Ang kampanya laban sa
pagbubukas muli ng Bataan Nuclear Power Plant
•   Safety and environmental concerns
1. Ang BNPP ay depektibo, luma at di ligtas.
2. Ang reduksyon sa carbon emission ng BNPP ay maliit
    lamang sa konteksto ng buong mundo.
•   Electricity alternatives
3. May iba pang mapapagkunan na indigenous energy
     (geothermal, natural gas, etc) ng elektrisidad para
     masagot ang kakulangan sa 2012.
4. Hindi ibig sabihin ng operasyon ng BNPP na maging mura
     ang elektrisidad.
•    Economic costs
5. Ang pagpapaandar muli ng BNPP ay kukunin sa
    mamamayan at uutangin. Dadagdag ng 24.1
    centavo/kWh sa singil sa kuryente at magiging ugat pa
    ng korupsyon ito
1. Safety and environmental concerns

Ang BNPP ay depektibo, luma at di ligtas.
Maraming problema na kinalulugaran (site), sa lumang planta, at sa pagtatapon
  ng basurang nukleyar.
     1.   Nasa bulkang Natib ang BNPP
     2.   Geologically active ang paligid at wala pang malinaw na pagaaral
          sa mga faults na malapit sa BNPP
     3.   Matagal ang ilalagi ng nuclear waste sa mundo at wala pang
          solusyon sa pagtatago nito
     4.   May CO2 emission din ang nuclear plants
Hernandez-Santos January 12, 1977 report
conclusion:
“… The above review has revealed the high risk
potential for the protection of health and safety
of the public if the proposed site is accepted.
High probability earth motions associated with
earthquakes due to the Manila Trench – West
Luzon Trough displacements and presence of a
probable fault in the plant location itself may lend
to structural failures causing the release of
radioactive materials from the nuclear power plant
or may cause extensive damage to the plant.”
Ang nuclear plants ay gumagawa rin ng CO2.

•   Bawat kilowatt-hour na nangaling sa plantang nuklear ay
    gumawa ng 1/3 kadami sa nanggaling sa pagsunog ng
    natural gas. 66 g/kWh ang CO2 mula plantang nukleyar
     –   6 na beses mas mataas kaysa sa solar at wind
•   Ang pinakayaman na mga mina ay mabilis nauubos dahil sa
    pagdami ng mga plantang nuklear.
•   Lalaki ang CO2 galing sa nuklear kasama sa pagbaba ang
    laman ng mga natitirang ore bodies.
•   Magkapanahon na ang CO2 galing sa Uranium ay aabot sa
    nanggaling sa pagsunog ng fossil fuel.
•   Ang reduksyon sa carbon emission ng BNPP ay maliit
    lamang sa konteksto ng buong mundo

                          •    J.W.S van Leeuwen and P. Smith, 2004, Nuclear Power – The
                                                                            Energy Balance.
                                     http://beheer.opvit.rug.nl/deenen/Nuclear_sustainability-
Solusyon ba ang BNPP sa
kakulangan ng kuryente?
3. May iba pang mapapagkunan na indigenous energy
   (geothermal, natural gas, etc) ng elektrisidad para masagot
   ang kakulangan sa 2012.
4. Hindi ibig sabihin ng operasyon ng BNPP na maging mura
   ang elektrisidad.
Gap of 1495 MW from required
      capacity and online dependable
      capacity.
                                                  2012
                                                  (1495
                                                  mw)




(combined data 2006 PEP Update+Supply Demand Profile, Napocor
                                +simulation of half growth rates
Kabuuang maaring itayo: 2534-3400 MW
(Total Indicative Capacity)
                              (2006 PEP Update+Supply Demand Profile, Napocor)
Nasaan ang mga planta?

    Privatization
      – Pagbebenta ng
         mga plantang
         pangkuryente

    Electric Power
    Industry Reform Act
    (EPIRA)
The Malampaya Project
October 2001
Shell as operator (45%),
Chevron (45%), PNOC
(10%)
3.9 trillion cu. ft. (Tcf) of
proven reserves
Estimated 30-40 million
barrels of recoverable oil
deposits (to be bidded
out)
Other Alternative Energy Sources

 Solar: tropical country
 Wind: 7,400- 14,363 MW
(DOST 70,000 MW)
potential
 Geothermal: 2nd in world:
1931 MW – 3131 MW
(estimated)
 Tidal Power, Wave Energy,
Ocean Thermal Energy,
Fuel Cells and Hydrogen
Technologies
Government's grand mega-sale
• Expected
   foreign
   investments
• P295 billion
   potential
   investment in
   the
   renewable
   energy sector
   for 2004-
   2013
Economic costs

5. Ang pagpapaandar muli ng BNPP ay kukunin sa
   mamamayan at uutangin. Dadagdag ng 24.1 centavo/kWh
   sa singil sa kuryente at magiging ugat pa ng korupsyon ito




    Dagdag na singil ng 72 pesos kada buwan at
        dagdag na 500M++ USD na utang
Power Plays
Electric Power and the Bataan Nuclear Power Plant




              www.no2bnpprevival.org

Mais conteúdo relacionado

Mais de lisa.ito

Mais de lisa.ito (8)

Philstar Climate Change Mitigation Needed
Philstar Climate Change Mitigation NeededPhilstar Climate Change Mitigation Needed
Philstar Climate Change Mitigation Needed
 
042009 W S1 Input Coastal Communities
042009  W S1 Input  Coastal Communities042009  W S1 Input  Coastal Communities
042009 W S1 Input Coastal Communities
 
Report Agriculture And Food Security In Lowland Communities
Report Agriculture And Food Security In Lowland CommunitiesReport Agriculture And Food Security In Lowland Communities
Report Agriculture And Food Security In Lowland Communities
 
042009 Effects Of Climate Change On Health Dr Troy Gepte
042009 Effects Of Climate Change On Health Dr Troy Gepte042009 Effects Of Climate Change On Health Dr Troy Gepte
042009 Effects Of Climate Change On Health Dr Troy Gepte
 
042009 Climate Change: Third World Vulnerability, First World Accountability ...
042009 Climate Change: Third World Vulnerability, First World Accountability ...042009 Climate Change: Third World Vulnerability, First World Accountability ...
042009 Climate Change: Third World Vulnerability, First World Accountability ...
 
042009 Science Of Climate Change: Overview For Community Organizations Dr Tes...
042009 Science Of Climate Change: Overview For Community Organizations Dr Tes...042009 Science Of Climate Change: Overview For Community Organizations Dr Tes...
042009 Science Of Climate Change: Overview For Community Organizations Dr Tes...
 
0402009 Effects Of Philippine Biofuel Production Arnold Padilla
0402009 Effects Of Philippine Biofuel Production Arnold Padilla0402009 Effects Of Philippine Biofuel Production Arnold Padilla
0402009 Effects Of Philippine Biofuel Production Arnold Padilla
 
042009 Cdm In The Philippines Promises And Realities Neth Dano
042009 Cdm In The Philippines Promises And Realities Neth Dano042009 Cdm In The Philippines Promises And Realities Neth Dano
042009 Cdm In The Philippines Promises And Realities Neth Dano
 

042009 Campaign Vs Bataan Nuclear Power Plant Dr Giovanni Tapang

  • 1. Ang kampanya laban sa pagbubukas muli ng Bataan Nuclear Power Plant
  • 2. Safety and environmental concerns 1. Ang BNPP ay depektibo, luma at di ligtas. 2. Ang reduksyon sa carbon emission ng BNPP ay maliit lamang sa konteksto ng buong mundo. • Electricity alternatives 3. May iba pang mapapagkunan na indigenous energy (geothermal, natural gas, etc) ng elektrisidad para masagot ang kakulangan sa 2012. 4. Hindi ibig sabihin ng operasyon ng BNPP na maging mura ang elektrisidad. • Economic costs 5. Ang pagpapaandar muli ng BNPP ay kukunin sa mamamayan at uutangin. Dadagdag ng 24.1 centavo/kWh sa singil sa kuryente at magiging ugat pa ng korupsyon ito
  • 3. 1. Safety and environmental concerns Ang BNPP ay depektibo, luma at di ligtas. Maraming problema na kinalulugaran (site), sa lumang planta, at sa pagtatapon ng basurang nukleyar. 1. Nasa bulkang Natib ang BNPP 2. Geologically active ang paligid at wala pang malinaw na pagaaral sa mga faults na malapit sa BNPP 3. Matagal ang ilalagi ng nuclear waste sa mundo at wala pang solusyon sa pagtatago nito 4. May CO2 emission din ang nuclear plants
  • 4. Hernandez-Santos January 12, 1977 report conclusion: “… The above review has revealed the high risk potential for the protection of health and safety of the public if the proposed site is accepted. High probability earth motions associated with earthquakes due to the Manila Trench – West Luzon Trough displacements and presence of a probable fault in the plant location itself may lend to structural failures causing the release of radioactive materials from the nuclear power plant or may cause extensive damage to the plant.”
  • 5.
  • 6.
  • 7. Ang nuclear plants ay gumagawa rin ng CO2. • Bawat kilowatt-hour na nangaling sa plantang nuklear ay gumawa ng 1/3 kadami sa nanggaling sa pagsunog ng natural gas. 66 g/kWh ang CO2 mula plantang nukleyar – 6 na beses mas mataas kaysa sa solar at wind • Ang pinakayaman na mga mina ay mabilis nauubos dahil sa pagdami ng mga plantang nuklear. • Lalaki ang CO2 galing sa nuklear kasama sa pagbaba ang laman ng mga natitirang ore bodies. • Magkapanahon na ang CO2 galing sa Uranium ay aabot sa nanggaling sa pagsunog ng fossil fuel. • Ang reduksyon sa carbon emission ng BNPP ay maliit lamang sa konteksto ng buong mundo • J.W.S van Leeuwen and P. Smith, 2004, Nuclear Power – The Energy Balance. http://beheer.opvit.rug.nl/deenen/Nuclear_sustainability-
  • 8. Solusyon ba ang BNPP sa kakulangan ng kuryente? 3. May iba pang mapapagkunan na indigenous energy (geothermal, natural gas, etc) ng elektrisidad para masagot ang kakulangan sa 2012. 4. Hindi ibig sabihin ng operasyon ng BNPP na maging mura ang elektrisidad.
  • 9. Gap of 1495 MW from required capacity and online dependable capacity. 2012 (1495 mw) (combined data 2006 PEP Update+Supply Demand Profile, Napocor +simulation of half growth rates
  • 10. Kabuuang maaring itayo: 2534-3400 MW (Total Indicative Capacity) (2006 PEP Update+Supply Demand Profile, Napocor)
  • 11. Nasaan ang mga planta?  Privatization – Pagbebenta ng mga plantang pangkuryente  Electric Power Industry Reform Act (EPIRA)
  • 12. The Malampaya Project October 2001 Shell as operator (45%), Chevron (45%), PNOC (10%) 3.9 trillion cu. ft. (Tcf) of proven reserves Estimated 30-40 million barrels of recoverable oil deposits (to be bidded out)
  • 13. Other Alternative Energy Sources Solar: tropical country Wind: 7,400- 14,363 MW (DOST 70,000 MW) potential Geothermal: 2nd in world: 1931 MW – 3131 MW (estimated) Tidal Power, Wave Energy, Ocean Thermal Energy, Fuel Cells and Hydrogen Technologies
  • 14. Government's grand mega-sale • Expected foreign investments • P295 billion potential investment in the renewable energy sector for 2004- 2013
  • 15. Economic costs 5. Ang pagpapaandar muli ng BNPP ay kukunin sa mamamayan at uutangin. Dadagdag ng 24.1 centavo/kWh sa singil sa kuryente at magiging ugat pa ng korupsyon ito Dagdag na singil ng 72 pesos kada buwan at dagdag na 500M++ USD na utang
  • 16. Power Plays Electric Power and the Bataan Nuclear Power Plant www.no2bnpprevival.org