SlideShare uma empresa Scribd logo
1 de 15
Baixar para ler offline
Legend Power Systems Inc.
2013 AGM
April 11, 2013
Forward Looking Statement
This presentation contains projections and forward-looking information that
involve various risks and uncertainties regarding future events. Such
forward-looking information can include without limitation statements
based on current expectations involving a number of risks and uncertainties
and are not guarantees of future performance of Legend Power Systems Inc.
(“the Company”). These risks and uncertainties could cause actual results
and future events to differ materially from those anticipated in such
information. These and all subsequent written and oral forward-looking
statements are based on estimates and opinions of management on the
dates they are made and expressly qualified in their entirety by this notice.
The Company assumes no obligation to update forward-looking information
should circumstances or management’s estimates or opinions change.
Strategy Review
• Implement / prove new sales strategy
• Leverage Ontario strategy/results and
resources for new territory start up
– Testimonials / results
– Establish “anchor tenant” accounts and “pull” in
distribution channel
• Utilize region specific talent to grow territory
• Work out of distributors locations
– Provide expertise at low overheads
Fiscal 2011/12
Goal - Prove our sales model works
– Started last fiscal with new sales process / team
– Focus on Ontario retail and commercial office
markets
– Experienced success with constant “tweaking”
– Secured “brand” account commitments
• 100 plus location potential
• “Try and buy” philosophy – “Prove it”
– Long gap between commitment and install (why?)
Q1 2011/2012
• $440,650 revenue Q1 recorded
• 8 units at 7 locations + 4 harmonizers SA
• Secured bookings of $700K for Q2
• Continued to secure “brand” accounts
• Significant product / install failure (late
November)
• AVR - evaluation – testing
• Hold on “commissioning” but installs continued
• AVR failure #2 Dec 30th (unrelated issues)
• $500K raise was minimum – little “wiggle” room
Q2 2012/13
• January 4th – AVR problem in customer's building
• Test / Fix / Test / Fix .....
– AVR testing – Westfair
– Rental of large load bank
• Continued to install transformer and housing
– Shutdown up to 8 hours
– Booked additional date for “commissioning”
– Rev rec. and invoicing delayed until commissioning
– Cash flow dramatically affected
• Customer “experience” well managed
• Cash tight - $600k raise
Impact
• Unexpected happened
• Have orders but not cash
• Cash flow 5 months behind plan
• Lost some credibility
Q3 Thoughts
• Large back log of orders
– Haven’t lost one order / customer
• Booking new install / commissioning dates
• Managing cash flow – cost containment
• Booking new commitments
Product
• New transformer
– New platform / the future
– Enhancements
• Product challenges
– Limited testing capabilities
• Where are we now?
• Future
Building Blocks
Product
• Current product focused on Canadian Market
• Need platform that is easily adaptable to
additional segments & international markets
– Appropriately size and feature set for all markets
– New transformer partner can adapt platform
• Distributor “ready” product – multi markets
Building Blocks
• Continue to develop Ontario market
– Highest energy rates in Canada
– Strong government rebates
– Concentrated population & business hub
• Demand for product has never been higher.
– Customer needs: save energy, money and lower GHG emissions all with 3 year ROI
– As credibility increases, so does demand.
• Target Building Profile: Commercial Buildings between 50,000 to 200,000 square
feet
– A: Property Management (office towers) and Retail
– B: Schools & Mixed use facilities (public buildings)
• Growth: Focus on markets with high electricity cost
– Top 3 regional US markets = $1.5B+ Opportunity
• New York
• New Jersey
• New England
Markets
…Building Blocks
• Replicate the Ontario Sales model to expand in to new markets.
• Proven low cost growth model
• Leverage existing international accounts as case studies as a potential entry
point
• Leverage partners that already have “brand / trust” in our
geo/target markets
• Electrical Contractors
• Engineering Firms
• Power Utilities
• Geo specific “targeted” communications
– Product Success/Testimonials to build credibility in new markets
• Case Studies
• Product Champion
Markets
Fiscal 2012/13 View
• Lost 5 months with product challenges
• Game back on
• Lots of interest and commitments (Demand)
• Product must work as planned
• Product performance = credibility = GROWTH
• Begin geographical and product expansion
Strategic Direction
To be the world’s leading provider of electrical
energy consumption reduction technologies
• Concentrate/focus on proving out business
strategy in Ontario
– Build out sales to $10M annually
• Expand to eastern US (10/10 Plan)
• Complete & implement ROW (distributors)
• Communicate results – enhance value
Questions?

Mais conteúdo relacionado

Mais procurados

Denise_harper__resume 2015
Denise_harper__resume 2015Denise_harper__resume 2015
Denise_harper__resume 2015
Denise Harper
 
RAM_FINORACLE_Resume
RAM_FINORACLE_ResumeRAM_FINORACLE_Resume
RAM_FINORACLE_Resume
ramesh A
 
Erin Morin resume6.docx
Erin Morin resume6.docxErin Morin resume6.docx
Erin Morin resume6.docx
Erin Morin
 
Gayle Spurlock_Resume_041416 copy
Gayle Spurlock_Resume_041416 copyGayle Spurlock_Resume_041416 copy
Gayle Spurlock_Resume_041416 copy
Gayle Spurlock
 
Resume - nitin Solanki 1
Resume - nitin Solanki 1Resume - nitin Solanki 1
Resume - nitin Solanki 1
Nitin solanki
 
Regan B. Mitchell Resume 2016
Regan B. Mitchell Resume 2016Regan B. Mitchell Resume 2016
Regan B. Mitchell Resume 2016
Regan Mitchell
 
Comprehensive Professional Experience
Comprehensive Professional ExperienceComprehensive Professional Experience
Comprehensive Professional Experience
John Walter
 
Dan Internship Presentation (1)
Dan Internship Presentation (1)Dan Internship Presentation (1)
Dan Internship Presentation (1)
Dan Meislin
 
Erica's Resume
Erica's ResumeErica's Resume
Erica's Resume
Erica Crum
 

Mais procurados (20)

Denise_harper__resume 2015
Denise_harper__resume 2015Denise_harper__resume 2015
Denise_harper__resume 2015
 
THOMAS P COOPER
THOMAS P COOPERTHOMAS P COOPER
THOMAS P COOPER
 
RAM_FINORACLE_Resume
RAM_FINORACLE_ResumeRAM_FINORACLE_Resume
RAM_FINORACLE_Resume
 
Nicole_Pabst
Nicole_PabstNicole_Pabst
Nicole_Pabst
 
Robert Sanders
Robert SandersRobert Sanders
Robert Sanders
 
Resume 02-May-2016
Resume 02-May-2016Resume 02-May-2016
Resume 02-May-2016
 
Erin Morin resume6.docx
Erin Morin resume6.docxErin Morin resume6.docx
Erin Morin resume6.docx
 
Gayle Spurlock_Resume_041416 copy
Gayle Spurlock_Resume_041416 copyGayle Spurlock_Resume_041416 copy
Gayle Spurlock_Resume_041416 copy
 
Resume_16
Resume_16Resume_16
Resume_16
 
saakes natalie 2
saakes natalie 2saakes natalie 2
saakes natalie 2
 
Resume - nitin Solanki 1
Resume - nitin Solanki 1Resume - nitin Solanki 1
Resume - nitin Solanki 1
 
Regan B. Mitchell Resume 2016
Regan B. Mitchell Resume 2016Regan B. Mitchell Resume 2016
Regan B. Mitchell Resume 2016
 
Finit - All Things Chart of Accounts
Finit  - All Things Chart of AccountsFinit  - All Things Chart of Accounts
Finit - All Things Chart of Accounts
 
Financial Statements and Reporting
Financial Statements and ReportingFinancial Statements and Reporting
Financial Statements and Reporting
 
Comprehensive Professional Experience
Comprehensive Professional ExperienceComprehensive Professional Experience
Comprehensive Professional Experience
 
MPP Resume
MPP Resume MPP Resume
MPP Resume
 
revised 5-27-2014 resume
revised 5-27-2014 resumerevised 5-27-2014 resume
revised 5-27-2014 resume
 
Dan Internship Presentation (1)
Dan Internship Presentation (1)Dan Internship Presentation (1)
Dan Internship Presentation (1)
 
Cv surjeet.docx
Cv surjeet.docxCv surjeet.docx
Cv surjeet.docx
 
Erica's Resume
Erica's ResumeErica's Resume
Erica's Resume
 

Destaque

Destaque (9)

Sostenibilità nella comunicazione
Sostenibilità nella comunicazioneSostenibilità nella comunicazione
Sostenibilità nella comunicazione
 
Agm presentation 2012
Agm presentation 2012Agm presentation 2012
Agm presentation 2012
 
Usare Mindomo
Usare MindomoUsare Mindomo
Usare Mindomo
 
Tech Talk Comp Apps851 20090930
Tech Talk Comp Apps851 20090930Tech Talk Comp Apps851 20090930
Tech Talk Comp Apps851 20090930
 
Bedrijfspresentatie NIOPS, interim HR/P&O services
Bedrijfspresentatie NIOPS, interim HR/P&O servicesBedrijfspresentatie NIOPS, interim HR/P&O services
Bedrijfspresentatie NIOPS, interim HR/P&O services
 
Ohio
OhioOhio
Ohio
 
Case Study: IKEA Richmond Reduces Power Costs by 5%
Case Study: IKEA Richmond Reduces Power Costs by 5%Case Study: IKEA Richmond Reduces Power Costs by 5%
Case Study: IKEA Richmond Reduces Power Costs by 5%
 
John DiFruscio III's Portfolio
John DiFruscio III's PortfolioJohn DiFruscio III's Portfolio
John DiFruscio III's Portfolio
 
Product Client Presentation
Product Client PresentationProduct Client Presentation
Product Client Presentation
 

Semelhante a Legend 2013 agm april 11

Mel Capili CV 2015
Mel Capili CV 2015Mel Capili CV 2015
Mel Capili CV 2015
Mel Capili
 
Judy Joseph resume
Judy Joseph resumeJudy Joseph resume
Judy Joseph resume
Judy Joseph
 
Deepak Mahle -SAP IS U Billing & Invoicing
Deepak Mahle -SAP IS U Billing & InvoicingDeepak Mahle -SAP IS U Billing & Invoicing
Deepak Mahle -SAP IS U Billing & Invoicing
Deepak Mahle
 
JULIANA_BACCHUS_RESUME 2015
JULIANA_BACCHUS_RESUME 2015JULIANA_BACCHUS_RESUME 2015
JULIANA_BACCHUS_RESUME 2015
Juliana Bacchus
 
Schul Doc 8_10_15
Schul Doc 8_10_15Schul Doc 8_10_15
Schul Doc 8_10_15
Rich Schul
 
Schul Doc 8_10_15
Schul Doc 8_10_15Schul Doc 8_10_15
Schul Doc 8_10_15
Rich Schul
 
Energy Storage Solutions for an Intelligent Future, Garth Bryans, Aquamarine ...
Energy Storage Solutions for an Intelligent Future, Garth Bryans, Aquamarine ...Energy Storage Solutions for an Intelligent Future, Garth Bryans, Aquamarine ...
Energy Storage Solutions for an Intelligent Future, Garth Bryans, Aquamarine ...
Invest Northern Ireland
 

Semelhante a Legend 2013 agm april 11 (20)

vaidehi
vaidehivaidehi
vaidehi
 
Lowe's after C&C investor power point
Lowe's after C&C investor power pointLowe's after C&C investor power point
Lowe's after C&C investor power point
 
Resume
ResumeResume
Resume
 
Mel Capili CV 2015
Mel Capili CV 2015Mel Capili CV 2015
Mel Capili CV 2015
 
Judy Joseph resume
Judy Joseph resumeJudy Joseph resume
Judy Joseph resume
 
Lowe's before C&C investor power point
Lowe's before C&C investor power pointLowe's before C&C investor power point
Lowe's before C&C investor power point
 
Deepak Mahle -SAP IS U Billing & Invoicing
Deepak Mahle -SAP IS U Billing & InvoicingDeepak Mahle -SAP IS U Billing & Invoicing
Deepak Mahle -SAP IS U Billing & Invoicing
 
JULIANA_BACCHUS_RESUME 2015
JULIANA_BACCHUS_RESUME 2015JULIANA_BACCHUS_RESUME 2015
JULIANA_BACCHUS_RESUME 2015
 
Schul Doc 8_10_15
Schul Doc 8_10_15Schul Doc 8_10_15
Schul Doc 8_10_15
 
Schul Doc 8_10_15
Schul Doc 8_10_15Schul Doc 8_10_15
Schul Doc 8_10_15
 
How to Win an Investment Approval from your Board
How to Win an Investment Approval from your BoardHow to Win an Investment Approval from your Board
How to Win an Investment Approval from your Board
 
Eliminate Bottlenecks in Software Development & Delivery
Eliminate Bottlenecks in Software Development & DeliveryEliminate Bottlenecks in Software Development & Delivery
Eliminate Bottlenecks in Software Development & Delivery
 
SAP Curriculum Vitae Judell Reddy_3
SAP Curriculum Vitae Judell Reddy_3SAP Curriculum Vitae Judell Reddy_3
SAP Curriculum Vitae Judell Reddy_3
 
Eleinko Resume 2016
Eleinko Resume 2016Eleinko Resume 2016
Eleinko Resume 2016
 
Supply Chain Strategy Assessment
Supply Chain Strategy AssessmentSupply Chain Strategy Assessment
Supply Chain Strategy Assessment
 
Ryan Fong Resume
Ryan Fong ResumeRyan Fong Resume
Ryan Fong Resume
 
Sean Nicholls C V
Sean Nicholls C VSean Nicholls C V
Sean Nicholls C V
 
Energy Storage Solutions for an Intelligent Future, Garth Bryans, Aquamarine ...
Energy Storage Solutions for an Intelligent Future, Garth Bryans, Aquamarine ...Energy Storage Solutions for an Intelligent Future, Garth Bryans, Aquamarine ...
Energy Storage Solutions for an Intelligent Future, Garth Bryans, Aquamarine ...
 
The Bottom Line on Agility: Bringing FP&A and Accounting Together to Drive Tr...
The Bottom Line on Agility: Bringing FP&A and Accounting Together to Drive Tr...The Bottom Line on Agility: Bringing FP&A and Accounting Together to Drive Tr...
The Bottom Line on Agility: Bringing FP&A and Accounting Together to Drive Tr...
 
FASB/IASB for JD Edwards
FASB/IASB for JD EdwardsFASB/IASB for JD Edwards
FASB/IASB for JD Edwards
 

Legend 2013 agm april 11

  • 1. Legend Power Systems Inc. 2013 AGM April 11, 2013
  • 2. Forward Looking Statement This presentation contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance of Legend Power Systems Inc. (“the Company”). These risks and uncertainties could cause actual results and future events to differ materially from those anticipated in such information. These and all subsequent written and oral forward-looking statements are based on estimates and opinions of management on the dates they are made and expressly qualified in their entirety by this notice. The Company assumes no obligation to update forward-looking information should circumstances or management’s estimates or opinions change.
  • 3. Strategy Review • Implement / prove new sales strategy • Leverage Ontario strategy/results and resources for new territory start up – Testimonials / results – Establish “anchor tenant” accounts and “pull” in distribution channel • Utilize region specific talent to grow territory • Work out of distributors locations – Provide expertise at low overheads
  • 4. Fiscal 2011/12 Goal - Prove our sales model works – Started last fiscal with new sales process / team – Focus on Ontario retail and commercial office markets – Experienced success with constant “tweaking” – Secured “brand” account commitments • 100 plus location potential • “Try and buy” philosophy – “Prove it” – Long gap between commitment and install (why?)
  • 5. Q1 2011/2012 • $440,650 revenue Q1 recorded • 8 units at 7 locations + 4 harmonizers SA • Secured bookings of $700K for Q2 • Continued to secure “brand” accounts • Significant product / install failure (late November) • AVR - evaluation – testing • Hold on “commissioning” but installs continued • AVR failure #2 Dec 30th (unrelated issues) • $500K raise was minimum – little “wiggle” room
  • 6. Q2 2012/13 • January 4th – AVR problem in customer's building • Test / Fix / Test / Fix ..... – AVR testing – Westfair – Rental of large load bank • Continued to install transformer and housing – Shutdown up to 8 hours – Booked additional date for “commissioning” – Rev rec. and invoicing delayed until commissioning – Cash flow dramatically affected • Customer “experience” well managed • Cash tight - $600k raise
  • 7. Impact • Unexpected happened • Have orders but not cash • Cash flow 5 months behind plan • Lost some credibility
  • 8. Q3 Thoughts • Large back log of orders – Haven’t lost one order / customer • Booking new install / commissioning dates • Managing cash flow – cost containment • Booking new commitments
  • 9. Product • New transformer – New platform / the future – Enhancements • Product challenges – Limited testing capabilities • Where are we now? • Future
  • 10. Building Blocks Product • Current product focused on Canadian Market • Need platform that is easily adaptable to additional segments & international markets – Appropriately size and feature set for all markets – New transformer partner can adapt platform • Distributor “ready” product – multi markets
  • 11. Building Blocks • Continue to develop Ontario market – Highest energy rates in Canada – Strong government rebates – Concentrated population & business hub • Demand for product has never been higher. – Customer needs: save energy, money and lower GHG emissions all with 3 year ROI – As credibility increases, so does demand. • Target Building Profile: Commercial Buildings between 50,000 to 200,000 square feet – A: Property Management (office towers) and Retail – B: Schools & Mixed use facilities (public buildings) • Growth: Focus on markets with high electricity cost – Top 3 regional US markets = $1.5B+ Opportunity • New York • New Jersey • New England Markets
  • 12. …Building Blocks • Replicate the Ontario Sales model to expand in to new markets. • Proven low cost growth model • Leverage existing international accounts as case studies as a potential entry point • Leverage partners that already have “brand / trust” in our geo/target markets • Electrical Contractors • Engineering Firms • Power Utilities • Geo specific “targeted” communications – Product Success/Testimonials to build credibility in new markets • Case Studies • Product Champion Markets
  • 13. Fiscal 2012/13 View • Lost 5 months with product challenges • Game back on • Lots of interest and commitments (Demand) • Product must work as planned • Product performance = credibility = GROWTH • Begin geographical and product expansion
  • 14. Strategic Direction To be the world’s leading provider of electrical energy consumption reduction technologies • Concentrate/focus on proving out business strategy in Ontario – Build out sales to $10M annually • Expand to eastern US (10/10 Plan) • Complete & implement ROW (distributors) • Communicate results – enhance value