BY:- Varnit Agarwal
Navodit Thareja
Pranav Mohindru
Abhay Rana
 Cost/benefit analysis gives a picture of the
various costs,benefits and rules associated
with each alternative system.
 Costs and benefits are classified as:
1. Tangible & Intangible costs and benefits
2. Direct & Indirect costs and benefits
3. Fixed & variable costs and benefits
 Cost/benefit analysis is done with the
following procedure:
1. Identifying the costs and benefits related to
the project.
2. Categorising the various costs and benefits
for the analysis.
3. Selecting a method of evaluation.
4. Interpreting the result of an analysis.
5. Taking action.
 When all the financial data have been
identified, the analyst has to select a method
of evaluation.
 Based on that evaluation,the result has been
interpreted. On the basis of the interpreted
result, an action has been taken for the
alternative system of an organisation.
1. Net Benefit Analysis
2. Present Value Analysis
3. Net Present Value
4. Payback Analysis
5. Break-even Analysis
6. Cash-flow Analysis
 It involves subtracting total cost from total
benefits i.e.
Net Benefit=Total Benefit – Total Cost.
 Example of net benefit analysis.
Advantages:
 It is easy to calculate.
 It is easy to interpret.
 It is easy to present.
Disadvantage:
 It does not account for the time value of
money.
 Present Value analysis is used for long-term
projects where it is difficult to compare
today’s cost with the benefits of tomorrow.
 In this method cost and benefits are
calculated in terms of today’s value of
investment.
 The present value analysis determines how
much money is invested now in order to
receive a given return in some year’s time.
 The present value can be computed through the
formula:
F=P(1+i)^n
So, P=F/(1+i)^n
E.g. The present value of Rs1500(which is
estimated future value) invested at 10% interest
at the end of fourth year is:
P=1500/(1+.10)^4
=1500/1.61=Rs 1027.39
i.e. if we invest Rs1027.39 today at 10%
interest, we can expect to have Rs1500 in four
years.
Year Estimated
future vale
Present
value
Cumulative
present
value of
benefits
1 Rs 1500 Rs 1363.63 Rs 1363.63
2 Rs 1500 Rs 1239.67 Rs 2603.30
3 Rs 1500 Rs 1127.82 Rs 3731.12
4 Rs 1500 Rs 1027.39 Rs 4758.51
It shows that present value of a stream of estimated
future values of Rs. 1500 each for the next 4 years
after discounting for 10% is Rs. 4758.51
Advantages:
 It is easy to calculate.
 It equates different investment opportunities
with various costs and benefits and discount
rates.
 It accounts for time value of money.
Disadvantage:
 It is only a relative(not absolute) measure of a
project’s return on investment.
 The present value analysis when carried out
for the net benefits is called NET PRESENT
VALUE(NPV).
 Its equal to benefits minus costs. It is
expressed as percentage of the investment.
 NET PRESENT VALUE(%)=BENEFITS-COSTS
 Example:
Suppose a company invested Rs 3000 for a
microcomputer that yields a cumulative
benefit of Rs 4758.51. So, net present
value(gain) of Rs 1758.51.
The net present value is expressed as a
percentage of the investment. Therefore,
1758.51/3000=0.55=55%
Advantages:
 It is relatively easy to calculate.
 It accounts for time value of money.
Disadvantage:
 It is only a relative(not absolute) measure of a
project’s return on investment.
 When a project is started, costs are incurred
while the benefits take time to start.
 Payback analysis is to determine how long it
will take for a project when the accumulated
benefits equal the benefits used.
 Payback analysis defines the period required
to recover the money spent on a project. This
period is called the payback period. The
shorter the period ,the faster the benefits.
 The table below shows the example of
Payback Analysis.
Year1 Year2 Year3 Year4 Year5
Initial cost 10000
Operating
cost
1000 1000 1000 1000
Total cost 10000 1000 1000 1000 1000
Cumulative
cost
10000 11000 12000 13000 14000
Benefits 0 5000 5000 5000 5000
Cumulative
benefits
0 5000 10000 15000 20000
Advantage:
 It is easy to calculate.
 It has straightforward interpretation for
choice between two or more alternatives for
candidate system.
Disadvantages:
 It is conservative economic measure applied
to one opportunity at a time.
 It does not compare profitability of multiple
investment alternatives.
 It does not allow for time value of money.
 Break-even analysis is a technique which
compares the costs of using present and
candidate systems.
 It is based on categorizing production costs
between those which are "variable" (costs that
change when the production output changes)
and those that are "fixed" (costs not directly
related to the volume of production).
 Total variable and fixed costs are compared
with sales revenue in order to determine the
level of sales volume.
 Sales value or production at which the
business makes neither a profit nor a loss is
known as the "break- even point".
 It is a graphical representation of costs at
various levels of activity shown on the same
chart as the variation of income with the
same variation in activity.
 The point at which neither profit nor loss is
made is known as the "break-even point" and
is represented on the chart below by the
intersection of the two lines.
Advantage:
 It is easy to understand.
Disadvantage:
 It does not allow for time factor and
depreciation value of money.
 Cash flow analysis deals with the timing and
amount of cash inflows/outflows from a firm
or an investment.
 Cash flow analysis keeps tracks of
accumulated cost and revenues on regular
basis.
 It is simply calculated by deducting the
operating cost from revenues created from
investment on a period-by-period basis and
then calculates the accumulated cost.
Cash flow =Revenue – operating Expenses
Accumulated Cash Flow=Cash Flow (month 1)
+ Cash Flow(month 2) +…+Cash Flow(month
n).
Here the payback period is of 3 years.
Advantage:
 It combines benefits of both break-even and
payback method.
Disadvantages:
 Ignores time value of money for limited time
period.
 It does not take into account the probability
of the project.
 Ignores behavioral implications of numbers in
the financial statement.
 Once the evaluation of the project is
complete, actual results are compared against
standards or alternative investments.
 The decision to adopt an alternative system
can be highly subjective, depending on the
analyst’s or user’s confidence in the
estimated cost and benefit values and the
magnitude of the investment.
1. Net Benefit Analysis is calculated through
(a) Total cost –Total benefit
(b) Total benefit – Total cost
(c) Total cost + Total benefit
2. What is “break-even” point?
(a) Profit with loss.
(b) No profit but loss
(c) Profit but no loss
(d) Neither profit nor loss
3. What is the formula for calculating future
value of a project?
(a) F=P(1+i)^n
(b) F=P/(1+i)^n
(c) F=P^n/(1+i)
(d) None of the above.
4. Tangible cost can be
(a) Measured
(b) Identified
(c) All of above
5. “Cost of breakdown of an online system
during banking hours will cost the bank to
lose deposit” is an example of
(a) Tangible cost
(b) Indirect cost
(c) Variable cost
(d) Intangible cost
Thank You !!!

Mais conteúdo relacionado

Mais procurados

001 lpp introduction
001 lpp introduction001 lpp introduction
001 lpp introductionVictor Seelan
 
Construction Equipment Management
Construction Equipment ManagementConstruction Equipment Management
Construction Equipment ManagementChintan Raichura
 
Session 8.3: Business Work Improvement Course (Financial Statements and Analy...
Session 8.3: Business Work Improvement Course (Financial Statements and Analy...Session 8.3: Business Work Improvement Course (Financial Statements and Analy...
Session 8.3: Business Work Improvement Course (Financial Statements and Analy...Lym Relampagos Ongoy
 
1 introduction to engineering economics
1  introduction to engineering economics1  introduction to engineering economics
1 introduction to engineering economicsMohsin Siddique
 
3. eng. cost and estimation
3. eng. cost and estimation3. eng. cost and estimation
3. eng. cost and estimationMohsin Siddique
 
Linear programming problem
Linear programming problemLinear programming problem
Linear programming problemmakeitsimple007
 
decision making in Lp
decision making in Lp decision making in Lp
decision making in Lp Dronak Sahu
 
Methods for solving ‘or’ models
Methods for solving ‘or’ modelsMethods for solving ‘or’ models
Methods for solving ‘or’ modelsJishnu Rajan
 
Engineering economic importance & application
Engineering economic importance & applicationEngineering economic importance & application
Engineering economic importance & applicationabdus sobhan
 
NPV, IRR, Capital budgeting, Evaluation techniques
NPV, IRR, Capital budgeting, Evaluation techniques NPV, IRR, Capital budgeting, Evaluation techniques
NPV, IRR, Capital budgeting, Evaluation techniques Gurjot Singh
 
Price level Accounting
Price level AccountingPrice level Accounting
Price level AccountingAijaz Aryan
 
Linear programming
Linear programmingLinear programming
Linear programmingKarnav Rana
 
Lecture 8 responsiblity accounting and transfer pricing
Lecture 8 responsiblity accounting and transfer pricingLecture 8 responsiblity accounting and transfer pricing
Lecture 8 responsiblity accounting and transfer pricingFrozen Corpse
 
Intro to engineering economy
Intro to engineering economyIntro to engineering economy
Intro to engineering economyKwesi Kissiedu
 
Lecture # 6 cost estimation ii
Lecture # 6 cost estimation iiLecture # 6 cost estimation ii
Lecture # 6 cost estimation iiBich Lien Pham
 
Techniques in marketing research
Techniques in marketing researchTechniques in marketing research
Techniques in marketing researchSunny Bose
 
Lecture # 13 investment alternatives i
Lecture # 13 investment alternatives iLecture # 13 investment alternatives i
Lecture # 13 investment alternatives iBich Lien Pham
 

Mais procurados (19)

001 lpp introduction
001 lpp introduction001 lpp introduction
001 lpp introduction
 
Construction Equipment Management
Construction Equipment ManagementConstruction Equipment Management
Construction Equipment Management
 
Session 8.3: Business Work Improvement Course (Financial Statements and Analy...
Session 8.3: Business Work Improvement Course (Financial Statements and Analy...Session 8.3: Business Work Improvement Course (Financial Statements and Analy...
Session 8.3: Business Work Improvement Course (Financial Statements and Analy...
 
1 introduction to engineering economics
1  introduction to engineering economics1  introduction to engineering economics
1 introduction to engineering economics
 
3. eng. cost and estimation
3. eng. cost and estimation3. eng. cost and estimation
3. eng. cost and estimation
 
Linear programming problem
Linear programming problemLinear programming problem
Linear programming problem
 
Responsibility accounting
Responsibility accountingResponsibility accounting
Responsibility accounting
 
decision making in Lp
decision making in Lp decision making in Lp
decision making in Lp
 
Methods for solving ‘or’ models
Methods for solving ‘or’ modelsMethods for solving ‘or’ models
Methods for solving ‘or’ models
 
Engineering economic importance & application
Engineering economic importance & applicationEngineering economic importance & application
Engineering economic importance & application
 
NPV, IRR, Capital budgeting, Evaluation techniques
NPV, IRR, Capital budgeting, Evaluation techniques NPV, IRR, Capital budgeting, Evaluation techniques
NPV, IRR, Capital budgeting, Evaluation techniques
 
Price level Accounting
Price level AccountingPrice level Accounting
Price level Accounting
 
Linear programming
Linear programmingLinear programming
Linear programming
 
Lecture 8 responsiblity accounting and transfer pricing
Lecture 8 responsiblity accounting and transfer pricingLecture 8 responsiblity accounting and transfer pricing
Lecture 8 responsiblity accounting and transfer pricing
 
Intro to engineering economy
Intro to engineering economyIntro to engineering economy
Intro to engineering economy
 
Lecture # 6 cost estimation ii
Lecture # 6 cost estimation iiLecture # 6 cost estimation ii
Lecture # 6 cost estimation ii
 
Unit ii-1-lp
Unit ii-1-lpUnit ii-1-lp
Unit ii-1-lp
 
Techniques in marketing research
Techniques in marketing researchTechniques in marketing research
Techniques in marketing research
 
Lecture # 13 investment alternatives i
Lecture # 13 investment alternatives iLecture # 13 investment alternatives i
Lecture # 13 investment alternatives i
 

Destaque

F58fbnatural resources 2 (1)
F58fbnatural resources 2 (1)F58fbnatural resources 2 (1)
F58fbnatural resources 2 (1)Mukund Trivedi
 
Project Selection Model
Project Selection ModelProject Selection Model
Project Selection ModelErsen çelebi
 
System development life cycle (sdlc)
System development life cycle (sdlc)System development life cycle (sdlc)
System development life cycle (sdlc)Mukund Trivedi
 
Project planning and feasibility study
Project planning and feasibility studyProject planning and feasibility study
Project planning and feasibility studyMars Mfyam
 

Destaque (9)

F58fbnatural resources 2 (1)
F58fbnatural resources 2 (1)F58fbnatural resources 2 (1)
F58fbnatural resources 2 (1)
 
Project Selection Model
Project Selection ModelProject Selection Model
Project Selection Model
 
How to Prepare Innovative Feasibility Study in transitional economy
How to Prepare Innovative Feasibility Study in transitional economyHow to Prepare Innovative Feasibility Study in transitional economy
How to Prepare Innovative Feasibility Study in transitional economy
 
project selection
project selectionproject selection
project selection
 
Project Selection
Project SelectionProject Selection
Project Selection
 
The Process of Project Selection
The Process of Project SelectionThe Process of Project Selection
The Process of Project Selection
 
System development life cycle (sdlc)
System development life cycle (sdlc)System development life cycle (sdlc)
System development life cycle (sdlc)
 
Health economics
Health economicsHealth economics
Health economics
 
Project planning and feasibility study
Project planning and feasibility studyProject planning and feasibility study
Project planning and feasibility study
 

Semelhante a Evaluation

Training on Financial and Economic Project Evaluation
Training on Financial and Economic Project Evaluation Training on Financial and Economic Project Evaluation
Training on Financial and Economic Project Evaluation tobiassommer2013
 
Unit 10 Investment decisions.pdf
Unit 10 Investment decisions.pdfUnit 10 Investment decisions.pdf
Unit 10 Investment decisions.pdfPrabin Pandit
 
PPT PM - Chapter 4 & 5.pdf
PPT PM - Chapter 4 & 5.pdfPPT PM - Chapter 4 & 5.pdf
PPT PM - Chapter 4 & 5.pdfjitendramane8
 
Financial analysis pp
Financial analysis ppFinancial analysis pp
Financial analysis ppJoeVelarde
 
Engineering economics Slides for Postgraduates
Engineering economics Slides for PostgraduatesEngineering economics Slides for Postgraduates
Engineering economics Slides for Postgraduatesssuser50050d1
 
Capital Budgeting.ppt
Capital Budgeting.pptCapital Budgeting.ppt
Capital Budgeting.pptPrakhar796898
 
Financial Analysis for Project Management.ppt
Financial Analysis for Project Management.pptFinancial Analysis for Project Management.ppt
Financial Analysis for Project Management.pptIndranilGanguly21
 
software-project-management-unit-2.ppt
software-project-management-unit-2.pptsoftware-project-management-unit-2.ppt
software-project-management-unit-2.pptMaanbahadurkhadka
 
software-project-management-unit-2-220808125214-00921612 (1).pdf
software-project-management-unit-2-220808125214-00921612 (1).pdfsoftware-project-management-unit-2-220808125214-00921612 (1).pdf
software-project-management-unit-2-220808125214-00921612 (1).pdfVinoth Kumar
 
Quantitative methods
Quantitative methodsQuantitative methods
Quantitative methodsHimanshu Shah
 
Resource Management
Resource ManagementResource Management
Resource Managementbodo-con
 
Module 3 Economics VTU
Module 3 Economics VTUModule 3 Economics VTU
Module 3 Economics VTUIndependent
 
INVESTMENT DECISION AND RELATED PROBLEM
INVESTMENT DECISION AND RELATED PROBLEMINVESTMENT DECISION AND RELATED PROBLEM
INVESTMENT DECISION AND RELATED PROBLEMMohammed Jasir PV
 

Semelhante a Evaluation (20)

Cost benefit
Cost benefitCost benefit
Cost benefit
 
Nce603 mod unit3
Nce603 mod unit3Nce603 mod unit3
Nce603 mod unit3
 
Engineering Economy
Engineering EconomyEngineering Economy
Engineering Economy
 
Training on Financial and Economic Project Evaluation
Training on Financial and Economic Project Evaluation Training on Financial and Economic Project Evaluation
Training on Financial and Economic Project Evaluation
 
Unit 10 Investment decisions.pdf
Unit 10 Investment decisions.pdfUnit 10 Investment decisions.pdf
Unit 10 Investment decisions.pdf
 
Public projects evaluation cba analysis
Public projects evaluation cba analysisPublic projects evaluation cba analysis
Public projects evaluation cba analysis
 
PPT PM - Chapter 4 & 5.pdf
PPT PM - Chapter 4 & 5.pdfPPT PM - Chapter 4 & 5.pdf
PPT PM - Chapter 4 & 5.pdf
 
Financial analysis pp
Financial analysis ppFinancial analysis pp
Financial analysis pp
 
Engineering economics Slides for Postgraduates
Engineering economics Slides for PostgraduatesEngineering economics Slides for Postgraduates
Engineering economics Slides for Postgraduates
 
Chapter 3.pptx
Chapter 3.pptxChapter 3.pptx
Chapter 3.pptx
 
ENGINEERING-ECONOMY.docx
ENGINEERING-ECONOMY.docxENGINEERING-ECONOMY.docx
ENGINEERING-ECONOMY.docx
 
Capital Budgeting.ppt
Capital Budgeting.pptCapital Budgeting.ppt
Capital Budgeting.ppt
 
Capital Budgeting
Capital BudgetingCapital Budgeting
Capital Budgeting
 
Financial Analysis for Project Management.ppt
Financial Analysis for Project Management.pptFinancial Analysis for Project Management.ppt
Financial Analysis for Project Management.ppt
 
software-project-management-unit-2.ppt
software-project-management-unit-2.pptsoftware-project-management-unit-2.ppt
software-project-management-unit-2.ppt
 
software-project-management-unit-2-220808125214-00921612 (1).pdf
software-project-management-unit-2-220808125214-00921612 (1).pdfsoftware-project-management-unit-2-220808125214-00921612 (1).pdf
software-project-management-unit-2-220808125214-00921612 (1).pdf
 
Quantitative methods
Quantitative methodsQuantitative methods
Quantitative methods
 
Resource Management
Resource ManagementResource Management
Resource Management
 
Module 3 Economics VTU
Module 3 Economics VTUModule 3 Economics VTU
Module 3 Economics VTU
 
INVESTMENT DECISION AND RELATED PROBLEM
INVESTMENT DECISION AND RELATED PROBLEMINVESTMENT DECISION AND RELATED PROBLEM
INVESTMENT DECISION AND RELATED PROBLEM
 

Mais de Mukund Trivedi (20)

Process of design
Process of designProcess of design
Process of design
 
New file and form 2
New file and form 2New file and form 2
New file and form 2
 
File organisation
File organisationFile organisation
File organisation
 
Database
DatabaseDatabase
Database
 
Case tools
Case toolsCase tools
Case tools
 
Dfd final
Dfd finalDfd final
Dfd final
 
Sad
SadSad
Sad
 
C++ file
C++ fileC++ file
C++ file
 
Ff40fnatural resources (1)
Ff40fnatural resources (1)Ff40fnatural resources (1)
Ff40fnatural resources (1)
 
Ff40fnatural resources
Ff40fnatural resourcesFf40fnatural resources
Ff40fnatural resources
 
F58fbnatural resources 2
F58fbnatural resources 2F58fbnatural resources 2
F58fbnatural resources 2
 
F6dc1 session6 c++
F6dc1 session6 c++F6dc1 session6 c++
F6dc1 session6 c++
 
Ee2fbunit 7
Ee2fbunit 7Ee2fbunit 7
Ee2fbunit 7
 
E212d9a797dbms chapter3 b.sc2 (2)
E212d9a797dbms chapter3 b.sc2 (2)E212d9a797dbms chapter3 b.sc2 (2)
E212d9a797dbms chapter3 b.sc2 (2)
 
E212d9a797dbms chapter3 b.sc2 (1)
E212d9a797dbms chapter3 b.sc2 (1)E212d9a797dbms chapter3 b.sc2 (1)
E212d9a797dbms chapter3 b.sc2 (1)
 
E212d9a797dbms chapter3 b.sc2
E212d9a797dbms chapter3 b.sc2E212d9a797dbms chapter3 b.sc2
E212d9a797dbms chapter3 b.sc2
 
C96e1 session3 c++
C96e1 session3 c++C96e1 session3 c++
C96e1 session3 c++
 
B1ce9 assignmentbsc
B1ce9 assignmentbscB1ce9 assignmentbsc
B1ce9 assignmentbsc
 
Af7ff syllabuslablist
Af7ff syllabuslablistAf7ff syllabuslablist
Af7ff syllabuslablist
 
106da session5 c++
106da session5 c++106da session5 c++
106da session5 c++
 

Último

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Sheetaleventcompany
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Sheetaleventcompany
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...allensay1
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 

Último (20)

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 

Evaluation

  • 1. BY:- Varnit Agarwal Navodit Thareja Pranav Mohindru Abhay Rana
  • 2.  Cost/benefit analysis gives a picture of the various costs,benefits and rules associated with each alternative system.  Costs and benefits are classified as: 1. Tangible & Intangible costs and benefits 2. Direct & Indirect costs and benefits 3. Fixed & variable costs and benefits
  • 3.  Cost/benefit analysis is done with the following procedure: 1. Identifying the costs and benefits related to the project. 2. Categorising the various costs and benefits for the analysis. 3. Selecting a method of evaluation. 4. Interpreting the result of an analysis. 5. Taking action.
  • 4.  When all the financial data have been identified, the analyst has to select a method of evaluation.  Based on that evaluation,the result has been interpreted. On the basis of the interpreted result, an action has been taken for the alternative system of an organisation.
  • 5. 1. Net Benefit Analysis 2. Present Value Analysis 3. Net Present Value 4. Payback Analysis 5. Break-even Analysis 6. Cash-flow Analysis
  • 6.  It involves subtracting total cost from total benefits i.e. Net Benefit=Total Benefit – Total Cost.
  • 7.  Example of net benefit analysis.
  • 8. Advantages:  It is easy to calculate.  It is easy to interpret.  It is easy to present. Disadvantage:  It does not account for the time value of money.
  • 9.  Present Value analysis is used for long-term projects where it is difficult to compare today’s cost with the benefits of tomorrow.  In this method cost and benefits are calculated in terms of today’s value of investment.  The present value analysis determines how much money is invested now in order to receive a given return in some year’s time.
  • 10.  The present value can be computed through the formula: F=P(1+i)^n So, P=F/(1+i)^n E.g. The present value of Rs1500(which is estimated future value) invested at 10% interest at the end of fourth year is: P=1500/(1+.10)^4 =1500/1.61=Rs 1027.39 i.e. if we invest Rs1027.39 today at 10% interest, we can expect to have Rs1500 in four years.
  • 11. Year Estimated future vale Present value Cumulative present value of benefits 1 Rs 1500 Rs 1363.63 Rs 1363.63 2 Rs 1500 Rs 1239.67 Rs 2603.30 3 Rs 1500 Rs 1127.82 Rs 3731.12 4 Rs 1500 Rs 1027.39 Rs 4758.51 It shows that present value of a stream of estimated future values of Rs. 1500 each for the next 4 years after discounting for 10% is Rs. 4758.51
  • 12. Advantages:  It is easy to calculate.  It equates different investment opportunities with various costs and benefits and discount rates.  It accounts for time value of money. Disadvantage:  It is only a relative(not absolute) measure of a project’s return on investment.
  • 13.  The present value analysis when carried out for the net benefits is called NET PRESENT VALUE(NPV).  Its equal to benefits minus costs. It is expressed as percentage of the investment.  NET PRESENT VALUE(%)=BENEFITS-COSTS
  • 14.  Example: Suppose a company invested Rs 3000 for a microcomputer that yields a cumulative benefit of Rs 4758.51. So, net present value(gain) of Rs 1758.51. The net present value is expressed as a percentage of the investment. Therefore, 1758.51/3000=0.55=55%
  • 15. Advantages:  It is relatively easy to calculate.  It accounts for time value of money. Disadvantage:  It is only a relative(not absolute) measure of a project’s return on investment.
  • 16.  When a project is started, costs are incurred while the benefits take time to start.  Payback analysis is to determine how long it will take for a project when the accumulated benefits equal the benefits used.  Payback analysis defines the period required to recover the money spent on a project. This period is called the payback period. The shorter the period ,the faster the benefits.
  • 17.  The table below shows the example of Payback Analysis. Year1 Year2 Year3 Year4 Year5 Initial cost 10000 Operating cost 1000 1000 1000 1000 Total cost 10000 1000 1000 1000 1000 Cumulative cost 10000 11000 12000 13000 14000 Benefits 0 5000 5000 5000 5000 Cumulative benefits 0 5000 10000 15000 20000
  • 18. Advantage:  It is easy to calculate.  It has straightforward interpretation for choice between two or more alternatives for candidate system. Disadvantages:  It is conservative economic measure applied to one opportunity at a time.  It does not compare profitability of multiple investment alternatives.  It does not allow for time value of money.
  • 19.  Break-even analysis is a technique which compares the costs of using present and candidate systems.  It is based on categorizing production costs between those which are "variable" (costs that change when the production output changes) and those that are "fixed" (costs not directly related to the volume of production).
  • 20.  Total variable and fixed costs are compared with sales revenue in order to determine the level of sales volume.  Sales value or production at which the business makes neither a profit nor a loss is known as the "break- even point".
  • 21.  It is a graphical representation of costs at various levels of activity shown on the same chart as the variation of income with the same variation in activity.  The point at which neither profit nor loss is made is known as the "break-even point" and is represented on the chart below by the intersection of the two lines.
  • 22.
  • 23. Advantage:  It is easy to understand. Disadvantage:  It does not allow for time factor and depreciation value of money.
  • 24.  Cash flow analysis deals with the timing and amount of cash inflows/outflows from a firm or an investment.  Cash flow analysis keeps tracks of accumulated cost and revenues on regular basis.
  • 25.  It is simply calculated by deducting the operating cost from revenues created from investment on a period-by-period basis and then calculates the accumulated cost. Cash flow =Revenue – operating Expenses Accumulated Cash Flow=Cash Flow (month 1) + Cash Flow(month 2) +…+Cash Flow(month n).
  • 26. Here the payback period is of 3 years.
  • 27. Advantage:  It combines benefits of both break-even and payback method. Disadvantages:  Ignores time value of money for limited time period.  It does not take into account the probability of the project.  Ignores behavioral implications of numbers in the financial statement.
  • 28.  Once the evaluation of the project is complete, actual results are compared against standards or alternative investments.  The decision to adopt an alternative system can be highly subjective, depending on the analyst’s or user’s confidence in the estimated cost and benefit values and the magnitude of the investment.
  • 29. 1. Net Benefit Analysis is calculated through (a) Total cost –Total benefit (b) Total benefit – Total cost (c) Total cost + Total benefit 2. What is “break-even” point? (a) Profit with loss. (b) No profit but loss (c) Profit but no loss (d) Neither profit nor loss
  • 30. 3. What is the formula for calculating future value of a project? (a) F=P(1+i)^n (b) F=P/(1+i)^n (c) F=P^n/(1+i) (d) None of the above. 4. Tangible cost can be (a) Measured (b) Identified (c) All of above
  • 31. 5. “Cost of breakdown of an online system during banking hours will cost the bank to lose deposit” is an example of (a) Tangible cost (b) Indirect cost (c) Variable cost (d) Intangible cost