SlideShare uma empresa Scribd logo
1 de 88
Baixar para ler offline
Mechanisms and Mitigation
of Highway Landslide
Collapse in Indiana
100th Annual Road School 2014
3/12/2013
Malek Smadi, Ph.D., P.E.
Principal Engineer - GEOTILL - Fishers, IN
msmadi@geotill.com - www.geotill.com
Joey Franzino, P.E.
Operations Engineer - INDOT
jfranzino@indot.in.gov - www. indot.in.gov
CONTENTS
1. Geologic Conditions
2. Landslide Areas
3. Landslide Types
4. Timing of Landslides
5. Potential Slide and Steep
Slope Areas
6. Purpose of Geotechnical
Evaluations
7. Improvements Related To
Landslide Type
a. Surface Water Improvements
b. Groundwater Improvements
c. Light Weight Fill
d. Retaining Structures
e. Soil Reinforcement
f. Grading
8. Case History
Geologic Conditions in Indiana
Oldest Bedrock
Youngest Bedrock
Geologic Conditions in Indiana
Correlation of Landslide Occurrence & Geology
Groundwater and Wet Weather
Landslide Types in Indiana
 There are four general landslide-type
possibilities in Indiana:
 High bluff peeloff
 Groundwater blowout
 Deep-seated
 Shallow colluvial
There are various combinations of these generalized landslide types,
as one type of mechanism may lead to another during the sliding, or
the slide may be complex, exhibiting different modes of failure in
different portions of the slide.
High Bluff Peeloff - Landslide Types in Indiana
High Bluff Peeloff - Landslide Types in Indiana
US 50
Ripley
County
Gabion
Wall
Failure
High Bluff Peeloff - Landslide Types in Indiana
US 50
&
US 241
Gabion
Wall
Failure
High Bluff Peeloff - Landslide Types in Indiana
US 50
&
US 241
Gabion
Wall
Failure
14 HP 89 sections - 410 ft long - spaced 6 ft center-to-center
Extend 10 ft into sound bedrock
High Bluff Peeloff - Landslide Types in Indiana
SR 66
Spencer
County
Re-Grading
High Bluff Peeloff - Landslide Types in Indiana
SR 66
Spencer
County
High Bluff Peeloff - Landslide Types in Indiana
SR 66
at
66.3RP
Re-Grading
Groundwater Blowout - Landslide Types in Indiana
Groundwater Blowout - Landslide Types in Indiana
SR 237
1.05RP
Tell City
El 544
El 436
Groundwater Blowout - Landslide Types in Indiana
SR 237
1.05RP
Tell City
Groundwater Blowout - Landslide Types in Indiana
SR 1
Old
Road
in
Cedar
Grove
We lost 3/4 of the road in this rain event.
Groundwater Blowout - Landslide Types in Indiana
SR 1
Old
Road
in
Cedar
Grove
Groundwater Blowout - Landslide Types in Indiana
SR 1
Old
Road
in
Cedar
Grove
Needs
toe protection
Deep-Seated - Landslide Types in Indiana
Deep-Seated - Landslide Types in Indiana
I-74 Landslide
Geofoam
Deep-Seated - Landslide Types in Indiana
I-74
Landslide
Geofoam
20 ft high
Deep-Seated - Landslide Types in Indiana
I-74
Landslide
Geofoam
Deep-Seated - Landslide Types in Indiana
I-74
Landslide
Geofoam
Deep-Seated - Landslide Types in Indiana
I-74
Landslide
Geofoam
Deep-Seated - Landslide Types in Indiana
SR 37
RP 11.4
Perry
County
Deep-Seated - Landslide Types in Indiana
SR 37
RP 11.4
Perry
County
Deep-Seated - Landslide Types in Indiana
SR 37
RP 11.4
Perry
County
550 piers, 30 inches in diameter – 28 to 30 ft deep
Deep-Seated - Landslide Types in Indiana
SR 37
RP 11.4
Perry
County
Rip-rap key was placed two feet within the competent sandstone bedrock
Deep-Seated - Landslide Types in Indiana
SR 37
RP 11.4
Perry
County
Deep-Seated - Landslide Types in Indiana
SR 37
RP 11.4
Perry
County
Deep-Seated - Landslide Types in Indiana
US 50
Slide at
SR 62
Replacing the fill
Deep-Seated - Landslide Types in Indiana
SR 37
RP 11.4
Perry
County
Deep-Seated - Landslide Types in Indiana
SR 46
RP 150
Dearborn
County
Drilled
Shaft Wall
In 1952 bin-wall was constructed
Deep-Seated - Landslide Types in Indiana
SR 46
RP 150
Dearborn
County
Drilled
Shaft Wall
Drilled shaft with tiedback 4 ft in diamter - 7 ft center to center – 40 ft deep
Deep-Seated - Landslide Types in Indiana
SR 46
RP 150
Dearborn
County
Drilled
Shaft Wall
Deep-Seated - Landslide Types in Indiana
SR 56
Switzerland
County
Vevay
Drilled Shaft
Wall
Deep-Seated - Landslide Types in Indiana
SR 56
Switzerland
County
Vevay
Drilled
Shaft Wall
2000 ft long wall
300 drilled shafts with
tied-back
3 ft in diameter
8 ft center to center
5 ft into the bedrock
Deep-Seated - Landslide Types in Indiana
US 150
Deep-Seated - Landslide Types in Indiana
US 150
Shallow Colluvial - Landslide Types in Indiana
Shallow Colluvial - Landslide Types in Indiana
US 50
Shallow Colluvial - Landslide Types in Indiana
US 41
RP
57+20
Shallow Colluvial - Landslide Types in Indiana
Mixture being spread over
geotextile
Slide Correction on I-74, 7/10th mile east
of SR1 and I-74
Case History
S.R. 237 in Perry County, IN
Indiana Road Map
Project location
General Site Plan
Aerial View of the Site
Slide Area
 S.R. 237 was originally built in 2003. This
particular slope is approximately one-half mile
long and was designed to be 2:1 and up to 112
feet high.
Original Roadway Construction
Geotechnical Challenges
 High embankment fills
 Slopes designed as steep as 2:1, placed on
sloping natural ground
 Variations in rock surface elevations
 Fills consist of soils, shale and sandstone
 Environmental constraints
Slope after original construction.
First Slope Failure
 In May 2010 during heavy rain, the
slope moved.
 The road edge and guardrail
experienced vertical displacement.
 Northbound driving lane closed.
First Slope Failure
First Slope Failure
First Slide
 Possible causes for the first slide:
 Actual slope measured steeper than 2:1 with the
height of 112 feet, combined with the type of fill
used (co-mingled soil and shale) was unstable.
 Possible inadequate benching.
 Water pouring from slope (excessive groundwater).
 Heavy rainfall in spring.
Boring location plan for the first slide.
First Slide
First Slide Correction in 2010
 A soil nail wall with a design-build contract
requiring a seven year warranty.
 Extend outlet drainage pipe to the toe of the
east slope.
 The contractor proposed a new H-pile encased
in concrete wall with tiebacks and a shotcrete
facing after the bid which was accepted by
INDOT.
First Slide Correction in 2010
Contractor’s Design
After First Correction
 In April 2012 during heavy rain, the slope in
front of the wall moved. It gradually dropped
vertically approximately 12 feet due to new
failure.
Second Slope Failure
Second Slope Failure
Roadway Existing Slope
Tie Back Wall
Second Slope Failure
Second Slope Failure
Second Slope Failure
 Possible causes for the second slide:
 Surface slide triggered by heavy rainfall.
 Failure of outlet pipe of spring box which was buried
underneath the roadway.
 Insufficient investigation after the first slide (Borings
were only 40 feet deep.)
Second Slide
Second Slide
Boring location plan for the second slide.
 Phase-1 Design
 Drainage correction: includes spring box
repair & horizontal drains
 Phase-2 Design
 Rock backfill (chosen)
 Three tier soil nail walls
Design for Second Slide
Correction Using Rock Backfill
Correction Using Three Tier Wall
Problems With Rock Backfill
 Slide aggravated further after letting in March
2013 due to heavy rains.
 Massive amount of water seeped out of the
slope.
 The rock backfill was not viable option
anymore because it would require the 1:1
temporary slope.
 Potential destabilization of existing soldier pile
wall.
Problems With Rock Backfill
Another Surprise:
 During exploratory excavation for the spring box
repair, coal mine shafts were uncovered.
Mine Shaft Discovery
Mine Shaft Discovery
Mine Shaft Discovery
More Investigation
 Resistivity study done to search for mines.
Map of Resistivity Lines
Resistivity Study Results
More Investigation
 Resistivity study done to search for mines.
 More borings to verify the locations of suspected
mines under the roadway as per geophysical
study (resistivity testing).
 Borings reveal several collapsed mine shafts
under roadway.
 Phase-1 Design
 Drainage correction
 Mine shaft interceptor drain
 Grout the mine shafts
 Phase-2 Design
 Drilled pier (3 ft. dia.) with tieback socket into rock
Revised Solution
Interceptor Drains
Design Cross Section
Drilled Shafts and Drain Layout
Drainage Correction
Grouting to Fill Mine Shafts
 The new drilled pier wall was originally proposed
to be 15 feet from the existing wall.
 The construction of new drilled pier wall
affecting the integrity of existing soldier pile
wall.
Constructability Concerns
 Move the proposed drilled pier wall 40 ft away
from existing soldier pile wall (25 ft further) to
provide safe excavation for inside lagging and
backfill.
 Change temporary casing to a permanent casing
for drilled piers due to possible co-mingled fill
material.
 Provide casing for tieback un-bonded length to
avoid major loss of grout due to unclassified fill
material.
Additional Changes to the Design
Questions ?
Malek Smadi, Ph.D., P.E.
Principal Engineer - GEOTILL - Fishers, IN
msmadi@geotill.com - www.geotill.com
Joey Franzino, P.E.
Operations Engineer - INDOT
jfranzino@indot.in.gov - www. indot.in.gov

Mais conteúdo relacionado

Mais procurados

General & geotechnical considerations for pile design
General & geotechnical considerations for pile designGeneral & geotechnical considerations for pile design
General & geotechnical considerations for pile design
Rizwan Khurram
 
Important of soil survey and selection of suitable dam site-topography/geolog...
Important of soil survey and selection of suitable dam site-topography/geolog...Important of soil survey and selection of suitable dam site-topography/geolog...
Important of soil survey and selection of suitable dam site-topography/geolog...
GauravGautam344043
 
Geotechnical Engineering I Co
Geotechnical Engineering I CoGeotechnical Engineering I Co
Geotechnical Engineering I Co
jagadeesha M U
 

Mais procurados (20)

Engineering geology of dam
Engineering geology of damEngineering geology of dam
Engineering geology of dam
 
Reinforced earth & its application
Reinforced earth & its applicationReinforced earth & its application
Reinforced earth & its application
 
Dam, reservoir & tunnels
Dam, reservoir & tunnelsDam, reservoir & tunnels
Dam, reservoir & tunnels
 
Soil cement walls for excavation support
Soil cement walls for excavation supportSoil cement walls for excavation support
Soil cement walls for excavation support
 
General & geotechnical considerations for pile design
General & geotechnical considerations for pile designGeneral & geotechnical considerations for pile design
General & geotechnical considerations for pile design
 
PROJECT REPORT ON SOIL REINFORCEMENT RETAINING STRUCTURES
PROJECT REPORT ON SOIL REINFORCEMENT RETAINING STRUCTURESPROJECT REPORT ON SOIL REINFORCEMENT RETAINING STRUCTURES
PROJECT REPORT ON SOIL REINFORCEMENT RETAINING STRUCTURES
 
Building Prothro Football Practice Fields
Building Prothro Football Practice FieldsBuilding Prothro Football Practice Fields
Building Prothro Football Practice Fields
 
Chapter 1 soil
Chapter 1 soilChapter 1 soil
Chapter 1 soil
 
Gabion information manufacturing & installation
Gabion information manufacturing  & installationGabion information manufacturing  & installation
Gabion information manufacturing & installation
 
Introduction to Geotechnical Engineering SU - Fall 2015
Introduction to Geotechnical Engineering   SU - Fall 2015Introduction to Geotechnical Engineering   SU - Fall 2015
Introduction to Geotechnical Engineering SU - Fall 2015
 
Important of soil survey and selection of suitable dam site-topography/geolog...
Important of soil survey and selection of suitable dam site-topography/geolog...Important of soil survey and selection of suitable dam site-topography/geolog...
Important of soil survey and selection of suitable dam site-topography/geolog...
 
3.0 soil exploration
3.0 soil exploration3.0 soil exploration
3.0 soil exploration
 
GCS PSU Pegula2
GCS PSU Pegula2GCS PSU Pegula2
GCS PSU Pegula2
 
Geotechnical Engineering I Co
Geotechnical Engineering I CoGeotechnical Engineering I Co
Geotechnical Engineering I Co
 
Materials and Installation Techniques for Retaining Wall
Materials and Installation Techniques for Retaining WallMaterials and Installation Techniques for Retaining Wall
Materials and Installation Techniques for Retaining Wall
 
Tunnelling
TunnellingTunnelling
Tunnelling
 
Final EIS Appendix E
Final EIS Appendix EFinal EIS Appendix E
Final EIS Appendix E
 
Cape Rachado Site A Analysis
Cape Rachado Site A AnalysisCape Rachado Site A Analysis
Cape Rachado Site A Analysis
 
Lecture 4
Lecture 4Lecture 4
Lecture 4
 
2 tunnels
2 tunnels2 tunnels
2 tunnels
 

Destaque (8)

F2 Drainage of golf course features
F2 Drainage of golf course featuresF2 Drainage of golf course features
F2 Drainage of golf course features
 
Smart tunnel
Smart  tunnelSmart  tunnel
Smart tunnel
 
LANDSLIDES
LANDSLIDESLANDSLIDES
LANDSLIDES
 
Lanslides tam 2013-04
Lanslides tam 2013-04Lanslides tam 2013-04
Lanslides tam 2013-04
 
Group 5 1
Group 5 1Group 5 1
Group 5 1
 
1.4 landslide
1.4 landslide1.4 landslide
1.4 landslide
 
House Drainage System
House Drainage SystemHouse Drainage System
House Drainage System
 
Drainage system
Drainage systemDrainage system
Drainage system
 

Semelhante a Mechanisms and mitigation of highway landslide collapse in indiana by by Malek Smadi of GEOTILL

Mechanisms and kinematics of three translational slides along the North Saska...
Mechanisms and kinematics of three translational slides along the North Saska...Mechanisms and kinematics of three translational slides along the North Saska...
Mechanisms and kinematics of three translational slides along the North Saska...
Soe Moe Kyaw Win
 
San Elijo Hills Drainage Diversion storm drain line ‘n’ 1
San Elijo Hills Drainage Diversion storm drain line ‘n’  1San Elijo Hills Drainage Diversion storm drain line ‘n’  1
San Elijo Hills Drainage Diversion storm drain line ‘n’ 1
talerco
 
Integrating Geomechanics With Operational Practices Improves Extended-Reach D...
Integrating Geomechanics With Operational Practices Improves Extended-Reach D...Integrating Geomechanics With Operational Practices Improves Extended-Reach D...
Integrating Geomechanics With Operational Practices Improves Extended-Reach D...
Society of Petroleum Engineers
 
Tri State Presentation - 9-24-15
Tri State Presentation - 9-24-15Tri State Presentation - 9-24-15
Tri State Presentation - 9-24-15
Noah Hoefs
 

Semelhante a Mechanisms and mitigation of highway landslide collapse in indiana by by Malek Smadi of GEOTILL (20)

Innovative Slope Stabilisation
Innovative Slope StabilisationInnovative Slope Stabilisation
Innovative Slope Stabilisation
 
Selection of Claycrete Projects from 1995 - 2004 Re-visited (2006)
Selection of Claycrete Projects from 1995 - 2004 Re-visited (2006)Selection of Claycrete Projects from 1995 - 2004 Re-visited (2006)
Selection of Claycrete Projects from 1995 - 2004 Re-visited (2006)
 
Our Disappearing Sandspit
Our Disappearing SandspitOur Disappearing Sandspit
Our Disappearing Sandspit
 
ASDSO Dam Safety 2010 Presentation
ASDSO Dam Safety 2010 PresentationASDSO Dam Safety 2010 Presentation
ASDSO Dam Safety 2010 Presentation
 
Schoharie Creek Bridge Collapse - Case Study
Schoharie Creek Bridge Collapse - Case StudySchoharie Creek Bridge Collapse - Case Study
Schoharie Creek Bridge Collapse - Case Study
 
Mechanisms and kinematics of three translational slides along the North Saska...
Mechanisms and kinematics of three translational slides along the North Saska...Mechanisms and kinematics of three translational slides along the North Saska...
Mechanisms and kinematics of three translational slides along the North Saska...
 
Foundation Repair Systems & Forensic Repairs
Foundation Repair Systems & Forensic RepairsFoundation Repair Systems & Forensic Repairs
Foundation Repair Systems & Forensic Repairs
 
Deep foundation construction in bouldery bed an over view
Deep foundation construction in bouldery bed an over viewDeep foundation construction in bouldery bed an over view
Deep foundation construction in bouldery bed an over view
 
Robert W. Fairbanks and Richard N. St. Jean, Coastal Shoreline Protection Usi...
Robert W. Fairbanks and Richard N. St. Jean, Coastal Shoreline Protection Usi...Robert W. Fairbanks and Richard N. St. Jean, Coastal Shoreline Protection Usi...
Robert W. Fairbanks and Richard N. St. Jean, Coastal Shoreline Protection Usi...
 
Hill roads and Drainage
Hill roads and DrainageHill roads and Drainage
Hill roads and Drainage
 
San Elijo Hills Drainage Diversion storm drain line ‘n’ 1
San Elijo Hills Drainage Diversion storm drain line ‘n’  1San Elijo Hills Drainage Diversion storm drain line ‘n’  1
San Elijo Hills Drainage Diversion storm drain line ‘n’ 1
 
Bridge 91 Design
Bridge 91 DesignBridge 91 Design
Bridge 91 Design
 
W Wright Sess8 102709
W Wright Sess8 102709W Wright Sess8 102709
W Wright Sess8 102709
 
Rd cs steele_county
Rd cs steele_countyRd cs steele_county
Rd cs steele_county
 
ASCEMLSTPRESENTATION 05-06-03.PPT
ASCEMLSTPRESENTATION 05-06-03.PPTASCEMLSTPRESENTATION 05-06-03.PPT
ASCEMLSTPRESENTATION 05-06-03.PPT
 
Integrating Geomechanics With Operational Practices Improves Extended-Reach D...
Integrating Geomechanics With Operational Practices Improves Extended-Reach D...Integrating Geomechanics With Operational Practices Improves Extended-Reach D...
Integrating Geomechanics With Operational Practices Improves Extended-Reach D...
 
Tri State Presentation - 9-24-15
Tri State Presentation - 9-24-15Tri State Presentation - 9-24-15
Tri State Presentation - 9-24-15
 
Construction Job Story in GeoDrilling International
Construction Job Story in GeoDrilling InternationalConstruction Job Story in GeoDrilling International
Construction Job Story in GeoDrilling International
 
Rock engineering-overview
Rock engineering-overviewRock engineering-overview
Rock engineering-overview
 
Dams
Dams Dams
Dams
 

Último

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Último (20)

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 

Mechanisms and mitigation of highway landslide collapse in indiana by by Malek Smadi of GEOTILL