ELABORATED BY : ARTURO LLANOS
OBJETIVE
OUTLINE A GUIDE FOR A.I.’S TO DEAL WITH A
CUSTOMERS REQUEST TO CERTIFY THEIR SHOPS
UNDER ASME SECTION VIII DIV. 2 REGULATIONS
STEP 1
Elaborate Applications to :
ASME ( caconnect)
NATIONAL BOARD
(www.nationalboard.org)
STEP 2
Have a Contract with HSB GS
STEP No. 3
Develop a QCSM to meet Annex 2E
Requirements
ANNEX E
2-E.1 GENERAL
2-E.1.1 The Manufacturer shall develop and
maintain a Quality Control System that will
establish that all Code requirements, including
material, design, fabrication, examination (by the
Manufacturer), and inspection of vessels and
vessel parts (by the inspector) will be met.
.
Provided that Code requirements are suitably
identified, System :
May include provisions for satisfying any
requirements by the Manufacturer or user that
exceed minimum Code requirements
May include provisions for quality control of non-
Code work.
In such systems, the Manufacturer of vessels and
vessel parts may make changes in parts of the
system that do not affect the Code requirements
without securing acceptance by the Inspector
Shall be one suitable for the Manufacturer’s
circumstances. The necessary scope and detail of
the system shall depend on the complexity of the
work performed and on the size and complexity
of the Manufacturer's organization.
STEP 4
BUY OF ASME CODES LATEST EDITION
SECTION VIII DIVISION 2
SECTION II PARTS A,B,C AND D
SECTION V
SECTION IX
BUY OF NBIC BOOKS
PARTS 1,2 AND 3
BUY OF ACCEPTED EDITION OF
REFERENCED STANDARDS AS APPLICABLE
STEP 5
Develop a set of Drawings
and Calculations meeting with
Section VIII Div. 2 requirements.
TIP:
This is the only requirement on this matter for
Joint Review purposes, that means, Construction
of Mock Up for Joint Review can be constructed
following Section VIII Div. 1.
STEP 6
Develop Special Procedures
in English Language
Among others:
- Hydrostatic Test Procedure.
- NDE procedures( RT, UT, PT,MT and VT)
- Coded Marking Procedure( Traceability)
--PWHT procedures
STEP 7
Qualification and
Certification of :
- WPS’s
- PQR’s
- WPQ’s
STEP 8
Implementing QCSM
Recommendation:
AI’s shall recommend Clients that QCSM
must be read it Section by Section with all
personnel involve in Joint Review in order to
be aware of activities , responsibilities and
sharing responsibilities between them.
Prepair documentacion of demonstration:
Engineering Department
* Calculations
* Fabrication Drawings
* Bill of Materials
* Materials Requisition including Code Requirements
Purchasing Department
* P.O.’s without change material requisition requirements
Quality Control
* Traveler Sheet
* WPS’s PQR’s and WPQ’s
* Materials and Welding Maps
Among others the following activities must be done:
-Distribution of QCSM as per QCSM Distribution Log
establish and be sure it is completely understood
- Distribution of Drawings, List of Materials and Materials
Requisition to all departments involve in construction of
Mock up and in accordance with QCSM
- Be sure that Purchase Orders be the same as Materials
requisition establish without any change on it
- Company must search a NDE Agency properly qualified ,
including the level III appointment, reviewing all
documentation ( Procedures and Personnel qualification)
meet Code Requirements.
-Implementing QCSM in shop
-Company must be sure that the following documentation be available in
shop during construction of Mock Up :
-Last revision of Drawing
-Have a copy of the traveler sheet
-WPS’s
-WPQ’s
-Welder’s Continuity Log
-Pressure Parts properly identified with Coded Markings and properly
identified by Q.C. as accepted material
-Welding Filler according with WPS
-Give welders their welder Stamp in order to identify job made by them
-In my personal opinion , A.I must give a brief explanation of handling of
documents below mentioned to the following personnel:
-Production Manager , Production Supervisors and Welders and Fitters ,
-And Q.C. personnel.
Ware house implementation
Among others following activities must be shown
- Set up Code Material Area and Non-Code Material Area
- Set up in warehouse identified areas for:
Receiving Inspection
Accepted Material
Holding Material
Rejected Material
- Have available a Oven for storage of Welding Material with
attached instructions for Storage handling mainly for electrodes
- Implementing controlled handling of delivering to shop only
materials ( including welding) already accepted by QC
- Have a implementation of Q.C. stickers of accepted,hold
and rejected
STEP 9
Schedule A.I./AIS visits
Purpose:
Confirm that all steps above
referenced have been met and Client is
ready to Pre Joint Review and Joint
Review .
Among others the next are part of A.I. activities:
- Revision of documentation
(calculations,drawings,wps’s,pqr’s,,special procedures,etc.)
- Revision, Aceptance and Verification of implementation of
QCSM
- Set up Hold, Revision and Witness points in Traveler Sheet
to be used during construction of Mock up.
Activities of AIS during Prejoint Review
-- Make an audit of Quality Program at this time QCSM
must be docummented and implemmented completely
and the Mock up be in process, if possible just like it is
going to show during Joint Review
-- Give Customer recommendations to fix findings found
during PreJoint Review
-- Elaborate Prejoint Review Report and send it to
Customer Representative and A.I. for follow up purposes
Main Requirements to be added during
developing a QCSM to meet Section VIII Div. 2:
Glossary of Terms
Addition of the following nomenclature:
CE Certified Engineer
UDS User’s Design Specification
MFRDR Manufacturer’s Design Report
CE Certified Engineer.
Any Engineer that signs and certifies a User´s Design Specification shall meet one
of the criteria shown below :
a) A Registered Professional Engineer who is registered in one or more of the
states of the United Stated of America or the provinces of Canada and
experienced in pressure vessel design.
b) An Engineer experienced in pressure vessel design that meets all required
qualifications to perform engineering work and any supplemental requirements
stipulated by the user. The Engineer shall identify the location and the licensing
or registering authorities under which he or she has received the authority to
perform engineering work.
c) An Engineer experienced in pressure vessel design who meets all required
qualifications to perform engineering work and any supplemental requirements
stipulated by the user. The Engineer shall be registered in the International
Register of Professional Engineers of the Engineers Mobility Forum.
USER RESPONSIBILITIES
It is the responsibility of the user or an agent acting on behalf of
the user to provide a certified User’s Design Specification for
each pressure vessel to be constructed in accordance with this
Division.
What is User’s Design Specification?
The User’s Design Specification shall contain sufficient detail to
provide a complete basis for design and construction in
accordance with this Division. It is the user's responsibility to
specify, or cause to be specified, the effective Code Edition to be
used for construction.( See paragraph 2.2.2)
2.2.2 USER’S DESIGN SPECIFICATION
2.2.2.1 The User’s Design Specification shall include but not necessarily
be limited to the following:
(a) Installation Site
(1) Location
(2) Jurisdictional authority if applicable
(3) Environmental conditions
(-a) Wind design loads including relevant factors (i.e. design wind
speed, exposure, gust factors)
(-b) Earthquake design loads
(-c) Snow loads
(-d) Lowest one day mean temperature for location
(b) Vessel Identification
(1) Vessel number or identification
(2) Service fluid for proprietary fluids specific properties needed for
design, e.g., gas, liquid, density, etc.
(c) Vessel Configuration and Controlling Dimensions
(1) Outline drawings
(2) Vertical or horizontal
(3) Openings, connections, closures including quantity, type and size,
and location (i.e. elevation and orientation)
(4) Principal component dimensions in sufficient detail so that volume
capacities can be determined
(5) Support method
(d) Design Conditions
(1) Specified design pressure. The specified design pressure is the
design pressure, see paragraph 4.1.5.2(a),required at the top of the vessel
in its operating position. It shall include suitable margins required
above the maximum anticipated operating pressure to ensure proper
operation of the pressure relief devices. The MAWP of the vessel may be
set equal to this specified design pressure. If the actual MAWP of the
vessel is calculated, it shall not be less than the specified design
pressure.
(2) Design temperature and coincident specified design pressure (see
paragraph 4.1.5.2(d)).
(3) Minimum Design Metal Temperature (MDMT) and coincident specified
design pressure(see paragraph 4.1.5.2(e)).
(4) Dead loads, live loads and other loads required to perform the load case
combinations required in Parts 4 and 5.
(e) Operating Conditions
(1) Operating pressure
(2) Operating temperature
(3) Fluid transients and flow and sufficient properties for determination of
steady state and transient thermal
gradients across the vessel sections, if applicable (see paragraph 5.5.2)
(f) Design Fatigue Life
(1) Cyclic operating conditions and whether or not a fatigue analysis of the
vessel as required shall be determined in accordance with paragraph 4.1.1.4.
When a fatigue analysis is required, provide information in sufficient detail so
that an analysis of the cyclic operation can be carried out in accordance with
paragraph 5.5. comparable equipment experience.
(2) When a vessel is designed for cyclic conditions, the number of design
cycles per year and the required vessel design life in years shall be stated.
(3) When cyclic operating conditions exist and a fatigue analysis is not
required based on comparable equipment experience, this shall be stated.
The possible harmful effects of the design features listed in 5.5.2.2(a)
through 5.5.2.2
(f) shall be evaluated when contemplating comparable equipment
experience.
(g) Materials of Construction
(1) Material specification requirements shall be in accordance with one or
more of the following criteria.
(-a) Specification of materials of construction in accordance with Part 3.
(-b) Generic material type (i.e. carbon steel or Type 304 Stainless Steel).
The user shall specify requirements that provide an adequate basis for
selecting materials to be used for the construction of the vessel. The
Manufacturer shall select the appropriate material from Part 3, considering
information provided by the user per paragraph (3).
(2) The user, shall specify the corrosion and/or erosion
allowance.
(3) The user, when selecting the materials of construction,
shall consider the following:
(-a) Damage mechanisms associated with the service fluid at
design conditions. Informative and non-mandatory
guidance regarding metallurgical phenomena is provided in
Section II, Part D, Appendix A, API RP 571, and WRC Bulletins
488, 489 and 490.
(-b) Minimum Design Metal Temperature and any additional
toughness requirements.
(-c) The need for specific weld filler material to meet corrosion
resistance requirements, see paragraph 6.2.5.8
(h) Loads and Load Cases
(1) The user shall specify all expected loads and load
case combinations as listed in paragraph 4.1.5.3.
(2) These loading data may be established by:
(-a) Calculation
(-b) Experimental methods
(-c) Actual experience measurement from similar units
(-d) Computer analysis
(-e) Published data
(i) Overpressure Protection
(1) The user shall be responsible for the design,
construction and installation of the overpressure
protection system unless it is delegated to the
Manufacturer. This system shall meet the requirements
of Part 9.
(2) The type of over pressure protection intended for the
vessel shall be documented in the User’s Design
Specification as follows (see paragraph 9.1):
(-a) Type of overpressure protection system (e.g., type of
pressure relief valve, rupture disc, etc.)
(-b) System design (see paragraph 9.7)
(3) The user shall state if jurisdictional acceptance is
required prior to operation of the vessel.
2.2.2.2 Additional Requirements – The user shall state
what additional requirements are appropriate for the
intended vessel service such as:
(a)Additional requirements such as non-destructive
examination, restricted chemistry, or heat treatments
(b) Type of weld joints and the extent of required
nondestructive examinations
(c) Non-mandatory or optional provisions of this Division that
are considered to be mandatory for the subject vessel
(d) Any special requirements for marking and their location
(see paragraph 4.1 and Annex 2-F)
(e) Requirements for seals and/or bolting for closures and
covers
(f) Additional requirements relating to erection loadings
(g) Any agreements which resolve the problems of operation and
maintenance control unique to the particular
pressure vessel.
(h) Specific additional requirements relating to pressure testing
such as:
(1) Fluid properties and test temperature limits
(2) Position of vessel and support/foundation adequacy if field
hydrostatic testing is required
(3) Location: Manufacturer’s facility or on-site
(4) Cleaning and drying
(5) Selection of pressure test method, see paragraph 8.1.1
(6) Application of paints, coatings and linings, see paragraph
8.1.2(e)
2.2.2.3 The User’s Design Specification shall be certified in
accordance with Annex 2-A.
UDS User´s Design Specification.
Manufacturer’s Design Report
Who’s responsible?
An individual(s) of Manufacturer Organization often
Engineering Manager,is in responsible charge of the design
and construction of the vessel(s) and shall certify that the
Manufacturer’s Design Report is complete, accurate and in
accordance with the User’s Design Specification, and that all
the requirements of this Division and any additional
requirements needed for adequate design have been met.
Such certification requires the signature(s) of one or more
Engineers with requisite experience and qualifications as
defined below. One or more individuals may sign the
documentation based on information they reviewed, and the
knowledge and belief that the requirements of this Division
have been satisfied.
2.3.3 MANUFACTURER’S DESIGN REPORT
2.3.3.1 The Manufacturer shall provide a Manufacturer’s Design Report that
includes:
(a) Final as-built drawings.
(b) The actual material specifications used for each component.
(c) Design calculations and analysis that establish that the design as shown on
the drawings complies with the requirements of this Division for the design
conditions that have been specified in the User’s Design Specification.
(1) Documentation of design-by-rule calculations in Part 4 shall include the
following:
(-a) The name and version of computer software, if applicable
(-b) Loading conditions and boundary conditions used to address the load
cases in the User’s Design Specification
(-c) Material models utilized for all required physical properties (i.e. stress-
strain data, modulus of elasticity, Poisson’s ratio, thermal expansion
coefficient, thermal conductivity, thermal diffusivity), strength parameters
(i.e. yield and tensile strength), and allowable stresses
(-d) Detailed calculations, including results from all of the applicable
steps in the calculations, showing the acceptance criteria utilized to
meet the requirements of this Division.
(-e) A summary of the calculation results
(2) Documentation of design-by-analysis calculations in Part 5 shall
include the following:
(-a) A detailed description of the numerical method used, including the
name and version of computer software, if
applicable
(-b) Description of model geometry (including element type for finite
element analysis)
(-c) Loading conditions and boundary conditions used to address the
load cases in the User’s Design Specification
(-d) Material models utilized for all required physical properties (i.e.
modulus of elasticity, Poisson’s ratio, thermal expansion coefficient,
thermal conductivity, thermal diffusivity), strength parameters (i.e.
yield and tensile strength), strain limits, if applicable, and the design
membrane stress intensity per Part 3
(-e) Description of whether material nonlinearity is utilized in
the analysis including a description of the material model (i.e.
stress-strain curve and cyclic stress-strain curve)
(-f) Description of the numerical analysis procedure (i.e. static
analysis, thermal analysis (temperature and stress), buckling
analysis, natural frequency analysis, dynamic analysis) and
whether a geometrically linear or nonlinear option is invoked
(-g) Graphical display of relevant results (i.e. numerical model,
deformed plots, and contour plots of thermal and stress results)
(-h) Method used to validate the numerical model (i.e. mesh
sensitivity review and equilibrium check for finite element
analysis, e.g. check of hoop stress in a component away from
structural discontinuity and a check to ensure that global
equilibrium is achieved between applied loads and reactions at
specified boundary conditions)
(-i) Description of results processing performed to establish
numerical analysis results (i.e. stress linearization method, use of
centroidal or nodal values for stress, strain, and temperature
results)
(-j) A summary of the numerical analysis results showing the
acceptance criteria utilized to meet the requirements of this
Division
(-k) Electronic storage of analysis results including input files and
output files that contain numerical analysis results utilized to
demonstrate compliance with the requirements of this Division
(d) The results of any fatigue analyses according to paragraph 5.5,
as applicable.
(e) Any assumptions used by the Manufacturer to perform the
vessel design.
2.3.3.2 The Manufacturer’s Design Report shall be certified in
accordance with Annex 2-B.
MFRDR Manufacturer´s Design Report
ENGINEERING ADDITIONAL REQUIREMENTS FOR SECTION VIII, DIV. 2
It is the responsibility of the user or an agent acting on behalf of the user to
provide a UDS for each pressure vessel to be constructed in accordance with
Section VIII, Div. 2. The UDS shall contain sufficient detail to provide a complete
basis for design and construction in accordance with Section VIII, Div. 2. It is the
user's responsibility to specify, or cause to specify, the effective Code Edition to be
used for construction of Code Items.
The UDS shall include but not necessarily be limited to the requirements
stated in 2.2.2.1 of Section VIII, Div. 2
The Company is responsible for the structural and pressure retaining
integrity of a vessel or part thereof, as established by conformance with the
requirements of the rules of Section VIII, Div. 2 and the requirements in the UDS.
The Company completing any Item or part marked with ASME Certification
mark and U2 designator has the responsibility to comply with all the applicable
requirements of this Section VIII Div. 2 and, through proper certification, to
ensure that any work by others also complies with the requirements of this
Division. QCM shall certify compliance with these requirements by completing a
MDR.
Continue……..
Any material substitutions by EM are subject to approval of the
User and communicated to AI for revision of UDS and MFRDR.
A UDS Certified by CE or Professional Engineer shall be
furnished to the EM for review against the requirements of
paragraph 2.2.2 and Annex 2.A of Code, the EM shall be responsible
for verifying that the UDS meets such requirements and for verifying
Code Edition to be used for Construction it’s also specified.
EM is also responsible for preparing the MFRDR which shall
comply with the requirements of paragraph 2.3.3 and Annex 2.B of
Code.
Restricted requirements on allowable materials as reflected by
the fatigue curves of paragraph 3.15 of Code must be considered
where a fatigue (Cyclic) analysis is required.
UDS, TS and MFRDR must be reviewed by AI prior to start
of fabrication.
Revisions if any, to the UDS, MFRDR, drawings and
calculations shall be handled as described above.
Upon completion of fabrication, EM will provide all
fabrication records to the CE. The MFRDR will be reconciled
against the UDS and if found to be in compliance, the MFRDR
will be certified by the CE.
AI AVAILABILITY
All documents described in this section shall be available
thru the EM for review by the AI.
MATERIAL CONTROL ADDITIONAL REQUIREMENTS FOR
SECTION VIII DIV. 2
All conflicts between the material specification and the
supplemental requirements stipulated in Part 3 the ASME Section VIII
Division 2 Code, shall be noted on the BOM by the DE, and compliance
with the supplemental requirements shall be certified by the material
manufacturer.
If the requirements in a material specification are to be
completed by other than the materials manufacturer, then the DE shall
address on the BOM that supplementary material test reports are
required. QCM receives and review all MTR’s, tests, examination
reports and/or C of C for ensuring compliance and makes them
available to the AI for verification of compliance with the material
specification. If acceptance QCM certifies compliance with
supplemental requirements of Section VIII, Div. 2 by dated initials on
the document.
The DE shall specify in the BOM that the certification of materials
shall meet Part 3 paragraph 3.2.6 of the ASME Section VIII Division 2
Code requirements.
The BOM for the forming of carbon and low alloy material parts
shall specify that certification to paragraph 6.1.2.3(e) of the ASME
Section VIII Division 2 Code is required.
The DE shall specify on the BOM that material manufacturer´s
identification marking required by the material specification shall not
be stamped on plate material less than 6mm (1/4”) in thickness. (Unless
the requirements of 3.2.7.4 are complied with ASME Section VIII
Division 2).
Substitution of the specified material requires approval of the
User and both the CE responsible for the Certification of the User’s
Specifications and the Manufacturer’s Design Report, and acceptance
by AI.
The QCM is responsible for providing an as built sketch or
tabulation of materials identifying each piece of material with the MTR
or, if permitted by Code C of C and coded marking which assure
identification of each piece of material during fabrication and
subsequent identification in the completed vessel.
EXAMINATION AND INSPECTION PROGRAM ADDITIONAL
REQUIREMENTS FOR ASME SECTION VIII, DIV. 2
The QCM shall prepare, collect and maintain construction records
and documentation as fabrication progress, (Files of Quality Control).
All materials to be used in constructing a pressure vessel shall be
in accordance with ASME Section VIII Div. 2 Code examined before
fabrication with the purpose of detecting, as far possible, defects that
will affect the safety of the vessel, in accordance with paragraph 6.1.3.1 of
ASME Section
VIII Div. 2 Code.
The QCM is responsible for having examined all cut edges of base
material in accordance with Paragraph 6.1.3 (b) of Code. All welding
shall be subject to in-process examination by Visual Examination at the
fit-up stage and during back gouging.
All weld for pressure retaining parts shall be visually examined by
the QCI who must pass the annual eye test in accordance with
paragraph 7.A.2.2 (b)(1) of ASME Section VIII Div. 2 Code. shall be as
established in paragraphs 7.5.6 and 7.5.7 of ASME Section VIII Div. 2
code.
Weld seams that will be hidden by assembly are given a visually
examination by the QCM from workmanship to final assembly. As per
paragraph 8.2.5 (a) (3) of ASME Section VIII Div. 2 Code.
Forming tolerances shall be maintained in accordance with 6.1.2
and paragraph 4.3.2 & 4.4.4 as applicable, of ASME Sec. VIII Div. 2
Code.
Removal of temporary attachments shall be in accordance with
6.1.4.4 of ASME Section VIII Div. 2 Code.
If a fatigue analysis is required for a part of a Code Vessel, then all
of the internal and external surfaces or pressure boundary and
attachment welds for that part shall be examined by wet magnetic
particle method (if ferromagnetic) or by liquid penetrant method (if
non magnetic) after Hydrostatic, unless accessibility prevents
meaningful interpretation and characterization of imperfections. The
acceptance criteria shall be as established in paragraphs 7.5.6 and 7.5.7
of ASME Section VIII Div. 2 code.
The pressure test shall be in accordance with a pressure test
procedure, prepared and approved by the QCM, which shall be in
accordance with 8.2 or 8.3 of the ASME Section VIII Div. 2 Code.
The test method and the upper test pressure limit shall be
referenced on the drawings by the DE. Pressure test procedure
must be submitted to AI for review.
The required markings for Code Vessel of paragraph 2.F.1 of
the ASME Sec. VIII Div. 2 Code shall be applied on a Nameplate
or shall be stamped with low stress type stamps directly on the
Item, located on an area designated as a low stress area by the DE
in the MFRDR.
The ASME Certification Mark with U2 designator shall be
applied by the QCM only with the approval of the AI and after
the hydrostatic test and all other required inspection and
testing has been satisfactorily completed.
The MFRDR shall be prepared by EM and submitted to CE
for review for accuracy and signed by him prior to being
presented to the AI for his review and signature. The name of
the Company’s Certified Engineer shall be on the MFRDR. The
QCM shall be responsible for routing the MFRDR to the
customer, the appropriate enforcement authority in the
jurisdiction in which the Code Vessel is to be installed where
required by law and National Board as applicable. The QCM
shall also be responsible for retention of the Company’s copy of
the Manufacturer’s Data Report.
NON CONFORMITIES CONTROL ADDITIONAL
REQUIREMENTS FOR SECTION VIII, DIV. 2
NCR shall be serialized and retained on file by
QCM
NON-DESTRUCTIVE EXAMINATION ADDITIONAL
REQUIREMENTS FOR SECTION VIII, DIV. 2
All finished welds shall be subject to nondestructive Examination
depending on Examination Group selected in paragraph 7.4.2 and the
Joint Category and weld type as defined in paragraph 4.2 of Code.
All welding shall be subject to in process examination by QCI,
making visual examination at the fit up stage and during back gouging
in accordance with paragraph 7.4.1.3 of Code.
Personnel performing and evaluating NDE shall be qualified and
certified per 7.3 of Code.
CALIBRATION OF MEASUREMENT AND TEST EQUIPMENT
ADDITIONAL REQUIREMENTS FOR SECTION VIII, DIV. 2
All gages shall be calibrated against a standard
deadweight tester or a calibrated master gage at
least every 6 months or at any time there is a
reason to believe that they are in error.
RECORDS RETENTION ADDITIONAL REQUIREMENTS FOR ASME
Section VIII Div. 2 items:
a) User’s Design Specification
b) Manufacturer’s Design Report
c) Manufacturer’s Data Report
d) Manufacturer’s Construction Records and Partial Data Reports.
An Index of the Construction Record Files shall consist of the following as a minimum
as applicable:
1) Tabulated list of all material used for fabrication with Materials Certifications and
Material Test Reports, and a record of any repairs to pressure retaining material that
require a radiographic examination by the rules of this Div. 2. The record of the repairs
shall include the location of the repair, examination results, and the repair procedures.
2) Fabrication information including all heat treatment requirements, forming and
rolling procedure when prepared, an inspection and test plan identifying all inspection
points required by the user, and signed inspection reports.
3) List of any subcontracted services or parts, if applicable.
4) Pressure Parts documentation and certifications.
5) Welding Procedure Specifications (WPS), Procedure Qualification Records (PQR),
weld map and welder or welding operator qualification test results.
6) Record of all heat treatments including post weld heat treatment (these records may
be either the actual heat treatment charts or a certified summary description of heat
treatment time and temperature).
7) Results of production test plates, if applicable.
8) NDE procedures, records of procedure demonstrations, and records of personnel
certifications.
9) All reports stating the results of inspection, nondestructive examinations and testing
including radiographic examination, ultrasonic examination, magnetic particle
examination, liquid dye penetrant examination and hardness tests.
10)All non-conformance reports including resolution and a detailed description of any
repairs including repair procedures, a sketch, photo, or drawing indicating the location
and size of the repaired area.
11) Charts or other records of required hydrostatic, pneumatic, or other tests. Test logs
shall include the test date, testing fluid, duration of the test, temperature of the test
fluid, and test pressure.
12) Dimensional drawings of the as-built condition.
The Company shall maintain a complete set of radiographs until the signing of
the Manufacturer’s Data Report, and furnish upon request to the user and, upon
request to the AI.
Questions ?

Mais conteúdo relacionado

Mais procurados

ASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfPKNanavati
 
ASME BOILER & PRESSURE SECTION VIII.ppt
ASME BOILER & PRESSURE SECTION VIII.pptASME BOILER & PRESSURE SECTION VIII.ppt
ASME BOILER & PRESSURE SECTION VIII.ppthesham ismail
 
How to review wps part 1 (mau company)
How to review wps part 1 (mau company)How to review wps part 1 (mau company)
How to review wps part 1 (mau company)Mohamed Farouk
 
Asme sec viii div 2
Asme sec viii div 2Asme sec viii div 2
Asme sec viii div 2Jithu John
 
Static and Fatigue Analysis of Pressure Vessel as per ASME Codes
Static and Fatigue Analysis of Pressure Vessel as per ASME CodesStatic and Fatigue Analysis of Pressure Vessel as per ASME Codes
Static and Fatigue Analysis of Pressure Vessel as per ASME CodesUtsav Patel
 
Asme sec ix overview
Asme sec ix overviewAsme sec ix overview
Asme sec ix overviewAshifuddinAli
 
Aramco inspection handbook
Aramco inspection handbookAramco inspection handbook
Aramco inspection handbookram111eg
 
Asme sec. ix bkr - 051010
Asme sec. ix   bkr - 051010Asme sec. ix   bkr - 051010
Asme sec. ix bkr - 051010Jithu John
 
Inspection of Heat exchanger .pdf
Inspection of Heat exchanger .pdfInspection of Heat exchanger .pdf
Inspection of Heat exchanger .pdfTusharNayak32
 
How to write a Welding Procedure Specification (ISO 15614-1
How to write a Welding Procedure Specification (ISO 15614-1How to write a Welding Procedure Specification (ISO 15614-1
How to write a Welding Procedure Specification (ISO 15614-1Tiago Pereira
 
Process piping fundamentals, codes and standards module 1
Process piping fundamentals, codes and standards    module 1Process piping fundamentals, codes and standards    module 1
Process piping fundamentals, codes and standards module 1BHARAT BELLAD
 
Piping material-specification
Piping material-specificationPiping material-specification
Piping material-specificationChiragShah127
 

Mais procurados (20)

Asme b31.3 interpretation
Asme b31.3 interpretationAsme b31.3 interpretation
Asme b31.3 interpretation
 
How to Qualify a Welding Procedure
How to Qualify a Welding ProcedureHow to Qualify a Welding Procedure
How to Qualify a Welding Procedure
 
ASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfASME SEC IX PPT.pdf
ASME SEC IX PPT.pdf
 
ASME BOILER & PRESSURE SECTION VIII.ppt
ASME BOILER & PRESSURE SECTION VIII.pptASME BOILER & PRESSURE SECTION VIII.ppt
ASME BOILER & PRESSURE SECTION VIII.ppt
 
How to review wps part 1 (mau company)
How to review wps part 1 (mau company)How to review wps part 1 (mau company)
How to review wps part 1 (mau company)
 
Asme sec viii div 2
Asme sec viii div 2Asme sec viii div 2
Asme sec viii div 2
 
Asmecodesstandards
AsmecodesstandardsAsmecodesstandards
Asmecodesstandards
 
Static and Fatigue Analysis of Pressure Vessel as per ASME Codes
Static and Fatigue Analysis of Pressure Vessel as per ASME CodesStatic and Fatigue Analysis of Pressure Vessel as per ASME Codes
Static and Fatigue Analysis of Pressure Vessel as per ASME Codes
 
Api 653 study guide
Api 653 study guideApi 653 study guide
Api 653 study guide
 
How to produce PQR
How to produce PQRHow to produce PQR
How to produce PQR
 
Asme sec ix overview
Asme sec ix overviewAsme sec ix overview
Asme sec ix overview
 
Aramco inspection handbook
Aramco inspection handbookAramco inspection handbook
Aramco inspection handbook
 
Asme sec. ix bkr - 051010
Asme sec. ix   bkr - 051010Asme sec. ix   bkr - 051010
Asme sec. ix bkr - 051010
 
Inspection of Heat exchanger .pdf
Inspection of Heat exchanger .pdfInspection of Heat exchanger .pdf
Inspection of Heat exchanger .pdf
 
How to write a Welding Procedure Specification (ISO 15614-1
How to write a Welding Procedure Specification (ISO 15614-1How to write a Welding Procedure Specification (ISO 15614-1
How to write a Welding Procedure Specification (ISO 15614-1
 
Process piping fundamentals, codes and standards module 1
Process piping fundamentals, codes and standards    module 1Process piping fundamentals, codes and standards    module 1
Process piping fundamentals, codes and standards module 1
 
Piping material-specification
Piping material-specificationPiping material-specification
Piping material-specification
 
floating tank design
floating tank designfloating tank design
floating tank design
 
Piping Introduction
Piping IntroductionPiping Introduction
Piping Introduction
 
Pressure vessels
Pressure vesselsPressure vessels
Pressure vessels
 

Destaque

ASME Accreditation Programs
ASME Accreditation ProgramsASME Accreditation Programs
ASME Accreditation Programsasme_sg
 
Pad+eye+design lifting+lug+standart
Pad+eye+design lifting+lug+standartPad+eye+design lifting+lug+standart
Pad+eye+design lifting+lug+standartsuchit arivu
 
Anexo 8 norma asme seccion VIII en español
Anexo 8 norma asme seccion VIII en españolAnexo 8 norma asme seccion VIII en español
Anexo 8 norma asme seccion VIII en españolRicardo Aranda
 
What is MAWP? Difference between MAWP , Design Pressure and Operating Pressure
What is MAWP? Difference between MAWP , Design Pressure and Operating Pressure  What is MAWP? Difference between MAWP , Design Pressure and Operating Pressure
What is MAWP? Difference between MAWP , Design Pressure and Operating Pressure Varun Patel
 
생각의 구조화 마인드맵
생각의 구조화 마인드맵생각의 구조화 마인드맵
생각의 구조화 마인드맵ThinkCafe
 
Heat_exchanger_mechanical_design_calculations_per_asme_& tema by abdel hali...
Heat_exchanger_mechanical_design_calculations_per_asme_& tema   by abdel hali...Heat_exchanger_mechanical_design_calculations_per_asme_& tema   by abdel hali...
Heat_exchanger_mechanical_design_calculations_per_asme_& tema by abdel hali...MIGUEL SALDIVAR HERNANDEZ
 
Padeye design calculation
Padeye design calculationPadeye design calculation
Padeye design calculationadiq1901
 
Padeye calculation example
Padeye calculation examplePadeye calculation example
Padeye calculation exampleJhon Keliat
 
Swe cs external 25112013 services
Swe cs external 25112013   servicesSwe cs external 25112013   services
Swe cs external 25112013 servicesAfiman Abdul Rahman
 
2011+addenda+asme+code+synopsis+by+one cis+insurance+co
2011+addenda+asme+code+synopsis+by+one cis+insurance+co2011+addenda+asme+code+synopsis+by+one cis+insurance+co
2011+addenda+asme+code+synopsis+by+one cis+insurance+coneelraju2000
 
WCM_PRESENTATION_Flange_Management_Rev4
WCM_PRESENTATION_Flange_Management_Rev4WCM_PRESENTATION_Flange_Management_Rev4
WCM_PRESENTATION_Flange_Management_Rev4Afiman Abdul Rahman
 
스마트워크를 위한 마인드맵 세상
스마트워크를 위한 마인드맵 세상스마트워크를 위한 마인드맵 세상
스마트워크를 위한 마인드맵 세상co-pen co-work company
 

Destaque (14)

Asme
AsmeAsme
Asme
 
Daily Mind Map
Daily Mind MapDaily Mind Map
Daily Mind Map
 
ASME Accreditation Programs
ASME Accreditation ProgramsASME Accreditation Programs
ASME Accreditation Programs
 
Pad+eye+design lifting+lug+standart
Pad+eye+design lifting+lug+standartPad+eye+design lifting+lug+standart
Pad+eye+design lifting+lug+standart
 
Anexo 8 norma asme seccion VIII en español
Anexo 8 norma asme seccion VIII en españolAnexo 8 norma asme seccion VIII en español
Anexo 8 norma asme seccion VIII en español
 
What is MAWP? Difference between MAWP , Design Pressure and Operating Pressure
What is MAWP? Difference between MAWP , Design Pressure and Operating Pressure  What is MAWP? Difference between MAWP , Design Pressure and Operating Pressure
What is MAWP? Difference between MAWP , Design Pressure and Operating Pressure
 
생각의 구조화 마인드맵
생각의 구조화 마인드맵생각의 구조화 마인드맵
생각의 구조화 마인드맵
 
Heat_exchanger_mechanical_design_calculations_per_asme_& tema by abdel hali...
Heat_exchanger_mechanical_design_calculations_per_asme_& tema   by abdel hali...Heat_exchanger_mechanical_design_calculations_per_asme_& tema   by abdel hali...
Heat_exchanger_mechanical_design_calculations_per_asme_& tema by abdel hali...
 
Padeye design calculation
Padeye design calculationPadeye design calculation
Padeye design calculation
 
Padeye calculation example
Padeye calculation examplePadeye calculation example
Padeye calculation example
 
Swe cs external 25112013 services
Swe cs external 25112013   servicesSwe cs external 25112013   services
Swe cs external 25112013 services
 
2011+addenda+asme+code+synopsis+by+one cis+insurance+co
2011+addenda+asme+code+synopsis+by+one cis+insurance+co2011+addenda+asme+code+synopsis+by+one cis+insurance+co
2011+addenda+asme+code+synopsis+by+one cis+insurance+co
 
WCM_PRESENTATION_Flange_Management_Rev4
WCM_PRESENTATION_Flange_Management_Rev4WCM_PRESENTATION_Flange_Management_Rev4
WCM_PRESENTATION_Flange_Management_Rev4
 
스마트워크를 위한 마인드맵 세상
스마트워크를 위한 마인드맵 세상스마트워크를 위한 마인드맵 세상
스마트워크를 위한 마인드맵 세상
 

Semelhante a Presentacion asme seccion viii division 2 2013

Episode 30 : Project Execution ( Part 1 )
Episode 30 :  Project Execution ( Part 1 ) Episode 30 :  Project Execution ( Part 1 )
Episode 30 : Project Execution ( Part 1 ) SAJJAD KHUDHUR ABBAS
 
Chapter7_ControlLoop-1.pdf
Chapter7_ControlLoop-1.pdfChapter7_ControlLoop-1.pdf
Chapter7_ControlLoop-1.pdfJoshua25806
 
TG-15595- report-and-analysis_powerpointviewer(1).doc
TG-15595- report-and-analysis_powerpointviewer(1).docTG-15595- report-and-analysis_powerpointviewer(1).doc
TG-15595- report-and-analysis_powerpointviewer(1).docjennbarroga7
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTNur Ain Samsudin
 
User specification requirements (urs) rash
User specification requirements (urs) rashUser specification requirements (urs) rash
User specification requirements (urs) rashRASHMINasare
 
Engineering
EngineeringEngineering
EngineeringKomalia
 
Engineering
EngineeringEngineering
EngineeringKomalia
 
commissioning.pdf
commissioning.pdfcommissioning.pdf
commissioning.pdfharis348605
 
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Gaurav Singh Rajput
 
Jamco_FAI_Training_Materials_AS9102_Rev_B.pdf
Jamco_FAI_Training_Materials_AS9102_Rev_B.pdfJamco_FAI_Training_Materials_AS9102_Rev_B.pdf
Jamco_FAI_Training_Materials_AS9102_Rev_B.pdfFaizyNoh
 
Terms defenations-abriviations
Terms defenations-abriviationsTerms defenations-abriviations
Terms defenations-abriviationsAta Alvi
 
Module 6 qaqc training
Module 6 qaqc trainingModule 6 qaqc training
Module 6 qaqc trainingDiaz Susetyo
 
2 cm-ms-bld-012 - roof fan & natural ventilator
2   cm-ms-bld-012 - roof fan & natural ventilator2   cm-ms-bld-012 - roof fan & natural ventilator
2 cm-ms-bld-012 - roof fan & natural ventilatorMinh Bui Si
 
Spec05 pro-ka-kc151a -contractor_quality_control_dated_10-19-98
Spec05 pro-ka-kc151a -contractor_quality_control_dated_10-19-98Spec05 pro-ka-kc151a -contractor_quality_control_dated_10-19-98
Spec05 pro-ka-kc151a -contractor_quality_control_dated_10-19-98osers
 

Semelhante a Presentacion asme seccion viii division 2 2013 (20)

Episode 30 : Project Execution ( Part 1 )
Episode 30 :  Project Execution ( Part 1 ) Episode 30 :  Project Execution ( Part 1 )
Episode 30 : Project Execution ( Part 1 )
 
Chapter7_ControlLoop-1.pdf
Chapter7_ControlLoop-1.pdfChapter7_ControlLoop-1.pdf
Chapter7_ControlLoop-1.pdf
 
TG-15595- report-and-analysis_powerpointviewer(1).doc
TG-15595- report-and-analysis_powerpointviewer(1).docTG-15595- report-and-analysis_powerpointviewer(1).doc
TG-15595- report-and-analysis_powerpointviewer(1).doc
 
Mechanical completion
Mechanical completionMechanical completion
Mechanical completion
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
 
User specification requirements (urs) rash
User specification requirements (urs) rashUser specification requirements (urs) rash
User specification requirements (urs) rash
 
019113
019113019113
019113
 
Engineering
EngineeringEngineering
Engineering
 
Engineering
EngineeringEngineering
Engineering
 
Engineering
EngineeringEngineering
Engineering
 
commissioning.pdf
commissioning.pdfcommissioning.pdf
commissioning.pdf
 
S2011-6.pdf
S2011-6.pdfS2011-6.pdf
S2011-6.pdf
 
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
 
Jamco_FAI_Training_Materials_AS9102_Rev_B.pdf
Jamco_FAI_Training_Materials_AS9102_Rev_B.pdfJamco_FAI_Training_Materials_AS9102_Rev_B.pdf
Jamco_FAI_Training_Materials_AS9102_Rev_B.pdf
 
Terms defenations-abriviations
Terms defenations-abriviationsTerms defenations-abriviations
Terms defenations-abriviations
 
Module 6 qaqc training
Module 6 qaqc trainingModule 6 qaqc training
Module 6 qaqc training
 
Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)
 
2 cm-ms-bld-012 - roof fan & natural ventilator
2   cm-ms-bld-012 - roof fan & natural ventilator2   cm-ms-bld-012 - roof fan & natural ventilator
2 cm-ms-bld-012 - roof fan & natural ventilator
 
Spec05 pro-ka-kc151a -contractor_quality_control_dated_10-19-98
Spec05 pro-ka-kc151a -contractor_quality_control_dated_10-19-98Spec05 pro-ka-kc151a -contractor_quality_control_dated_10-19-98
Spec05 pro-ka-kc151a -contractor_quality_control_dated_10-19-98
 
EL-SAYES_CV
EL-SAYES_CV EL-SAYES_CV
EL-SAYES_CV
 

Último

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 

Último (20)

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 

Presentacion asme seccion viii division 2 2013

  • 1. ELABORATED BY : ARTURO LLANOS
  • 2. OBJETIVE OUTLINE A GUIDE FOR A.I.’S TO DEAL WITH A CUSTOMERS REQUEST TO CERTIFY THEIR SHOPS UNDER ASME SECTION VIII DIV. 2 REGULATIONS
  • 3. STEP 1 Elaborate Applications to : ASME ( caconnect) NATIONAL BOARD (www.nationalboard.org)
  • 4. STEP 2 Have a Contract with HSB GS
  • 5. STEP No. 3 Develop a QCSM to meet Annex 2E Requirements
  • 6. ANNEX E 2-E.1 GENERAL 2-E.1.1 The Manufacturer shall develop and maintain a Quality Control System that will establish that all Code requirements, including material, design, fabrication, examination (by the Manufacturer), and inspection of vessels and vessel parts (by the inspector) will be met. .
  • 7. Provided that Code requirements are suitably identified, System : May include provisions for satisfying any requirements by the Manufacturer or user that exceed minimum Code requirements May include provisions for quality control of non- Code work. In such systems, the Manufacturer of vessels and vessel parts may make changes in parts of the system that do not affect the Code requirements without securing acceptance by the Inspector
  • 8. Shall be one suitable for the Manufacturer’s circumstances. The necessary scope and detail of the system shall depend on the complexity of the work performed and on the size and complexity of the Manufacturer's organization.
  • 9. STEP 4 BUY OF ASME CODES LATEST EDITION SECTION VIII DIVISION 2 SECTION II PARTS A,B,C AND D SECTION V SECTION IX BUY OF NBIC BOOKS PARTS 1,2 AND 3 BUY OF ACCEPTED EDITION OF REFERENCED STANDARDS AS APPLICABLE
  • 10. STEP 5 Develop a set of Drawings and Calculations meeting with Section VIII Div. 2 requirements. TIP: This is the only requirement on this matter for Joint Review purposes, that means, Construction of Mock Up for Joint Review can be constructed following Section VIII Div. 1.
  • 11. STEP 6 Develop Special Procedures in English Language Among others: - Hydrostatic Test Procedure. - NDE procedures( RT, UT, PT,MT and VT) - Coded Marking Procedure( Traceability) --PWHT procedures
  • 12. STEP 7 Qualification and Certification of : - WPS’s - PQR’s - WPQ’s
  • 13. STEP 8 Implementing QCSM Recommendation: AI’s shall recommend Clients that QCSM must be read it Section by Section with all personnel involve in Joint Review in order to be aware of activities , responsibilities and sharing responsibilities between them.
  • 14. Prepair documentacion of demonstration: Engineering Department * Calculations * Fabrication Drawings * Bill of Materials * Materials Requisition including Code Requirements Purchasing Department * P.O.’s without change material requisition requirements Quality Control * Traveler Sheet * WPS’s PQR’s and WPQ’s * Materials and Welding Maps
  • 15. Among others the following activities must be done: -Distribution of QCSM as per QCSM Distribution Log establish and be sure it is completely understood - Distribution of Drawings, List of Materials and Materials Requisition to all departments involve in construction of Mock up and in accordance with QCSM - Be sure that Purchase Orders be the same as Materials requisition establish without any change on it - Company must search a NDE Agency properly qualified , including the level III appointment, reviewing all documentation ( Procedures and Personnel qualification) meet Code Requirements.
  • 16. -Implementing QCSM in shop -Company must be sure that the following documentation be available in shop during construction of Mock Up : -Last revision of Drawing -Have a copy of the traveler sheet -WPS’s -WPQ’s -Welder’s Continuity Log -Pressure Parts properly identified with Coded Markings and properly identified by Q.C. as accepted material -Welding Filler according with WPS -Give welders their welder Stamp in order to identify job made by them -In my personal opinion , A.I must give a brief explanation of handling of documents below mentioned to the following personnel: -Production Manager , Production Supervisors and Welders and Fitters , -And Q.C. personnel.
  • 17. Ware house implementation Among others following activities must be shown - Set up Code Material Area and Non-Code Material Area - Set up in warehouse identified areas for: Receiving Inspection Accepted Material Holding Material Rejected Material - Have available a Oven for storage of Welding Material with attached instructions for Storage handling mainly for electrodes - Implementing controlled handling of delivering to shop only materials ( including welding) already accepted by QC - Have a implementation of Q.C. stickers of accepted,hold and rejected
  • 18. STEP 9 Schedule A.I./AIS visits Purpose: Confirm that all steps above referenced have been met and Client is ready to Pre Joint Review and Joint Review .
  • 19. Among others the next are part of A.I. activities: - Revision of documentation (calculations,drawings,wps’s,pqr’s,,special procedures,etc.) - Revision, Aceptance and Verification of implementation of QCSM - Set up Hold, Revision and Witness points in Traveler Sheet to be used during construction of Mock up.
  • 20. Activities of AIS during Prejoint Review -- Make an audit of Quality Program at this time QCSM must be docummented and implemmented completely and the Mock up be in process, if possible just like it is going to show during Joint Review -- Give Customer recommendations to fix findings found during PreJoint Review -- Elaborate Prejoint Review Report and send it to Customer Representative and A.I. for follow up purposes
  • 21. Main Requirements to be added during developing a QCSM to meet Section VIII Div. 2: Glossary of Terms Addition of the following nomenclature: CE Certified Engineer UDS User’s Design Specification MFRDR Manufacturer’s Design Report
  • 22. CE Certified Engineer. Any Engineer that signs and certifies a User´s Design Specification shall meet one of the criteria shown below : a) A Registered Professional Engineer who is registered in one or more of the states of the United Stated of America or the provinces of Canada and experienced in pressure vessel design. b) An Engineer experienced in pressure vessel design that meets all required qualifications to perform engineering work and any supplemental requirements stipulated by the user. The Engineer shall identify the location and the licensing or registering authorities under which he or she has received the authority to perform engineering work. c) An Engineer experienced in pressure vessel design who meets all required qualifications to perform engineering work and any supplemental requirements stipulated by the user. The Engineer shall be registered in the International Register of Professional Engineers of the Engineers Mobility Forum.
  • 23. USER RESPONSIBILITIES It is the responsibility of the user or an agent acting on behalf of the user to provide a certified User’s Design Specification for each pressure vessel to be constructed in accordance with this Division. What is User’s Design Specification? The User’s Design Specification shall contain sufficient detail to provide a complete basis for design and construction in accordance with this Division. It is the user's responsibility to specify, or cause to be specified, the effective Code Edition to be used for construction.( See paragraph 2.2.2)
  • 24. 2.2.2 USER’S DESIGN SPECIFICATION 2.2.2.1 The User’s Design Specification shall include but not necessarily be limited to the following: (a) Installation Site (1) Location (2) Jurisdictional authority if applicable (3) Environmental conditions (-a) Wind design loads including relevant factors (i.e. design wind speed, exposure, gust factors) (-b) Earthquake design loads (-c) Snow loads (-d) Lowest one day mean temperature for location (b) Vessel Identification (1) Vessel number or identification (2) Service fluid for proprietary fluids specific properties needed for design, e.g., gas, liquid, density, etc.
  • 25. (c) Vessel Configuration and Controlling Dimensions (1) Outline drawings (2) Vertical or horizontal (3) Openings, connections, closures including quantity, type and size, and location (i.e. elevation and orientation) (4) Principal component dimensions in sufficient detail so that volume capacities can be determined (5) Support method (d) Design Conditions (1) Specified design pressure. The specified design pressure is the design pressure, see paragraph 4.1.5.2(a),required at the top of the vessel in its operating position. It shall include suitable margins required above the maximum anticipated operating pressure to ensure proper operation of the pressure relief devices. The MAWP of the vessel may be set equal to this specified design pressure. If the actual MAWP of the vessel is calculated, it shall not be less than the specified design pressure.
  • 26. (2) Design temperature and coincident specified design pressure (see paragraph 4.1.5.2(d)). (3) Minimum Design Metal Temperature (MDMT) and coincident specified design pressure(see paragraph 4.1.5.2(e)). (4) Dead loads, live loads and other loads required to perform the load case combinations required in Parts 4 and 5. (e) Operating Conditions (1) Operating pressure (2) Operating temperature (3) Fluid transients and flow and sufficient properties for determination of steady state and transient thermal gradients across the vessel sections, if applicable (see paragraph 5.5.2) (f) Design Fatigue Life (1) Cyclic operating conditions and whether or not a fatigue analysis of the vessel as required shall be determined in accordance with paragraph 4.1.1.4. When a fatigue analysis is required, provide information in sufficient detail so that an analysis of the cyclic operation can be carried out in accordance with paragraph 5.5. comparable equipment experience.
  • 27. (2) When a vessel is designed for cyclic conditions, the number of design cycles per year and the required vessel design life in years shall be stated. (3) When cyclic operating conditions exist and a fatigue analysis is not required based on comparable equipment experience, this shall be stated. The possible harmful effects of the design features listed in 5.5.2.2(a) through 5.5.2.2 (f) shall be evaluated when contemplating comparable equipment experience. (g) Materials of Construction (1) Material specification requirements shall be in accordance with one or more of the following criteria. (-a) Specification of materials of construction in accordance with Part 3. (-b) Generic material type (i.e. carbon steel or Type 304 Stainless Steel). The user shall specify requirements that provide an adequate basis for selecting materials to be used for the construction of the vessel. The Manufacturer shall select the appropriate material from Part 3, considering information provided by the user per paragraph (3).
  • 28. (2) The user, shall specify the corrosion and/or erosion allowance. (3) The user, when selecting the materials of construction, shall consider the following: (-a) Damage mechanisms associated with the service fluid at design conditions. Informative and non-mandatory guidance regarding metallurgical phenomena is provided in Section II, Part D, Appendix A, API RP 571, and WRC Bulletins 488, 489 and 490. (-b) Minimum Design Metal Temperature and any additional toughness requirements. (-c) The need for specific weld filler material to meet corrosion resistance requirements, see paragraph 6.2.5.8
  • 29. (h) Loads and Load Cases (1) The user shall specify all expected loads and load case combinations as listed in paragraph 4.1.5.3. (2) These loading data may be established by: (-a) Calculation (-b) Experimental methods (-c) Actual experience measurement from similar units (-d) Computer analysis (-e) Published data (i) Overpressure Protection
  • 30. (1) The user shall be responsible for the design, construction and installation of the overpressure protection system unless it is delegated to the Manufacturer. This system shall meet the requirements of Part 9. (2) The type of over pressure protection intended for the vessel shall be documented in the User’s Design Specification as follows (see paragraph 9.1): (-a) Type of overpressure protection system (e.g., type of pressure relief valve, rupture disc, etc.) (-b) System design (see paragraph 9.7) (3) The user shall state if jurisdictional acceptance is required prior to operation of the vessel.
  • 31. 2.2.2.2 Additional Requirements – The user shall state what additional requirements are appropriate for the intended vessel service such as: (a)Additional requirements such as non-destructive examination, restricted chemistry, or heat treatments (b) Type of weld joints and the extent of required nondestructive examinations (c) Non-mandatory or optional provisions of this Division that are considered to be mandatory for the subject vessel (d) Any special requirements for marking and their location (see paragraph 4.1 and Annex 2-F) (e) Requirements for seals and/or bolting for closures and covers (f) Additional requirements relating to erection loadings
  • 32. (g) Any agreements which resolve the problems of operation and maintenance control unique to the particular pressure vessel. (h) Specific additional requirements relating to pressure testing such as: (1) Fluid properties and test temperature limits (2) Position of vessel and support/foundation adequacy if field hydrostatic testing is required (3) Location: Manufacturer’s facility or on-site (4) Cleaning and drying (5) Selection of pressure test method, see paragraph 8.1.1 (6) Application of paints, coatings and linings, see paragraph 8.1.2(e) 2.2.2.3 The User’s Design Specification shall be certified in accordance with Annex 2-A.
  • 33. UDS User´s Design Specification.
  • 34. Manufacturer’s Design Report Who’s responsible? An individual(s) of Manufacturer Organization often Engineering Manager,is in responsible charge of the design and construction of the vessel(s) and shall certify that the Manufacturer’s Design Report is complete, accurate and in accordance with the User’s Design Specification, and that all the requirements of this Division and any additional requirements needed for adequate design have been met. Such certification requires the signature(s) of one or more Engineers with requisite experience and qualifications as defined below. One or more individuals may sign the documentation based on information they reviewed, and the knowledge and belief that the requirements of this Division have been satisfied.
  • 35. 2.3.3 MANUFACTURER’S DESIGN REPORT 2.3.3.1 The Manufacturer shall provide a Manufacturer’s Design Report that includes: (a) Final as-built drawings. (b) The actual material specifications used for each component. (c) Design calculations and analysis that establish that the design as shown on the drawings complies with the requirements of this Division for the design conditions that have been specified in the User’s Design Specification. (1) Documentation of design-by-rule calculations in Part 4 shall include the following: (-a) The name and version of computer software, if applicable (-b) Loading conditions and boundary conditions used to address the load cases in the User’s Design Specification (-c) Material models utilized for all required physical properties (i.e. stress- strain data, modulus of elasticity, Poisson’s ratio, thermal expansion coefficient, thermal conductivity, thermal diffusivity), strength parameters (i.e. yield and tensile strength), and allowable stresses
  • 36. (-d) Detailed calculations, including results from all of the applicable steps in the calculations, showing the acceptance criteria utilized to meet the requirements of this Division. (-e) A summary of the calculation results (2) Documentation of design-by-analysis calculations in Part 5 shall include the following: (-a) A detailed description of the numerical method used, including the name and version of computer software, if applicable (-b) Description of model geometry (including element type for finite element analysis) (-c) Loading conditions and boundary conditions used to address the load cases in the User’s Design Specification (-d) Material models utilized for all required physical properties (i.e. modulus of elasticity, Poisson’s ratio, thermal expansion coefficient, thermal conductivity, thermal diffusivity), strength parameters (i.e. yield and tensile strength), strain limits, if applicable, and the design membrane stress intensity per Part 3
  • 37. (-e) Description of whether material nonlinearity is utilized in the analysis including a description of the material model (i.e. stress-strain curve and cyclic stress-strain curve) (-f) Description of the numerical analysis procedure (i.e. static analysis, thermal analysis (temperature and stress), buckling analysis, natural frequency analysis, dynamic analysis) and whether a geometrically linear or nonlinear option is invoked (-g) Graphical display of relevant results (i.e. numerical model, deformed plots, and contour plots of thermal and stress results) (-h) Method used to validate the numerical model (i.e. mesh sensitivity review and equilibrium check for finite element analysis, e.g. check of hoop stress in a component away from structural discontinuity and a check to ensure that global equilibrium is achieved between applied loads and reactions at specified boundary conditions)
  • 38. (-i) Description of results processing performed to establish numerical analysis results (i.e. stress linearization method, use of centroidal or nodal values for stress, strain, and temperature results) (-j) A summary of the numerical analysis results showing the acceptance criteria utilized to meet the requirements of this Division (-k) Electronic storage of analysis results including input files and output files that contain numerical analysis results utilized to demonstrate compliance with the requirements of this Division (d) The results of any fatigue analyses according to paragraph 5.5, as applicable. (e) Any assumptions used by the Manufacturer to perform the vessel design. 2.3.3.2 The Manufacturer’s Design Report shall be certified in accordance with Annex 2-B.
  • 40. ENGINEERING ADDITIONAL REQUIREMENTS FOR SECTION VIII, DIV. 2 It is the responsibility of the user or an agent acting on behalf of the user to provide a UDS for each pressure vessel to be constructed in accordance with Section VIII, Div. 2. The UDS shall contain sufficient detail to provide a complete basis for design and construction in accordance with Section VIII, Div. 2. It is the user's responsibility to specify, or cause to specify, the effective Code Edition to be used for construction of Code Items. The UDS shall include but not necessarily be limited to the requirements stated in 2.2.2.1 of Section VIII, Div. 2 The Company is responsible for the structural and pressure retaining integrity of a vessel or part thereof, as established by conformance with the requirements of the rules of Section VIII, Div. 2 and the requirements in the UDS. The Company completing any Item or part marked with ASME Certification mark and U2 designator has the responsibility to comply with all the applicable requirements of this Section VIII Div. 2 and, through proper certification, to ensure that any work by others also complies with the requirements of this Division. QCM shall certify compliance with these requirements by completing a MDR. Continue……..
  • 41. Any material substitutions by EM are subject to approval of the User and communicated to AI for revision of UDS and MFRDR. A UDS Certified by CE or Professional Engineer shall be furnished to the EM for review against the requirements of paragraph 2.2.2 and Annex 2.A of Code, the EM shall be responsible for verifying that the UDS meets such requirements and for verifying Code Edition to be used for Construction it’s also specified. EM is also responsible for preparing the MFRDR which shall comply with the requirements of paragraph 2.3.3 and Annex 2.B of Code. Restricted requirements on allowable materials as reflected by the fatigue curves of paragraph 3.15 of Code must be considered where a fatigue (Cyclic) analysis is required.
  • 42. UDS, TS and MFRDR must be reviewed by AI prior to start of fabrication. Revisions if any, to the UDS, MFRDR, drawings and calculations shall be handled as described above. Upon completion of fabrication, EM will provide all fabrication records to the CE. The MFRDR will be reconciled against the UDS and if found to be in compliance, the MFRDR will be certified by the CE. AI AVAILABILITY All documents described in this section shall be available thru the EM for review by the AI.
  • 43. MATERIAL CONTROL ADDITIONAL REQUIREMENTS FOR SECTION VIII DIV. 2 All conflicts between the material specification and the supplemental requirements stipulated in Part 3 the ASME Section VIII Division 2 Code, shall be noted on the BOM by the DE, and compliance with the supplemental requirements shall be certified by the material manufacturer. If the requirements in a material specification are to be completed by other than the materials manufacturer, then the DE shall address on the BOM that supplementary material test reports are required. QCM receives and review all MTR’s, tests, examination reports and/or C of C for ensuring compliance and makes them available to the AI for verification of compliance with the material specification. If acceptance QCM certifies compliance with supplemental requirements of Section VIII, Div. 2 by dated initials on the document. The DE shall specify in the BOM that the certification of materials shall meet Part 3 paragraph 3.2.6 of the ASME Section VIII Division 2 Code requirements.
  • 44. The BOM for the forming of carbon and low alloy material parts shall specify that certification to paragraph 6.1.2.3(e) of the ASME Section VIII Division 2 Code is required. The DE shall specify on the BOM that material manufacturer´s identification marking required by the material specification shall not be stamped on plate material less than 6mm (1/4”) in thickness. (Unless the requirements of 3.2.7.4 are complied with ASME Section VIII Division 2). Substitution of the specified material requires approval of the User and both the CE responsible for the Certification of the User’s Specifications and the Manufacturer’s Design Report, and acceptance by AI. The QCM is responsible for providing an as built sketch or tabulation of materials identifying each piece of material with the MTR or, if permitted by Code C of C and coded marking which assure identification of each piece of material during fabrication and subsequent identification in the completed vessel.
  • 45. EXAMINATION AND INSPECTION PROGRAM ADDITIONAL REQUIREMENTS FOR ASME SECTION VIII, DIV. 2 The QCM shall prepare, collect and maintain construction records and documentation as fabrication progress, (Files of Quality Control). All materials to be used in constructing a pressure vessel shall be in accordance with ASME Section VIII Div. 2 Code examined before fabrication with the purpose of detecting, as far possible, defects that will affect the safety of the vessel, in accordance with paragraph 6.1.3.1 of ASME Section VIII Div. 2 Code. The QCM is responsible for having examined all cut edges of base material in accordance with Paragraph 6.1.3 (b) of Code. All welding shall be subject to in-process examination by Visual Examination at the fit-up stage and during back gouging. All weld for pressure retaining parts shall be visually examined by the QCI who must pass the annual eye test in accordance with paragraph 7.A.2.2 (b)(1) of ASME Section VIII Div. 2 Code. shall be as established in paragraphs 7.5.6 and 7.5.7 of ASME Section VIII Div. 2 code.
  • 46. Weld seams that will be hidden by assembly are given a visually examination by the QCM from workmanship to final assembly. As per paragraph 8.2.5 (a) (3) of ASME Section VIII Div. 2 Code. Forming tolerances shall be maintained in accordance with 6.1.2 and paragraph 4.3.2 & 4.4.4 as applicable, of ASME Sec. VIII Div. 2 Code. Removal of temporary attachments shall be in accordance with 6.1.4.4 of ASME Section VIII Div. 2 Code. If a fatigue analysis is required for a part of a Code Vessel, then all of the internal and external surfaces or pressure boundary and attachment welds for that part shall be examined by wet magnetic particle method (if ferromagnetic) or by liquid penetrant method (if non magnetic) after Hydrostatic, unless accessibility prevents meaningful interpretation and characterization of imperfections. The acceptance criteria shall be as established in paragraphs 7.5.6 and 7.5.7 of ASME Section VIII Div. 2 code.
  • 47. The pressure test shall be in accordance with a pressure test procedure, prepared and approved by the QCM, which shall be in accordance with 8.2 or 8.3 of the ASME Section VIII Div. 2 Code. The test method and the upper test pressure limit shall be referenced on the drawings by the DE. Pressure test procedure must be submitted to AI for review. The required markings for Code Vessel of paragraph 2.F.1 of the ASME Sec. VIII Div. 2 Code shall be applied on a Nameplate or shall be stamped with low stress type stamps directly on the Item, located on an area designated as a low stress area by the DE in the MFRDR.
  • 48. The ASME Certification Mark with U2 designator shall be applied by the QCM only with the approval of the AI and after the hydrostatic test and all other required inspection and testing has been satisfactorily completed. The MFRDR shall be prepared by EM and submitted to CE for review for accuracy and signed by him prior to being presented to the AI for his review and signature. The name of the Company’s Certified Engineer shall be on the MFRDR. The QCM shall be responsible for routing the MFRDR to the customer, the appropriate enforcement authority in the jurisdiction in which the Code Vessel is to be installed where required by law and National Board as applicable. The QCM shall also be responsible for retention of the Company’s copy of the Manufacturer’s Data Report.
  • 49. NON CONFORMITIES CONTROL ADDITIONAL REQUIREMENTS FOR SECTION VIII, DIV. 2 NCR shall be serialized and retained on file by QCM
  • 50. NON-DESTRUCTIVE EXAMINATION ADDITIONAL REQUIREMENTS FOR SECTION VIII, DIV. 2 All finished welds shall be subject to nondestructive Examination depending on Examination Group selected in paragraph 7.4.2 and the Joint Category and weld type as defined in paragraph 4.2 of Code. All welding shall be subject to in process examination by QCI, making visual examination at the fit up stage and during back gouging in accordance with paragraph 7.4.1.3 of Code. Personnel performing and evaluating NDE shall be qualified and certified per 7.3 of Code.
  • 51. CALIBRATION OF MEASUREMENT AND TEST EQUIPMENT ADDITIONAL REQUIREMENTS FOR SECTION VIII, DIV. 2 All gages shall be calibrated against a standard deadweight tester or a calibrated master gage at least every 6 months or at any time there is a reason to believe that they are in error.
  • 52. RECORDS RETENTION ADDITIONAL REQUIREMENTS FOR ASME Section VIII Div. 2 items: a) User’s Design Specification b) Manufacturer’s Design Report c) Manufacturer’s Data Report d) Manufacturer’s Construction Records and Partial Data Reports. An Index of the Construction Record Files shall consist of the following as a minimum as applicable: 1) Tabulated list of all material used for fabrication with Materials Certifications and Material Test Reports, and a record of any repairs to pressure retaining material that require a radiographic examination by the rules of this Div. 2. The record of the repairs shall include the location of the repair, examination results, and the repair procedures. 2) Fabrication information including all heat treatment requirements, forming and rolling procedure when prepared, an inspection and test plan identifying all inspection points required by the user, and signed inspection reports. 3) List of any subcontracted services or parts, if applicable. 4) Pressure Parts documentation and certifications. 5) Welding Procedure Specifications (WPS), Procedure Qualification Records (PQR), weld map and welder or welding operator qualification test results.
  • 53. 6) Record of all heat treatments including post weld heat treatment (these records may be either the actual heat treatment charts or a certified summary description of heat treatment time and temperature). 7) Results of production test plates, if applicable. 8) NDE procedures, records of procedure demonstrations, and records of personnel certifications. 9) All reports stating the results of inspection, nondestructive examinations and testing including radiographic examination, ultrasonic examination, magnetic particle examination, liquid dye penetrant examination and hardness tests. 10)All non-conformance reports including resolution and a detailed description of any repairs including repair procedures, a sketch, photo, or drawing indicating the location and size of the repaired area. 11) Charts or other records of required hydrostatic, pneumatic, or other tests. Test logs shall include the test date, testing fluid, duration of the test, temperature of the test fluid, and test pressure. 12) Dimensional drawings of the as-built condition. The Company shall maintain a complete set of radiographs until the signing of the Manufacturer’s Data Report, and furnish upon request to the user and, upon request to the AI.