Flanders Electric – Engineering Division   Welcomes You to an Overview of  Reconditioned Switchgear
Reasons for Reconditioning Switchgear Cost Savings Reuse material Buswork Building/enclosure Components Energy Efficiencies Shorter Production outages often required with  switchgear upgrades
Technology Upgrade Obsolete Parts Replacement Vacuum Contactors/Breakers Solid State Protection Web Enabled Power Monitoring Equipment (wireless Ethernet) Reasons for Reconditioning Switchgear – con’t Environmental Considerations Removal of Equipment From Old Mines More Energy Efficient Components
Meggar/Hi Pot Line and Load Conductors Visually inspect for hot spots/fluid leaks etc. Thoroughly Clean Compartment Remove:  Dirt,  Rocks, Excess oils, Rodent infestation Inspect all components for excess wear and damage Basic inspections/cleanings on all components Visually inspect all Connections – i.e.  Power Cable Clamps (draglines)   Fuse Clips (loose, corrosion) Inspect Insulators, Bushings and Surge Arrestors
For Load Break Switches Adjust and lubricate linkages as necessary Clean and Calibrate Electro-Mechanical Protection Devices  (if not being replaced) Oil Analysis where necessary Basic inspections/cleanings on all components (con’t)
Technology Upgrades Typically  Recommended Change OCB’s (Oil Filled Circuit Breakers) to Vacuum  Circuit Breakers Replace Capacitive Trip Devices – Depending upon Age Change Electro-Mechanical Overload protection devices to  Solid State – Improve Repeatability and Accuracy
Replace low voltage, air contactor size 4 and above with  vacuum contactors and any medium voltage with vacuum contactor   -Improves contactor life (number of cycles) -Minimizes effect of environmental elements on contacts Replace old lighting with more energy efficient lighting -High pressure sodium or Metal Halide on outside  -Replace incandescent lights with fluorescent bulbs in  sockets Technology Upgrades Typically  Recommended  (con’t)
Safety Related items – must do Upgrade all receptacles to GFCI type Install new safety signage/warning labels Simulate all Ground Faults Repair all door interlocks per MSHA Check Ground Monitor (Coal Mines)
Standards Followed National Electrical Code Mining Safety and Health Administration UL/c UL – Underwriters Laboratory ANSI – American National Standards Institute NFPA 79 – Electrical Standard for Industrial Machinery EIA RS821 – Electronics Industries Assoc.: Construction Standards
Just a few examples
EXAMPLES – 1  BEFORE
EXAMPLE - 2
EXAMPLE -3  INSTALLATIONS
EXAMPLE 4
EXAMPLE -5
EXAMPLE – 6  BEFORE
EXAMPLE – 7  AFTER
Example # 1  Medium Voltage Pump Sub  Specifications 7200/480Y, 225KVA Description of operation - Transformer and Breaker to Feed Pumps for  Water Removal
Material  Cost $6,500.00 Repair Load Switch Replace two 480VAC Breakers Labor cost  $1,200.00 Total Cost  $7,700.00 Example # 1  Medium Voltage Pump Sub Summary  Estimated Cost of new  $30,000
Example # 2  OCB – Vacuum Retrofit  Specifications Voltage: 7200VAC Current:  400 Amp Description of Operation – Dragline Contactor for Motor Starting with  Overload and Ground Fault Protection
Material  Cost $9,000.00 Labor cost  $1000.00 Total Cost  $10,000.00 Example # 2  OCB - Vacuum Retrofit Summary  Other Savings/Benefits:  Installation of new contactor  during normal outage time.  Estimated Cost of new  Switchgear:  $55,000.00
Example # 3 Portable Breaker House Specifications Voltage: 4160 VAC Current:  1200 Amps Description of operation – Converted 7200VAC Portable Breaker House to 4160 Line Drop Station
Items Replaced  (2) Potential Transformers (PT’s) (3) 5kV Bushing Assemblies Labor cost  $8,000.00 Total Cost  $13,000.00 Example # 3  Portable Breaker House Summary  Estimated Cost of new  $50,000.00 Material Cost  $5,000.00
Example # 4 -  3 Way Switch House Specifications Voltage  7200 VAC Current  400 amps Description of operation  - Switches to Provide Alternative Feed for  Distribution.  Single Main to 3 feeds
Material Cost  $900.00 Mechanical Interlocks Calibration  Labor cost  $1,000.00 Total Cost  $1,900.00 Example # 4  3 Way Switch House Summary  Estimated Cost of new  $25,000.00
Example # 5 Large Portable Substation Specifications Voltage  23,000VAC Current  1000 amps Description of operation - Power Feed and Distribution to Dragline
Items Replaced  Replaced 25KV OCB Contacts and Changed Oil Ground Monitor GE Potential Transformer Labor cost  $11,000.00 Total Cost   $27,000.00 Example # 5  Large Portable Switchgear Summary  Estimated Cost of new  $75,000.00 Material Cost $16,000.00  (includes purchase of used skid)
Questions ???

Mais conteúdo relacionado

Mais procurados

JIE_hybrid_PVT_model
JIE_hybrid_PVT_modelJIE_hybrid_PVT_model
JIE_hybrid_PVT_model
Sam Sim
 

Mais procurados (11)

Brian Jonathan - FYP Extended Summary
Brian Jonathan - FYP Extended SummaryBrian Jonathan - FYP Extended Summary
Brian Jonathan - FYP Extended Summary
 
JIE_hybrid_PVT_model
JIE_hybrid_PVT_modelJIE_hybrid_PVT_model
JIE_hybrid_PVT_model
 
BTECH/MTECH PROJECTS 2015
BTECH/MTECH PROJECTS 2015BTECH/MTECH PROJECTS 2015
BTECH/MTECH PROJECTS 2015
 
Power[1]
Power[1]Power[1]
Power[1]
 
Improved Time Responses of PI & FL Controlled SEPIC Converter based Series Re...
Improved Time Responses of PI & FL Controlled SEPIC Converter based Series Re...Improved Time Responses of PI & FL Controlled SEPIC Converter based Series Re...
Improved Time Responses of PI & FL Controlled SEPIC Converter based Series Re...
 
Latest 2016 IEEE Electrical Projects List for BTech and MTech
Latest 2016 IEEE Electrical Projects List for BTech and MTechLatest 2016 IEEE Electrical Projects List for BTech and MTech
Latest 2016 IEEE Electrical Projects List for BTech and MTech
 
IRJET-Study of Three State Switching Cell Based DC-To-DC Converter
IRJET-Study of Three State Switching Cell Based DC-To-DC ConverterIRJET-Study of Three State Switching Cell Based DC-To-DC Converter
IRJET-Study of Three State Switching Cell Based DC-To-DC Converter
 
Wind Loads on PV roof top solar installations.
Wind Loads on PV roof top solar installations.Wind Loads on PV roof top solar installations.
Wind Loads on PV roof top solar installations.
 
A laboratory model of a dual active bridge dc-dc converter for a smart user n...
A laboratory model of a dual active bridge dc-dc converter for a smart user n...A laboratory model of a dual active bridge dc-dc converter for a smart user n...
A laboratory model of a dual active bridge dc-dc converter for a smart user n...
 
Design of a Single Phase Isolated Bidirectional AC to DC Converter for Batter...
Design of a Single Phase Isolated Bidirectional AC to DC Converter for Batter...Design of a Single Phase Isolated Bidirectional AC to DC Converter for Batter...
Design of a Single Phase Isolated Bidirectional AC to DC Converter for Batter...
 
Project list 2019-2020
Project list 2019-2020Project list 2019-2020
Project list 2019-2020
 

Destaque (8)

Qs 7001
Qs 7001Qs 7001
Qs 7001
 
Five o'clock tea...
Five o'clock tea...Five o'clock tea...
Five o'clock tea...
 
Nd pharma green science for life
 Nd pharma green science for life Nd pharma green science for life
Nd pharma green science for life
 
Are you going to fight or fleet.pptx (1)
Are you going to fight or fleet.pptx (1)Are you going to fight or fleet.pptx (1)
Are you going to fight or fleet.pptx (1)
 
Alokraj Resume
Alokraj ResumeAlokraj Resume
Alokraj Resume
 
7 mangus intestinal transplantation
7 mangus intestinal transplantation7 mangus intestinal transplantation
7 mangus intestinal transplantation
 
Alokraj Application
Alokraj ApplicationAlokraj Application
Alokraj Application
 
Decrecimiento en la escuela.
Decrecimiento en la escuela.Decrecimiento en la escuela.
Decrecimiento en la escuela.
 

Semelhante a Prsn

Legend Power Overview 97 2003 120410 1256 Do
Legend Power   Overview 97 2003 120410 1256 DoLegend Power   Overview 97 2003 120410 1256 Do
Legend Power Overview 97 2003 120410 1256 Do
Legend Power
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentation
Ramendra Dhiman
 
Power factor corrector
Power factor correctorPower factor corrector
Power factor corrector
JoeChueng
 
Getting the Most out of your Electrical Room
Getting the Most out of your Electrical RoomGetting the Most out of your Electrical Room
Getting the Most out of your Electrical Room
michaeljmack
 
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
MOHAMMAD KHALID MUSTAFA
 
UPS operation, Rev 2.pptx
UPS operation, Rev 2.pptxUPS operation, Rev 2.pptx
UPS operation, Rev 2.pptx
Jaimohan15
 
Integrating fuel cell systems in critical industrial processes
Integrating fuel cell systems in critical industrial processesIntegrating fuel cell systems in critical industrial processes
Integrating fuel cell systems in critical industrial processes
Zondits
 
Power electronics and its applications.pptx
Power electronics and its applications.pptxPower electronics and its applications.pptx
Power electronics and its applications.pptx
SHIVANICHAUUHAN1
 

Semelhante a Prsn (20)

CHAPTER 2 Design of Building Electrical Systems (2).pptx.pptx
CHAPTER 2 Design of Building Electrical Systems (2).pptx.pptxCHAPTER 2 Design of Building Electrical Systems (2).pptx.pptx
CHAPTER 2 Design of Building Electrical Systems (2).pptx.pptx
 
Legend Power Overview 97 2003 120410 1256 Do
Legend Power   Overview 97 2003 120410 1256 DoLegend Power   Overview 97 2003 120410 1256 Do
Legend Power Overview 97 2003 120410 1256 Do
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentation
 
Shivesh ntpc ppt
Shivesh ntpc pptShivesh ntpc ppt
Shivesh ntpc ppt
 
Session 05 grid connected inverter
Session 05   grid connected inverterSession 05   grid connected inverter
Session 05 grid connected inverter
 
Electrical component at airport for airfield lighting circuit
Electrical component at airport for airfield lighting circuitElectrical component at airport for airfield lighting circuit
Electrical component at airport for airfield lighting circuit
 
Power factor corrector
Power factor correctorPower factor corrector
Power factor corrector
 
Power factor correction
Power factor correctionPower factor correction
Power factor correction
 
Designing an Uninterruptible Power Supply
Designing an Uninterruptible Power SupplyDesigning an Uninterruptible Power Supply
Designing an Uninterruptible Power Supply
 
Getting the Most out of your Electrical Room
Getting the Most out of your Electrical RoomGetting the Most out of your Electrical Room
Getting the Most out of your Electrical Room
 
A Five – Level Integrated AC – DC Converter
A Five – Level Integrated AC – DC ConverterA Five – Level Integrated AC – DC Converter
A Five – Level Integrated AC – DC Converter
 
Distributed Generation By Roland Desouza
Distributed Generation By Roland DesouzaDistributed Generation By Roland Desouza
Distributed Generation By Roland Desouza
 
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
 
UPS operation, Rev 2.pptx
UPS operation, Rev 2.pptxUPS operation, Rev 2.pptx
UPS operation, Rev 2.pptx
 
Power transformers rating
Power transformers ratingPower transformers rating
Power transformers rating
 
Integrating fuel cell systems in critical industrial processes
Integrating fuel cell systems in critical industrial processesIntegrating fuel cell systems in critical industrial processes
Integrating fuel cell systems in critical industrial processes
 
Permaculutre Renewable Energy
Permaculutre Renewable EnergyPermaculutre Renewable Energy
Permaculutre Renewable Energy
 
Electrical Engineering Basics - What Design Engineers Need to Know
Electrical Engineering Basics - What Design Engineers Need to KnowElectrical Engineering Basics - What Design Engineers Need to Know
Electrical Engineering Basics - What Design Engineers Need to Know
 
Basics of Power Inverters
Basics of Power InvertersBasics of Power Inverters
Basics of Power Inverters
 
Power electronics and its applications.pptx
Power electronics and its applications.pptxPower electronics and its applications.pptx
Power electronics and its applications.pptx
 

Último

會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
中 央社
 
The basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptxThe basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptx
heathfieldcps1
 

Último (20)

Graduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptxGraduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptx
 
Exploring Gemini AI and Integration with MuleSoft | MuleSoft Mysore Meetup #45
Exploring Gemini AI and Integration with MuleSoft | MuleSoft Mysore Meetup #45Exploring Gemini AI and Integration with MuleSoft | MuleSoft Mysore Meetup #45
Exploring Gemini AI and Integration with MuleSoft | MuleSoft Mysore Meetup #45
 
Championnat de France de Tennis de table/
Championnat de France de Tennis de table/Championnat de France de Tennis de table/
Championnat de France de Tennis de table/
 
How to Manage Closest Location in Odoo 17 Inventory
How to Manage Closest Location in Odoo 17 InventoryHow to Manage Closest Location in Odoo 17 Inventory
How to Manage Closest Location in Odoo 17 Inventory
 
Improved Approval Flow in Odoo 17 Studio App
Improved Approval Flow in Odoo 17 Studio AppImproved Approval Flow in Odoo 17 Studio App
Improved Approval Flow in Odoo 17 Studio App
 
diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....
 
Đề tieng anh thpt 2024 danh cho cac ban hoc sinh
Đề tieng anh thpt 2024 danh cho cac ban hoc sinhĐề tieng anh thpt 2024 danh cho cac ban hoc sinh
Đề tieng anh thpt 2024 danh cho cac ban hoc sinh
 
PSYPACT- Practicing Over State Lines May 2024.pptx
PSYPACT- Practicing Over State Lines May 2024.pptxPSYPACT- Practicing Over State Lines May 2024.pptx
PSYPACT- Practicing Over State Lines May 2024.pptx
 
Including Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdfIncluding Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdf
 
Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...
 
Implanted Devices - VP Shunts: EMGuidewire's Radiology Reading Room
Implanted Devices - VP Shunts: EMGuidewire's Radiology Reading RoomImplanted Devices - VP Shunts: EMGuidewire's Radiology Reading Room
Implanted Devices - VP Shunts: EMGuidewire's Radiology Reading Room
 
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
 
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
 
An Overview of the Odoo 17 Knowledge App
An Overview of the Odoo 17 Knowledge AppAn Overview of the Odoo 17 Knowledge App
An Overview of the Odoo 17 Knowledge App
 
Features of Video Calls in the Discuss Module in Odoo 17
Features of Video Calls in the Discuss Module in Odoo 17Features of Video Calls in the Discuss Module in Odoo 17
Features of Video Calls in the Discuss Module in Odoo 17
 
An overview of the various scriptures in Hinduism
An overview of the various scriptures in HinduismAn overview of the various scriptures in Hinduism
An overview of the various scriptures in Hinduism
 
Chapter 7 Pharmacosy Traditional System of Medicine & Ayurvedic Preparations ...
Chapter 7 Pharmacosy Traditional System of Medicine & Ayurvedic Preparations ...Chapter 7 Pharmacosy Traditional System of Medicine & Ayurvedic Preparations ...
Chapter 7 Pharmacosy Traditional System of Medicine & Ayurvedic Preparations ...
 
The Liver & Gallbladder (Anatomy & Physiology).pptx
The Liver &  Gallbladder (Anatomy & Physiology).pptxThe Liver &  Gallbladder (Anatomy & Physiology).pptx
The Liver & Gallbladder (Anatomy & Physiology).pptx
 
Capitol Tech Univ Doctoral Presentation -May 2024
Capitol Tech Univ Doctoral Presentation -May 2024Capitol Tech Univ Doctoral Presentation -May 2024
Capitol Tech Univ Doctoral Presentation -May 2024
 
The basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptxThe basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptx
 

Prsn

  • 1. Flanders Electric – Engineering Division Welcomes You to an Overview of Reconditioned Switchgear
  • 2. Reasons for Reconditioning Switchgear Cost Savings Reuse material Buswork Building/enclosure Components Energy Efficiencies Shorter Production outages often required with switchgear upgrades
  • 3. Technology Upgrade Obsolete Parts Replacement Vacuum Contactors/Breakers Solid State Protection Web Enabled Power Monitoring Equipment (wireless Ethernet) Reasons for Reconditioning Switchgear – con’t Environmental Considerations Removal of Equipment From Old Mines More Energy Efficient Components
  • 4. Meggar/Hi Pot Line and Load Conductors Visually inspect for hot spots/fluid leaks etc. Thoroughly Clean Compartment Remove: Dirt, Rocks, Excess oils, Rodent infestation Inspect all components for excess wear and damage Basic inspections/cleanings on all components Visually inspect all Connections – i.e. Power Cable Clamps (draglines) Fuse Clips (loose, corrosion) Inspect Insulators, Bushings and Surge Arrestors
  • 5. For Load Break Switches Adjust and lubricate linkages as necessary Clean and Calibrate Electro-Mechanical Protection Devices (if not being replaced) Oil Analysis where necessary Basic inspections/cleanings on all components (con’t)
  • 6. Technology Upgrades Typically Recommended Change OCB’s (Oil Filled Circuit Breakers) to Vacuum Circuit Breakers Replace Capacitive Trip Devices – Depending upon Age Change Electro-Mechanical Overload protection devices to Solid State – Improve Repeatability and Accuracy
  • 7. Replace low voltage, air contactor size 4 and above with vacuum contactors and any medium voltage with vacuum contactor -Improves contactor life (number of cycles) -Minimizes effect of environmental elements on contacts Replace old lighting with more energy efficient lighting -High pressure sodium or Metal Halide on outside -Replace incandescent lights with fluorescent bulbs in sockets Technology Upgrades Typically Recommended (con’t)
  • 8. Safety Related items – must do Upgrade all receptacles to GFCI type Install new safety signage/warning labels Simulate all Ground Faults Repair all door interlocks per MSHA Check Ground Monitor (Coal Mines)
  • 9. Standards Followed National Electrical Code Mining Safety and Health Administration UL/c UL – Underwriters Laboratory ANSI – American National Standards Institute NFPA 79 – Electrical Standard for Industrial Machinery EIA RS821 – Electronics Industries Assoc.: Construction Standards
  • 10. Just a few examples
  • 11. EXAMPLES – 1 BEFORE
  • 13. EXAMPLE -3 INSTALLATIONS
  • 16. EXAMPLE – 6 BEFORE
  • 17. EXAMPLE – 7 AFTER
  • 18. Example # 1 Medium Voltage Pump Sub Specifications 7200/480Y, 225KVA Description of operation - Transformer and Breaker to Feed Pumps for Water Removal
  • 19. Material Cost $6,500.00 Repair Load Switch Replace two 480VAC Breakers Labor cost $1,200.00 Total Cost $7,700.00 Example # 1 Medium Voltage Pump Sub Summary Estimated Cost of new $30,000
  • 20. Example # 2 OCB – Vacuum Retrofit Specifications Voltage: 7200VAC Current: 400 Amp Description of Operation – Dragline Contactor for Motor Starting with Overload and Ground Fault Protection
  • 21. Material Cost $9,000.00 Labor cost $1000.00 Total Cost $10,000.00 Example # 2 OCB - Vacuum Retrofit Summary Other Savings/Benefits: Installation of new contactor during normal outage time. Estimated Cost of new Switchgear: $55,000.00
  • 22. Example # 3 Portable Breaker House Specifications Voltage: 4160 VAC Current: 1200 Amps Description of operation – Converted 7200VAC Portable Breaker House to 4160 Line Drop Station
  • 23. Items Replaced (2) Potential Transformers (PT’s) (3) 5kV Bushing Assemblies Labor cost $8,000.00 Total Cost $13,000.00 Example # 3 Portable Breaker House Summary Estimated Cost of new $50,000.00 Material Cost $5,000.00
  • 24. Example # 4 - 3 Way Switch House Specifications Voltage 7200 VAC Current 400 amps Description of operation - Switches to Provide Alternative Feed for Distribution. Single Main to 3 feeds
  • 25. Material Cost $900.00 Mechanical Interlocks Calibration Labor cost $1,000.00 Total Cost $1,900.00 Example # 4 3 Way Switch House Summary Estimated Cost of new $25,000.00
  • 26. Example # 5 Large Portable Substation Specifications Voltage 23,000VAC Current 1000 amps Description of operation - Power Feed and Distribution to Dragline
  • 27. Items Replaced Replaced 25KV OCB Contacts and Changed Oil Ground Monitor GE Potential Transformer Labor cost $11,000.00 Total Cost $27,000.00 Example # 5 Large Portable Switchgear Summary Estimated Cost of new $75,000.00 Material Cost $16,000.00 (includes purchase of used skid)