues
CAPEX
400
COGS
OPEX
300 Revenue Debris Removal
Free Cash Flow
Bond Issue
200
[M$]
100
0
2011 2016 2021 2026 2031
-100
-200
Year Bond Repayment
Total CAPEX: $2190 M Total Revenues: $5.7 B
Business Case
Total CAPEX: $2190 M Total Revenues: $5.7 B
Total OPEX:
Total OPEX: $641 M
$641 M Debris Removal:
Debris Removal: $4.7 B
$4.7 B
Total COGS:
Total COGS: $158 M
$158 M Extended Services:
Extended Services: $1.0 B
$1.0 B
CAPEX: Capital Expenditures
OPEX: Operating Expenditures
COGS: Cost of Goods Sold
© SpaceTech 12. Do not reproduce and distribute without permission 61/76
- 62. Financial Performance
500
Revenues
400 Net Income
Cash Flow (operating)
300
Million US$
200
100
Payback Period: 10 years
0
Time to Profit: 6 years
-100
Business Case
2014
2015
2016
2017
2018
2025
2026
2027
2034
2035
2019
2028
2029
2030
2011
2012
2013
2020
2021
2022
2023
2024
2031
2032
2033
Year
© SpaceTech 12. Do not reproduce and distribute without permission 62/76
- 63. 25 Year Financial Summary
Founders
Founders
•• Minority stake in RetroSpace
Minority stake in RetroSpace
•• Multiple exit options
Multiple exit options
Financial Investor (2017)
Financial Investor (2017)
•• Capital gain: $80 M
Capital gain: $80 M
•• Multiple: 5
Multiple: 5
•• IRR: 31% p.a.
IRR: 31% p.a.
Satellite Manufacturer
Satellite Manufacturer
•• Profit from satellite sales: $130 M
Profit from satellite sales: $130 M
•• Majority stake in RetroSpace
Majority stake in RetroSpace
•• Dividends from 2020 onwards
Dividends from 2020 onwards
Business Case
General public (2023)
General public (2023)
•• Interest income: $150 M
Interest income: $150 M
IRR: Internal Rate of Return
© SpaceTech 12. Do not reproduce and distribute without permission 63/76
- 64. NextGen PPP Rationale
• Creation of public good with commercial efficiency
• Creation of public good with commercial efficiency
• Lifecycle-based phased approach
• Lifecycle-based phased approach
• Exploitation of partner’s capabilities & strengths
• Exploitation of partner’s capabilities & strengths
• Apportionment of risk and finance geared to
• Apportionment of risk and finance geared to
• Investors
• Investors
• Private Industry
• Private Industry
• Public sector
• Public sector
• General public
• General public
• Balanced risk-reward ratio for all partners
• Balanced risk-reward ratio for all partners
Private
Investors
Industry
Business Case
International General
Governments
Organization Public
NextGen PPP: Next Generation Public-Private Partnership
© SpaceTech 12. Do not reproduce and distribute without permission 64/76
- 65. Global Economic Summary
Private Investments Economic Benefit
Government Tax Income
$701 M
Economic Benefit: $3.5 B
Insurance Companies
$320 M
Revenues: $2.8 B
Launch Service Provider
$432 M
Operator Company
$663 M
Satellite Manufacturer
$70 M Satellite Manufacturer
Business Case
$1436 M
Financial Investor
$20 M
© SpaceTech 12. Do not reproduce and distribute without permission 65/76
- 66. Agenda
Introduction into RetroSpace
Market
System Solution
Business Case
Conclusion
Summary
Closing Thoughts
Acknowledgements
Agenda
© SpaceTech 12. Do not reproduce and distribute without permission 66/76
- 67. RetroSpace Summary (1/2)
• Core Business:
• Providing a public service
• Primary Customer:
• Space Agencies / Governments
• Public-Private Partnership:
• Strategic manufacturing partner
• “Clean Skies Bond“
• Revenues exceeding $400 M per year
Conclusion
© SpaceTech 12. Do not reproduce and distribute without permission 67/76
- 68. RetroSpace Summary (2/2)
• End-to-end system
• Fleet of 7
• Robotic capture
• Electrical propulsion
• Operational in 2016
Business Rendezvous, Grab, and De-orbit Launch
Removal of 15+ large debris per year
Removal of 15+ large debris per year
Reducing risk to space assets
Reducing risk to space assets
Securing future access
Securing future access
Conclusion
© SpaceTech 12. Do not reproduce and distribute without permission 68/76
- 69. Risk Assessment
• International Cooperation
• Agencies must agree to fund this solution collaboratively
• Clarity of Ownership
• Consent required from debris owners
• Maturity of Technology
• Readiness levels are high (some details to iron out)
Low Risk
Low Risk
Conclusion
© SpaceTech 12. Do not reproduce and distribute without permission 69/76
- 70. RetroSpace is the Solution!
• Responsive
• Bringing today’s technologies together
• Effective
• Preserving Earth orbit into the future
• Affordable
• Achievable funding requirements
• Profitable
• Attractive returns for all parties
Conclusion
© SpaceTech 12. Do not reproduce and distribute without permission 70/76
- 71. RetroSpace Focus
• Lobbying for international coordination
• Securing key partnerships
• Investing in key technology
Be part of the solution!
Conclusion
© SpaceTech 12. Do not reproduce and distribute without permission 71/76
- 72. RetroSpace
Restoring Space…
2010
2030
2040
2050
…to the way it was
Conclusion
© SpaceTech 12. Do not reproduce and distribute without permission 72/76
- 73. RetroSpace is… (1/2)
Wolfgang Jung
Frank de Bruin
Susanne Wagenbach
Marco Castronuovo
Simon Hyde
Francesco Longo
Conclusion
© SpaceTech 12. Do not reproduce and distribute without permission 73/76
- 74. RetroSpace is… (2/2)
Monica Martinez
Fernandez
Fabio Covello
Kristina Springborn
Martin Lösch
Shawn Mason
James Geary
Conclusion
© SpaceTech 12. Do not reproduce and distribute without permission 74/76
- 75. Acknowledgments
• Central Case Project sponsor:
• Deutsches Zentrum für Luft- und Raumfahrt e.V.
• Delft University of Technology
• ESA ESTEC
• Our Coaches
• Jon & Jon
Conclusion
© SpaceTech 12. Do not reproduce and distribute without permission 75/76
- 76. Thank You!
Any questions?
Conclusion
© SpaceTech 12. Do not reproduce and distribute without permission 76/76