2. We believe in strong personal involvement in each and every project by the
principal are one of the office main attributes in ensuring success and continuity.
We pride ourselves in the wealth of talents and experience of its entire professional
staff where teamwork plays an important factor.
We are well equipped with computerization in our design and draughting
operations in keeping with the current demand of the architectural practice locally
as well as globally.
We adopt an adaptable and flexible approach in handling projects. Each projects
shall be responded in its own unique and specific approached tailored to meet its
specific needs and parameters. We see that every problem posed as an
opportunity and positive steps to be taken to resolve it.
We believe in good architecture as a social art and not to be treated as an isolated
individual response, no matter how poetic it is. Good architecture exists in time and
place and reflects the social, cultural, technological and economic conditions of its
time.
We believe the main task in achieving total design excellence means
acquiring the knowledge to orchestrate and understand various technical
and specialized skills, building technique and materials, latest technology as
well as human relation and business behavior. Immense support and active
participation as well as sympathetic collaboration from the client and
various other specialized skills shall contribute in achieving the objectives.
3. CONTENTS
KLCC LOT C . PALACE OF JUSTICE . PRIME
MINISTER OFFICE . BURJ AN-NILE
4. Obtained his early working experience
in BEP Architecture Sdn Bhd from 1983 after
which he joined Perunding Alam Bina from 1987 to 1989 . He rejoined BEP
Architect in 1989 progressing into numerous design and site management ,
mainly office , condominium , sport stadium , theme park and colleges . In
1991, Ahmad Rozi joined KLCC being one of the biggest real estate
developments in the world . He was involved in the early stages of the design
development of the 88 story Petro Twin Towers and was sent to work at the
consultation office of Cesar Pelli Associates in New Haven , CT ,
USA and Adamsons Associates , Toronto , Canada from 1992
to 1993 .
6. ! Preparing and refining the brief in consultation with the client and interpreting the client’s objective
to arrive at an agreed brief for the project.
! Carry out such studied as maybe necessary for the project and reviewing with the client alternative
design and construction solutions.
! Preparing the outline project plan which may include a preliminary cost plan, a preliminary project
planning and implementation scheduled, a preliminary cash flow projection including probable
constructions costs and fees and a resources plan.
! At the early stage of starting a project, architect must have an
appointment with the client.
! Ascertaining the client’s objective, brief and constraints for the project and
advising the client how to achieve the objectives.
7.
The development calls for a mixed development that includes retail, class A
office space and residential service apartments. The three different program
functions were stacked vertically and topped with a health club and sky garden
at level 53.
The design makes an elegant and more importantly a fitting addition to the
Kuala Lumpur City Center. The tower has its own distinguished presence while
complimenting the monumental presence of the Petronas Tower.
8.
The palace of justice sited on 8.2 acres site across
the central boulevard, facing the Putrajaya
Corporation and Putrajaya Grand Mosque along the
qiblat axis. The complex shall replace the Bangunan
Sultan Abdul Samad at Dataran Merdeka. The
complex shall be a landmark building where the
future Merdeka Parade will be held.
Utilising locally sourced and manufactured materials, finishes and technology were the main criteria in the formulation of the
design. The architecture was designed to be in characteristic with the other landmark and notable buildings in Putrajaya.
To complete and deliver by 2003 require close liaison with the client, the end user and the other specialist consultant that
requires instant and pro-active attention. A specialize complex, the courthouse is to function efficiently, extreme protocol and
security segregation between the judges, staff, public and accused were closely scrutinised.
9. The 50 acres site is located within the
government precinct oval. The complex
accommodates the Prime Minister’s
Department. The complexity of designing
and conceptualising arises since day one.
Initially, with the understanding of the
government hierarchy and protocols.
The overall traffic circulation into and within the complex was crucial and
considered. The segregation between the private, public, official traffic and
pedestrian was finely tuned to maximum security and efficient. The
circulation network put much emphasis on manipulating the complex
grandeur and intricacies.
The fast track construction requires immediate, constant monitoring and
decisions from end users, clients, project managers, consultants and
contractors. New building materials and technology were introduced
throughout the construction of the complex.
10. The Burj An-Nile, with its sleek, contemporary, high technology
façade, a fluid and bold sculptural silhouette relates back to
Sudan’s won culture buildings heritage. Islamic pattern and
The Burj An-Nile, a landmark building worthy to represents
GNPOC and The Republican of Sudan to the world.
detailing introduced to the lobbies, fixtures
and landscape elements shall further enhance
the image. The Burj An-Nile potrays an
international image as well as an Islamic
Sudan.
The tower was designed to set further back
from the south boundary, to make way for a
landscape plaza where public access and
congrerate, view and appreaciate, the tower
and the entire complex composition as a total.