Key performance indicators
of JSC Lenenergo
in 2013-2017
under the approved
Business plan
Disclaimer
This presentation is not an offer or invitation to make offers (advertisement) in respect of purchase or subscription to securities of
Lenenergo. Neither the presentation, nor any part hereof, nor the fact of its representation or distribution serve as the basis for entering into
any agreement or taking any investment decision; therefore, the presentation should not be relied upon in this respect.
This presentation may contain estimates. The estimates are not based on actual circumstances and include statements in respect of the
intentions, opinions or current expectations of JSC Lenenergo as regards the results of its activity, financial position, liquidity, prospects of
growth, strategy and the industry, in which Lenenergo operates. Such estimates by their nature are characterized by presence of risks and
uncertainty factors since they are related to the events and depend on the circumstances, which may fail to happen in the future.
Lenenergo warns that the estimates are not a guarantee of the future parameters, and the actual results of Lenenergo activities, its financial
position and liquidity, as well as development of the industry, in which it operates, may significantly differ from those included in the
estimates contained herein. Besides, even if the results of the Company's activities, its financial position and liquidity, as well as the
development of the industry, in which it operates, correspond to the estimates contained herein, such results and events are not indicative
of the results and events in the future.
This presentation contains the information received from third parties besides the official information on Lenenergo activities. This
information has been received from the sources which are reliable in Lenenergo opinion. Nevertheless, we do not guarantee the accuracy of
such information which may be reduced or incomplete. All opinions and estimates contained herein reflect our opinion as at the date of
publication and are subject to change without notice. Lenenergo does not bear liability for the consequences of use of the opinions or
estimates contained herein, or information incompleteness.
Lenenergo does not undertake obligations in respect of revision or confirmation of the estimates and evaluations, as well as in respect of
updating of the information contained herein.
General Information on the Company of 31.12.2012
LENENERGO is the largest electricity distribution grid company (the
operator of 0,4-110 kV networks), servicing the territory of St.-Petersburg
and the Leningrad region. It is a natural monopoly, which tariffs are set
by the regulating authorities - Federal Tariff Service (FTS) and regional
regulators
Main types of activity:
• electricity transmission & distribution
• technological connection of new customers to networks
The share of Lenenergo on the electricity transmission market as of
31.12.2012 - 70.3 %
Service area:
St.-Petersburg and the Leningrad region
Main competitors: in St.-Petersburg - JSC SPbES, in the Leningrad
region - JSC LOESK
Assets
Service area
87.3 thous sq.km
Population
of the region
6.2 mln people
Unit 2010 2011 2012
Installed capacity MVA 20,741 21,427 21,952
0,4-110 kV OTL (on circuit) km 39,419 39,783 40,053
0,4-110 kV (on ROW) km 36,274 36,587 36,859
0,4-110 kV cable lines km 18,622 19,554 20,400
35-110 kV substations
pcs.
(MVA)
372
(13,466)
373
(13,742)
377
(13,969)
6-35 kV transformer
substations
pcs.
(MVA)
14,361
(7,275)
14,770
(7,686)
15,025
(7,983)
* The indicator is calculated in accordance with the methodology applied in the formation of the
Business Plan for 2013: EBITDA = Net profit+ Income Tax + Depreciation + (Interest payable -
Interest receivable)
** MCap is calculated based on the weighted average price at the MICEX SE
Unit 31.12.2012
Productive electricity supply mln kWh 30,007
Connected capacity MW 523
Revenue RUB mln 36,273
EBITDA* RUB mln 9,925
Net profit RUB mln 1,234
CAPEX RUB mln 14,891
Capitalization** as of 25.03.2013 RUB mln 7, 926
Average number of employees people 6,007
Key indicators
Forecast _RAS_2013 | 1
Share Capital and Organizational Structure
Forecast _RAS_2013 | 2
53.41%
26.57%
7.15%
2.24%
3.60%
1.49%
5.54%
JSC IDGC Holding
St.-Petersburg
(CPMC)
JSC IDGC of Ural
ENERGYO SOLUTIONS RUSSIA
LIMITED (EOS Russia)
RUSENERGO FUND LIMITED
JP Morgan Funds
others
PRODUCTION UNITS (ELECTRICITY TRANSMISSION)
JSC LENENERGO
CJSC Tsarskoselskaya Energy Company
(96.95%)*
CJSC Kurortenergo (98.13%)*
CJSC Lenenergospetsremont (100%)*
SUBSIDIARIESBRANCHES
* – from the authorized capital
electricity transmission and technological
connection services
design and construction work in power supply
Management of objects under construction
Service branch
JSC Energy Service Company Lenenergo
(100%)*
energy services, services of energy saving and
energy efficiency
JSC IDGC Holding The city of St.-Petersburg (CPMC) Minority shareholders
Russian Federation
53.41% (+ 7.15% - share of JSC IDGC of Ural) 26.57% 12.87%
Vyborg power networks
Gatchina power networks
Kingisepp power networks
St-Petersburg high-voltage power networks
Novaya Ladoga power networks
Suburban power networks
Tikhvin power networks
Cable network
** as of the last closing date of the shareholders register: 06.06.2012 considering the additional
issue of ordinary shares in 2102 and purchase of shares by IDGC of Ural
Share capital structure of Lenenergo**, % from ordinary shares
Authorized capital 1,228,325,624.08
Ordinary shares* 1,135,061,313.08
Preferred shares 93,264,311
Authorized capital of Lenenergo, pcs. (RUB)
Organizational Structure of Lenenergo
* In 2012, the authorized capital was increased by placing
of 209,039,634.04 additional ordinary shares
JSC Energouchet (40%)*manufacture, installation and repair of energy
resources gauges
High-voltage grids
(FGC) LENENERGO
Third-party grid
organizations (TGOs)
Electricity trade
companies
End consumers
Generation
wholesale electricity
market
Major TGOs in
the region:
in SPb – JSC
SPbES,
in LR – JSC
LOESK
• Independent electricity trading companies
• Guaranteeing suppliers: JSC PSK, LLC RSK-Energo,
LLC Rusenergosbyt, LLC Energy Holding
• Direct consumers – participants of wholesale and
retail electricity markets
Payment
of losses in
Lenenergo
networks
TGK-1, OGK-6, NW GRES, LAES, etc.
Consolidated revenue system*
electricity fee
purchase of
electricity
electricity
transmission
fee
electricity
transmission fee
electricity
electricity electricity
0.4-110 kV grids 0.4-10 kV grids> 220 kV grids
electricity
*RGR of TGOs and RGR of FGC comprise RGR of Lenenergo
Transmission services
Distribution grid
company
electricity
transmission fee
Market share
of TGOs
.
.
.
Branch of FSK UES – MES of
North-West
Wholesale electricity market
34%
Business Model of Lenenergo:
Cash Flows and Electric Power Flows
Forecast _RAS_2013 | 3
Key indicators of activity of JSC Lenenergo in 2013 and
forecast for 2014-2017 under the approved Business Plan
Business Plan of JSC Lenenergo for 2013-2017 is approved by the Board
of Directors on 26.04.2013 (Minutes #29 of 30.04.2013)
Priority tasks of Lenenergo in 2013
Key indicators of the Business Plan for 2013
Plan on formation of financial result in 2013
Plan on formation of revenues and expenses in 2013
Long-term tariff models, revenues from transmission in 2013
Factors of formation of a loss on electricity transmission in 2013
Long-term investment program of Lenenergo for 2013-2018
Plan on formation of a credit portfolio and debt position at the end of 2013
Dynamics of Lenenergo key financials under the Business Plan in 2013-2017
CONTENTS
Forecast _RAS_2013 | 4
Creation of free transformer capacity
for ensuring optimum loading
of the nutrition centers of power
accepting equipment, providing
an optimum operating mode
of the grid
Implementation of obligations
to applicants under contracts of grid
connection, including accumulated and
preferential categories of applicants,
formation of network infrastructure
corresponding to the rates of social and
economic development of the region
Renovation of fixed assets
and decrease in wear of equipment
under the investment programs
coordinated with administrations
of the region
Development of an optimum system
of electricity metering providing control
over the volume of rendered services
and decrease in commercial losses
of electricity within the program
of power efficiency and energy saving
Implementation
of innovative development
measures
Achievement of balanced results
of the price regulation providing
dynamics of decrease in regulatory
losses on electricity transmission
and creation of own funding sources
for the investment program
Providing optimum indicators
of the Company’s financial stability
and MCap increase
Cost optimization and achievement
of the Company’s KPI
Priority tasks of Lenenergo in 2013
1 2 3
4 5 6
7 8
Forecast _RAS_2013 | 5
Key Indicators of the Business Plan for 2013
Indicator Unit 2012 2013F
Δ in %
2013F/2012
Productive supply mln kWh 30,007 30,230 1%
Losses % 10,37% 10.21% - 0.16 p.p.
Connected capacity MW 523 621 19%
Revenues: RUB mln 36,273 42,669 18%
- from transmission RUB mln 28,816 34,271 19%
- from grid connections RUB mln 7,282 8,239 13%
- from other activities RUB mln 175 159 -9%
Prime cost RUB mln 32,830 38,659 18%
Gross profit RUB mln 3,443 4,010 16%
Profit before tax RUB mln 2,154 1,979 -8%
Net profit RUB mln 1,234 801 -35%
Fro reference:
ROE % 2.08% 1.05% -1.03 p.p.
EBITDA* RUB mln 9,925 13,085 32%
EBITDA margin % 27.36% 30.67% 3.31 p.p.
Net Debt**/EBITDA - 2.25 2.45 -
Investment program
(disbursement)
RUB mln 14,891 18,499 24%
** Net debt is calculated as total borrowings (including debt on interest %) minus cash
assets and short-term investments
Basic parameters of the draft Business Plan
of Lenenergo for 2013
• Productive electricity supply will make 30,230 mln kWh that is above the
actual value of 2012 by 224 mln kWh, or 0.7 %. Relative losses will decrease by
0.16 p.p. and total 10.21%
• Revenues from electricity transmission will make RUB 34,271 mln (+19% to
the fact of 2012)
• Revenues from grid connections of applicants will make RUB 8,239 mln (+13%
to the fact of 2012). The increase in revenues from rendering grid connection
services is associated with performance in 2013 of accumulated obligations on
connection of applicants
• Prime cost in comparison with 2012 will increase by 18% generally at the
expense of growth of depreciation charges, property tax and the expenses on
federal factors
• In 2013, the Company plans to get Net profit at a rate of RUB 801 mln that is
below the actual value of 2012 by 35 %, generally, at the expense of a gain of
depreciation charges following the results of revaluation of fixed assets and the
property tax according to changes of the legislation, decrease in balance of
other income and expenses due to the estimated decrease in incomes from
identification of non-contractual power consumption
• Economic effect of Program on costs management as a part of the Business
plan is planned for 2013 at a rate of RUB 928.8 mln
• Disbursement of investment program will make RUB 18,499 mln that exceeds
the level of 2012 by 24%
• Growth of EBITDA due to the higher growth rate of revenues in relation to
growth rates of operational expenses without amortization is forecasted
• Ratio of Net Debt/EBITDA is 2.45 and does not exceed the recommended
value (3)
Forecast _RAS_2013 | 6
* Hereinafter, the indicator is calculated in accordance with the methodology applied in
the formation of the Business Plan for 2013: EBITDA = Net profit+ Income Tax +
Depreciation + (Interest payable - Interest receivable)
-6,573 -7,116
6,494 7,427
1,313 490
2012 2013П
от прочей пром. деятельности
от услуг по ТП
от услуг по передаче э/э
Plan on Formation of Financial Result in 2013
+18% +18% +16 % -35%
+ 32%
Formation of sales profit and net profit, RUB mln EBITDA, RUB mln
EBITDA margin, %
27% 31%
EBITDA 13,085 100%
Depreciation of FA and
intangible assets
9,274 71%
Interest payable 1,832 14%
Profit tax 1,179 9%
Net profit 801 6%
- =
1,234 801- 35%
Net profit by types of activity, RUB mln
Net Profit
2013F
Factors of estimated decrease of net profit in 2013
Following the results of 2013 deterioration of financial result at simultaneous
growth of EBITDA due to higher growth rate of revenues in relation to growth
rates of operational expenses without amortization is expected
2012 2013П
36,273
32,830
3,443 1,234
42,669
38,659
4,010
801
Выручка от
реализации
Себестоимость Пприбыль от
реализации
Чистая прибыль
2012 2013П
-16
+5,454
1,234
+957
-2,626
-3,203
-743
- 258
801
Revenues growth from
e/e transmission with a
deduction of loading
losses
Revenues
growth
from GC
Growth of own
expenses,
including
depreciation
Revenues
decrease from
other activities
Federal factors
growth with a
deduction of loading
losses
Growth of negative
balance of other
incomes and expenses
Growth of
profit tax
Net Profit
2012
9,925
13,085
2012 2013П
The reasons of estimated
deterioration of financial
result:
- gain of depreciation charges
following the results of FA and
property tax revaluation according
to the legislation changes;
- decrease in balance of other
incomes and expenses due to
estimated decrease in income of
identification of non-contractual
power consumption
Forecast _RAS_2013 | 7
Sales revenue Prime cost Sales profit Net profit
2013F
2013F
2013F
2013F
from other activities
from grid connections
from electricity transmission
32,344
38,244
400
352
2 012 2013П
28,816 34,271
7,282
8,239
2012 2013П
от услуг по передаче э/э от услуг по ТП
Plan on Formation of Revenues and Expenses in 2013
36,273 42,669
Revenues by types of activity*, RUB mln
+18%
Prime cost by types of activity*, RUB mln
32,830 38,65918%
* Including other types of activity, revenues and prime cost sums on which make less than 1 % in total amount
Forecasted structure of prime cost in 2013, RUB mln
Indicator 2012 2013F
Δ in %
2013F/2012
Controllable expenses 5,857 6,114 4%
Materials 469 519 11%
Production work and services 1,218 893 -27%
Compensation fund 2,790 3,088 11%
Other expenses 1,380 1,614 17%
Non-controllable expenses 26,973 32,545 21%
Purchased power for compensation of losses 4,754 5,533 16%
Services of TGOs 8,029 9,063 13%
Services of FGC UES 6,119 6,932 13%
Depreciation of fixed assets and intangible assets 6,278 9,274 48%
Lease payments 803 123 -85%
Other expenses 990 1,620 64%
Total expenses 32,830 38,659 18%
Reasons of planned growth of key items of expenses
in 2013
Depreciation of fixed assets and intangible assets - growth
by RUB 2,995 mln due to revaluation of fixed assets for the
end of 2012, increases in cost of fixed assets taking into
account input volumes under the investment program,
increases in average norm of depreciation charges and
changes of the fixed assets structure
FGC UES services - growth by RUB 813 mln due to the
increased tariff for networks maintenance and a tariff for
electric power purchase for compensation of losses in the
UNEG networks, volume of losses, costs of loaded losses
Purchased power for compensation of losses - growth by
RUB 779 mln due to increased prices for losses purchase
Labor costs and insurance fees - growth by RUB 406 mln due
to wages indexation by Consumer Price Index of 5.5%, fillings
of vacancies linked with input of new facilities, increases in a
salary from 01.10.12 on key professions
Services of distribution grid companies - growth by RUB
1,034 mln is caused by adopted tariff-balanced decisions for
2013 and the tariff option for electricity transmission services
selected by the Company
Forecast _RAS_2013 | 8
2013F 2013F
from e/e transmission from grid connections
The tariff projection is created on the basis of the
tariff models coordinated by regional regulators
within acceptance of TBD for 2013, taking into
account the following conditions:
• Excess of growth rates of transmission tariffs
over a forecast of the strategy of economic
development for 2013-2017 according to
Governmental Decree of 30.06.12 #663
• Increase in the approved investment program
across the Leningrad region on expenses for
connection of preferential applicants at a rate
of RUB 6 bn in 2013-2015 was made according
to p.32 and p.87 of the Pricing Bases approved
by Governmental Decree of 29.12.11 #1178,
for exception of direct influence on increase in
level of a gain of electricity transmission tariff
at electric power transfer
2012 2013 2014 2015 2016 2017
St.-Petersburg
Gain of an average annual tariff in the approved model 3.2% 17.5% 16.0% 14.0% 12.5% 9.7%
IP in the transmission tariff in the approved model 4.4 5.0 5.8 6.3 6.9 7.5
Gain of an average annual tariff in the model for BP 3.2% 17.5% 15.4% 15.3% 15.1% 14.7%
IP in the transmission tariff in the model for BP 7.2 5.9 11.7 15.7 15.4 13.6
Deviation from IP in the approved model 2.8 0.9 5.9 9.4 8.5 6.1
Leningrad region
Gain of an average annual tariff in the approved model 6.0% 1.9% 20.6% 12.9% 10.7% 15.8%
IP in the transmission tariff in the approved model 2.5 3.3 4.5 4.7 2.8 3.1
Gain of an average annual tariff in the model for BP 6.0% 1.9% 26.0% 14.2% 14.2% 14.2%
IP in the transmission tariff in the model for BP 2.3 4.2 7.9 6.2 7.1 10.1
Deviation from IP in the approved model -0.1 0.9 3.5 1.5 4.4 7.0
RUB bn
Forecasted revenues considering the approved tariff-balanced
decisions for 2013
2013
TBD BP Deviation
St.-Petersburg
Revenues, RUB mln 22,852 20,822 -2,030 -9.7%
Tariff, kop/kWh 117.4 106.9 -10.5 -9.8%
Productive supply, mln kWh 19,463 19,472 9 0.0%
Leningrad region
Revenues, RUB mln 14,130 14,211 81 0.6%
Tariff, kop/kWh 115.3 117.7 2.4 2.0%
Productive supply, mln kWh* 12,257 12,078 -179 -1.5%
Lenenergo
Revenues, RUB mln 36,982 35,033 -1,949 -5.6%
Productive supply, mln kWh 31,720 31,550 -170 -0.5%
• Across St.-Petersburg the deviation is associated with overestimate of declared
capacity at regulation. At application from 01.01.2013 of the mechanism of
translation of the type of tariff for end users due to a considerable deviation of NHU
of double-rate consumers from the average NHU considered by Committee at
calculation of tariff rates, there is a considerable deviation of revenues expected to
receiving from regulated ones (about RUB 1.9 bn)
• Deviation of the actual structure of consumption by voltage levels from that
considered by Committees in the formation of the balance of power and capacity: a
smaller share of productive supply at a low voltage level, for which the highest rate
for transmission is set and a larger share of consumption at a high voltage level with
a minimum rate
• Decrease in the estimated productive supply of electric power and capacity
relative to that considered by LenRTC and its redistribution on half-year 2013
Long-term tariff models, revenues from transmission in 2013
*Considering the consumers of generative voltage
Glossary:
IP – Investment program
TBD – tariff-balanced decision
NHU – number of hours in use
Reasons for deviation of planned revenues from those approved by the regulator
Forecast _RAS_2013 | 9
Indicator Len. region St.-Petersburg Lenenergo
Loss on electricity transmission, included by regulators -795 -1,622 -2,416
Deviation of sales revenues from approved values 81 -2,030 -1,949
Decrease in estimated expenses over approved values (controllable, non-
controllable, profit tax, expenses from profit)
-232 89 -143
• Expenses in the structure of RGR (controllable and non-controllable) -90 -492 -582
• Expenses from profit (interest under loans, social payments, dividends,
other expenses)
-142 581 439
Depreciation excess over that considered by the regulator -1,661 -987 -2,648
Total forecasted loss on electricity transmission -2,607 -4,550 -7,156
Given the tariff growth limitations in 2013 a loss on electricity transmission is included in the tariff model (to be compensated
in subsequent years):
RUB mln
Own funds for
investment and
expenses from
profit
Interest on
loans, expenses
from profit
Smoothing Own funds for
investment
Depreciation
Loss on
electricity
transmission,
included by
regulators
LR
2,866
SPb
5,658
LR
1,424
SPb
2,181
LR
-232
SPb
-477
LR
1,210
SPb
3,001
LR
2,005
SPb
4,621
LR
-795
SPb
-1,622
Due to decrease in estimated revenues relative to the revenues approved by regulators and depreciation excess, an expected loss from
electricity transmission exceeds the loss put at regulation:
Factors of formation of a loss on electricity transmission in 2013
Forecast _RAS_2013 | 10
Funding sources of the long-term investment program
2013 2014 2015 2016 2017 2018
Input of capacity,
MVA
881 2,134 3,016 2,735 3,010 1,958
Input of capacity,
km
2,488 3,321 2,534 2,505 2,298 2,778
By regions 2013F 2014F 2015F 2016F 2017F 2018F 2013 -2018
Lenenergo 18,499 26,338 28,273 27,400 26,759 27,054 154,323
St.-Petersburg 12,065 17,391 20,710 18,978 16,525 18,241 103,910
Leningrad region 6,435 8,947 7,563 8,422 10,234 8,813 50,414
By types 2013F 2014F 2015F 2016F 2017F 2018F 2013 -2018
Lenenergo 18,499 26,338 28,273 27,400 26,759 27,054 154,323
Re-equipment and
repairs
7,914 11,534 14,180 15,501 17,010 19,184 85,323
New construction &
expansion 10,522 14,704 14,093 11,899 9,749 7,870 68,836
Other 63 101 0 0 0 0 164
2013F 2014F 2015F 2016F 2017F 2018F
Investment program, total 18,499 26,338 28,273 27,400 26,759 27,054
Transmission tariff 9,462 20,265 21,872 22,564 23,756 24,502
Depreciation 0 6,660 10,101 8,984 9,539 10,745
Credits and loans, including credits,
attracted under additional issue
9,462 13,606 11,771 13,580 14,217 13,756
Additional issue of shares 1,725 562 0 0 0 0
Fee for grid connection 7,313 5,511 6,401 4,836 3,003 2,552
Settlements with property 644 1,355 1,888 0 0 0
Lost income 10 0 0 0 0 0
Advances on grid connection 6,659 4,156 4,513 4,836 3,003 2,552
RUB mln, w/o VAT
RUB mln, w/o VAT
9,462
20,265 21,872 22,564 23,756 24,5027,313
5,511 6,401 4,836 3,003 2,552
1,725
562
2013П 2014П 2015П 2016П 2017П 2018П
Дополнительная эмиссия акций
Плата за технологическое присоединение
Тариф на передачу
18,499 26,338 28,273 27,400 26,759 27,054
18,499 26,338 28,273 27,400 26,759 27,054
7,914 11,534 14,180 15,501 17,010 19,184
10,522
14,704
14,093 11,899 9,749 7,870
63
101
2013П 2014П 2015П 2016П 2017П 2018П
ТПиР Новое строительство и расширение Прочее
Parameters of the long-term investment program
Input of capacity
RUB mln, w/o VAT
Draft Investment program for 2013-2018 is approved by the Commission on investments of JSC Rosseti and is sent to Ministry of the Power Industry of Russia for its
approval. At present, draft Investment program for 2013-2018 is on coordination in executive bodies of St. Petersburg and the Leningrad region
Long-term investment program of Lenenergo for 2013-2018
2013F 2014F 2015F 2016F 2017F 2018F
2013F 2014F 2015F 2016F 2017F 2018F
Re-
equipment
and repairs
New construction & expansion Other
Additional issue of shares
Fee for grid connections
Transmission tariff
Forecast _RAS_2013 | 11
9%
9%
7%
1%
12%
13%14%
35%
Облигации (Серия 04)
Облигации (Серия БО-01)
Банк ВТБ
Связь-Банк
Сбербанк России
АБ Россия
Внешэкономбанк
Новые кредиты и займы
14,336 10,866
3,000
22,202
13,309
5,604
7,505
11,408
Кредитный
портфель на
01.01.13
Привлечение Погашение Кредитный
портфель на
31.12.13
Операционные
кредиты
Инвестиционные
кредиты
Plan on formation of a credit portfolio and debt position at the end of 2013
Debt position, RUB mln
Borrowings flow in 2013, RUB mln
* Net debt is calculated as the sum of credits and loans (including the debt on accrued
but not paid interest) minus cash assets and short-term financial investments
** The indicator is calculated in accordance with the methodology applied in the
formation of the Business Plan for 2013: EBITDA = Net profit+ Income Tax +
Depreciation + (Interest payable - Interest receivable)
31.12.2012
31.12.2013
F
Δ in %
31.12.2013 F/
31.12.2012
Net debt at the end of the period** 22,360 32,074 43%
Net debt/EBITDA** 2.25 2.45 -
-+
Parameters of Series 04
bonded loan
RU000A0JS785
Volume RUB 3 bn
Rate, % 8.5 %
Date of placement 24.04.2012
Maturity date 1,820th day
Term of the offer 3 years
Circulation period 5 years
Agency Rating Assigned
Moody’s
Ba2
(outlook – stable)
Nov. 2009
Moody’s Interfax Rating Agency
(rating on the national scale)
Aa2.ru
(outlook - stable)
Nov. 2009
Credit rating
Confirmed in January 2013
Estimated structure of credit portfolio for the end of 2013
Average rate
10.6%
Net Debt/EBITDA, RUB mln, %
27,645
16,470
10,505
33,610
Parameters of BO-01
bonded loan
RU000A0JTVA1
Volume RUB 3 bn
Rate, % 8.25%
Date of placement 17.04.2013
Maturity date 1,092nd
day
Term of the offer w/o
Circulation period 3 years
Planned ratio
Debt/EBITDA for the
end of 2013 is 2.58 and
does not exceed the
recommended value (3)
Forecast _RAS_2013 | 12
11,564
14,405
20,197 22,360
32,074
1.42 1.40
2.36 2.25
2.45
2009 2010 2011 2012 2013П
Net Debt Net Debt/EBITDA
Credit portfolio
as of
01.01.2013
Credit portfolio
as of
31.12.2013
Attraction Maturity
Operational
credits
Investment
credits
Bonds (Series 04)
Bonds (Series BO-01)
VTB Bank
Svyaz-Bank
Sberbank of Russia
AB Russia
Vnesheconombank
New credits & loans
2013F
Transition to RAB provides receiving by the Company of net profit from activities on electric power
transmission since 2015, therefore the source for repayment of earlier involved investment credits is
formed, and since 2017 – the profit goes on financing of investment activity.
As a whole, growth of net profit positively influences an indicator of profitability of equity capital, in
this connection the indicator growth - in 5 times in 2017 concerning 2012 is provided.
Indicator
2012
Fact
2013
Plan
2014F 2015F 2016F 2017F
2017/2012,
times
Revenues 36,273 42,669 50,632 62,674 66,026 74,297 2.0
Net profit (loss) 1,234 801 4,819 10,325 8,921 10,735 8.7
Net profit (loss) from electricity transmission
on networks
-6,573 -7,116 -1,714 362 3,112 6,235 -
EBITDA 9,925 13,085 20,143 29,710 30,578 35,996 3.6
Debt 27,789 33,809 47,901 58,742 66,968 72,068 2.6
Net debt 22,360 32,074 47,183 58,240 66,510 71,582 3.2
Debt/EBITDA 2.80 2.58 2.38 1.98 2.19 2.00 0.7
ROE,% 2.08% 1.05% 5.91% 11.96% 9.28% 10.32% 5.0
Leverage,% 26.7% 29.3% 35.7% 37.9% 39.2% 38.8% 1.5
Dynamics of Lenenergo key financials under the Business Plan in 2013-2017
36,273
42,669
50,632
62,674 66,026
74,297
2012 2013П 2014П 2015П 2016П 2017П
1,234 801
4,819
10,325
8,921
10,735
2012 2013П 2014П 2015П 2016П 2017П
Revenues forecast, RUB mln
RUB mln
EBITDA and EBITDA margin forecast, RUB mln, % Net profit forecast, RUB mln
Total revenues of the Company in 2013-2017
will amount to RUB 296,299 mln, including:
- from electricity transmission services – RUB
252,860 mln
- from grid connection services – RUB 42,586
mln
- from other activities – RUB 853 mln
Forecast _RAS_2013 | 13
9,925
13,085
20,143
29,710 30,578
35,996
27%
31%
40%
47% 46%
48%
-10%
0%
10%
20%
30%
40%
50%
60%
70%
0
5 000
10 000
15 000
20 000
25 000
30 000
35 000
40 000
2012 2013П 2014П 2015П 2016П 2017П2013F 2014F 2015F 2016F 2017F2012 2013F 2014F 2015F 2016F 2017F2012 2013F 2014F 2015F 2016F 2017F2012
JSC Lenenergo
196247, Russia, Saint-Petersburg, Constitution Sq., 1
Head of Department for Corporate Governance
and Shareholders Relationship
Andrey Smolnikov
Tel./ fax +7 (812) 595 31 76
Smolnikov.AS@nwenergo.com
Investor Relations
Ulyana Davydova
Tel. +7 (812) 494 39 06
Fax +7 (812) 494 37 34
ir@lenenergo.ru
Davydova.UE@nwenergo.com
www.lenenergo.ru
CONTACTS

Mais conteúdo relacionado

Semelhante a Key performance indicators of JSC Lenenergo in 2013-2017 under the approved Business plan

FY2012 Key Results (RAS)
FY2012 Key Results (RAS)FY2012 Key Results (RAS)
FY2012 Key Results (RAS)Lenenergo IR
 
RAB regulation parameters, estimates of key financial indicators of JSC “Lene...
RAB regulation parameters, estimates of key financial indicators of JSC “Lene...RAB regulation parameters, estimates of key financial indicators of JSC “Lene...
RAB regulation parameters, estimates of key financial indicators of JSC “Lene...Lenenergo IR
 
IDGC of Cente presentation Investment road-show AccEssMeeting China-Russia, ...
IDGC of Cente  presentation Investment road-show AccEssMeeting China-Russia, ...IDGC of Cente  presentation Investment road-show AccEssMeeting China-Russia, ...
IDGC of Cente presentation Investment road-show AccEssMeeting China-Russia, ...MRSK Centre
 
9M 2011 Operational & Financial Results of JSC “Lenenergo”
9M 2011 Operational & Financial Results of JSC “Lenenergo”9M 2011 Operational & Financial Results of JSC “Lenenergo”
9M 2011 Operational & Financial Results of JSC “Lenenergo”Lenenergo IR
 
THE RUSSIA FORUM 2011
THE RUSSIA FORUM 2011THE RUSSIA FORUM 2011
THE RUSSIA FORUM 2011Lenenergo IR
 
THE RUSSIA FORUM 2011
THE RUSSIA FORUM 2011THE RUSSIA FORUM 2011
THE RUSSIA FORUM 2011Lenenergo IR
 
Investor's Day of JSC "IDGC Holding"
Investor's Day of JSC "IDGC Holding"Investor's Day of JSC "IDGC Holding"
Investor's Day of JSC "IDGC Holding"Lenenergo IR
 
Analyst’s Day of IDGC of Centre, 21 March 2017
Analyst’s Day of IDGC of Centre, 21 March 2017Analyst’s Day of IDGC of Centre, 21 March 2017
Analyst’s Day of IDGC of Centre, 21 March 2017MRSK Centre
 
FY 2010 Operational & Financial Results (under RAS)
FY 2010 Operational & Financial Results (under RAS)FY 2010 Operational & Financial Results (under RAS)
FY 2010 Operational & Financial Results (under RAS)Lenenergo IR
 
IDGC of Cente presentation (VTB Capital Russia Calling!) 13-14 Оctober 2015
IDGC of Cente presentation (VTB Capital Russia Calling!) 13-14 Оctober 2015 IDGC of Cente presentation (VTB Capital Russia Calling!) 13-14 Оctober 2015
IDGC of Cente presentation (VTB Capital Russia Calling!) 13-14 Оctober 2015 MRSK Centre
 
Eng общая презентация ленэнерго 1 пг 2014 ifrs
Eng общая презентация ленэнерго 1 пг 2014 ifrsEng общая презентация ленэнерго 1 пг 2014 ifrs
Eng общая презентация ленэнерго 1 пг 2014 ifrsAleksandr Doronin
 
Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...
Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...
Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...Lenenergo IR
 
Troika Dialog Russia Forum 2012
Troika Dialog Russia Forum 2012Troika Dialog Russia Forum 2012
Troika Dialog Russia Forum 2012Computershare
 
Sberbank: The Russia Forum 2013, 16-19 April 2013
Sberbank: The Russia Forum 2013, 16-19 April 2013Sberbank: The Russia Forum 2013, 16-19 April 2013
Sberbank: The Russia Forum 2013, 16-19 April 2013MRSK Centre
 
Eskom Interim Results Presentation 30 Sept 2013
Eskom Interim Results Presentation 30 Sept 2013Eskom Interim Results Presentation 30 Sept 2013
Eskom Interim Results Presentation 30 Sept 2013Eskom Holdings SOC Ltd
 
26 jurnal internasional factor affecting the implementation of gcg in contro...
26  jurnal internasional factor affecting the implementation of gcg in contro...26  jurnal internasional factor affecting the implementation of gcg in contro...
26 jurnal internasional factor affecting the implementation of gcg in contro...Aminullah Assagaf
 
Presentation IDGC of Cente (VTB Capital) 03.10.2013_final_eng
Presentation IDGC of Cente (VTB Capital) 03.10.2013_final_engPresentation IDGC of Cente (VTB Capital) 03.10.2013_final_eng
Presentation IDGC of Cente (VTB Capital) 03.10.2013_final_engMRSK Centre
 
Key indices of consolidated financial reports of JSC “Lenenergo”, prepared un...
Key indices of consolidated financial reports of JSC “Lenenergo”, prepared un...Key indices of consolidated financial reports of JSC “Lenenergo”, prepared un...
Key indices of consolidated financial reports of JSC “Lenenergo”, prepared un...Lenenergo IR
 
SOES
SOESSOES
SOESSPFU
 

Semelhante a Key performance indicators of JSC Lenenergo in 2013-2017 under the approved Business plan (20)

FY2012 Key Results (RAS)
FY2012 Key Results (RAS)FY2012 Key Results (RAS)
FY2012 Key Results (RAS)
 
RAB regulation parameters, estimates of key financial indicators of JSC “Lene...
RAB regulation parameters, estimates of key financial indicators of JSC “Lene...RAB regulation parameters, estimates of key financial indicators of JSC “Lene...
RAB regulation parameters, estimates of key financial indicators of JSC “Lene...
 
RUSSIA FORUM 2012
RUSSIA FORUM 2012RUSSIA FORUM 2012
RUSSIA FORUM 2012
 
IDGC of Cente presentation Investment road-show AccEssMeeting China-Russia, ...
IDGC of Cente  presentation Investment road-show AccEssMeeting China-Russia, ...IDGC of Cente  presentation Investment road-show AccEssMeeting China-Russia, ...
IDGC of Cente presentation Investment road-show AccEssMeeting China-Russia, ...
 
9M 2011 Operational & Financial Results of JSC “Lenenergo”
9M 2011 Operational & Financial Results of JSC “Lenenergo”9M 2011 Operational & Financial Results of JSC “Lenenergo”
9M 2011 Operational & Financial Results of JSC “Lenenergo”
 
THE RUSSIA FORUM 2011
THE RUSSIA FORUM 2011THE RUSSIA FORUM 2011
THE RUSSIA FORUM 2011
 
THE RUSSIA FORUM 2011
THE RUSSIA FORUM 2011THE RUSSIA FORUM 2011
THE RUSSIA FORUM 2011
 
Investor's Day of JSC "IDGC Holding"
Investor's Day of JSC "IDGC Holding"Investor's Day of JSC "IDGC Holding"
Investor's Day of JSC "IDGC Holding"
 
Analyst’s Day of IDGC of Centre, 21 March 2017
Analyst’s Day of IDGC of Centre, 21 March 2017Analyst’s Day of IDGC of Centre, 21 March 2017
Analyst’s Day of IDGC of Centre, 21 March 2017
 
FY 2010 Operational & Financial Results (under RAS)
FY 2010 Operational & Financial Results (under RAS)FY 2010 Operational & Financial Results (under RAS)
FY 2010 Operational & Financial Results (under RAS)
 
IDGC of Cente presentation (VTB Capital Russia Calling!) 13-14 Оctober 2015
IDGC of Cente presentation (VTB Capital Russia Calling!) 13-14 Оctober 2015 IDGC of Cente presentation (VTB Capital Russia Calling!) 13-14 Оctober 2015
IDGC of Cente presentation (VTB Capital Russia Calling!) 13-14 Оctober 2015
 
Eng общая презентация ленэнерго 1 пг 2014 ifrs
Eng общая презентация ленэнерго 1 пг 2014 ifrsEng общая презентация ленэнерго 1 пг 2014 ifrs
Eng общая презентация ленэнерго 1 пг 2014 ifrs
 
Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...
Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...
Business Plan Adjustments for 2010.Operational and Financial Results of JSC “...
 
Troika Dialog Russia Forum 2012
Troika Dialog Russia Forum 2012Troika Dialog Russia Forum 2012
Troika Dialog Russia Forum 2012
 
Sberbank: The Russia Forum 2013, 16-19 April 2013
Sberbank: The Russia Forum 2013, 16-19 April 2013Sberbank: The Russia Forum 2013, 16-19 April 2013
Sberbank: The Russia Forum 2013, 16-19 April 2013
 
Eskom Interim Results Presentation 30 Sept 2013
Eskom Interim Results Presentation 30 Sept 2013Eskom Interim Results Presentation 30 Sept 2013
Eskom Interim Results Presentation 30 Sept 2013
 
26 jurnal internasional factor affecting the implementation of gcg in contro...
26  jurnal internasional factor affecting the implementation of gcg in contro...26  jurnal internasional factor affecting the implementation of gcg in contro...
26 jurnal internasional factor affecting the implementation of gcg in contro...
 
Presentation IDGC of Cente (VTB Capital) 03.10.2013_final_eng
Presentation IDGC of Cente (VTB Capital) 03.10.2013_final_engPresentation IDGC of Cente (VTB Capital) 03.10.2013_final_eng
Presentation IDGC of Cente (VTB Capital) 03.10.2013_final_eng
 
Key indices of consolidated financial reports of JSC “Lenenergo”, prepared un...
Key indices of consolidated financial reports of JSC “Lenenergo”, prepared un...Key indices of consolidated financial reports of JSC “Lenenergo”, prepared un...
Key indices of consolidated financial reports of JSC “Lenenergo”, prepared un...
 
SOES
SOESSOES
SOES
 

Mais de Lenenergo IR

Lenenergo, PJSC. FY2016 RAS
Lenenergo, PJSC. FY2016 RASLenenergo, PJSC. FY2016 RAS
Lenenergo, PJSC. FY2016 RASLenenergo IR
 
3Q2016 RAS Lenenergo, PJSC
3Q2016 RAS Lenenergo, PJSC 3Q2016 RAS Lenenergo, PJSC
3Q2016 RAS Lenenergo, PJSC Lenenergo IR
 
Key Indicators of Interim Financial Statements prepared in accordance with IF...
Key Indicators of Interim Financial Statements prepared in accordance with IF...Key Indicators of Interim Financial Statements prepared in accordance with IF...
Key Indicators of Interim Financial Statements prepared in accordance with IF...Lenenergo IR
 
Conference - Call. RAB-regulation parameters_SCRIPT
Conference - Call. RAB-regulation parameters_SCRIPTConference - Call. RAB-regulation parameters_SCRIPT
Conference - Call. RAB-regulation parameters_SCRIPTLenenergo IR
 
Key Indicators of Interim Financial Statements prepared in accordance with IF...
Key Indicators of Interim Financial Statements prepared in accordance with IF...Key Indicators of Interim Financial Statements prepared in accordance with IF...
Key Indicators of Interim Financial Statements prepared in accordance with IF...Lenenergo IR
 
Key indicators of consolidated financial statements of JSC "Lenenergo" prepar...
Key indicators of consolidated financial statements of JSC "Lenenergo" prepar...Key indicators of consolidated financial statements of JSC "Lenenergo" prepar...
Key indicators of consolidated financial statements of JSC "Lenenergo" prepar...Lenenergo IR
 
Conference Call - Business Plan Adjustments for 2010. 9M 2010 RAS Results_SCRIPT
Conference Call - Business Plan Adjustments for 2010. 9M 2010 RAS Results_SCRIPTConference Call - Business Plan Adjustments for 2010. 9M 2010 RAS Results_SCRIPT
Conference Call - Business Plan Adjustments for 2010. 9M 2010 RAS Results_SCRIPTLenenergo IR
 
Key Indicators of Unaudited Interim Condensed Consolidated Financial Statemen...
Key Indicators of Unaudited Interim Condensed Consolidated Financial Statemen...Key Indicators of Unaudited Interim Condensed Consolidated Financial Statemen...
Key Indicators of Unaudited Interim Condensed Consolidated Financial Statemen...Lenenergo IR
 
INVESTOR RELATIONS PRESENTATION
INVESTOR RELATIONS PRESENTATIONINVESTOR RELATIONS PRESENTATION
INVESTOR RELATIONS PRESENTATIONLenenergo IR
 
ПРЕЗЕНТАЦИЯ КОМПАНИИ ОАО «ЛЕНЭНЕРГО»
ПРЕЗЕНТАЦИЯ КОМПАНИИ ОАО «ЛЕНЭНЕРГО»ПРЕЗЕНТАЦИЯ КОМПАНИИ ОАО «ЛЕНЭНЕРГО»
ПРЕЗЕНТАЦИЯ КОМПАНИИ ОАО «ЛЕНЭНЕРГО»Lenenergo IR
 
IR ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» с учетом результатов деятельности Общества за ...
IR ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» с учетом результатов деятельности Общества за ...IR ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» с учетом результатов деятельности Общества за ...
IR ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» с учетом результатов деятельности Общества за ...Lenenergo IR
 
ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» К ВСТРЕЧЕ С ОТРАСЛЕВЫМИ АНАЛИТИКАМИ
ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» К ВСТРЕЧЕ С ОТРАСЛЕВЫМИ АНАЛИТИКАМИПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» К ВСТРЕЧЕ С ОТРАСЛЕВЫМИ АНАЛИТИКАМИ
ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» К ВСТРЕЧЕ С ОТРАСЛЕВЫМИ АНАЛИТИКАМИLenenergo IR
 
Презентация деятельности ОАО «Ленэнерго» по итогам 1 полугодия 2010
Презентация деятельности ОАО «Ленэнерго» по итогам 1 полугодия 2010Презентация деятельности ОАО «Ленэнерго» по итогам 1 полугодия 2010
Презентация деятельности ОАО «Ленэнерго» по итогам 1 полугодия 2010Lenenergo IR
 
Ключевые показатели неаудированной промежуточной сокращённой консолидированно...
Ключевые показатели неаудированной промежуточной сокращённой консолидированно...Ключевые показатели неаудированной промежуточной сокращённой консолидированно...
Ключевые показатели неаудированной промежуточной сокращённой консолидированно...Lenenergo IR
 
Корректировка Бизнес Плана на 2010 год. Результаты операционной и финансовой ...
Корректировка Бизнес Плана на 2010 год. Результаты операционной и финансовой ...Корректировка Бизнес Плана на 2010 год. Результаты операционной и финансовой ...
Корректировка Бизнес Плана на 2010 год. Результаты операционной и финансовой ...Lenenergo IR
 
Презентация деятельности ОАО «Ленэнерго» по итогам 1 квартала 2010
Презентация деятельности ОАО «Ленэнерго» по итогам 1 квартала 2010Презентация деятельности ОАО «Ленэнерго» по итогам 1 квартала 2010
Презентация деятельности ОАО «Ленэнерго» по итогам 1 квартала 2010Lenenergo IR
 
Результаты операционной и финансовой деятельности ОАО «Ленэнерго»за 9 месяцев...
Результаты операционной и финансовой деятельности ОАО «Ленэнерго»за 9 месяцев...Результаты операционной и финансовой деятельности ОАО «Ленэнерго»за 9 месяцев...
Результаты операционной и финансовой деятельности ОАО «Ленэнерго»за 9 месяцев...Lenenergo IR
 

Mais de Lenenergo IR (18)

Lenenergo, PJSC. FY2016 RAS
Lenenergo, PJSC. FY2016 RASLenenergo, PJSC. FY2016 RAS
Lenenergo, PJSC. FY2016 RAS
 
3Q2016 RAS Lenenergo, PJSC
3Q2016 RAS Lenenergo, PJSC 3Q2016 RAS Lenenergo, PJSC
3Q2016 RAS Lenenergo, PJSC
 
6m2016 RAS
6m2016 RAS6m2016 RAS
6m2016 RAS
 
Key Indicators of Interim Financial Statements prepared in accordance with IF...
Key Indicators of Interim Financial Statements prepared in accordance with IF...Key Indicators of Interim Financial Statements prepared in accordance with IF...
Key Indicators of Interim Financial Statements prepared in accordance with IF...
 
Conference - Call. RAB-regulation parameters_SCRIPT
Conference - Call. RAB-regulation parameters_SCRIPTConference - Call. RAB-regulation parameters_SCRIPT
Conference - Call. RAB-regulation parameters_SCRIPT
 
Key Indicators of Interim Financial Statements prepared in accordance with IF...
Key Indicators of Interim Financial Statements prepared in accordance with IF...Key Indicators of Interim Financial Statements prepared in accordance with IF...
Key Indicators of Interim Financial Statements prepared in accordance with IF...
 
Key indicators of consolidated financial statements of JSC "Lenenergo" prepar...
Key indicators of consolidated financial statements of JSC "Lenenergo" prepar...Key indicators of consolidated financial statements of JSC "Lenenergo" prepar...
Key indicators of consolidated financial statements of JSC "Lenenergo" prepar...
 
Conference Call - Business Plan Adjustments for 2010. 9M 2010 RAS Results_SCRIPT
Conference Call - Business Plan Adjustments for 2010. 9M 2010 RAS Results_SCRIPTConference Call - Business Plan Adjustments for 2010. 9M 2010 RAS Results_SCRIPT
Conference Call - Business Plan Adjustments for 2010. 9M 2010 RAS Results_SCRIPT
 
Key Indicators of Unaudited Interim Condensed Consolidated Financial Statemen...
Key Indicators of Unaudited Interim Condensed Consolidated Financial Statemen...Key Indicators of Unaudited Interim Condensed Consolidated Financial Statemen...
Key Indicators of Unaudited Interim Condensed Consolidated Financial Statemen...
 
INVESTOR RELATIONS PRESENTATION
INVESTOR RELATIONS PRESENTATIONINVESTOR RELATIONS PRESENTATION
INVESTOR RELATIONS PRESENTATION
 
ПРЕЗЕНТАЦИЯ КОМПАНИИ ОАО «ЛЕНЭНЕРГО»
ПРЕЗЕНТАЦИЯ КОМПАНИИ ОАО «ЛЕНЭНЕРГО»ПРЕЗЕНТАЦИЯ КОМПАНИИ ОАО «ЛЕНЭНЕРГО»
ПРЕЗЕНТАЦИЯ КОМПАНИИ ОАО «ЛЕНЭНЕРГО»
 
IR ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» с учетом результатов деятельности Общества за ...
IR ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» с учетом результатов деятельности Общества за ...IR ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» с учетом результатов деятельности Общества за ...
IR ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» с учетом результатов деятельности Общества за ...
 
ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» К ВСТРЕЧЕ С ОТРАСЛЕВЫМИ АНАЛИТИКАМИ
ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» К ВСТРЕЧЕ С ОТРАСЛЕВЫМИ АНАЛИТИКАМИПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» К ВСТРЕЧЕ С ОТРАСЛЕВЫМИ АНАЛИТИКАМИ
ПРЕЗЕНТАЦИЯ ОАО «ЛЕНЭНЕРГО» К ВСТРЕЧЕ С ОТРАСЛЕВЫМИ АНАЛИТИКАМИ
 
Презентация деятельности ОАО «Ленэнерго» по итогам 1 полугодия 2010
Презентация деятельности ОАО «Ленэнерго» по итогам 1 полугодия 2010Презентация деятельности ОАО «Ленэнерго» по итогам 1 полугодия 2010
Презентация деятельности ОАО «Ленэнерго» по итогам 1 полугодия 2010
 
Ключевые показатели неаудированной промежуточной сокращённой консолидированно...
Ключевые показатели неаудированной промежуточной сокращённой консолидированно...Ключевые показатели неаудированной промежуточной сокращённой консолидированно...
Ключевые показатели неаудированной промежуточной сокращённой консолидированно...
 
Корректировка Бизнес Плана на 2010 год. Результаты операционной и финансовой ...
Корректировка Бизнес Плана на 2010 год. Результаты операционной и финансовой ...Корректировка Бизнес Плана на 2010 год. Результаты операционной и финансовой ...
Корректировка Бизнес Плана на 2010 год. Результаты операционной и финансовой ...
 
Презентация деятельности ОАО «Ленэнерго» по итогам 1 квартала 2010
Презентация деятельности ОАО «Ленэнерго» по итогам 1 квартала 2010Презентация деятельности ОАО «Ленэнерго» по итогам 1 квартала 2010
Презентация деятельности ОАО «Ленэнерго» по итогам 1 квартала 2010
 
Результаты операционной и финансовой деятельности ОАО «Ленэнерго»за 9 месяцев...
Результаты операционной и финансовой деятельности ОАО «Ленэнерго»за 9 месяцев...Результаты операционной и финансовой деятельности ОАО «Ленэнерго»за 9 месяцев...
Результаты операционной и финансовой деятельности ОАО «Ленэнерго»за 9 месяцев...
 

Último

BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceDelhi Call girls
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanhanshkumar9870
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024CollectiveMining1
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girladitipandeya
 
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...SUHANI PANDEY
 
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort ServiceDelhi Call girls
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girladitipandeya
 
Q3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationQ3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationSysco_Investors
 
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...mriyagarg453
 
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escortssonatiwari757
 
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...SUHANI PANDEY
 
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦anilsa9823
 

Último (20)

(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
 
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhan
 
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
 
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
Vip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
 
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
 
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
 
Q3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationQ3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call Presentation
 
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
 
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
 
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
 
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
 
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi : 9999 Cash Pa...
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi  : 9999 Cash Pa...(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi  : 9999 Cash Pa...
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi : 9999 Cash Pa...
 
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
 
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 

Key performance indicators of JSC Lenenergo in 2013-2017 under the approved Business plan

  • 1. Key performance indicators of JSC Lenenergo in 2013-2017 under the approved Business plan
  • 2. Disclaimer This presentation is not an offer or invitation to make offers (advertisement) in respect of purchase or subscription to securities of Lenenergo. Neither the presentation, nor any part hereof, nor the fact of its representation or distribution serve as the basis for entering into any agreement or taking any investment decision; therefore, the presentation should not be relied upon in this respect. This presentation may contain estimates. The estimates are not based on actual circumstances and include statements in respect of the intentions, opinions or current expectations of JSC Lenenergo as regards the results of its activity, financial position, liquidity, prospects of growth, strategy and the industry, in which Lenenergo operates. Such estimates by their nature are characterized by presence of risks and uncertainty factors since they are related to the events and depend on the circumstances, which may fail to happen in the future. Lenenergo warns that the estimates are not a guarantee of the future parameters, and the actual results of Lenenergo activities, its financial position and liquidity, as well as development of the industry, in which it operates, may significantly differ from those included in the estimates contained herein. Besides, even if the results of the Company's activities, its financial position and liquidity, as well as the development of the industry, in which it operates, correspond to the estimates contained herein, such results and events are not indicative of the results and events in the future. This presentation contains the information received from third parties besides the official information on Lenenergo activities. This information has been received from the sources which are reliable in Lenenergo opinion. Nevertheless, we do not guarantee the accuracy of such information which may be reduced or incomplete. All opinions and estimates contained herein reflect our opinion as at the date of publication and are subject to change without notice. Lenenergo does not bear liability for the consequences of use of the opinions or estimates contained herein, or information incompleteness. Lenenergo does not undertake obligations in respect of revision or confirmation of the estimates and evaluations, as well as in respect of updating of the information contained herein.
  • 3. General Information on the Company of 31.12.2012 LENENERGO is the largest electricity distribution grid company (the operator of 0,4-110 kV networks), servicing the territory of St.-Petersburg and the Leningrad region. It is a natural monopoly, which tariffs are set by the regulating authorities - Federal Tariff Service (FTS) and regional regulators Main types of activity: • electricity transmission & distribution • technological connection of new customers to networks The share of Lenenergo on the electricity transmission market as of 31.12.2012 - 70.3 % Service area: St.-Petersburg and the Leningrad region Main competitors: in St.-Petersburg - JSC SPbES, in the Leningrad region - JSC LOESK Assets Service area 87.3 thous sq.km Population of the region 6.2 mln people Unit 2010 2011 2012 Installed capacity MVA 20,741 21,427 21,952 0,4-110 kV OTL (on circuit) km 39,419 39,783 40,053 0,4-110 kV (on ROW) km 36,274 36,587 36,859 0,4-110 kV cable lines km 18,622 19,554 20,400 35-110 kV substations pcs. (MVA) 372 (13,466) 373 (13,742) 377 (13,969) 6-35 kV transformer substations pcs. (MVA) 14,361 (7,275) 14,770 (7,686) 15,025 (7,983) * The indicator is calculated in accordance with the methodology applied in the formation of the Business Plan for 2013: EBITDA = Net profit+ Income Tax + Depreciation + (Interest payable - Interest receivable) ** MCap is calculated based on the weighted average price at the MICEX SE Unit 31.12.2012 Productive electricity supply mln kWh 30,007 Connected capacity MW 523 Revenue RUB mln 36,273 EBITDA* RUB mln 9,925 Net profit RUB mln 1,234 CAPEX RUB mln 14,891 Capitalization** as of 25.03.2013 RUB mln 7, 926 Average number of employees people 6,007 Key indicators Forecast _RAS_2013 | 1
  • 4. Share Capital and Organizational Structure Forecast _RAS_2013 | 2 53.41% 26.57% 7.15% 2.24% 3.60% 1.49% 5.54% JSC IDGC Holding St.-Petersburg (CPMC) JSC IDGC of Ural ENERGYO SOLUTIONS RUSSIA LIMITED (EOS Russia) RUSENERGO FUND LIMITED JP Morgan Funds others PRODUCTION UNITS (ELECTRICITY TRANSMISSION) JSC LENENERGO CJSC Tsarskoselskaya Energy Company (96.95%)* CJSC Kurortenergo (98.13%)* CJSC Lenenergospetsremont (100%)* SUBSIDIARIESBRANCHES * – from the authorized capital electricity transmission and technological connection services design and construction work in power supply Management of objects under construction Service branch JSC Energy Service Company Lenenergo (100%)* energy services, services of energy saving and energy efficiency JSC IDGC Holding The city of St.-Petersburg (CPMC) Minority shareholders Russian Federation 53.41% (+ 7.15% - share of JSC IDGC of Ural) 26.57% 12.87% Vyborg power networks Gatchina power networks Kingisepp power networks St-Petersburg high-voltage power networks Novaya Ladoga power networks Suburban power networks Tikhvin power networks Cable network ** as of the last closing date of the shareholders register: 06.06.2012 considering the additional issue of ordinary shares in 2102 and purchase of shares by IDGC of Ural Share capital structure of Lenenergo**, % from ordinary shares Authorized capital 1,228,325,624.08 Ordinary shares* 1,135,061,313.08 Preferred shares 93,264,311 Authorized capital of Lenenergo, pcs. (RUB) Organizational Structure of Lenenergo * In 2012, the authorized capital was increased by placing of 209,039,634.04 additional ordinary shares JSC Energouchet (40%)*manufacture, installation and repair of energy resources gauges
  • 5. High-voltage grids (FGC) LENENERGO Third-party grid organizations (TGOs) Electricity trade companies End consumers Generation wholesale electricity market Major TGOs in the region: in SPb – JSC SPbES, in LR – JSC LOESK • Independent electricity trading companies • Guaranteeing suppliers: JSC PSK, LLC RSK-Energo, LLC Rusenergosbyt, LLC Energy Holding • Direct consumers – participants of wholesale and retail electricity markets Payment of losses in Lenenergo networks TGK-1, OGK-6, NW GRES, LAES, etc. Consolidated revenue system* electricity fee purchase of electricity electricity transmission fee electricity transmission fee electricity electricity electricity 0.4-110 kV grids 0.4-10 kV grids> 220 kV grids electricity *RGR of TGOs and RGR of FGC comprise RGR of Lenenergo Transmission services Distribution grid company electricity transmission fee Market share of TGOs . . . Branch of FSK UES – MES of North-West Wholesale electricity market 34% Business Model of Lenenergo: Cash Flows and Electric Power Flows Forecast _RAS_2013 | 3
  • 6. Key indicators of activity of JSC Lenenergo in 2013 and forecast for 2014-2017 under the approved Business Plan Business Plan of JSC Lenenergo for 2013-2017 is approved by the Board of Directors on 26.04.2013 (Minutes #29 of 30.04.2013) Priority tasks of Lenenergo in 2013 Key indicators of the Business Plan for 2013 Plan on formation of financial result in 2013 Plan on formation of revenues and expenses in 2013 Long-term tariff models, revenues from transmission in 2013 Factors of formation of a loss on electricity transmission in 2013 Long-term investment program of Lenenergo for 2013-2018 Plan on formation of a credit portfolio and debt position at the end of 2013 Dynamics of Lenenergo key financials under the Business Plan in 2013-2017 CONTENTS Forecast _RAS_2013 | 4
  • 7. Creation of free transformer capacity for ensuring optimum loading of the nutrition centers of power accepting equipment, providing an optimum operating mode of the grid Implementation of obligations to applicants under contracts of grid connection, including accumulated and preferential categories of applicants, formation of network infrastructure corresponding to the rates of social and economic development of the region Renovation of fixed assets and decrease in wear of equipment under the investment programs coordinated with administrations of the region Development of an optimum system of electricity metering providing control over the volume of rendered services and decrease in commercial losses of electricity within the program of power efficiency and energy saving Implementation of innovative development measures Achievement of balanced results of the price regulation providing dynamics of decrease in regulatory losses on electricity transmission and creation of own funding sources for the investment program Providing optimum indicators of the Company’s financial stability and MCap increase Cost optimization and achievement of the Company’s KPI Priority tasks of Lenenergo in 2013 1 2 3 4 5 6 7 8 Forecast _RAS_2013 | 5
  • 8. Key Indicators of the Business Plan for 2013 Indicator Unit 2012 2013F Δ in % 2013F/2012 Productive supply mln kWh 30,007 30,230 1% Losses % 10,37% 10.21% - 0.16 p.p. Connected capacity MW 523 621 19% Revenues: RUB mln 36,273 42,669 18% - from transmission RUB mln 28,816 34,271 19% - from grid connections RUB mln 7,282 8,239 13% - from other activities RUB mln 175 159 -9% Prime cost RUB mln 32,830 38,659 18% Gross profit RUB mln 3,443 4,010 16% Profit before tax RUB mln 2,154 1,979 -8% Net profit RUB mln 1,234 801 -35% Fro reference: ROE % 2.08% 1.05% -1.03 p.p. EBITDA* RUB mln 9,925 13,085 32% EBITDA margin % 27.36% 30.67% 3.31 p.p. Net Debt**/EBITDA - 2.25 2.45 - Investment program (disbursement) RUB mln 14,891 18,499 24% ** Net debt is calculated as total borrowings (including debt on interest %) minus cash assets and short-term investments Basic parameters of the draft Business Plan of Lenenergo for 2013 • Productive electricity supply will make 30,230 mln kWh that is above the actual value of 2012 by 224 mln kWh, or 0.7 %. Relative losses will decrease by 0.16 p.p. and total 10.21% • Revenues from electricity transmission will make RUB 34,271 mln (+19% to the fact of 2012) • Revenues from grid connections of applicants will make RUB 8,239 mln (+13% to the fact of 2012). The increase in revenues from rendering grid connection services is associated with performance in 2013 of accumulated obligations on connection of applicants • Prime cost in comparison with 2012 will increase by 18% generally at the expense of growth of depreciation charges, property tax and the expenses on federal factors • In 2013, the Company plans to get Net profit at a rate of RUB 801 mln that is below the actual value of 2012 by 35 %, generally, at the expense of a gain of depreciation charges following the results of revaluation of fixed assets and the property tax according to changes of the legislation, decrease in balance of other income and expenses due to the estimated decrease in incomes from identification of non-contractual power consumption • Economic effect of Program on costs management as a part of the Business plan is planned for 2013 at a rate of RUB 928.8 mln • Disbursement of investment program will make RUB 18,499 mln that exceeds the level of 2012 by 24% • Growth of EBITDA due to the higher growth rate of revenues in relation to growth rates of operational expenses without amortization is forecasted • Ratio of Net Debt/EBITDA is 2.45 and does not exceed the recommended value (3) Forecast _RAS_2013 | 6 * Hereinafter, the indicator is calculated in accordance with the methodology applied in the formation of the Business Plan for 2013: EBITDA = Net profit+ Income Tax + Depreciation + (Interest payable - Interest receivable)
  • 9. -6,573 -7,116 6,494 7,427 1,313 490 2012 2013П от прочей пром. деятельности от услуг по ТП от услуг по передаче э/э Plan on Formation of Financial Result in 2013 +18% +18% +16 % -35% + 32% Formation of sales profit and net profit, RUB mln EBITDA, RUB mln EBITDA margin, % 27% 31% EBITDA 13,085 100% Depreciation of FA and intangible assets 9,274 71% Interest payable 1,832 14% Profit tax 1,179 9% Net profit 801 6% - = 1,234 801- 35% Net profit by types of activity, RUB mln Net Profit 2013F Factors of estimated decrease of net profit in 2013 Following the results of 2013 deterioration of financial result at simultaneous growth of EBITDA due to higher growth rate of revenues in relation to growth rates of operational expenses without amortization is expected 2012 2013П 36,273 32,830 3,443 1,234 42,669 38,659 4,010 801 Выручка от реализации Себестоимость Пприбыль от реализации Чистая прибыль 2012 2013П -16 +5,454 1,234 +957 -2,626 -3,203 -743 - 258 801 Revenues growth from e/e transmission with a deduction of loading losses Revenues growth from GC Growth of own expenses, including depreciation Revenues decrease from other activities Federal factors growth with a deduction of loading losses Growth of negative balance of other incomes and expenses Growth of profit tax Net Profit 2012 9,925 13,085 2012 2013П The reasons of estimated deterioration of financial result: - gain of depreciation charges following the results of FA and property tax revaluation according to the legislation changes; - decrease in balance of other incomes and expenses due to estimated decrease in income of identification of non-contractual power consumption Forecast _RAS_2013 | 7 Sales revenue Prime cost Sales profit Net profit 2013F 2013F 2013F 2013F from other activities from grid connections from electricity transmission
  • 10. 32,344 38,244 400 352 2 012 2013П 28,816 34,271 7,282 8,239 2012 2013П от услуг по передаче э/э от услуг по ТП Plan on Formation of Revenues and Expenses in 2013 36,273 42,669 Revenues by types of activity*, RUB mln +18% Prime cost by types of activity*, RUB mln 32,830 38,65918% * Including other types of activity, revenues and prime cost sums on which make less than 1 % in total amount Forecasted structure of prime cost in 2013, RUB mln Indicator 2012 2013F Δ in % 2013F/2012 Controllable expenses 5,857 6,114 4% Materials 469 519 11% Production work and services 1,218 893 -27% Compensation fund 2,790 3,088 11% Other expenses 1,380 1,614 17% Non-controllable expenses 26,973 32,545 21% Purchased power for compensation of losses 4,754 5,533 16% Services of TGOs 8,029 9,063 13% Services of FGC UES 6,119 6,932 13% Depreciation of fixed assets and intangible assets 6,278 9,274 48% Lease payments 803 123 -85% Other expenses 990 1,620 64% Total expenses 32,830 38,659 18% Reasons of planned growth of key items of expenses in 2013 Depreciation of fixed assets and intangible assets - growth by RUB 2,995 mln due to revaluation of fixed assets for the end of 2012, increases in cost of fixed assets taking into account input volumes under the investment program, increases in average norm of depreciation charges and changes of the fixed assets structure FGC UES services - growth by RUB 813 mln due to the increased tariff for networks maintenance and a tariff for electric power purchase for compensation of losses in the UNEG networks, volume of losses, costs of loaded losses Purchased power for compensation of losses - growth by RUB 779 mln due to increased prices for losses purchase Labor costs and insurance fees - growth by RUB 406 mln due to wages indexation by Consumer Price Index of 5.5%, fillings of vacancies linked with input of new facilities, increases in a salary from 01.10.12 on key professions Services of distribution grid companies - growth by RUB 1,034 mln is caused by adopted tariff-balanced decisions for 2013 and the tariff option for electricity transmission services selected by the Company Forecast _RAS_2013 | 8 2013F 2013F from e/e transmission from grid connections
  • 11. The tariff projection is created on the basis of the tariff models coordinated by regional regulators within acceptance of TBD for 2013, taking into account the following conditions: • Excess of growth rates of transmission tariffs over a forecast of the strategy of economic development for 2013-2017 according to Governmental Decree of 30.06.12 #663 • Increase in the approved investment program across the Leningrad region on expenses for connection of preferential applicants at a rate of RUB 6 bn in 2013-2015 was made according to p.32 and p.87 of the Pricing Bases approved by Governmental Decree of 29.12.11 #1178, for exception of direct influence on increase in level of a gain of electricity transmission tariff at electric power transfer 2012 2013 2014 2015 2016 2017 St.-Petersburg Gain of an average annual tariff in the approved model 3.2% 17.5% 16.0% 14.0% 12.5% 9.7% IP in the transmission tariff in the approved model 4.4 5.0 5.8 6.3 6.9 7.5 Gain of an average annual tariff in the model for BP 3.2% 17.5% 15.4% 15.3% 15.1% 14.7% IP in the transmission tariff in the model for BP 7.2 5.9 11.7 15.7 15.4 13.6 Deviation from IP in the approved model 2.8 0.9 5.9 9.4 8.5 6.1 Leningrad region Gain of an average annual tariff in the approved model 6.0% 1.9% 20.6% 12.9% 10.7% 15.8% IP in the transmission tariff in the approved model 2.5 3.3 4.5 4.7 2.8 3.1 Gain of an average annual tariff in the model for BP 6.0% 1.9% 26.0% 14.2% 14.2% 14.2% IP in the transmission tariff in the model for BP 2.3 4.2 7.9 6.2 7.1 10.1 Deviation from IP in the approved model -0.1 0.9 3.5 1.5 4.4 7.0 RUB bn Forecasted revenues considering the approved tariff-balanced decisions for 2013 2013 TBD BP Deviation St.-Petersburg Revenues, RUB mln 22,852 20,822 -2,030 -9.7% Tariff, kop/kWh 117.4 106.9 -10.5 -9.8% Productive supply, mln kWh 19,463 19,472 9 0.0% Leningrad region Revenues, RUB mln 14,130 14,211 81 0.6% Tariff, kop/kWh 115.3 117.7 2.4 2.0% Productive supply, mln kWh* 12,257 12,078 -179 -1.5% Lenenergo Revenues, RUB mln 36,982 35,033 -1,949 -5.6% Productive supply, mln kWh 31,720 31,550 -170 -0.5% • Across St.-Petersburg the deviation is associated with overestimate of declared capacity at regulation. At application from 01.01.2013 of the mechanism of translation of the type of tariff for end users due to a considerable deviation of NHU of double-rate consumers from the average NHU considered by Committee at calculation of tariff rates, there is a considerable deviation of revenues expected to receiving from regulated ones (about RUB 1.9 bn) • Deviation of the actual structure of consumption by voltage levels from that considered by Committees in the formation of the balance of power and capacity: a smaller share of productive supply at a low voltage level, for which the highest rate for transmission is set and a larger share of consumption at a high voltage level with a minimum rate • Decrease in the estimated productive supply of electric power and capacity relative to that considered by LenRTC and its redistribution on half-year 2013 Long-term tariff models, revenues from transmission in 2013 *Considering the consumers of generative voltage Glossary: IP – Investment program TBD – tariff-balanced decision NHU – number of hours in use Reasons for deviation of planned revenues from those approved by the regulator Forecast _RAS_2013 | 9
  • 12. Indicator Len. region St.-Petersburg Lenenergo Loss on electricity transmission, included by regulators -795 -1,622 -2,416 Deviation of sales revenues from approved values 81 -2,030 -1,949 Decrease in estimated expenses over approved values (controllable, non- controllable, profit tax, expenses from profit) -232 89 -143 • Expenses in the structure of RGR (controllable and non-controllable) -90 -492 -582 • Expenses from profit (interest under loans, social payments, dividends, other expenses) -142 581 439 Depreciation excess over that considered by the regulator -1,661 -987 -2,648 Total forecasted loss on electricity transmission -2,607 -4,550 -7,156 Given the tariff growth limitations in 2013 a loss on electricity transmission is included in the tariff model (to be compensated in subsequent years): RUB mln Own funds for investment and expenses from profit Interest on loans, expenses from profit Smoothing Own funds for investment Depreciation Loss on electricity transmission, included by regulators LR 2,866 SPb 5,658 LR 1,424 SPb 2,181 LR -232 SPb -477 LR 1,210 SPb 3,001 LR 2,005 SPb 4,621 LR -795 SPb -1,622 Due to decrease in estimated revenues relative to the revenues approved by regulators and depreciation excess, an expected loss from electricity transmission exceeds the loss put at regulation: Factors of formation of a loss on electricity transmission in 2013 Forecast _RAS_2013 | 10
  • 13. Funding sources of the long-term investment program 2013 2014 2015 2016 2017 2018 Input of capacity, MVA 881 2,134 3,016 2,735 3,010 1,958 Input of capacity, km 2,488 3,321 2,534 2,505 2,298 2,778 By regions 2013F 2014F 2015F 2016F 2017F 2018F 2013 -2018 Lenenergo 18,499 26,338 28,273 27,400 26,759 27,054 154,323 St.-Petersburg 12,065 17,391 20,710 18,978 16,525 18,241 103,910 Leningrad region 6,435 8,947 7,563 8,422 10,234 8,813 50,414 By types 2013F 2014F 2015F 2016F 2017F 2018F 2013 -2018 Lenenergo 18,499 26,338 28,273 27,400 26,759 27,054 154,323 Re-equipment and repairs 7,914 11,534 14,180 15,501 17,010 19,184 85,323 New construction & expansion 10,522 14,704 14,093 11,899 9,749 7,870 68,836 Other 63 101 0 0 0 0 164 2013F 2014F 2015F 2016F 2017F 2018F Investment program, total 18,499 26,338 28,273 27,400 26,759 27,054 Transmission tariff 9,462 20,265 21,872 22,564 23,756 24,502 Depreciation 0 6,660 10,101 8,984 9,539 10,745 Credits and loans, including credits, attracted under additional issue 9,462 13,606 11,771 13,580 14,217 13,756 Additional issue of shares 1,725 562 0 0 0 0 Fee for grid connection 7,313 5,511 6,401 4,836 3,003 2,552 Settlements with property 644 1,355 1,888 0 0 0 Lost income 10 0 0 0 0 0 Advances on grid connection 6,659 4,156 4,513 4,836 3,003 2,552 RUB mln, w/o VAT RUB mln, w/o VAT 9,462 20,265 21,872 22,564 23,756 24,5027,313 5,511 6,401 4,836 3,003 2,552 1,725 562 2013П 2014П 2015П 2016П 2017П 2018П Дополнительная эмиссия акций Плата за технологическое присоединение Тариф на передачу 18,499 26,338 28,273 27,400 26,759 27,054 18,499 26,338 28,273 27,400 26,759 27,054 7,914 11,534 14,180 15,501 17,010 19,184 10,522 14,704 14,093 11,899 9,749 7,870 63 101 2013П 2014П 2015П 2016П 2017П 2018П ТПиР Новое строительство и расширение Прочее Parameters of the long-term investment program Input of capacity RUB mln, w/o VAT Draft Investment program for 2013-2018 is approved by the Commission on investments of JSC Rosseti and is sent to Ministry of the Power Industry of Russia for its approval. At present, draft Investment program for 2013-2018 is on coordination in executive bodies of St. Petersburg and the Leningrad region Long-term investment program of Lenenergo for 2013-2018 2013F 2014F 2015F 2016F 2017F 2018F 2013F 2014F 2015F 2016F 2017F 2018F Re- equipment and repairs New construction & expansion Other Additional issue of shares Fee for grid connections Transmission tariff Forecast _RAS_2013 | 11
  • 14. 9% 9% 7% 1% 12% 13%14% 35% Облигации (Серия 04) Облигации (Серия БО-01) Банк ВТБ Связь-Банк Сбербанк России АБ Россия Внешэкономбанк Новые кредиты и займы 14,336 10,866 3,000 22,202 13,309 5,604 7,505 11,408 Кредитный портфель на 01.01.13 Привлечение Погашение Кредитный портфель на 31.12.13 Операционные кредиты Инвестиционные кредиты Plan on formation of a credit portfolio and debt position at the end of 2013 Debt position, RUB mln Borrowings flow in 2013, RUB mln * Net debt is calculated as the sum of credits and loans (including the debt on accrued but not paid interest) minus cash assets and short-term financial investments ** The indicator is calculated in accordance with the methodology applied in the formation of the Business Plan for 2013: EBITDA = Net profit+ Income Tax + Depreciation + (Interest payable - Interest receivable) 31.12.2012 31.12.2013 F Δ in % 31.12.2013 F/ 31.12.2012 Net debt at the end of the period** 22,360 32,074 43% Net debt/EBITDA** 2.25 2.45 - -+ Parameters of Series 04 bonded loan RU000A0JS785 Volume RUB 3 bn Rate, % 8.5 % Date of placement 24.04.2012 Maturity date 1,820th day Term of the offer 3 years Circulation period 5 years Agency Rating Assigned Moody’s Ba2 (outlook – stable) Nov. 2009 Moody’s Interfax Rating Agency (rating on the national scale) Aa2.ru (outlook - stable) Nov. 2009 Credit rating Confirmed in January 2013 Estimated structure of credit portfolio for the end of 2013 Average rate 10.6% Net Debt/EBITDA, RUB mln, % 27,645 16,470 10,505 33,610 Parameters of BO-01 bonded loan RU000A0JTVA1 Volume RUB 3 bn Rate, % 8.25% Date of placement 17.04.2013 Maturity date 1,092nd day Term of the offer w/o Circulation period 3 years Planned ratio Debt/EBITDA for the end of 2013 is 2.58 and does not exceed the recommended value (3) Forecast _RAS_2013 | 12 11,564 14,405 20,197 22,360 32,074 1.42 1.40 2.36 2.25 2.45 2009 2010 2011 2012 2013П Net Debt Net Debt/EBITDA Credit portfolio as of 01.01.2013 Credit portfolio as of 31.12.2013 Attraction Maturity Operational credits Investment credits Bonds (Series 04) Bonds (Series BO-01) VTB Bank Svyaz-Bank Sberbank of Russia AB Russia Vnesheconombank New credits & loans 2013F
  • 15. Transition to RAB provides receiving by the Company of net profit from activities on electric power transmission since 2015, therefore the source for repayment of earlier involved investment credits is formed, and since 2017 – the profit goes on financing of investment activity. As a whole, growth of net profit positively influences an indicator of profitability of equity capital, in this connection the indicator growth - in 5 times in 2017 concerning 2012 is provided. Indicator 2012 Fact 2013 Plan 2014F 2015F 2016F 2017F 2017/2012, times Revenues 36,273 42,669 50,632 62,674 66,026 74,297 2.0 Net profit (loss) 1,234 801 4,819 10,325 8,921 10,735 8.7 Net profit (loss) from electricity transmission on networks -6,573 -7,116 -1,714 362 3,112 6,235 - EBITDA 9,925 13,085 20,143 29,710 30,578 35,996 3.6 Debt 27,789 33,809 47,901 58,742 66,968 72,068 2.6 Net debt 22,360 32,074 47,183 58,240 66,510 71,582 3.2 Debt/EBITDA 2.80 2.58 2.38 1.98 2.19 2.00 0.7 ROE,% 2.08% 1.05% 5.91% 11.96% 9.28% 10.32% 5.0 Leverage,% 26.7% 29.3% 35.7% 37.9% 39.2% 38.8% 1.5 Dynamics of Lenenergo key financials under the Business Plan in 2013-2017 36,273 42,669 50,632 62,674 66,026 74,297 2012 2013П 2014П 2015П 2016П 2017П 1,234 801 4,819 10,325 8,921 10,735 2012 2013П 2014П 2015П 2016П 2017П Revenues forecast, RUB mln RUB mln EBITDA and EBITDA margin forecast, RUB mln, % Net profit forecast, RUB mln Total revenues of the Company in 2013-2017 will amount to RUB 296,299 mln, including: - from electricity transmission services – RUB 252,860 mln - from grid connection services – RUB 42,586 mln - from other activities – RUB 853 mln Forecast _RAS_2013 | 13 9,925 13,085 20,143 29,710 30,578 35,996 27% 31% 40% 47% 46% 48% -10% 0% 10% 20% 30% 40% 50% 60% 70% 0 5 000 10 000 15 000 20 000 25 000 30 000 35 000 40 000 2012 2013П 2014П 2015П 2016П 2017П2013F 2014F 2015F 2016F 2017F2012 2013F 2014F 2015F 2016F 2017F2012 2013F 2014F 2015F 2016F 2017F2012
  • 16. JSC Lenenergo 196247, Russia, Saint-Petersburg, Constitution Sq., 1 Head of Department for Corporate Governance and Shareholders Relationship Andrey Smolnikov Tel./ fax +7 (812) 595 31 76 Smolnikov.AS@nwenergo.com Investor Relations Ulyana Davydova Tel. +7 (812) 494 39 06 Fax +7 (812) 494 37 34 ir@lenenergo.ru Davydova.UE@nwenergo.com www.lenenergo.ru CONTACTS