The Chaucer Way
Change Management
Copyright © Chaucer 2009-2012 | www.chaucer.com
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management ii
The Change Management Process
The Chaucer Way is Chaucer’s unique approach to Change Management
Change projects can be large scale and complex:
	 Impacting multiple dimensions of a business
	 Geographically and culturally diverse
	 Technically complex
	 Competing initiatives
The nature of the change can bring many challenges:
	 Scope of the change(s)
	 Wide reaching staff, behavioural and cultural issues.
	 Visibility and pressure for results
	 Technology solutions may be needed
Chaucer has a wide breadth and depth of capability across the Change Management
life cycle and our unique approach has been successfully utilised and accepted as
best practice by our clients.
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management iii
Index
1 	 The Chaucer Way is…
2	 Change Program Support
3	 The Change Landscape
4	 Why define the change landscape?
5 	 Engage change program sponsors
6 	 Analyse organisation complexity
7 	 Assess organisation culture
8 	 Identify and analyse organisation impacts
9 	 Create the case for change
10 	 Define metrics
11 	 Change Readiness
12 	 Build change management teams
13 	 Identify and map stakeholders
14 	 Develop stakeholder engagement plan
15 	 Identify business sponsors
and change agents
16 	 Business sponsors – engagement plan
17 	 Plan for anticipated resistance
18 	 Engagement & Communication
19 	 Implement engagement plan
20 	 Moving advocates to required state
21 	 Develop and execute communications plan
22 	 Progress tracking and establishing feedback
loops
23 	 Promoting Change & Managing Resistance
24 	 Identify sources of resistance
25 	 Implement proactive/reactive resistance
management tactics
26 	 Devise and implement resistance toolkit
27 	 Tracking metrics
28 	 Sustaining and Reinforcing Change
29 	 Why reinforce change?
30 	 Implement tools to achieve
behavioural shift
31	 Move to continuous improvement
32 	 Chaucer – planning for change success
33 	 Why Chaucer for change management?
34	 Contact us
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 1
The Chaucer Way
The Chaucer Way is…
1 	 Structured
2 	 Tried, tested and proven to be successful
3 	 Progressive and pragmatic
4 	 Comprehensive
5 	 Efficient and effective
6 	 Auditable
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 2
Change Program Support
Sustaining
andReinforcingChange
ChangeReadiness
UnderstandingtheChan
geLandscape
PromotingChange&ManagingResista
nce
Engagement & Communication
Devise and implement
reinforcement Initiatives
Implement tools to
achieve behavioural shifts
Move to situation of
continuous improvement
Engage change
program sponsors
Analyse organisation
complexity
Assess organisational culture
Identify and analyse
organisational impacts
Create the case for change
Define metrics
Build change teams
Identify and map
stakeholders
Develop stakeholder
engagement plan
Identify business sponsor
and change agents
Plan for anticipated
resistance
Implement
engagement plan
Commence progress
tracking
Develop and execute
communications plan
Establish feedback loops
Devise resistance
management strategies
Identify sources
of resistance
Implement proactive/
reactive resistance
management tactics
Devise and implement
resistance toolkit
Track metrics
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 3
The Change Landscape
Sustaining
andReinforcingChange
ChangeReadiness
UnderstandingtheChan
geLandscape
PromotingChange&ManagingResista
nce
Engagement & Communication
Devise and implement
reinforcement Initiatives
Implement tools to
achieve behavioural shifts
Move to situation of
continuous improvement
Engage change
program sponsors
Analyse organisation
complexity
Assess organisational culture
Identify and analyse
organisational impacts
Create the case for change
Define metrics
Build change teams
Identify and map
stakeholders
Develop stakeholder
engagement plan
Identify business sponsor
and change agents
Plan for anticipated
resistance
Implement
engagement plan
Commence progress
tracking
Develop and execute
communications plan
Establish feedback loops
Devise resistance
management strategies
Identify sources
of resistance
Implement proactive/
reactive resistance
management tactics
Devise and implement
resistance toolkit
Track metrics
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 4
Why define the change landscape?
Initiating changes without understanding
the full program reach could potentially
derail the change program and
waste resources
Building a picture of the change landscape
is an essential step to:
	 Reveal the extent of the organisational
impact globally, regionally, nationally
and by business line, unit and function
	 Ensure the true scope of the change
program is recognised and considered
	 Construct a sound foundation
for the proposed change
	 Provide the basis for the
Change Management strategy
Blue Sky/
Corporate
Strategy
Change
Defined
Change
Implementation
Business StrategyBusiness Strategy
Change StrategyChange Strategy
Organisation
Culture
Organisation
Culture
Organisation
Structure
Organisation
Structure
Internal
Impacts
Internal
Impacts
External
Impacts
External
Impacts
Change
Landscape
Documented
Change
Landscape
Documented
Business Case
for Action
and ChangeVision
Signed Off
Business Case
for Action
and ChangeVision
Signed Off
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 5
Engage change program sponsors
Change
Program Sponsor(s)
Change
Program Sponsor(s)
Change
ManagementTeam
Change
ManagementTeam
Change
Strategies
Change
Strategies
Change
Tactics
Change
Tactics
Corporate
Mission
Corporate
Mission
Headline Change
Objectives
Headline Change
Objectives
	 To articulate objectives for the change from
the context of overall corporate strategy and activity
	 To outline current senior management
perception of landscape
	 To communicate constraints, if any
	 To approve the means by which the change
management team will make the change happen
	 Begin to take responsibility for active ownership
and promotion of the change
It is critical that the change program sponsor is actively engaged in the definition of
the change landscape to provide both context and approvals for proposed action
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 6
Analyse organisation complexity
Analysing organisational complexity provides a full picture of the extent of change impact
	 Missing this step risks change impacts
being felt in unexpected areas and
in not soliciting local support for
the impending change
	 The real extent of the change may
reach well beyond the area of
the business upon which it is focused
	 In global organisations impact on
other regions should be reviewed
	 Consider also external linkages
such as those to regulating authorities
VP Sponsor
Manager
DirectorDirector
Manager
SupervisorSupervisor
Manager
EmployeeRecipient
User Worker
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 7
Assess organisation culture
Organisational
Culture
Management
Style
Values,
Attitudes
Norms
Staff
Empowerment
Products
or Services
Leader
Behaviour
Sub-cultures
Formal
Management
Systems
Systems,
Technology,
People
History,
Previous
Change
External
Image - PR,
Advertising
Organisational
Culture
Management
Style
Values,
Attitudes
Norms
Staff
Empowerment
Products
or Services
Leader
Behaviour
Sub-cultures
Formal
Management
Systems
Systems,
Technology,
People
History,
Previous
Change
External
Image - PR,
Advertising
Understanding organisational culture is an essential part of managing change
and requires attention to both hard and soft influences
	 Understanding cultures and sub-cultures is essential for setting
the change management strategy
	 It is key input into preparing for resistance, planning for its
management and reinforcing change
	 Organisational culture is shaped by many influences, formal and
informal. It evolves continuously
	 Organisations with entrenched cultures find change difficult to
sustain
	 Behaviours are a powerful influence on culture. Producing
behaviour change is often a key component in making the
required change sustainable
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 8
Identify and analyse organisation impacts
Identify and analyse organisation impacts
Internal
Other planned or ongoing change initiatives, restructuring or
strategic vision in the organisation may cause staff to have conflicting priorities
People
Create a profile of all the individuals impacted by the change across the whole
organisation (globally, regionally etc.) to ensure visibility
External
Awareness of external impacts such as forthcoming regulatory changes on
the organisation and operating environment will enhance the program’s resilience
Legislative
Regulatory
Technological
Environmental
Political
Economic
Social
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 9
Create the case for change
A meaningful, unified, real-world vision of the
change state will be used in a variety of situations:
	 For communication to a wide variety of audiences
inside and outside the organisation
	 In the course of‘selling’the change to those impacted
	 It is key input into preparing for resistance,
planning for its management and reinforcing change
Create a compelling business case for action:
	 It is the means by which the change vision,
motives and goals can be confirmed and validated
by consensus before proceeding
	 Change program sponsors will both provide input
and be a consumer of the business case.
Validating it with them is essential
Ensuring that the Change Vision is clearly conceptualised and articulated is critical to success
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 10
Define metrics
	 Metrics must unambiguously
communicate progress
towards change success
	 Change metrics are likely to
be directly linked to any
overall program objectives.
These are frequently set out
in the financial Business Case
for the change which is
usually owned by
the change sponsor
	 The change management team
will track metrics and report on
them throughout the change
program’s lifecycle providing
assurance that the work is on
track towards success
Engagement Category 1 Status Owner Source Description
Stakeholders OK Stone Phil Stakholder Engagement Status
Planned Meetings +8 Waring Tim % Planned Meetings
Delivered Meetings OK Waring Deborah % Delivered Meetings
Change Agents ID OK Waring Bob % Change Agents Identified
Change Agents Recruited OK Waring Steve % Change Agents Recruited
Communication +1 Douglas Phil Communication
Plan onTrack OK Stone Tim Plan onTrack
Comms Drafted -1 Stone Deborah No. of Communications Drafted
Distributed -1 Patterson Bob No. of Communications Distributed
Surveys OK Lafferty Steve No. of Surveys Conducted
Feedback from Users OK Lafferty Phil % Unsolicitated Feedback Received
Behaviours -3 Douglas Tim Behaviours
Exhibited OK Stone Deborah Behaviours Desired Being Exhibited
Opinions OK Smith Bob Solicitated Opinions onTransition
FAQs +3 Stone Steve Nature of FAQs
With the change landscape established and the business case approved, identify suitable
metrics that demonstrate change success
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 11
Change Readiness
Sustaining
andReinforcingChange
ChangeReadiness
UnderstandingtheChan
geLandscape
PromotingChange&ManagingResista
nce
Engagement & Communication
Devise and implement
reinforcement Initiatives
Implement tools to
achieve behavioural shifts
Move to situation of
continuous improvement
Engage change
program sponsors
Analyse organisation
complexity
Assess organisational culture
Identify and analyse
organisational impacts
Create the case for change
Define metrics
Build change teams
Identify and map
stakeholders
Develop stakeholder
engagement plan
Identify business sponsor
and change agents
Plan for anticipated
resistance
Implement
engagement plan
Commence progress
tracking
Develop and execute
communications plan
Establish feedback loops
Devise resistance
management strategies
Identify sources
of resistance
Implement proactive/
reactive resistance
management tactics
Devise and implement
resistance toolkit
Track metrics
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 12
Build change management teams
	 Identifying all stakeholders
	 Identifying potential business
sponsors
	 Creating a plan to manage them
	 Anticipating resistance and devising
mitigation
Two important change teams
should be mobilised:
	 Steering Team / Leadership Team
	 Change Management Team
A significant amount of activity
will be required from these teams
throughout the duration of the
change program.
Reassess
Evaluate
Establish
Current Level
of Engagement
Develop
Engagement
Plan
Identify
Stakeholders
Segment
Change Readiness is focused on building a high level change management strategy and
implementation plan
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 13
Identify and map stakeholders
Stakeholders are all those:
	 Directly involved
	 Indirectly involved
	 Affected by the work or the outcomes
	 Able to influence the work or the outcomes
Change Program Sponsor(s)Change Program Sponsor(s)
Change ManagementTeam
Change Managers
Change Agents
Tactical Business Line Reps
PMO
Change ManagementTeam
Change Managers
Change Agents
Tactical Business Line Reps
PMO
Support FunctionsSupport FunctionsThird PartiesThird Parties Government AgenciesGovernment Agencies
ShareholdersShareholdersOthersOthers
Other Stakeholder Groups
Directors/Managers*Directors/Managers*
Change RecipientChange Recipient
Primary Business
Stakeholders
Primary Business
Stakeholders
Business Line FocusBusiness Line Focus
Steering Group/LT
Senior Business Leads
Senior Support Leads
Steering Group/LT
Senior Business Leads
Senior Support Leads
*Directors/Managers can also be ‘Business
Sponsors’as well as Stakeholders in their
own right. See slide on‘Business Sponsors’
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 14
Develop stakeholder engagement plan
	 Identify all the Stakeholder Groups and
their needs and any associated issues or risks.
1
	 Integrate the information gathered in
steps 1-3 into a comprehensive engagement
plan whose progress can be tracked.
4
	 Determine for each the current and required
degree of engagement with the change.
Define the types of activities required to
maintain or move them to the desired state.
2
	 Profile detailed engagement activities,
meeting opportunities etc. Agree which
activity type should
be leveraged for
each stakeholder
group.
3
Stakeholder Group Current Status Desired Status Activites to achieve to
desired state
Stakeholder Group 1 Ownership Ownership Ongoing program High Level
Communication
Stakeholder Group 2 Awareness Buy In Updates on program
progress
Stakeholder Group n
Stakeholder Group People Key Needs Issues & Risks
Country
Managers
2 Awareness of key
program details
Failure to engage leads to loss
of sponsorship
Stakeholder
Groups
SponsorMeeting
GlobalMeeting
CountryMeeting
Lunch&Learns
CoffeeMorning
Webex
Group 1
Group 2  
Group 3 
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 15
Identify business sponsors and change agents
Two critical stakeholder segments require
identification and dedicated attention:
Business Sponsors
	 Senior managers whose influence and buy-in to a
the change program are key. Their influence and advocacy
over their direct reports can make or break a change program
They can promote the change initiative, cascade
communications and ensure adoption
	 Identify, map, note linkages of all business sponsors.
There may be many individuals scheduled in a big program
Change Agents
	 Individuals from the operating business affected by the
change who are also a member of the extended program
team. This is a very important role‘on the ground’- their local
support and initiative makes them key to delivery of the
change program by supporting communications, feedback
and resistance management
	 Identifying, recruiting and training these individuals
is a material activity for the change management team
IdentificationIdentification
AwarenessTestingAwarenessTesting
TrainingTraining
Start RoleStart Role
Week 1
Week 2
Weeks 3-4
Week 5
Name 
Name 
Name 
Name 
Name 
Name 
Name 
Name 
Name 
Name 
Name 
Name 
Name 
Name 
Name 
Head of FacilityHead of Facility
Name 
Head of FinanceHead of Finance
Name 
Head of OperationsHead of Operations
Name 
DirectorDirector
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 16
Business sponsors – engagement plan
	 Communication with this group should be on an ongoing
relationship basis as opposed to a single event
	 Plan and prepare tools to closely manage this process
	 The change management team should track progress and act
on any resistance emerging
Objective is to secure advocacy from powerful, influential individuals and from line
management affected by change
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 17
Plan for anticipated resistance
Expect resistance to change. It’s natural
	 It is important even before the change activity gets going to identify likely sources of resistance
	 Change Agents and Business Sponsors will provide indications or specific details of likely resistance
to the change
	 Schedule a draft of proposed proactive and reactive resistance management activity to suit circumstances
	 Formulate pre-emptive mitigation tactics
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 18
Engagement & Communication
Sustaining
andReinforcingChange
ChangeReadiness
UnderstandingtheChan
geLandscape
PromotingChange&ManagingResista
nce
Engagement & Communication
Devise and implement
reinforcement Initiatives
Implement tools to
achieve behavioural shifts
Move to situation of
continuous improvement
Engage change
program sponsors
Analyse organisation
complexity
Assess organisational culture
Identify and analyse
organisational impacts
Create the case for change
Define metrics
Build change teams
Identify and map
stakeholders
Develop stakeholder
engagement plan
Identify business sponsor
and change agents
Plan for anticipated
resistance
Implement
engagement plan
Commence progress
tracking
Develop and execute
communications plan
Establish feedback loops
Devise resistance
management strategies
Identify sources
of resistance
Implement proactive/
reactive resistance
management tactics
Devise and implement
resistance toolkit
Track metrics
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 19
Implement previously planned Engagement plan and Communications activities
	 Utilise the tools and process created to track sponsor engagement with the change program
	 Communicate the desired Shared Vision using multiple channels but, critically,
ensuring consistency of message
	 Meet Business Sponsors and obtain their advocacy for the change
Assessment and
Impact Resistence
(ChangeTeam)
Assessment and
Impact Resistence
(ChangeTeam)
Contract Set with
Stakeholder
(meet in person)
Contract Set with
Stakeholder
(meet in person)
Stakeholder/
ChangeTeam
Contact as Required
Stakeholder/
ChangeTeam
Contact as Required
Goal Setting with
Stakeholder
Goal Setting with
Stakeholder
Initial
Stakeholder Meeting
Follow on
Stakeholder Activity
Follow on
Stakeholder Activity
Ongoing
Stakeholder Actvity
Time
Installation
Realisation
Follow Up
If Amber or Red
Project Finish
Project Start
SponsorshipEngagementSponsorshipEngagement
CommunicationsCommunications
Implement engagement plan
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 20
Moving advocates to the required state
Ownership
Intimate
Knowledge
Awareness
Understanding
Buy In
Barrier
Oppose Neutral Accept Support Champion
Neutral
Engagement State
Understand
Aware
Unaware
Understanding
SupportforUnderstanding
PersonA
PreSponsorContracting
PersonA
PostSponsorContracting
PersonA
DesiredPosition
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 21
Develop and execute communications plan
It is essential that everyone in the organisation
affected by, involved with or controlling the
change shares a common vision of it and the
means required to achieve it
	 The communication plan is a structured document that targets
specific communications to each of the impacted business
lines, regions etc. identified in the change landscape and during
readiness preparation
	 Ensure a robust communication sign-off process is in place
to make sure timely and appropriate release of information
Communication Rep
Drafts Content
Communication Rep
Drafts Content
ReviewWithin
CommunicationsTeam
ReviewWithin
CommunicationsTeam
Refine
Based on Feedback
Refine
Based on Feedback
Route for
Program Approval
Route for
Program Approval
DistributeDistribute
Route for
Business Approval
Route for
Business Approval
Pre-change
Communication
Change
Execution/Delivery
Post-change
Communication
Change
Time
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 22
Progress tracking and establishing feedback loops
Change AgentsChange Agents
Formal/Informal
Communications
Formal/Informal
Communications
Business SponsorsBusiness Sponsors
Response ProvidedResponse Provided
Feedback
Log Updated
Feedback
Log Updated
Response AgreedResponse Agreed
Program Communications
Updated
Program Communications
Updated
Feedback LoggedFeedback Logged
Theme IdentifiedTheme Identified
FeedbackFeedback
Acquiring feedback and taking action on it is a best practice means of securing advocacy
	 People respond well when they see that their feedback is being taken seriously
	 Change Agents are one of the critical feedback providers
Use tracking tools to:
	 Establish status and effectiveness of feedback channels used
	 Determine key themes emerging
	 Ensure timely response to feedback
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 23
Promoting Change & Managing Resistance
Sustaining
andReinforcingChange
ChangeReadiness
UnderstandingtheChan
geLandscape
PromotingChange&ManagingResista
nce
Engagement & Communication
Devise and implement
reinforcement Initiatives
Implement tools to
achieve behavioural shifts
Move to situation of
continuous improvement
Engage change
program sponsors
Analyse organisation
complexity
Assess organisational culture
Identify and analyse
organisational impacts
Create the case for change
Define metrics
Build change teams
Identify and map
stakeholders
Develop stakeholder
engagement plan
Identify business sponsor
and change agents
Plan for anticipated
resistance
Implement
engagement plan
Commence progress
tracking
Develop and execute
communications plan
Establish feedback loops
Devise resistance
management strategies
Identify sources
of resistance
Implement proactive/
reactive resistance
management tactics
Devise and implement
resistance toolkit
Track metrics
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 24
Identify sources of resistance
Resistance is…
Inevitable
A natural function of change
Manageable
An attempt to protect the individual’s
perspective
A sign that something important
has been touched
A sign that potential for change exists
A type of communication channel –
don’t ignore it!
Part of the learning process
Resistance isn't…
Necessarily‘logical’
A sign of disloyalty
Necessarily personal
Indicative of poor performance by
the change program
A sign that the change process is out of control
All change programs encounter some degree of resistance
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 25
Implement proactive/reactive resistance management tactics
ProjectedImpact
Resistance IndicationsLow High
Low
High
Resistance
can be
managed via
‘Business Sponsors
Regional Change
Team Member
Sufficient
Resistance
Can Be
ManagedVia
‘Business Sponsors
Local Change
Team Member
Required
Local Change
Team Member
Required
Regional Change
Team Member
Sufficient
Proactive
Reactive
	 A flexible resistance management strategy is essential
	 Resistance management should not be a‘fire fighting’
activity
Resistance can be managed:
	 	 Proactively
	 For resistance in areas where high levels are anticipated
	 	 Reactively
	 Where low level resistance impacts are anticipated
Resistance can be experienced in a wide
variety of ways at various levels of the
organisation – how it’s managed can
make or break a change program
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 26
Devise and implement resistance toolkit
Behavioural Change Strategies
Most change effort will require a behaviour
change in order for it to be sustained.
Formal behavioural reinforcement
e.g. setting goals during appraisal
processes are effective tools
Empowerment
In this context is about removing
barriers that prevent people from acting
on the Change initiative such as introducing
redefined roles that clearly match the changed
environment
Promoting Change Success
Visible delivery of change program objectives/
benefits is a powerful means to build further
support for the change
Communication
Different types of information are
required by various audiences. This is
a complex area but restating program
rationale/benefits is a simple but
effective technique
RESISTANCE
TOOLKIT
Imagination is required to construct the means to deal with resistance
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 27
Tracking metrics
Example Program Dashboards
Providing accurate data driven reporting for program governance and stakeholder management
Tracking progress against metrics established during the Change Landscape provides
assurance about project status and the means to manage towards success
Successful or‘on track’delivery
of metrics should be reported:
	 Upwards to demonstrate
successful delivery
	 Outwards to‘champion
program success’
	 Inwards to energise and maintain
motivation within the change team
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 28
Sustaining and Reinforcing Change
Sustaining
andReinforcingChange
ChangeReadiness
UnderstandingtheChan
geLandscape
PromotingChange&ManagingResista
nce
Engagement & Communication
Devise and implement
reinforcement Initiatives
Implement tools to
achieve behavioural shifts
Move to situation of
continuous improvement
Engage change
program sponsors
Analyse organisation
complexity
Assess organisational culture
Identify and analyse
organisational impacts
Create the case for change
Define metrics
Build change teams
Identify and map
stakeholders
Develop stakeholder
engagement plan
Identify business sponsor
and change agents
Plan for anticipated
resistance
Implement
engagement plan
Commence progress
tracking
Develop and execute
communications plan
Establish feedback loops
Devise resistance
management strategies
Identify sources
of resistance
Implement proactive/
reactive resistance
management tactics
Devise and implement
resistance toolkit
Track metrics
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 29
Why reinforce change?
Technical Objectives
OnTime
On Budget
Human Objectives Met
Business Objectives Met
Installation Realisation
* Harvard Business Review Michael Beer and Nitin Nohria
70% of all Change Projects fail because the organisation fails to manage the human
element to change*
	 Reinforcing the change is required to deliver the anticipated ROI and other intended benefits.
Failure to do so risks wasting much of the resource expended to get this far
	 This requires sustained effort (and organisational commitment) to see the‘realisation’through
and not quit after the‘installation’phase
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 30
Implement tools to achieve behavioural shift
The change process is not over until supportive behaviours are the norm
i.e. the change is fully embedded
	 Planning for behavioural change should take place early on in the overall change process
	 Chaucer employ the right tools to achieve shifts in mindset, behaviour, productivity and compliance
NewWay of Operating
Success Realised
NewWay of Operating
Success Realised
Behavioral ShiftBehavioral Shift
Sustaining Change
Phase
Implementation
Productivity and Sharing
Implementation
Productivity and Sharing
Movement
Phase
Create Buy In
Inform
Involve
Create Buy In
Inform
Involve
Communication &
Engagement Phase
Prepare
Plan
Prepare
Plan
Understanding
& Readiness Phase
Business as UsualBusiness as Usual Mindset ShiftMindset Shift
High Productivity
& Compliance
High Productivity
& Compliance
Monitor and AdjustMonitor and Adjust Monitor and AdjustMonitor and Adjust Monitor and AdjustMonitor and Adjust MaintainMaintain
REINFORCEMENT
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 31
Move to continuous improvement
Developing
Lasting Support
Network
Ongoing
Comms
Take Action
onTarget
Feedback
Enhance/
Update
Business Process
Champion 
Successes
Reward 
Positive
Behaviour
Maintain
Stakeholder
Engagement
External Cross 
Program
Alignment
Increase Change
ProgramAwarenessDevise, manage and track a series
of activities to reinforce change
	 Reinforcement activity planning should
be considered on a holistic basis
	 Individual but interlocking pieces of action
are devised to address specific areas of need
	 An important final task for the Change
Program is move into an environment of
‘continuous improvement’
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 32
Chaucer – planning for change success
The Change Challenge
Change projects can be large scale
and complex:
	 Impacting multiple dimensions of
the business
	 Geographically/culturally diverse
	 Technically complex
	 Competing initiatives
The nature of the change can bring
many challenges:
	 Scope of the change
	 Visibility and pressure for results
	 Wide reaching staff and
cultural issues
Chaucer can help: Managing Change Project/Programs
Chaucer has extensive capability and experience in managing change projects/programs.
Examples of where we can help include:
	 Realistic strategic vision and goals
	 Flexible and realistic business operational design
	 Portfolio and program planning
	 Risk management, cost control, assurance etc.
	 Tried  trusted tools and techniques to ensure delivery
Chaucer can help: Change Management
Chaucer has a wide breadth and depth of capability across the Change management life cycle.
Examples of where we can help include:
	 Understanding the change landscape			 Resistance management
	 Change readiness and preparation				 Sustaining and reinforcing change
	 Communication and engagement
Chaucer has expertise in managing change programs/projects and in performing
specialist change management activities
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 33
Why Chaucer for change management?
	 Chaucer is a strategic global partner, operating sensitively to provide extensive
Change Management experience in support of delivery for our clients
	 We utilise proven tools, methods and processes and adapt them to the specific
client situation ensuring it is 'fit for purpose' and delivers business value
	 Our flexible approach ensures the solutions developed fit, minimising disruption
and accelerating the transition to business as usual at the end of the engagement
copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 34
Contact Us
UK
Neil O’Brien
Mobile: +44 7834 265917
neil.obrien@chaucer.com
USA
Rupert Laslett
Cell: +1 832 681 6858
rupert.laslett@chaucer.com
Paul Burke
Cell: +1 734 834 4395
paul.burke@chaucer.com
Europe
Deborah Feakins
Mobile: +44 7799 893402
deborah.feakins@chaucer.com
Middle East  Asia Pacific
Nick Laslett
Mobile: +971 505 154 835
nick.laslett@chaucer.com
Rest of World
Bob Laslett
Mobile: +44 7767 698543
bob.laslett@chaucer.com

Mais conteúdo relacionado

Mais procurados

Benefit Realisation - a whitepaper
Benefit Realisation - a whitepaperBenefit Realisation - a whitepaper
Benefit Realisation - a whitepaperNewport Consulting
 
Enterprise Architecture Program Management Challenges
Enterprise Architecture Program Management ChallengesEnterprise Architecture Program Management Challenges
Enterprise Architecture Program Management ChallengesNashreen Hofmeester
 
Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016Rebecca Taylor
 
PRiSM Practitioner
PRiSM PractitionerPRiSM Practitioner
PRiSM Practitionerasapm
 
KM: Improving and Sustaining Quality - Some Opportunities and Challenges of I...
KM: Improving and Sustaining Quality - Some Opportunities and Challenges of I...KM: Improving and Sustaining Quality - Some Opportunities and Challenges of I...
KM: Improving and Sustaining Quality - Some Opportunities and Challenges of I...Dr. Helen Paige
 
Organizational Change Management and Communications
Organizational Change Management and CommunicationsOrganizational Change Management and Communications
Organizational Change Management and CommunicationsEnamul Haque
 
EFQM Sustainable Excellence -Primer and Good Practices
EFQM Sustainable Excellence -Primer and Good PracticesEFQM Sustainable Excellence -Primer and Good Practices
EFQM Sustainable Excellence -Primer and Good PracticesChris Hakes
 
NewResume.JamesHeverin.2016
NewResume.JamesHeverin.2016NewResume.JamesHeverin.2016
NewResume.JamesHeverin.2016Jim Heverin
 
Prosci Change Agility Webinar 230216
Prosci Change Agility Webinar 230216Prosci Change Agility Webinar 230216
Prosci Change Agility Webinar 230216Catherine Smithson
 
ISO 45001 018 . 2018 م.71-مبادرة#تواصل_تطوير-د.محمد عبدالمجيد-التعريف بمتطلبا...
ISO 45001 018 . 2018 م.71-مبادرة#تواصل_تطوير-د.محمد عبدالمجيد-التعريف بمتطلبا...ISO 45001 018 . 2018 م.71-مبادرة#تواصل_تطوير-د.محمد عبدالمجيد-التعريف بمتطلبا...
ISO 45001 018 . 2018 م.71-مبادرة#تواصل_تطوير-د.محمد عبدالمجيد-التعريف بمتطلبا...Egyptian Engineers Association
 
Sustainability strategy
Sustainability strategySustainability strategy
Sustainability strategyrethink
 
Infusing the PRiSM™ Sustainability Framework into the IPMA Project Excellence...
Infusing the PRiSM™ Sustainability Framework into the IPMA Project Excellence...Infusing the PRiSM™ Sustainability Framework into the IPMA Project Excellence...
Infusing the PRiSM™ Sustainability Framework into the IPMA Project Excellence...Triantafyllos Katsarelis
 
Understanding why people behave as they do to improve change delivery, Enabli...
Understanding why people behave as they do to improve change delivery, Enabli...Understanding why people behave as they do to improve change delivery, Enabli...
Understanding why people behave as they do to improve change delivery, Enabli...Association for Project Management
 
Being Human ROI of Change Management 081015
Being Human ROI of Change Management 081015Being Human ROI of Change Management 081015
Being Human ROI of Change Management 081015Catherine Smithson
 
Building a strong BC programme with ISO 22301
Building a strong BC programme with ISO 22301Building a strong BC programme with ISO 22301
Building a strong BC programme with ISO 22301PECB
 
Business strategies for sustainable development
Business strategies for sustainable developmentBusiness strategies for sustainable development
Business strategies for sustainable developmentrynbouc
 

Mais procurados (20)

Benefit Realisation - a whitepaper
Benefit Realisation - a whitepaperBenefit Realisation - a whitepaper
Benefit Realisation - a whitepaper
 
Change management
Change managementChange management
Change management
 
Mike Ward - Improving benefits management at Sellafield
Mike Ward - Improving benefits management at SellafieldMike Ward - Improving benefits management at Sellafield
Mike Ward - Improving benefits management at Sellafield
 
Enterprise Architecture Program Management Challenges
Enterprise Architecture Program Management ChallengesEnterprise Architecture Program Management Challenges
Enterprise Architecture Program Management Challenges
 
Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016
 
STG_OCM
STG_OCMSTG_OCM
STG_OCM
 
PRiSM Practitioner
PRiSM PractitionerPRiSM Practitioner
PRiSM Practitioner
 
KM: Improving and Sustaining Quality - Some Opportunities and Challenges of I...
KM: Improving and Sustaining Quality - Some Opportunities and Challenges of I...KM: Improving and Sustaining Quality - Some Opportunities and Challenges of I...
KM: Improving and Sustaining Quality - Some Opportunities and Challenges of I...
 
Organizational Change Management and Communications
Organizational Change Management and CommunicationsOrganizational Change Management and Communications
Organizational Change Management and Communications
 
EFQM Sustainable Excellence -Primer and Good Practices
EFQM Sustainable Excellence -Primer and Good PracticesEFQM Sustainable Excellence -Primer and Good Practices
EFQM Sustainable Excellence -Primer and Good Practices
 
NewResume.JamesHeverin.2016
NewResume.JamesHeverin.2016NewResume.JamesHeverin.2016
NewResume.JamesHeverin.2016
 
Prosci Change Agility Webinar 230216
Prosci Change Agility Webinar 230216Prosci Change Agility Webinar 230216
Prosci Change Agility Webinar 230216
 
ISO 45001 018 . 2018 م.71-مبادرة#تواصل_تطوير-د.محمد عبدالمجيد-التعريف بمتطلبا...
ISO 45001 018 . 2018 م.71-مبادرة#تواصل_تطوير-د.محمد عبدالمجيد-التعريف بمتطلبا...ISO 45001 018 . 2018 م.71-مبادرة#تواصل_تطوير-د.محمد عبدالمجيد-التعريف بمتطلبا...
ISO 45001 018 . 2018 م.71-مبادرة#تواصل_تطوير-د.محمد عبدالمجيد-التعريف بمتطلبا...
 
Sustainability strategy
Sustainability strategySustainability strategy
Sustainability strategy
 
Infusing the PRiSM™ Sustainability Framework into the IPMA Project Excellence...
Infusing the PRiSM™ Sustainability Framework into the IPMA Project Excellence...Infusing the PRiSM™ Sustainability Framework into the IPMA Project Excellence...
Infusing the PRiSM™ Sustainability Framework into the IPMA Project Excellence...
 
Understanding why people behave as they do to improve change delivery, Enabli...
Understanding why people behave as they do to improve change delivery, Enabli...Understanding why people behave as they do to improve change delivery, Enabli...
Understanding why people behave as they do to improve change delivery, Enabli...
 
Frank coo 2016
Frank coo 2016Frank coo 2016
Frank coo 2016
 
Being Human ROI of Change Management 081015
Being Human ROI of Change Management 081015Being Human ROI of Change Management 081015
Being Human ROI of Change Management 081015
 
Building a strong BC programme with ISO 22301
Building a strong BC programme with ISO 22301Building a strong BC programme with ISO 22301
Building a strong BC programme with ISO 22301
 
Business strategies for sustainable development
Business strategies for sustainable developmentBusiness strategies for sustainable development
Business strategies for sustainable development
 

Semelhante a The Chaucer Way Change Management

Change Management Strategies Webinar Slides
Change Management Strategies Webinar SlidesChange Management Strategies Webinar Slides
Change Management Strategies Webinar Slidesthechangesource
 
Managing Complex Transformations_Mining
Managing Complex Transformations_MiningManaging Complex Transformations_Mining
Managing Complex Transformations_MiningNiresh Rajah
 
dttl-er-managingcomplextransformations-08082013
dttl-er-managingcomplextransformations-08082013dttl-er-managingcomplextransformations-08082013
dttl-er-managingcomplextransformations-08082013Alina Aronova, MBA
 
Playbook-Street-Manager-Change-management-strategy.pdf
Playbook-Street-Manager-Change-management-strategy.pdfPlaybook-Street-Manager-Change-management-strategy.pdf
Playbook-Street-Manager-Change-management-strategy.pdfericaurtel1
 
Managing Complex Transformations
Managing Complex TransformationsManaging Complex Transformations
Managing Complex TransformationsNiresh Rajah
 
Simon Williams - Delivering effective business change - APM Planning for Chan...
Simon Williams - Delivering effective business change - APM Planning for Chan...Simon Williams - Delivering effective business change - APM Planning for Chan...
Simon Williams - Delivering effective business change - APM Planning for Chan...Association for Project Management
 
Prosci Webinar - How to Integrate Change Management and Project Management
Prosci Webinar - How to Integrate Change Management and Project ManagementProsci Webinar - How to Integrate Change Management and Project Management
Prosci Webinar - How to Integrate Change Management and Project ManagementProsci ANZ
 
Change Management 1
Change Management 1Change Management 1
Change Management 1IIFT01412
 
Fabrizio rotundi management_challenges_in_modernisation_proce
Fabrizio rotundi management_challenges_in_modernisation_proceFabrizio rotundi management_challenges_in_modernisation_proce
Fabrizio rotundi management_challenges_in_modernisation_proceСветла Иванова
 
Useful sources of change management information
Useful sources of change management informationUseful sources of change management information
Useful sources of change management informationMelanie Franklin
 
Business Transformation Quick Guide
Business Transformation Quick GuideBusiness Transformation Quick Guide
Business Transformation Quick GuideMaven
 
5 Ways To Prepare Your Workforce For Change Management
5 Ways To Prepare Your Workforce For Change Management5 Ways To Prepare Your Workforce For Change Management
5 Ways To Prepare Your Workforce For Change ManagementKeziyaRajan
 
North West branch Annual General Meeting & "Lessons on Governance"
North West branch Annual General Meeting & "Lessons on Governance"North West branch Annual General Meeting & "Lessons on Governance"
North West branch Annual General Meeting & "Lessons on Governance"Association for Project Management
 
3 Key Factors to Effective Change Management in Shared Services
3 Key Factors to Effective Change Management in Shared Services3 Key Factors to Effective Change Management in Shared Services
3 Key Factors to Effective Change Management in Shared ServicesChazey Partners
 
Bpug conference november 2012
Bpug conference november 2012 Bpug conference november 2012
Bpug conference november 2012 Maven
 
Wk 7b organizational change
Wk 7b organizational changeWk 7b organizational change
Wk 7b organizational changeShweta Varshney
 
Sustainability Change Management: We've Had the Green Audit...Now What?
Sustainability Change Management: We've Had the Green Audit...Now What?Sustainability Change Management: We've Had the Green Audit...Now What?
Sustainability Change Management: We've Had the Green Audit...Now What?Strategic Sustainability Consulting
 

Semelhante a The Chaucer Way Change Management (20)

Change Management Strategies Webinar Slides
Change Management Strategies Webinar SlidesChange Management Strategies Webinar Slides
Change Management Strategies Webinar Slides
 
Managing Complex Transformations_Mining
Managing Complex Transformations_MiningManaging Complex Transformations_Mining
Managing Complex Transformations_Mining
 
dttl-er-managingcomplextransformations-08082013
dttl-er-managingcomplextransformations-08082013dttl-er-managingcomplextransformations-08082013
dttl-er-managingcomplextransformations-08082013
 
Playbook-Street-Manager-Change-management-strategy.pdf
Playbook-Street-Manager-Change-management-strategy.pdfPlaybook-Street-Manager-Change-management-strategy.pdf
Playbook-Street-Manager-Change-management-strategy.pdf
 
Managing Complex Transformations
Managing Complex TransformationsManaging Complex Transformations
Managing Complex Transformations
 
Simon Williams - Delivering effective business change - APM Planning for Chan...
Simon Williams - Delivering effective business change - APM Planning for Chan...Simon Williams - Delivering effective business change - APM Planning for Chan...
Simon Williams - Delivering effective business change - APM Planning for Chan...
 
Prosci Webinar - How to Integrate Change Management and Project Management
Prosci Webinar - How to Integrate Change Management and Project ManagementProsci Webinar - How to Integrate Change Management and Project Management
Prosci Webinar - How to Integrate Change Management and Project Management
 
Change Management 1
Change Management 1Change Management 1
Change Management 1
 
Fabrizio rotundi management_challenges_in_modernisation_proce
Fabrizio rotundi management_challenges_in_modernisation_proceFabrizio rotundi management_challenges_in_modernisation_proce
Fabrizio rotundi management_challenges_in_modernisation_proce
 
Useful sources of change management information
Useful sources of change management informationUseful sources of change management information
Useful sources of change management information
 
Business Transformation Quick Guide
Business Transformation Quick GuideBusiness Transformation Quick Guide
Business Transformation Quick Guide
 
Change management
Change managementChange management
Change management
 
Chaucer Quarterly Review Issue 4 EN
Chaucer Quarterly Review Issue 4 ENChaucer Quarterly Review Issue 4 EN
Chaucer Quarterly Review Issue 4 EN
 
Make Change That Lasts
Make Change That LastsMake Change That Lasts
Make Change That Lasts
 
5 Ways To Prepare Your Workforce For Change Management
5 Ways To Prepare Your Workforce For Change Management5 Ways To Prepare Your Workforce For Change Management
5 Ways To Prepare Your Workforce For Change Management
 
North West branch Annual General Meeting & "Lessons on Governance"
North West branch Annual General Meeting & "Lessons on Governance"North West branch Annual General Meeting & "Lessons on Governance"
North West branch Annual General Meeting & "Lessons on Governance"
 
3 Key Factors to Effective Change Management in Shared Services
3 Key Factors to Effective Change Management in Shared Services3 Key Factors to Effective Change Management in Shared Services
3 Key Factors to Effective Change Management in Shared Services
 
Bpug conference november 2012
Bpug conference november 2012 Bpug conference november 2012
Bpug conference november 2012
 
Wk 7b organizational change
Wk 7b organizational changeWk 7b organizational change
Wk 7b organizational change
 
Sustainability Change Management: We've Had the Green Audit...Now What?
Sustainability Change Management: We've Had the Green Audit...Now What?Sustainability Change Management: We've Had the Green Audit...Now What?
Sustainability Change Management: We've Had the Green Audit...Now What?
 

Mais de Luis Alejandro Molina Sánchez

Portafolio Sinergy Latam Security & Defense, Special Criminal Investigations ...
Portafolio Sinergy Latam Security & Defense, Special Criminal Investigations ...Portafolio Sinergy Latam Security & Defense, Special Criminal Investigations ...
Portafolio Sinergy Latam Security & Defense, Special Criminal Investigations ...Luis Alejandro Molina Sánchez
 
Portafolio Sinergy Latam CG 2018 Unidad Estrategica EDU
Portafolio Sinergy Latam CG 2018 Unidad Estrategica EDUPortafolio Sinergy Latam CG 2018 Unidad Estrategica EDU
Portafolio Sinergy Latam CG 2018 Unidad Estrategica EDULuis Alejandro Molina Sánchez
 
Sinergy Latam Consulting Group 2018 SBU EDU PORTAFOLIO
Sinergy Latam Consulting Group 2018 SBU EDU PORTAFOLIOSinergy Latam Consulting Group 2018 SBU EDU PORTAFOLIO
Sinergy Latam Consulting Group 2018 SBU EDU PORTAFOLIOLuis Alejandro Molina Sánchez
 
SINERGY LATAM CG LANZA NUEVA ESTRUCTURA ORGANIZACIONAL SBU & PARTERSHIP
SINERGY LATAM CG LANZA NUEVA ESTRUCTURA ORGANIZACIONAL SBU & PARTERSHIPSINERGY LATAM CG LANZA NUEVA ESTRUCTURA ORGANIZACIONAL SBU & PARTERSHIP
SINERGY LATAM CG LANZA NUEVA ESTRUCTURA ORGANIZACIONAL SBU & PARTERSHIPLuis Alejandro Molina Sánchez
 

Mais de Luis Alejandro Molina Sánchez (20)

Portafolio Sinergy Latam Security & Defense, Special Criminal Investigations ...
Portafolio Sinergy Latam Security & Defense, Special Criminal Investigations ...Portafolio Sinergy Latam Security & Defense, Special Criminal Investigations ...
Portafolio Sinergy Latam Security & Defense, Special Criminal Investigations ...
 
Portafolio Sinergy Latam CG 2018 Unidad Estrategica EDU
Portafolio Sinergy Latam CG 2018 Unidad Estrategica EDUPortafolio Sinergy Latam CG 2018 Unidad Estrategica EDU
Portafolio Sinergy Latam CG 2018 Unidad Estrategica EDU
 
La nueva e conomia (Pilotea tu cometa)
La nueva e conomia (Pilotea tu cometa)La nueva e conomia (Pilotea tu cometa)
La nueva e conomia (Pilotea tu cometa)
 
Sinergy Latam Consulting Group 2018 SBU EDU PORTAFOLIO
Sinergy Latam Consulting Group 2018 SBU EDU PORTAFOLIOSinergy Latam Consulting Group 2018 SBU EDU PORTAFOLIO
Sinergy Latam Consulting Group 2018 SBU EDU PORTAFOLIO
 
cyber
cybercyber
cyber
 
World Economic Forum Annual Report_2016_17
World Economic Forum Annual Report_2016_17World Economic Forum Annual Report_2016_17
World Economic Forum Annual Report_2016_17
 
SINERGY LATAM CG LANZA NUEVA ESTRUCTURA ORGANIZACIONAL SBU & PARTERSHIP
SINERGY LATAM CG LANZA NUEVA ESTRUCTURA ORGANIZACIONAL SBU & PARTERSHIPSINERGY LATAM CG LANZA NUEVA ESTRUCTURA ORGANIZACIONAL SBU & PARTERSHIP
SINERGY LATAM CG LANZA NUEVA ESTRUCTURA ORGANIZACIONAL SBU & PARTERSHIP
 
I LOVE MY JOBS
I LOVE MY JOBSI LOVE MY JOBS
I LOVE MY JOBS
 
5 Caminos para Superar los Ataques Espirituales
5 Caminos para Superar los Ataques Espirituales5 Caminos para Superar los Ataques Espirituales
5 Caminos para Superar los Ataques Espirituales
 
Las Adicciones al Internet: ¿Cómo tratarlas?
Las Adicciones al Internet: ¿Cómo tratarlas?Las Adicciones al Internet: ¿Cómo tratarlas?
Las Adicciones al Internet: ¿Cómo tratarlas?
 
Peligros del internet
Peligros del internetPeligros del internet
Peligros del internet
 
Señales de Ataques Espirituales
Señales de Ataques EspiritualesSeñales de Ataques Espirituales
Señales de Ataques Espirituales
 
Adcciones al internet
Adcciones al internetAdcciones al internet
Adcciones al internet
 
Emprendimiento 2
Emprendimiento 2Emprendimiento 2
Emprendimiento 2
 
Emprendimiento 3
Emprendimiento 3Emprendimiento 3
Emprendimiento 3
 
Emprendimiento 1
Emprendimiento 1Emprendimiento 1
Emprendimiento 1
 
Procesos Organizacionales en gestión humana
Procesos Organizacionales en gestión humanaProcesos Organizacionales en gestión humana
Procesos Organizacionales en gestión humana
 
Módulo gestion de la calidad iso 9000 rrhh
Módulo gestion de la calidad iso 9000 rrhh Módulo gestion de la calidad iso 9000 rrhh
Módulo gestion de la calidad iso 9000 rrhh
 
Iso 9000 implementación eafit
Iso 9000 implementación eafitIso 9000 implementación eafit
Iso 9000 implementación eafit
 
Global young people report
Global young people reportGlobal young people report
Global young people report
 

Último

It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...Suhani Kapoor
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 

Último (20)

It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 

The Chaucer Way Change Management

  • 1. The Chaucer Way Change Management Copyright © Chaucer 2009-2012 | www.chaucer.com
  • 2. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management ii The Change Management Process The Chaucer Way is Chaucer’s unique approach to Change Management Change projects can be large scale and complex: Impacting multiple dimensions of a business Geographically and culturally diverse Technically complex Competing initiatives The nature of the change can bring many challenges: Scope of the change(s) Wide reaching staff, behavioural and cultural issues. Visibility and pressure for results Technology solutions may be needed Chaucer has a wide breadth and depth of capability across the Change Management life cycle and our unique approach has been successfully utilised and accepted as best practice by our clients.
  • 3. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management iii Index 1 The Chaucer Way is… 2 Change Program Support 3 The Change Landscape 4 Why define the change landscape? 5 Engage change program sponsors 6 Analyse organisation complexity 7 Assess organisation culture 8 Identify and analyse organisation impacts 9 Create the case for change 10 Define metrics 11 Change Readiness 12 Build change management teams 13 Identify and map stakeholders 14 Develop stakeholder engagement plan 15 Identify business sponsors and change agents 16 Business sponsors – engagement plan 17 Plan for anticipated resistance 18 Engagement & Communication 19 Implement engagement plan 20 Moving advocates to required state 21 Develop and execute communications plan 22 Progress tracking and establishing feedback loops 23 Promoting Change & Managing Resistance 24 Identify sources of resistance 25 Implement proactive/reactive resistance management tactics 26 Devise and implement resistance toolkit 27 Tracking metrics 28 Sustaining and Reinforcing Change 29 Why reinforce change? 30 Implement tools to achieve behavioural shift 31 Move to continuous improvement 32 Chaucer – planning for change success 33 Why Chaucer for change management? 34 Contact us
  • 4. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 1 The Chaucer Way The Chaucer Way is… 1 Structured 2 Tried, tested and proven to be successful 3 Progressive and pragmatic 4 Comprehensive 5 Efficient and effective 6 Auditable
  • 5. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 2 Change Program Support Sustaining andReinforcingChange ChangeReadiness UnderstandingtheChan geLandscape PromotingChange&ManagingResista nce Engagement & Communication Devise and implement reinforcement Initiatives Implement tools to achieve behavioural shifts Move to situation of continuous improvement Engage change program sponsors Analyse organisation complexity Assess organisational culture Identify and analyse organisational impacts Create the case for change Define metrics Build change teams Identify and map stakeholders Develop stakeholder engagement plan Identify business sponsor and change agents Plan for anticipated resistance Implement engagement plan Commence progress tracking Develop and execute communications plan Establish feedback loops Devise resistance management strategies Identify sources of resistance Implement proactive/ reactive resistance management tactics Devise and implement resistance toolkit Track metrics
  • 6. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 3 The Change Landscape Sustaining andReinforcingChange ChangeReadiness UnderstandingtheChan geLandscape PromotingChange&ManagingResista nce Engagement & Communication Devise and implement reinforcement Initiatives Implement tools to achieve behavioural shifts Move to situation of continuous improvement Engage change program sponsors Analyse organisation complexity Assess organisational culture Identify and analyse organisational impacts Create the case for change Define metrics Build change teams Identify and map stakeholders Develop stakeholder engagement plan Identify business sponsor and change agents Plan for anticipated resistance Implement engagement plan Commence progress tracking Develop and execute communications plan Establish feedback loops Devise resistance management strategies Identify sources of resistance Implement proactive/ reactive resistance management tactics Devise and implement resistance toolkit Track metrics
  • 7. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 4 Why define the change landscape? Initiating changes without understanding the full program reach could potentially derail the change program and waste resources Building a picture of the change landscape is an essential step to: Reveal the extent of the organisational impact globally, regionally, nationally and by business line, unit and function Ensure the true scope of the change program is recognised and considered Construct a sound foundation for the proposed change Provide the basis for the Change Management strategy Blue Sky/ Corporate Strategy Change Defined Change Implementation Business StrategyBusiness Strategy Change StrategyChange Strategy Organisation Culture Organisation Culture Organisation Structure Organisation Structure Internal Impacts Internal Impacts External Impacts External Impacts Change Landscape Documented Change Landscape Documented Business Case for Action and ChangeVision Signed Off Business Case for Action and ChangeVision Signed Off
  • 8. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 5 Engage change program sponsors Change Program Sponsor(s) Change Program Sponsor(s) Change ManagementTeam Change ManagementTeam Change Strategies Change Strategies Change Tactics Change Tactics Corporate Mission Corporate Mission Headline Change Objectives Headline Change Objectives To articulate objectives for the change from the context of overall corporate strategy and activity To outline current senior management perception of landscape To communicate constraints, if any To approve the means by which the change management team will make the change happen Begin to take responsibility for active ownership and promotion of the change It is critical that the change program sponsor is actively engaged in the definition of the change landscape to provide both context and approvals for proposed action
  • 9. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 6 Analyse organisation complexity Analysing organisational complexity provides a full picture of the extent of change impact Missing this step risks change impacts being felt in unexpected areas and in not soliciting local support for the impending change The real extent of the change may reach well beyond the area of the business upon which it is focused In global organisations impact on other regions should be reviewed Consider also external linkages such as those to regulating authorities VP Sponsor Manager DirectorDirector Manager SupervisorSupervisor Manager EmployeeRecipient User Worker
  • 10. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 7 Assess organisation culture Organisational Culture Management Style Values, Attitudes Norms Staff Empowerment Products or Services Leader Behaviour Sub-cultures Formal Management Systems Systems, Technology, People History, Previous Change External Image - PR, Advertising Organisational Culture Management Style Values, Attitudes Norms Staff Empowerment Products or Services Leader Behaviour Sub-cultures Formal Management Systems Systems, Technology, People History, Previous Change External Image - PR, Advertising Understanding organisational culture is an essential part of managing change and requires attention to both hard and soft influences Understanding cultures and sub-cultures is essential for setting the change management strategy It is key input into preparing for resistance, planning for its management and reinforcing change Organisational culture is shaped by many influences, formal and informal. It evolves continuously Organisations with entrenched cultures find change difficult to sustain Behaviours are a powerful influence on culture. Producing behaviour change is often a key component in making the required change sustainable
  • 11. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 8 Identify and analyse organisation impacts Identify and analyse organisation impacts Internal Other planned or ongoing change initiatives, restructuring or strategic vision in the organisation may cause staff to have conflicting priorities People Create a profile of all the individuals impacted by the change across the whole organisation (globally, regionally etc.) to ensure visibility External Awareness of external impacts such as forthcoming regulatory changes on the organisation and operating environment will enhance the program’s resilience Legislative Regulatory Technological Environmental Political Economic Social
  • 12. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 9 Create the case for change A meaningful, unified, real-world vision of the change state will be used in a variety of situations: For communication to a wide variety of audiences inside and outside the organisation In the course of‘selling’the change to those impacted It is key input into preparing for resistance, planning for its management and reinforcing change Create a compelling business case for action: It is the means by which the change vision, motives and goals can be confirmed and validated by consensus before proceeding Change program sponsors will both provide input and be a consumer of the business case. Validating it with them is essential Ensuring that the Change Vision is clearly conceptualised and articulated is critical to success
  • 13. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 10 Define metrics Metrics must unambiguously communicate progress towards change success Change metrics are likely to be directly linked to any overall program objectives. These are frequently set out in the financial Business Case for the change which is usually owned by the change sponsor The change management team will track metrics and report on them throughout the change program’s lifecycle providing assurance that the work is on track towards success Engagement Category 1 Status Owner Source Description Stakeholders OK Stone Phil Stakholder Engagement Status Planned Meetings +8 Waring Tim % Planned Meetings Delivered Meetings OK Waring Deborah % Delivered Meetings Change Agents ID OK Waring Bob % Change Agents Identified Change Agents Recruited OK Waring Steve % Change Agents Recruited Communication +1 Douglas Phil Communication Plan onTrack OK Stone Tim Plan onTrack Comms Drafted -1 Stone Deborah No. of Communications Drafted Distributed -1 Patterson Bob No. of Communications Distributed Surveys OK Lafferty Steve No. of Surveys Conducted Feedback from Users OK Lafferty Phil % Unsolicitated Feedback Received Behaviours -3 Douglas Tim Behaviours Exhibited OK Stone Deborah Behaviours Desired Being Exhibited Opinions OK Smith Bob Solicitated Opinions onTransition FAQs +3 Stone Steve Nature of FAQs With the change landscape established and the business case approved, identify suitable metrics that demonstrate change success
  • 14. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 11 Change Readiness Sustaining andReinforcingChange ChangeReadiness UnderstandingtheChan geLandscape PromotingChange&ManagingResista nce Engagement & Communication Devise and implement reinforcement Initiatives Implement tools to achieve behavioural shifts Move to situation of continuous improvement Engage change program sponsors Analyse organisation complexity Assess organisational culture Identify and analyse organisational impacts Create the case for change Define metrics Build change teams Identify and map stakeholders Develop stakeholder engagement plan Identify business sponsor and change agents Plan for anticipated resistance Implement engagement plan Commence progress tracking Develop and execute communications plan Establish feedback loops Devise resistance management strategies Identify sources of resistance Implement proactive/ reactive resistance management tactics Devise and implement resistance toolkit Track metrics
  • 15. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 12 Build change management teams Identifying all stakeholders Identifying potential business sponsors Creating a plan to manage them Anticipating resistance and devising mitigation Two important change teams should be mobilised: Steering Team / Leadership Team Change Management Team A significant amount of activity will be required from these teams throughout the duration of the change program. Reassess Evaluate Establish Current Level of Engagement Develop Engagement Plan Identify Stakeholders Segment Change Readiness is focused on building a high level change management strategy and implementation plan
  • 16. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 13 Identify and map stakeholders Stakeholders are all those: Directly involved Indirectly involved Affected by the work or the outcomes Able to influence the work or the outcomes Change Program Sponsor(s)Change Program Sponsor(s) Change ManagementTeam Change Managers Change Agents Tactical Business Line Reps PMO Change ManagementTeam Change Managers Change Agents Tactical Business Line Reps PMO Support FunctionsSupport FunctionsThird PartiesThird Parties Government AgenciesGovernment Agencies ShareholdersShareholdersOthersOthers Other Stakeholder Groups Directors/Managers*Directors/Managers* Change RecipientChange Recipient Primary Business Stakeholders Primary Business Stakeholders Business Line FocusBusiness Line Focus Steering Group/LT Senior Business Leads Senior Support Leads Steering Group/LT Senior Business Leads Senior Support Leads *Directors/Managers can also be ‘Business Sponsors’as well as Stakeholders in their own right. See slide on‘Business Sponsors’
  • 17. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 14 Develop stakeholder engagement plan Identify all the Stakeholder Groups and their needs and any associated issues or risks. 1 Integrate the information gathered in steps 1-3 into a comprehensive engagement plan whose progress can be tracked. 4 Determine for each the current and required degree of engagement with the change. Define the types of activities required to maintain or move them to the desired state. 2 Profile detailed engagement activities, meeting opportunities etc. Agree which activity type should be leveraged for each stakeholder group. 3 Stakeholder Group Current Status Desired Status Activites to achieve to desired state Stakeholder Group 1 Ownership Ownership Ongoing program High Level Communication Stakeholder Group 2 Awareness Buy In Updates on program progress Stakeholder Group n Stakeholder Group People Key Needs Issues & Risks Country Managers 2 Awareness of key program details Failure to engage leads to loss of sponsorship Stakeholder Groups SponsorMeeting GlobalMeeting CountryMeeting Lunch&Learns CoffeeMorning Webex Group 1 Group 2   Group 3 
  • 18. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 15 Identify business sponsors and change agents Two critical stakeholder segments require identification and dedicated attention: Business Sponsors Senior managers whose influence and buy-in to a the change program are key. Their influence and advocacy over their direct reports can make or break a change program They can promote the change initiative, cascade communications and ensure adoption Identify, map, note linkages of all business sponsors. There may be many individuals scheduled in a big program Change Agents Individuals from the operating business affected by the change who are also a member of the extended program team. This is a very important role‘on the ground’- their local support and initiative makes them key to delivery of the change program by supporting communications, feedback and resistance management Identifying, recruiting and training these individuals is a material activity for the change management team IdentificationIdentification AwarenessTestingAwarenessTesting TrainingTraining Start RoleStart Role Week 1 Week 2 Weeks 3-4 Week 5 Name  Name  Name  Name  Name  Name  Name  Name  Name  Name  Name  Name  Name  Name  Name  Head of FacilityHead of Facility Name  Head of FinanceHead of Finance Name  Head of OperationsHead of Operations Name  DirectorDirector
  • 19. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 16 Business sponsors – engagement plan Communication with this group should be on an ongoing relationship basis as opposed to a single event Plan and prepare tools to closely manage this process The change management team should track progress and act on any resistance emerging Objective is to secure advocacy from powerful, influential individuals and from line management affected by change
  • 20. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 17 Plan for anticipated resistance Expect resistance to change. It’s natural It is important even before the change activity gets going to identify likely sources of resistance Change Agents and Business Sponsors will provide indications or specific details of likely resistance to the change Schedule a draft of proposed proactive and reactive resistance management activity to suit circumstances Formulate pre-emptive mitigation tactics
  • 21. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 18 Engagement & Communication Sustaining andReinforcingChange ChangeReadiness UnderstandingtheChan geLandscape PromotingChange&ManagingResista nce Engagement & Communication Devise and implement reinforcement Initiatives Implement tools to achieve behavioural shifts Move to situation of continuous improvement Engage change program sponsors Analyse organisation complexity Assess organisational culture Identify and analyse organisational impacts Create the case for change Define metrics Build change teams Identify and map stakeholders Develop stakeholder engagement plan Identify business sponsor and change agents Plan for anticipated resistance Implement engagement plan Commence progress tracking Develop and execute communications plan Establish feedback loops Devise resistance management strategies Identify sources of resistance Implement proactive/ reactive resistance management tactics Devise and implement resistance toolkit Track metrics
  • 22. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 19 Implement previously planned Engagement plan and Communications activities Utilise the tools and process created to track sponsor engagement with the change program Communicate the desired Shared Vision using multiple channels but, critically, ensuring consistency of message Meet Business Sponsors and obtain their advocacy for the change Assessment and Impact Resistence (ChangeTeam) Assessment and Impact Resistence (ChangeTeam) Contract Set with Stakeholder (meet in person) Contract Set with Stakeholder (meet in person) Stakeholder/ ChangeTeam Contact as Required Stakeholder/ ChangeTeam Contact as Required Goal Setting with Stakeholder Goal Setting with Stakeholder Initial Stakeholder Meeting Follow on Stakeholder Activity Follow on Stakeholder Activity Ongoing Stakeholder Actvity Time Installation Realisation Follow Up If Amber or Red Project Finish Project Start SponsorshipEngagementSponsorshipEngagement CommunicationsCommunications Implement engagement plan
  • 23. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 20 Moving advocates to the required state Ownership Intimate Knowledge Awareness Understanding Buy In Barrier Oppose Neutral Accept Support Champion Neutral Engagement State Understand Aware Unaware Understanding SupportforUnderstanding PersonA PreSponsorContracting PersonA PostSponsorContracting PersonA DesiredPosition
  • 24. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 21 Develop and execute communications plan It is essential that everyone in the organisation affected by, involved with or controlling the change shares a common vision of it and the means required to achieve it The communication plan is a structured document that targets specific communications to each of the impacted business lines, regions etc. identified in the change landscape and during readiness preparation Ensure a robust communication sign-off process is in place to make sure timely and appropriate release of information Communication Rep Drafts Content Communication Rep Drafts Content ReviewWithin CommunicationsTeam ReviewWithin CommunicationsTeam Refine Based on Feedback Refine Based on Feedback Route for Program Approval Route for Program Approval DistributeDistribute Route for Business Approval Route for Business Approval Pre-change Communication Change Execution/Delivery Post-change Communication Change Time
  • 25. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 22 Progress tracking and establishing feedback loops Change AgentsChange Agents Formal/Informal Communications Formal/Informal Communications Business SponsorsBusiness Sponsors Response ProvidedResponse Provided Feedback Log Updated Feedback Log Updated Response AgreedResponse Agreed Program Communications Updated Program Communications Updated Feedback LoggedFeedback Logged Theme IdentifiedTheme Identified FeedbackFeedback Acquiring feedback and taking action on it is a best practice means of securing advocacy People respond well when they see that their feedback is being taken seriously Change Agents are one of the critical feedback providers Use tracking tools to: Establish status and effectiveness of feedback channels used Determine key themes emerging Ensure timely response to feedback
  • 26. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 23 Promoting Change & Managing Resistance Sustaining andReinforcingChange ChangeReadiness UnderstandingtheChan geLandscape PromotingChange&ManagingResista nce Engagement & Communication Devise and implement reinforcement Initiatives Implement tools to achieve behavioural shifts Move to situation of continuous improvement Engage change program sponsors Analyse organisation complexity Assess organisational culture Identify and analyse organisational impacts Create the case for change Define metrics Build change teams Identify and map stakeholders Develop stakeholder engagement plan Identify business sponsor and change agents Plan for anticipated resistance Implement engagement plan Commence progress tracking Develop and execute communications plan Establish feedback loops Devise resistance management strategies Identify sources of resistance Implement proactive/ reactive resistance management tactics Devise and implement resistance toolkit Track metrics
  • 27. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 24 Identify sources of resistance Resistance is… Inevitable A natural function of change Manageable An attempt to protect the individual’s perspective A sign that something important has been touched A sign that potential for change exists A type of communication channel – don’t ignore it! Part of the learning process Resistance isn't… Necessarily‘logical’ A sign of disloyalty Necessarily personal Indicative of poor performance by the change program A sign that the change process is out of control All change programs encounter some degree of resistance
  • 28. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 25 Implement proactive/reactive resistance management tactics ProjectedImpact Resistance IndicationsLow High Low High Resistance can be managed via ‘Business Sponsors Regional Change Team Member Sufficient Resistance Can Be ManagedVia ‘Business Sponsors Local Change Team Member Required Local Change Team Member Required Regional Change Team Member Sufficient Proactive Reactive A flexible resistance management strategy is essential Resistance management should not be a‘fire fighting’ activity Resistance can be managed: Proactively For resistance in areas where high levels are anticipated Reactively Where low level resistance impacts are anticipated Resistance can be experienced in a wide variety of ways at various levels of the organisation – how it’s managed can make or break a change program
  • 29. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 26 Devise and implement resistance toolkit Behavioural Change Strategies Most change effort will require a behaviour change in order for it to be sustained. Formal behavioural reinforcement e.g. setting goals during appraisal processes are effective tools Empowerment In this context is about removing barriers that prevent people from acting on the Change initiative such as introducing redefined roles that clearly match the changed environment Promoting Change Success Visible delivery of change program objectives/ benefits is a powerful means to build further support for the change Communication Different types of information are required by various audiences. This is a complex area but restating program rationale/benefits is a simple but effective technique RESISTANCE TOOLKIT Imagination is required to construct the means to deal with resistance
  • 30. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 27 Tracking metrics Example Program Dashboards Providing accurate data driven reporting for program governance and stakeholder management Tracking progress against metrics established during the Change Landscape provides assurance about project status and the means to manage towards success Successful or‘on track’delivery of metrics should be reported: Upwards to demonstrate successful delivery Outwards to‘champion program success’ Inwards to energise and maintain motivation within the change team
  • 31. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 28 Sustaining and Reinforcing Change Sustaining andReinforcingChange ChangeReadiness UnderstandingtheChan geLandscape PromotingChange&ManagingResista nce Engagement & Communication Devise and implement reinforcement Initiatives Implement tools to achieve behavioural shifts Move to situation of continuous improvement Engage change program sponsors Analyse organisation complexity Assess organisational culture Identify and analyse organisational impacts Create the case for change Define metrics Build change teams Identify and map stakeholders Develop stakeholder engagement plan Identify business sponsor and change agents Plan for anticipated resistance Implement engagement plan Commence progress tracking Develop and execute communications plan Establish feedback loops Devise resistance management strategies Identify sources of resistance Implement proactive/ reactive resistance management tactics Devise and implement resistance toolkit Track metrics
  • 32. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 29 Why reinforce change? Technical Objectives OnTime On Budget Human Objectives Met Business Objectives Met Installation Realisation * Harvard Business Review Michael Beer and Nitin Nohria 70% of all Change Projects fail because the organisation fails to manage the human element to change* Reinforcing the change is required to deliver the anticipated ROI and other intended benefits. Failure to do so risks wasting much of the resource expended to get this far This requires sustained effort (and organisational commitment) to see the‘realisation’through and not quit after the‘installation’phase
  • 33. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 30 Implement tools to achieve behavioural shift The change process is not over until supportive behaviours are the norm i.e. the change is fully embedded Planning for behavioural change should take place early on in the overall change process Chaucer employ the right tools to achieve shifts in mindset, behaviour, productivity and compliance NewWay of Operating Success Realised NewWay of Operating Success Realised Behavioral ShiftBehavioral Shift Sustaining Change Phase Implementation Productivity and Sharing Implementation Productivity and Sharing Movement Phase Create Buy In Inform Involve Create Buy In Inform Involve Communication & Engagement Phase Prepare Plan Prepare Plan Understanding & Readiness Phase Business as UsualBusiness as Usual Mindset ShiftMindset Shift High Productivity & Compliance High Productivity & Compliance Monitor and AdjustMonitor and Adjust Monitor and AdjustMonitor and Adjust Monitor and AdjustMonitor and Adjust MaintainMaintain REINFORCEMENT
  • 34. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 31 Move to continuous improvement Developing Lasting Support Network Ongoing Comms Take Action onTarget Feedback Enhance/ Update Business Process Champion Successes Reward Positive Behaviour Maintain Stakeholder Engagement External Cross Program Alignment Increase Change ProgramAwarenessDevise, manage and track a series of activities to reinforce change Reinforcement activity planning should be considered on a holistic basis Individual but interlocking pieces of action are devised to address specific areas of need An important final task for the Change Program is move into an environment of ‘continuous improvement’
  • 35. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 32 Chaucer – planning for change success The Change Challenge Change projects can be large scale and complex: Impacting multiple dimensions of the business Geographically/culturally diverse Technically complex Competing initiatives The nature of the change can bring many challenges: Scope of the change Visibility and pressure for results Wide reaching staff and cultural issues Chaucer can help: Managing Change Project/Programs Chaucer has extensive capability and experience in managing change projects/programs. Examples of where we can help include: Realistic strategic vision and goals Flexible and realistic business operational design Portfolio and program planning Risk management, cost control, assurance etc. Tried trusted tools and techniques to ensure delivery Chaucer can help: Change Management Chaucer has a wide breadth and depth of capability across the Change management life cycle. Examples of where we can help include: Understanding the change landscape Resistance management Change readiness and preparation Sustaining and reinforcing change Communication and engagement Chaucer has expertise in managing change programs/projects and in performing specialist change management activities
  • 36. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 33 Why Chaucer for change management? Chaucer is a strategic global partner, operating sensitively to provide extensive Change Management experience in support of delivery for our clients We utilise proven tools, methods and processes and adapt them to the specific client situation ensuring it is 'fit for purpose' and delivers business value Our flexible approach ensures the solutions developed fit, minimising disruption and accelerating the transition to business as usual at the end of the engagement
  • 37. copyright © Chaucer 2009-2012 | www.chaucer.comThe Chaucer Way – Change Management 34 Contact Us UK Neil O’Brien Mobile: +44 7834 265917 neil.obrien@chaucer.com USA Rupert Laslett Cell: +1 832 681 6858 rupert.laslett@chaucer.com Paul Burke Cell: +1 734 834 4395 paul.burke@chaucer.com Europe Deborah Feakins Mobile: +44 7799 893402 deborah.feakins@chaucer.com Middle East Asia Pacific Nick Laslett Mobile: +971 505 154 835 nick.laslett@chaucer.com Rest of World Bob Laslett Mobile: +44 7767 698543 bob.laslett@chaucer.com