SlideShare uma empresa Scribd logo
1 de 17
Compass surveying
Prismatic compass
Compass traversing:
         Important Definition
   True meridian: Line or plane passing         North
    through geographical north pole and          pole
    geographical south pole
                                                         True meridian
                                                          True bearing
   Magnetic meridian: When the magnetic                  Magnetic bearing
    needle is suspended freely and balanced
    properly, unaffected by magnetic
    substances, it indicates a direction. This            Magnetic meridian
    direction is known as magnetic meridian.
    The angle between the magnetic meridian
    and a line is known as magnetic bearing or
    simple bearing of the line.
   Arbitrary meridian: Convenient direction is assumed as a meridian.

   Grid meridian: Sometimes for preparing a map some state agencies
    assume several lines parallel to the true meridian for a particular
    zone these lines are termed as grid meridian.

   Designation of magnetic bearing
      Whole circle bearing (WCB)
      Quadrantal bearing (QB)

   WCB: The magnetic bearing of a line measured clockwise from the North
    Pole towards the line is known as WCB. Varies 0-360°
   Quadrantal Bearing: The magnetic bearing of a line measured
    clockwise or anticlockwise from NP or SP (whichever is nearer to the
    line) towards the east or west is known as QB. This system consists of 4-
    quadrants NE, SE, NW, SW. The values lie between 0-90°
        QB of OA = N a E
   Reduced Bearing: When the whole circle bearing of a line is
    converted to quadrantal bearing it is termed as reduced bearing.
   Fore and Back Bearing:




        In WCB the difference between FB and BB should be exactly 180°
        BB=FB+/-180°
        Use the +ve sign when FB<180°
        Use the –ve sign when FB> 180°
   Magnetic declination: The horizontal angle between the magnetic meridian and true
    meridian is known as magnetic declination.

   Dip of the magnetic needle: If the needle is perfectly balanced before magnetisation,
    it does not remain in the balanced position after it is magnetised. This is due to the
    magnetic influence of the earth. The needle is found to be inclined towards the pole. This
    inclination of the needle with the horizontal is known as dip of the magnetic
    needle.

   Local Attraction
   Method of correction for traverse:
      First method: Sum of the interior angle should be equal to (2n-4) x 90. if not than
       distribute the total error equally to all interior angles of the traverse. Then starting
       from unaffected line the bearings of all the lines are corrected using corrected interior
       angles.

        Second method: Unaffected line is first detected. Then, commencing from the
         unaffected line, the bearing of other affected lines are corrected by finding the
         amount of correction at each station.
Methods of traversing

    Chain traversing:

                                  15 m




                                  15 m

    Compass traversing: Fore bearings and back bearings between the traverse
     leg are measured
    Theodolite traversing: Horizontal angles between the traverse legs are
     measured. The length of the traverse legs are measured by chain/tape or by
     stadia method
    Plane table traversing: Plane table is set at every traverse station in
     clockwise and anticlockwise direction and the circuit is finally closed. During
     traversing the sides of the traverse are plotted according to any suitable scale.
Checks on traverse: Closed traverse
   Check on closed traverse:
      Sum of the measured interior angles (2n-4) x 90°
      Sum of the measured exterior angles (2n+4) x 90 °
      The algebric sum of the deflection angles should be equal to 360°.
       Right hand deflection is considered +ve, left hand deflection –ve

   Check on linear measurement
      The lines should be measured once each on two different days
       (along opposite directions). Both measurement should tally.
      Linear measurement should also be taken by the stadia method.
       The measurement by chaining and stadia method should tally.
Checks on traverse: Open traverse
   Taking cut-off lines: measured the
    bearings and lengths of cut off
    lines after plotting and tally with
    actual values.




   Taking an auxiliary point: Take P
    permanent point as auxiliary point
    measured bearings and lengths of
    P from each traverse point. If
    survey is accurate, while plotting
    all the measured bearing of P
    should meet at P.
Problems:
   Convert the following WCBs to QBs
      (a) WCB of AB = 45°30’
         (Ans 45°30’)
        (b) WCB of BC = 125°45’
         (Ans 180- 125°45’ = 54° 15’)

   Fore bearing of the following lines are given. Find back bearing
      AB=S 30°30’ E
      BC=N 40°30’ W
   The magnetic bearing of a line AB is 135°30’ what will be the true
    bearing, if the declination is 5°15’ W.
Problems
Contd…
Problems



           Included angle at A= 280-180-40=60
           =FB of DA-180-FB of AB
           Included angle at B= 40+180-70= 150
           =FB of AB+180-FB of BC
           Included angle at C= 70+180-210
           =FB of BC+180-FB of CD


           Formula: FB of previous line+/-180-
           FB of next line
Compass surveying

Mais conteúdo relacionado

Mais procurados

Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2Muhammad Zubair
 
Compass Surveying.ppt
Compass Surveying.pptCompass Surveying.ppt
Compass Surveying.pptWaseemUllah71
 
Minor instruments in surveying
Minor instruments in surveyingMinor instruments in surveying
Minor instruments in surveyingShikhar Malhotra
 
Compass survey part 2
Compass survey part 2Compass survey part 2
Compass survey part 2ArunRavi43
 
Ce6304 surveying 1 contour (iv unit) lecture ppt notes
Ce6304 surveying 1   contour (iv unit) lecture ppt notesCe6304 surveying 1   contour (iv unit) lecture ppt notes
Ce6304 surveying 1 contour (iv unit) lecture ppt notesnandishsajjan
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingDolat Ram
 
Two points problem of plane table
Two points problem of plane table Two points problem of plane table
Two points problem of plane table ecat031
 
Trigonometric leveling 02
Trigonometric leveling  02Trigonometric leveling  02
Trigonometric leveling 02Rajesh Rajguru
 
Theodolite angle measurement
Theodolite angle measurementTheodolite angle measurement
Theodolite angle measurementMujeeb Muji
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in SurveyLord1911
 
Chain surveying
Chain surveyingChain surveying
Chain surveyingJNTUK
 
Surveying - Module II - compass surveying
Surveying - Module  II - compass surveyingSurveying - Module  II - compass surveying
Surveying - Module II - compass surveyingSHAMJITH KM
 
3.2 Sounding methods.pptx
3.2 Sounding methods.pptx3.2 Sounding methods.pptx
3.2 Sounding methods.pptxYogeshwaranV4
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying neharajpl
 
traversing of survey
traversing of surveytraversing of survey
traversing of surveySelf-employed
 
Chain surveying and offset
Chain surveying and offsetChain surveying and offset
Chain surveying and offsetMir Zafarullah
 

Mais procurados (20)

Triangulation
Triangulation Triangulation
Triangulation
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2
 
BEARING AND ITS TYPES
BEARING AND ITS TYPESBEARING AND ITS TYPES
BEARING AND ITS TYPES
 
Compass Surveying.ppt
Compass Surveying.pptCompass Surveying.ppt
Compass Surveying.ppt
 
Minor instruments in surveying
Minor instruments in surveyingMinor instruments in surveying
Minor instruments in surveying
 
Compass survey part 2
Compass survey part 2Compass survey part 2
Compass survey part 2
 
Ce6304 surveying 1 contour (iv unit) lecture ppt notes
Ce6304 surveying 1   contour (iv unit) lecture ppt notesCe6304 surveying 1   contour (iv unit) lecture ppt notes
Ce6304 surveying 1 contour (iv unit) lecture ppt notes
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversing
 
Two points problem of plane table
Two points problem of plane table Two points problem of plane table
Two points problem of plane table
 
Trigonometric leveling 02
Trigonometric leveling  02Trigonometric leveling  02
Trigonometric leveling 02
 
Theodolite angle measurement
Theodolite angle measurementTheodolite angle measurement
Theodolite angle measurement
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in Survey
 
Chain surveying
Chain surveyingChain surveying
Chain surveying
 
Surveying - Module II - compass surveying
Surveying - Module  II - compass surveyingSurveying - Module  II - compass surveying
Surveying - Module II - compass surveying
 
Theodolite Surveying
Theodolite Surveying Theodolite Surveying
Theodolite Surveying
 
3.2 Sounding methods.pptx
3.2 Sounding methods.pptx3.2 Sounding methods.pptx
3.2 Sounding methods.pptx
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
 
traversing of survey
traversing of surveytraversing of survey
traversing of survey
 
Chain surveying and offset
Chain surveying and offsetChain surveying and offset
Chain surveying and offset
 

Semelhante a Compass surveying

Compass surveying
Compass surveyingCompass surveying
Compass surveyingUMT,Lahore
 
Compass surveying (1).ppt
Compass surveying (1).pptCompass surveying (1).ppt
Compass surveying (1).pptSrini Vasan
 
Compasssurveying 160050106053
Compasssurveying 160050106053Compasssurveying 160050106053
Compasssurveying 160050106053Sumit Nayani
 
Compass surveying
Compass surveyingCompass surveying
Compass surveyingAhmed Eid
 
Traverse Computations
Traverse ComputationsTraverse Computations
Traverse ComputationsBahzad5
 
Compass surveying
Compass surveyingCompass surveying
Compass surveyingRAHUL SINHA
 
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptx
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptxUnit3AngularMeasurementpptx__2022_01_08_11_22_11.pptx
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptxOKOKILOUISmefgi
 
COMPASS AND PLANE TABLE SURVEYING
COMPASS AND PLANE TABLE SURVEYINGCOMPASS AND PLANE TABLE SURVEYING
COMPASS AND PLANE TABLE SURVEYINGLavanya Singh
 
Prismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabus
Prismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabusPrismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabus
Prismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabusWarish Khan
 
traversing survey principles.docx
traversing survey principles.docxtraversing survey principles.docx
traversing survey principles.docxalexandermwaura
 
Chapter No. 04 - Angles and Directions.pptx
Chapter No. 04 - Angles and Directions.pptxChapter No. 04 - Angles and Directions.pptx
Chapter No. 04 - Angles and Directions.pptxSaadtariq82
 
COMPASS SURVEYING btech civil ...-I.pptx
COMPASS SURVEYING btech civil ...-I.pptxCOMPASS SURVEYING btech civil ...-I.pptx
COMPASS SURVEYING btech civil ...-I.pptxAyushsharma131736
 
Angular measurement
Angular measurementAngular measurement
Angular measurementKarnav Rana
 

Semelhante a Compass surveying (20)

Compass surveying.ppt
Compass surveying.pptCompass surveying.ppt
Compass surveying.ppt
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Compass surveying (1).ppt
Compass surveying (1).pptCompass surveying (1).ppt
Compass surveying (1).ppt
 
Compass Survaying
Compass SurvayingCompass Survaying
Compass Survaying
 
Compasssurveying 160050106053
Compasssurveying 160050106053Compasssurveying 160050106053
Compasssurveying 160050106053
 
Traverse surveiying
Traverse surveiyingTraverse surveiying
Traverse surveiying
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Traverse Computations
Traverse ComputationsTraverse Computations
Traverse Computations
 
3.compass surveying
3.compass surveying3.compass surveying
3.compass surveying
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptx
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptxUnit3AngularMeasurementpptx__2022_01_08_11_22_11.pptx
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptx
 
COMPASS AND PLANE TABLE SURVEYING
COMPASS AND PLANE TABLE SURVEYINGCOMPASS AND PLANE TABLE SURVEYING
COMPASS AND PLANE TABLE SURVEYING
 
Prismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabus
Prismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabusPrismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabus
Prismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabus
 
Variations in Magnetic Declination
Variations in Magnetic DeclinationVariations in Magnetic Declination
Variations in Magnetic Declination
 
traversing survey principles.docx
traversing survey principles.docxtraversing survey principles.docx
traversing survey principles.docx
 
Chapter No. 04 - Angles and Directions.pptx
Chapter No. 04 - Angles and Directions.pptxChapter No. 04 - Angles and Directions.pptx
Chapter No. 04 - Angles and Directions.pptx
 
Angular measurement for surveying
Angular measurement for surveyingAngular measurement for surveying
Angular measurement for surveying
 
COMPASS SURVEYING btech civil ...-I.pptx
COMPASS SURVEYING btech civil ...-I.pptxCOMPASS SURVEYING btech civil ...-I.pptx
COMPASS SURVEYING btech civil ...-I.pptx
 
Angular measurement
Angular measurementAngular measurement
Angular measurement
 

Compass surveying

  • 3. Compass traversing: Important Definition  True meridian: Line or plane passing North through geographical north pole and pole geographical south pole True meridian True bearing  Magnetic meridian: When the magnetic Magnetic bearing needle is suspended freely and balanced properly, unaffected by magnetic substances, it indicates a direction. This Magnetic meridian direction is known as magnetic meridian. The angle between the magnetic meridian and a line is known as magnetic bearing or simple bearing of the line.
  • 4. Arbitrary meridian: Convenient direction is assumed as a meridian.  Grid meridian: Sometimes for preparing a map some state agencies assume several lines parallel to the true meridian for a particular zone these lines are termed as grid meridian.  Designation of magnetic bearing  Whole circle bearing (WCB)  Quadrantal bearing (QB)  WCB: The magnetic bearing of a line measured clockwise from the North Pole towards the line is known as WCB. Varies 0-360°
  • 5. Quadrantal Bearing: The magnetic bearing of a line measured clockwise or anticlockwise from NP or SP (whichever is nearer to the line) towards the east or west is known as QB. This system consists of 4- quadrants NE, SE, NW, SW. The values lie between 0-90°  QB of OA = N a E  Reduced Bearing: When the whole circle bearing of a line is converted to quadrantal bearing it is termed as reduced bearing.  Fore and Back Bearing:  In WCB the difference between FB and BB should be exactly 180°  BB=FB+/-180°  Use the +ve sign when FB<180°  Use the –ve sign when FB> 180°
  • 6. Magnetic declination: The horizontal angle between the magnetic meridian and true meridian is known as magnetic declination.  Dip of the magnetic needle: If the needle is perfectly balanced before magnetisation, it does not remain in the balanced position after it is magnetised. This is due to the magnetic influence of the earth. The needle is found to be inclined towards the pole. This inclination of the needle with the horizontal is known as dip of the magnetic needle.  Local Attraction  Method of correction for traverse:  First method: Sum of the interior angle should be equal to (2n-4) x 90. if not than distribute the total error equally to all interior angles of the traverse. Then starting from unaffected line the bearings of all the lines are corrected using corrected interior angles.  Second method: Unaffected line is first detected. Then, commencing from the unaffected line, the bearing of other affected lines are corrected by finding the amount of correction at each station.
  • 7.
  • 8.
  • 9. Methods of traversing  Chain traversing: 15 m 15 m  Compass traversing: Fore bearings and back bearings between the traverse leg are measured  Theodolite traversing: Horizontal angles between the traverse legs are measured. The length of the traverse legs are measured by chain/tape or by stadia method  Plane table traversing: Plane table is set at every traverse station in clockwise and anticlockwise direction and the circuit is finally closed. During traversing the sides of the traverse are plotted according to any suitable scale.
  • 10. Checks on traverse: Closed traverse  Check on closed traverse:  Sum of the measured interior angles (2n-4) x 90°  Sum of the measured exterior angles (2n+4) x 90 °  The algebric sum of the deflection angles should be equal to 360°. Right hand deflection is considered +ve, left hand deflection –ve  Check on linear measurement  The lines should be measured once each on two different days (along opposite directions). Both measurement should tally.  Linear measurement should also be taken by the stadia method. The measurement by chaining and stadia method should tally.
  • 11. Checks on traverse: Open traverse  Taking cut-off lines: measured the bearings and lengths of cut off lines after plotting and tally with actual values.  Taking an auxiliary point: Take P permanent point as auxiliary point measured bearings and lengths of P from each traverse point. If survey is accurate, while plotting all the measured bearing of P should meet at P.
  • 12. Problems:  Convert the following WCBs to QBs  (a) WCB of AB = 45°30’ (Ans 45°30’)  (b) WCB of BC = 125°45’ (Ans 180- 125°45’ = 54° 15’)  Fore bearing of the following lines are given. Find back bearing  AB=S 30°30’ E  BC=N 40°30’ W  The magnetic bearing of a line AB is 135°30’ what will be the true bearing, if the declination is 5°15’ W.
  • 14.
  • 16. Problems Included angle at A= 280-180-40=60 =FB of DA-180-FB of AB Included angle at B= 40+180-70= 150 =FB of AB+180-FB of BC Included angle at C= 70+180-210 =FB of BC+180-FB of CD Formula: FB of previous line+/-180- FB of next line