Draft Bondi Beach Park &
Pavilion Plan of Management
Submission: Bondi Beach Precinct & Bondi Precinct
31 May 2013
SHORT TERM PLAN (STAGE 1)
5-7 years
Cars two way travel: parking meters instead of passes and gates
No access to Pavilion forecourt (except emergency vehicles and special events)
Council storage at back of Bondi Surf Club to be increased for beach rake
Access route for services and deliveries moved
SHORT TERM PLAN (STAGE 1)
Agree to have this at south end near promenade but
need to bear in mind the path taken by the barefoot
runners so there is no obstruction. Also would not like
to see this as a permanent structure, it should be
dismantled at end of play.
Agree with this
Agree with this
Agree with this plus find out about how the donated
wheelchair for surf access that the life guards have can
be obtained. Make this clear public knowledge.
COMMENTS:
Knotts pedestrian/vehicle share way. What does this
mean – more details needed. Is this not already
operating in this manner? Vehicle access to units in
Knotts Ave needs to be considered.
COMMENTS: see following page
SHORT TERM PLAN (STAGE 1)
COMMENTS:
Mixed views about the idea of having kiosks. Seating associated with any
kiosk would interfere with this busy pedestrian thoroughfare. If the
kiosks are for café style food no agreement for this, however re-siting the
take-away style operators currently on the Promenade to here could be
beneficial. Objection to the commercialisation of the Promenade –
concern that it would attract franchise businesses such as those on
Campbell Pde. Another concern was that the site would be cold and
windy, due to the southern aspect.
Other possible uses are bike storage, providing shaded seating (as at
Coogee), use as creative/artistic spaces as in contemporary urban design
concepts.
Don’t want to sacrifice the uniqueness of Bondi.
The Promenade after a storm
COMMENTS:
More detail needed to understand how
this would work. Safety issues related to service vehicle access would need to be thoroughly
researched and addressed as well as the logistics of multiple vehicles parking turning etc. Will
council vehicles also park here? Is there a space allocated for rubbish bins in this area?
SHORT TERM PLAN (STAGE 1)
SHORT TERM PLAN (STAGE 1)
COMMENTS:
Agreed to upgrade exercise station
Agreed to upgrade the children’s
playground, with the proviso that there is
input from parents as to the type of
equipment.
It is thought that having a sandpit in this
playground, metres from the giant sandpit that
is the beach, has not been properly thought
through.
Agreed with upgrade of toilets and amenities
Pedestrian Zone addressed later in this
document along with parking under Key Idea 1
COMMENTS:
• Agreed to widen ramp for access to beach
• Question whether new seating and shading
is within an existing structure or a new one?
• Question about whether the natural
contour of the landscape will be changed?
• Dimensions and more details are needed to
fully understand the plan, particularly
the correlation between the
section and planned north
elevation.
SHORT TERM PLAN STAGE 1
COMMENTS: See general comments on Pavilion
SHORT TERM PLAN STAGE 1
BONDI PAVILION
COMMENTS:
REINSTATE PAVILION ENTRANCE
• The majority agreed entrance from Campbell Pde would be good, but did not want the
amphitheatre demolished. The amphitheatre is a good space for shows and movies and is
desirable for containing noise (the relocation of Ben & Jerry’s Open Air Cinema from the
amphitheatre to the park a case in point.) If the amphitheatre is moved, noise and the use of
stages on the grassy areas will be a problem.
• People will still enter the beach from wherever is easier for them, particularly those exiting
buses at South and Middle Bondi.
• Question as to why the emphasis on wanting people to walk through Pavilion in its current state
with any plans for upgrading so far away?
BONDI PAVILION
FUTURE DIRECTIONS FOR THE PAVILION:
• Plan is too vague, a lot more detail needed.
• The Pavilion needs its own separate Plan of Management rather than being lumped in with the
Beach and Parks.
• The Pavilion needs an overall Manager to co-ordinate the various departments involved.
• The Pavilion needs above all its own separate set of accounts showing all revenue and
expenditure. A question was raised about setting up a Bondi Pavilion Trust or a not for profit
organization to manage it.
COMMENTS (cont):
• The Pavilion needs to be restored – it is currently a neglected building.
• Prior to restoration, the Pavilion needs to be assessed by an architect specialising in
interactive spaces spanning art, architecture and urbanism
• The Pavilion needs to be kept primarily as a community oriented space.
• The Pavilion would benefit immensely from a museum/ history area.
• Other suggestions for use:
o reinstate the Turkish baths/ steam room
o reinstate the ballroom/ promote a weekly/monthly dance – Trocadero style. There
is an existing problem with Tamarama Rock Surfers having control of the bar.
Details as to the arrangement between Council and the TRS are requested.
• Overall strategic vision is lacking.
The Friends of Bondi Pavilion will be reviewing the draft for the Pavilion on Saturday 25
May 2013 between 10am and 12 midday in the Ocean Room in the Pavilion.
BONDI PAVILION
LONG TERM PLAN (STAGE 2)
COMMENTS: see next page
LONG TERM PLAN (STAGE 2)
COMMENTS:
Stage 1: Short term car parking
• Majority disagreed with installation of metered parking.
• Boom gates and permits to be retained. This will also prevent hoons.
• Mixed views around pedestrianisation of Pavilion forecourt. There is an historical aspect
to the way cars currently use Queen Elizabeth Drive. Supported for safety reasons.
Detailed plans of how it is going to work needed.
• The executive committees of Bondi Girls Surfriders and Bondi Longboard Club have
concerns about removing the car-park, which will greatly impact on their monthly
competition days and surfers generally. The (elevated) car-park is used as a viewing
platform for the competition and the cars which transport all the necessary gear, park
there.
• Logistical review needed to assess suitability of 2 way traffic in beach carpark, in
particular, assessing space for cars waiting for spaces, and entering and leaving spaces.
Stage 2: Underground car park
• There were mixed views around this, with the increase of green space being a
factor, although it was pointed out that very few people choose to sit at the very back of
the park.
• Concern around increasing rates to fund this facility which would appear to provide
limited benefits for the community.
COMMENTS:
Stage 2: Underground car park (cont)
• Concern by families, little nippers parents, surfers, etc that it would not be an
inviting way to enter the beach – going underground and having to use a lift with
assorted beach gear including surfboards. The lift would have to be big enough
to accommodate this.
• Concern about the effect on the water table – a rigorous geographical survey
would need to be done.
• Concern about the effect of excavating a sand hill and the impact on the existing
buildings there – the Pavilion and Surf Clubs – a rigorous survey needed well
before any work was even considered.
• Concerns that customers from the proposed Woolworths in the Swiss Grand
would use it, along with other shoppers, as it is more commercially sited than the
current car park which is primarily for beachgoers.
• Suggestion to keep Stage 1 Parking Plan and place the north-western car park 1
(one) level underground rather than constructing a 3 (three) level car park.
• Martin Greer suggested an alternate underground plan and supplied a concept
drawing.
COMMENTS: dealt with previously
LONG TERM PLAN (STAGE 2)
COMMENTS:
• Agree to respect Bondi’s heritage
• Unanimous vote to keep the heritage foot bridges.
LONG TERM PLAN (STAGE 2)
COMMENTS: dealt with previously
LONG TERM PLAN (STAGE 2)
COMMENTS:
• Restore and consistently maintain the existing beach shelters. Any new buildings to adhere
to heritage values.
• Other items dealt with previously.
LONG TERM PLAN (STAGE 2)
COMMENTS:
Much more detail required
before a comment could
be made on Knotts Ave
Walkway.
LONG TERM PLAN (STAGE 2)
COMMENTS:
Unanimous vote to retain
Heritage Pedestrian
Bridges
LONG TERM PLAN (STAGE 2)

Mais conteúdo relacionado

Mais procurados

Emery village pic #1 boards v4 (reduced)
Emery village pic #1 boards v4 (reduced)Emery village pic #1 boards v4 (reduced)
Emery village pic #1 boards v4 (reduced)knelischer
 
St Andrew's Centre minor highways project supported by Histon & Impington Par...
St Andrew's Centre minor highways project supported by Histon & Impington Par...St Andrew's Centre minor highways project supported by Histon & Impington Par...
St Andrew's Centre minor highways project supported by Histon & Impington Par...hisimp
 
Capital Works Project Bulletin: Windsor Siding
Capital Works Project Bulletin: Windsor SidingCapital Works Project Bulletin: Windsor Siding
Capital Works Project Bulletin: Windsor SidingStonnington Connect
 
Whitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final finalWhitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final finalEdison Mugoya
 
Manor Park Neighborhood Urban Park
Manor Park Neighborhood Urban ParkManor Park Neighborhood Urban Park
Manor Park Neighborhood Urban ParkJose Carlos Ayala
 
Union Square Open Space Plan
Union Square Open Space PlanUnion Square Open Space Plan
Union Square Open Space PlanRob May
 
CPR Yards Crossing Study - open house panels
CPR Yards Crossing Study - open house panelsCPR Yards Crossing Study - open house panels
CPR Yards Crossing Study - open house panelsCrowdbrite
 
Waterbury Downtown October 29 2009
Waterbury Downtown October 29 2009Waterbury Downtown October 29 2009
Waterbury Downtown October 29 2009lizschlegel
 
Crespi Campus Modernization Presentation
Crespi Campus Modernization PresentationCrespi Campus Modernization Presentation
Crespi Campus Modernization PresentationChris Neil
 
Lde 362 gammage final torchia
Lde 362 gammage final torchiaLde 362 gammage final torchia
Lde 362 gammage final torchiaetorchia
 
Reimagining yonge_street__pic_3_display_panels
Reimagining yonge_street__pic_3_display_panelsReimagining yonge_street__pic_3_display_panels
Reimagining yonge_street__pic_3_display_panelsknelischer
 
Pokong pdf
Pokong pdfPokong pdf
Pokong pdfjenniech
 
120619ppt 12 s1084000 council stratpol presentation
120619ppt 12 s1084000 council stratpol presentation120619ppt 12 s1084000 council stratpol presentation
120619ppt 12 s1084000 council stratpol presentationTransport Planning
 
120314 southpoint plaza zoning presentation final 4.23.12
120314 southpoint plaza zoning presentation final 4.23.12120314 southpoint plaza zoning presentation final 4.23.12
120314 southpoint plaza zoning presentation final 4.23.12cityofevanston
 
Re imagining yonge street mcea study - pic 2 display panels low res
Re imagining yonge street mcea study - pic 2 display panels low resRe imagining yonge street mcea study - pic 2 display panels low res
Re imagining yonge street mcea study - pic 2 display panels low resknelischer
 
Oct 2016 public meeting presentation acoe reformulation plan
Oct 2016 public meeting presentation acoe reformulation planOct 2016 public meeting presentation acoe reformulation plan
Oct 2016 public meeting presentation acoe reformulation planecowatchers
 
Water Works Open House Presentation, Revised Design Concept - May 1st 2017
Water Works Open House Presentation, Revised Design Concept - May 1st 2017Water Works Open House Presentation, Revised Design Concept - May 1st 2017
Water Works Open House Presentation, Revised Design Concept - May 1st 2017Minneapolis Parks Foundation
 

Mais procurados (20)

Ada resurface apwa_2016_presentation
Ada resurface apwa_2016_presentationAda resurface apwa_2016_presentation
Ada resurface apwa_2016_presentation
 
Emery village pic #1 boards v4 (reduced)
Emery village pic #1 boards v4 (reduced)Emery village pic #1 boards v4 (reduced)
Emery village pic #1 boards v4 (reduced)
 
The Cermak/Blue Island Sustainable Streetscape
The Cermak/Blue Island Sustainable StreetscapeThe Cermak/Blue Island Sustainable Streetscape
The Cermak/Blue Island Sustainable Streetscape
 
St Andrew's Centre minor highways project supported by Histon & Impington Par...
St Andrew's Centre minor highways project supported by Histon & Impington Par...St Andrew's Centre minor highways project supported by Histon & Impington Par...
St Andrew's Centre minor highways project supported by Histon & Impington Par...
 
Capital Works Project Bulletin: Windsor Siding
Capital Works Project Bulletin: Windsor SidingCapital Works Project Bulletin: Windsor Siding
Capital Works Project Bulletin: Windsor Siding
 
Whitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final finalWhitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final final
 
Manor Park Neighborhood Urban Park
Manor Park Neighborhood Urban ParkManor Park Neighborhood Urban Park
Manor Park Neighborhood Urban Park
 
Union Square Open Space Plan
Union Square Open Space PlanUnion Square Open Space Plan
Union Square Open Space Plan
 
CPR Yards Crossing Study - open house panels
CPR Yards Crossing Study - open house panelsCPR Yards Crossing Study - open house panels
CPR Yards Crossing Study - open house panels
 
Waterbury Downtown October 29 2009
Waterbury Downtown October 29 2009Waterbury Downtown October 29 2009
Waterbury Downtown October 29 2009
 
Crespi Campus Modernization Presentation
Crespi Campus Modernization PresentationCrespi Campus Modernization Presentation
Crespi Campus Modernization Presentation
 
Lde 362 gammage final torchia
Lde 362 gammage final torchiaLde 362 gammage final torchia
Lde 362 gammage final torchia
 
Reimagining yonge_street__pic_3_display_panels
Reimagining yonge_street__pic_3_display_panelsReimagining yonge_street__pic_3_display_panels
Reimagining yonge_street__pic_3_display_panels
 
Pokong pdf
Pokong pdfPokong pdf
Pokong pdf
 
120619ppt 12 s1084000 council stratpol presentation
120619ppt 12 s1084000 council stratpol presentation120619ppt 12 s1084000 council stratpol presentation
120619ppt 12 s1084000 council stratpol presentation
 
120314 southpoint plaza zoning presentation final 4.23.12
120314 southpoint plaza zoning presentation final 4.23.12120314 southpoint plaza zoning presentation final 4.23.12
120314 southpoint plaza zoning presentation final 4.23.12
 
Re imagining yonge street mcea study - pic 2 display panels low res
Re imagining yonge street mcea study - pic 2 display panels low resRe imagining yonge street mcea study - pic 2 display panels low res
Re imagining yonge street mcea study - pic 2 display panels low res
 
Single-Family Parking UDO Amendment
Single-Family Parking UDO AmendmentSingle-Family Parking UDO Amendment
Single-Family Parking UDO Amendment
 
Oct 2016 public meeting presentation acoe reformulation plan
Oct 2016 public meeting presentation acoe reformulation planOct 2016 public meeting presentation acoe reformulation plan
Oct 2016 public meeting presentation acoe reformulation plan
 
Water Works Open House Presentation, Revised Design Concept - May 1st 2017
Water Works Open House Presentation, Revised Design Concept - May 1st 2017Water Works Open House Presentation, Revised Design Concept - May 1st 2017
Water Works Open House Presentation, Revised Design Concept - May 1st 2017
 

Destaque

Destaque (6)

Kwamnyandu node urban design precinct plan
Kwamnyandu node urban design precinct planKwamnyandu node urban design precinct plan
Kwamnyandu node urban design precinct plan
 
Conflicto y toma de decisiones
Conflicto y toma de decisionesConflicto y toma de decisiones
Conflicto y toma de decisiones
 
Binder1(1)
Binder1(1)Binder1(1)
Binder1(1)
 
Urban design book 2013
Urban design book 2013Urban design book 2013
Urban design book 2013
 
Urban design analysis, Circulation, Architecture, London, Redevelopment studies
Urban design analysis, Circulation, Architecture, London, Redevelopment  studiesUrban design analysis, Circulation, Architecture, London, Redevelopment  studies
Urban design analysis, Circulation, Architecture, London, Redevelopment studies
 
Urban Design project 1
Urban Design project 1Urban Design project 1
Urban Design project 1
 

Semelhante a Draft bbp&pom bondi_beach_precinct_may_2013_final

Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14Adam Cohen
 
Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020RamaChilamkurthy
 
Design charrette council presentation
Design charrette council presentationDesign charrette council presentation
Design charrette council presentationpublicinvolvement
 
AdamGosney_WritingSample2
AdamGosney_WritingSample2AdamGosney_WritingSample2
AdamGosney_WritingSample2Adam Gosney
 
ANC 1C presentation-Kalorama Park Plaza-Dec 3 2014
ANC 1C presentation-Kalorama Park Plaza-Dec 3 2014ANC 1C presentation-Kalorama Park Plaza-Dec 3 2014
ANC 1C presentation-Kalorama Park Plaza-Dec 3 2014Cynthia Pols
 
Hearst community meeting 10.02.18 pn_3-30pm
Hearst community meeting   10.02.18 pn_3-30pmHearst community meeting   10.02.18 pn_3-30pm
Hearst community meeting 10.02.18 pn_3-30pmRamaChilamkurthy
 
Summary - Wilmot Creek Phase 8
Summary - Wilmot Creek Phase 8Summary - Wilmot Creek Phase 8
Summary - Wilmot Creek Phase 8Greg Bolger
 
2020 Karol Bagh Pedestrianization & Parking Management
2020 Karol Bagh Pedestrianization & Parking Management2020 Karol Bagh Pedestrianization & Parking Management
2020 Karol Bagh Pedestrianization & Parking ManagementTOD India
 
Final DCP
Final DCPFinal DCP
Final DCPejjeff
 
2013 06 bristol deep sea container terminal - jerry stanford
2013   06 bristol deep sea container terminal - jerry stanford2013   06 bristol deep sea container terminal - jerry stanford
2013 06 bristol deep sea container terminal - jerry stanfordSevernEstuary
 
Active18 agm-2013 public
Active18 agm-2013 publicActive18 agm-2013 public
Active18 agm-2013 publicnorthcotegal
 
Windjammer Park Integration Plan Community Advisory Group meeting 5
Windjammer Park Integration Plan Community Advisory Group meeting 5Windjammer Park Integration Plan Community Advisory Group meeting 5
Windjammer Park Integration Plan Community Advisory Group meeting 5publicinvolvement
 
NJFuture Redevelopment Forum 2016 Hochreiter
NJFuture Redevelopment Forum 2016 HochreiterNJFuture Redevelopment Forum 2016 Hochreiter
NJFuture Redevelopment Forum 2016 HochreiterNew Jersey Future
 
Dan Ross NextGen ppt FINAL
Dan Ross NextGen ppt FINALDan Ross NextGen ppt FINAL
Dan Ross NextGen ppt FINALDan Ross
 

Semelhante a Draft bbp&pom bondi_beach_precinct_may_2013_final (20)

Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
 
Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020
 
Presentation Master
Presentation MasterPresentation Master
Presentation Master
 
Design charrette council presentation
Design charrette council presentationDesign charrette council presentation
Design charrette council presentation
 
May 11, 2021 BPAC Virtual Workshop
May 11, 2021 BPAC Virtual WorkshopMay 11, 2021 BPAC Virtual Workshop
May 11, 2021 BPAC Virtual Workshop
 
AdamGosney_WritingSample2
AdamGosney_WritingSample2AdamGosney_WritingSample2
AdamGosney_WritingSample2
 
ANC 1C presentation-Kalorama Park Plaza-Dec 3 2014
ANC 1C presentation-Kalorama Park Plaza-Dec 3 2014ANC 1C presentation-Kalorama Park Plaza-Dec 3 2014
ANC 1C presentation-Kalorama Park Plaza-Dec 3 2014
 
Hearst community meeting 10.02.18 pn_3-30pm
Hearst community meeting   10.02.18 pn_3-30pmHearst community meeting   10.02.18 pn_3-30pm
Hearst community meeting 10.02.18 pn_3-30pm
 
Summary - Wilmot Creek Phase 8
Summary - Wilmot Creek Phase 8Summary - Wilmot Creek Phase 8
Summary - Wilmot Creek Phase 8
 
2020 Karol Bagh Pedestrianization & Parking Management
2020 Karol Bagh Pedestrianization & Parking Management2020 Karol Bagh Pedestrianization & Parking Management
2020 Karol Bagh Pedestrianization & Parking Management
 
Drainage Salvation-JRiopelle
Drainage Salvation-JRiopelleDrainage Salvation-JRiopelle
Drainage Salvation-JRiopelle
 
Final DCP
Final DCPFinal DCP
Final DCP
 
2013 06 bristol deep sea container terminal - jerry stanford
2013   06 bristol deep sea container terminal - jerry stanford2013   06 bristol deep sea container terminal - jerry stanford
2013 06 bristol deep sea container terminal - jerry stanford
 
Active18 agm-2013 public
Active18 agm-2013 publicActive18 agm-2013 public
Active18 agm-2013 public
 
PIC 2 Display Boards
PIC 2 Display BoardsPIC 2 Display Boards
PIC 2 Display Boards
 
Windjammer Park Integration Plan Community Advisory Group meeting 5
Windjammer Park Integration Plan Community Advisory Group meeting 5Windjammer Park Integration Plan Community Advisory Group meeting 5
Windjammer Park Integration Plan Community Advisory Group meeting 5
 
Co Fa 11 Feb 2010 Clc
Co Fa 11 Feb 2010 ClcCo Fa 11 Feb 2010 Clc
Co Fa 11 Feb 2010 Clc
 
MB_SLR Studio 8
MB_SLR Studio 8MB_SLR Studio 8
MB_SLR Studio 8
 
NJFuture Redevelopment Forum 2016 Hochreiter
NJFuture Redevelopment Forum 2016 HochreiterNJFuture Redevelopment Forum 2016 Hochreiter
NJFuture Redevelopment Forum 2016 Hochreiter
 
Dan Ross NextGen ppt FINAL
Dan Ross NextGen ppt FINALDan Ross NextGen ppt FINAL
Dan Ross NextGen ppt FINAL
 

Último

Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 

Último (20)

Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 

Draft bbp&pom bondi_beach_precinct_may_2013_final

  • 1. Draft Bondi Beach Park & Pavilion Plan of Management Submission: Bondi Beach Precinct & Bondi Precinct 31 May 2013
  • 2.
  • 3. SHORT TERM PLAN (STAGE 1) 5-7 years Cars two way travel: parking meters instead of passes and gates No access to Pavilion forecourt (except emergency vehicles and special events) Council storage at back of Bondi Surf Club to be increased for beach rake Access route for services and deliveries moved
  • 4. SHORT TERM PLAN (STAGE 1) Agree to have this at south end near promenade but need to bear in mind the path taken by the barefoot runners so there is no obstruction. Also would not like to see this as a permanent structure, it should be dismantled at end of play. Agree with this Agree with this Agree with this plus find out about how the donated wheelchair for surf access that the life guards have can be obtained. Make this clear public knowledge. COMMENTS: Knotts pedestrian/vehicle share way. What does this mean – more details needed. Is this not already operating in this manner? Vehicle access to units in Knotts Ave needs to be considered.
  • 5. COMMENTS: see following page SHORT TERM PLAN (STAGE 1)
  • 6. COMMENTS: Mixed views about the idea of having kiosks. Seating associated with any kiosk would interfere with this busy pedestrian thoroughfare. If the kiosks are for café style food no agreement for this, however re-siting the take-away style operators currently on the Promenade to here could be beneficial. Objection to the commercialisation of the Promenade – concern that it would attract franchise businesses such as those on Campbell Pde. Another concern was that the site would be cold and windy, due to the southern aspect. Other possible uses are bike storage, providing shaded seating (as at Coogee), use as creative/artistic spaces as in contemporary urban design concepts. Don’t want to sacrifice the uniqueness of Bondi. The Promenade after a storm
  • 7. COMMENTS: More detail needed to understand how this would work. Safety issues related to service vehicle access would need to be thoroughly researched and addressed as well as the logistics of multiple vehicles parking turning etc. Will council vehicles also park here? Is there a space allocated for rubbish bins in this area? SHORT TERM PLAN (STAGE 1)
  • 8. SHORT TERM PLAN (STAGE 1) COMMENTS: Agreed to upgrade exercise station Agreed to upgrade the children’s playground, with the proviso that there is input from parents as to the type of equipment. It is thought that having a sandpit in this playground, metres from the giant sandpit that is the beach, has not been properly thought through. Agreed with upgrade of toilets and amenities Pedestrian Zone addressed later in this document along with parking under Key Idea 1
  • 9. COMMENTS: • Agreed to widen ramp for access to beach • Question whether new seating and shading is within an existing structure or a new one? • Question about whether the natural contour of the landscape will be changed? • Dimensions and more details are needed to fully understand the plan, particularly the correlation between the section and planned north elevation. SHORT TERM PLAN STAGE 1
  • 10. COMMENTS: See general comments on Pavilion SHORT TERM PLAN STAGE 1
  • 12. COMMENTS: REINSTATE PAVILION ENTRANCE • The majority agreed entrance from Campbell Pde would be good, but did not want the amphitheatre demolished. The amphitheatre is a good space for shows and movies and is desirable for containing noise (the relocation of Ben & Jerry’s Open Air Cinema from the amphitheatre to the park a case in point.) If the amphitheatre is moved, noise and the use of stages on the grassy areas will be a problem. • People will still enter the beach from wherever is easier for them, particularly those exiting buses at South and Middle Bondi. • Question as to why the emphasis on wanting people to walk through Pavilion in its current state with any plans for upgrading so far away? BONDI PAVILION FUTURE DIRECTIONS FOR THE PAVILION: • Plan is too vague, a lot more detail needed. • The Pavilion needs its own separate Plan of Management rather than being lumped in with the Beach and Parks. • The Pavilion needs an overall Manager to co-ordinate the various departments involved. • The Pavilion needs above all its own separate set of accounts showing all revenue and expenditure. A question was raised about setting up a Bondi Pavilion Trust or a not for profit organization to manage it.
  • 13. COMMENTS (cont): • The Pavilion needs to be restored – it is currently a neglected building. • Prior to restoration, the Pavilion needs to be assessed by an architect specialising in interactive spaces spanning art, architecture and urbanism • The Pavilion needs to be kept primarily as a community oriented space. • The Pavilion would benefit immensely from a museum/ history area. • Other suggestions for use: o reinstate the Turkish baths/ steam room o reinstate the ballroom/ promote a weekly/monthly dance – Trocadero style. There is an existing problem with Tamarama Rock Surfers having control of the bar. Details as to the arrangement between Council and the TRS are requested. • Overall strategic vision is lacking. The Friends of Bondi Pavilion will be reviewing the draft for the Pavilion on Saturday 25 May 2013 between 10am and 12 midday in the Ocean Room in the Pavilion. BONDI PAVILION
  • 14.
  • 15. LONG TERM PLAN (STAGE 2)
  • 16. COMMENTS: see next page LONG TERM PLAN (STAGE 2)
  • 17. COMMENTS: Stage 1: Short term car parking • Majority disagreed with installation of metered parking. • Boom gates and permits to be retained. This will also prevent hoons. • Mixed views around pedestrianisation of Pavilion forecourt. There is an historical aspect to the way cars currently use Queen Elizabeth Drive. Supported for safety reasons. Detailed plans of how it is going to work needed. • The executive committees of Bondi Girls Surfriders and Bondi Longboard Club have concerns about removing the car-park, which will greatly impact on their monthly competition days and surfers generally. The (elevated) car-park is used as a viewing platform for the competition and the cars which transport all the necessary gear, park there. • Logistical review needed to assess suitability of 2 way traffic in beach carpark, in particular, assessing space for cars waiting for spaces, and entering and leaving spaces. Stage 2: Underground car park • There were mixed views around this, with the increase of green space being a factor, although it was pointed out that very few people choose to sit at the very back of the park. • Concern around increasing rates to fund this facility which would appear to provide limited benefits for the community.
  • 18. COMMENTS: Stage 2: Underground car park (cont) • Concern by families, little nippers parents, surfers, etc that it would not be an inviting way to enter the beach – going underground and having to use a lift with assorted beach gear including surfboards. The lift would have to be big enough to accommodate this. • Concern about the effect on the water table – a rigorous geographical survey would need to be done. • Concern about the effect of excavating a sand hill and the impact on the existing buildings there – the Pavilion and Surf Clubs – a rigorous survey needed well before any work was even considered. • Concerns that customers from the proposed Woolworths in the Swiss Grand would use it, along with other shoppers, as it is more commercially sited than the current car park which is primarily for beachgoers. • Suggestion to keep Stage 1 Parking Plan and place the north-western car park 1 (one) level underground rather than constructing a 3 (three) level car park. • Martin Greer suggested an alternate underground plan and supplied a concept drawing.
  • 19. COMMENTS: dealt with previously LONG TERM PLAN (STAGE 2)
  • 20. COMMENTS: • Agree to respect Bondi’s heritage • Unanimous vote to keep the heritage foot bridges. LONG TERM PLAN (STAGE 2)
  • 21. COMMENTS: dealt with previously LONG TERM PLAN (STAGE 2)
  • 22. COMMENTS: • Restore and consistently maintain the existing beach shelters. Any new buildings to adhere to heritage values. • Other items dealt with previously. LONG TERM PLAN (STAGE 2)
  • 23. COMMENTS: Much more detail required before a comment could be made on Knotts Ave Walkway. LONG TERM PLAN (STAGE 2)
  • 24. COMMENTS: Unanimous vote to retain Heritage Pedestrian Bridges LONG TERM PLAN (STAGE 2)