Public Private Partnership 
in Urban Water Sector 
in India 
Ankit Tulsyan 
Ipshita Das 
Khalid Rahman 
TERI University 
20th October 2014
Public Private Partnership: 
Definition 
• A Public Private Partnership project means a 
project based on a contract or concession 
agreement, between a government or statutory 
entity on the one side and a private sector 
company on the other side, for delivering 
contractual service on payment of user charges. 
• The concept of PPP should not be confused with 
other concepts such as Public service(full state 
responsibility), Privatization(includes sale of assets) and 
Outsourcing(short term contracts, ex: hiring a security).
Need for a Public Private Partnership 
• The increasing trend of population pressures in a 
country alongside various developmental projects 
taking place for the welfare of state has severally 
constrained the government’s ability to address 
public needs through the traditional means. 
• Other considerations too, like 
 Increased efficiency in project delivery 
 Improved operation and management 
 Access to advanced technology 
 Need to bring in commercial viability considerations in the 
provision of urban infrastructure
Types of PPP 
Supply and 
Management 
Contract 
Manage part or 
whole of 
Infra/Service 
Ownership - State 
Management Fees in 
lieu 
3 – 5 Years 
Turnkey 
Traditional 
Model/Less Complex 
Bidding Process of 
Selection 
Design & Builds at a 
Fixed Fee 
Low Risk and Low 
Pvt. Investment 
Lease/Affermage 
Public Investment 
with private 
efficiency 
Operator run, 
collect revenue, 8-15 
Yr period 
Lease – fixed fee to 
the Owner 
Affermage – fixed 
fee to the operator 
Greater commercial 
risk to the Private 
operator 
Concessions 
Public authority 
grants the right to 
build and operate 
Revenue is linked to 
performance, 5 to 
50 year period 
High Pvt. 
InvestmentSeveral 
Forms – 
JV/BOOT/BOT. 
Govt. may do VGF 
Asset ownership of 
Govt
Genesis of Public Private Partnership 
• Public Private Partnerships (PPPs) were introduced in 
1992 in the UK by the Conservative government and 
subsequently expanded across the world. 
• This was the basis for the first PPP Policy developed 
in the state of Victoria, Australia. 
• In India, PPP Model was first followed in the power 
sector and thereafter expanded to other sector 
• In case of Urban water supply, the trend was 
primarily Build Operate Transfer (BOT) with 100 
percent private financing but post 2010, the 
operational contracts are a mix of concession 
agreements, BOT projects, and management contracts
Overview of PPP in Indian Urban water 
Sector 
Source: Trends in Private Sector Participation in the Indian Water Sector: A Critical Review
Reasons for Failure of the Projects 
Source: Trends in Private Sector Participation in the Indian Water Sector: A Critical Review
Analysis of factors for Success of the Projects 
Source: Trends in Private Sector Participation in the Indian Water Sector: A Critical Review
International Case Studies 
Senegal 
• In early 1990’s only 54% of Senegal’s urban population had 
access to safe water. 
• In 1994 Gov created steering committee of the ministers of 
each Gov agency concerned with WSS 
• The committee created a state asset-holding company to 
retain the asset and the right to extract water, and 
operating company would produce and distribute water. 
• Considering the need and constraint of the sector the 
committee decided to give it on a affermage contract 
• A 10 years affermage contract was signed between 
Government and Senegalaise des eaus which was formed 
specially for this purpose with specified term and condition
How PPP Helped Foster Efficient 
Public Investment in Senegal 
 Between 1996 and 2003, water production has increased by 18 percent 
with 81,000 new household connections and 400 standpipes according to 
the World Bank. 
 The financial equilibrium achieved in 2003, with average tariff increases 
not exceeding 3% per year 
 Water cuts are rare and more of Dakar is connected to a clean water 
supply than ever before, with careful measures to make sure that poor 
areas of town are not overlooked. 
 Service to the poor: Social connections programs (SCPs) have significantly 
helped expend access of service to the poor 
 Thus, the key outcomes of the PPP are: 
1. More water to more people 
2. Better financial heath 
3. Positive change in tariff
Key factors for successful implementation 
• The choice of affermage contact was an innovation. A performance 
contract has never been used before like this and initially there was 
a lot of skepticism, but it has proved to be very effective 
• The contract addressed the need of the Gov and kept the asset in 
hand 
• Strong political will and good leadership from the relevant ministry 
was present. 
• The operations and maintenance function were clearly defined. 
• Tariff Adjustments has introduced progressively as improvements 
are made in coverage and service quality.
International Case Studies Manila (the 
Philippines) –Past Scenario, before 1997 
• Before 1997, the capital’s water supply and distribution 
was in disarray. 
• Communal water sources were shared by hundreds of 
families who had to line up for hours just to get a few 
pails for the day’s use. 
• Two-thirds of the water produced was being lost to 
leaks, poor metering, and illegal connections 
• Clean and potable water was a luxury which poor 
families simply did not have, and that others had to 
acquire at a steep price
International Case Studies Manila (the 
Philippines) - Post a PPP arrangement in 1997 
• Two concessions were awarded in 1997 to cover two contrasting 
areas 
• The Ayala-led Manila Water Company took over the East Zone of 
Metro Manila & the Western concession by the Maynilad, operated 
by Benpres-Suez under a concession agreement. Winners invested 
$7 billion to expand and improve the facility 
• In the Western concession (Maynilad), coverage expanded 
from 67% to 86 percent. In the Eastern zone (Manila Water), 
coverage jumped from 26% to 99%. 
• An estimated 4 million people gained access to piped water in 
Manila during the period 1997–2006. 
• Water for poor programme at 1.5$ per month 
• With the contract the Price has been decreased by 74% in the east 
zone and 43% in the west zone.
International Case Studies 
Manila (the Philippines) 
Source: Public-Private Partnerships for Urban Water Utilities, Marin 2009
Way Forward – for strengthening PPP 
in Urban Water Sector 
 Establish sector trend approach rather than current 
project specific approach 
 States should follow well established and accepted 
principles to increase the chance of success for PPPs in 
water sector 
 Bureaucracy should be a facilitator and not an 
impediment 
 Develop sector regulation for long-term measure: 
 Develop states implementation and monitoring capacity 
 Tariff Structure Reforms for full cost recovery approach

Mais conteúdo relacionado

Mais procurados

Public-Private Partnerships
Public-Private PartnershipsPublic-Private Partnerships
Public-Private PartnershipsCultural Vistas
 
Municipal Resource Mobilisation
Municipal Resource MobilisationMunicipal Resource Mobilisation
Municipal Resource MobilisationRavikant Joshi
 
Analytical comparision of BOT,BOOT and PPP models
 Analytical comparision of BOT,BOOT and PPP models Analytical comparision of BOT,BOOT and PPP models
Analytical comparision of BOT,BOOT and PPP modelsBhavin Sharma
 
Private public partnership (ppp)
Private public partnership (ppp)Private public partnership (ppp)
Private public partnership (ppp)Môhãñ Raj
 
Case studies ppp
Case studies pppCase studies ppp
Case studies pppamityasum23
 
Public Private Partnerships Deloitte
Public Private Partnerships DeloittePublic Private Partnerships Deloitte
Public Private Partnerships Deloittejames3b
 
Public Private Patnership
Public Private Patnership Public Private Patnership
Public Private Patnership Sagar Srivastava
 
Policy & Strategy for PPP in Bangladesh
Policy & Strategy for PPP in BangladeshPolicy & Strategy for PPP in Bangladesh
Policy & Strategy for PPP in BangladeshEhsan Tanim
 
Public private partnership in infrastructure
Public private partnership in infrastructurePublic private partnership in infrastructure
Public private partnership in infrastructuresahilchauhan55
 
Infrastructure and Transportation Planning Study Notes
Infrastructure and Transportation Planning Study NotesInfrastructure and Transportation Planning Study Notes
Infrastructure and Transportation Planning Study NotesYash Shah
 
Analytical Comparison between BOT,BOOT and PPP Projects
Analytical Comparison between BOT,BOOT and PPP ProjectsAnalytical Comparison between BOT,BOOT and PPP Projects
Analytical Comparison between BOT,BOOT and PPP ProjectsSugiharto TuPiichai
 
National Urban Transport Policy
National Urban Transport PolicyNational Urban Transport Policy
National Urban Transport PolicyAshu Kedia
 
Public investment plan_management
Public investment plan_managementPublic investment plan_management
Public investment plan_managementJean-Marc Lepain
 
Infrastructure financing-india
Infrastructure financing-indiaInfrastructure financing-india
Infrastructure financing-indiaMahesh Gujrathi
 

Mais procurados (20)

Public-Private Partnerships
Public-Private PartnershipsPublic-Private Partnerships
Public-Private Partnerships
 
Municipal Resource Mobilisation
Municipal Resource MobilisationMunicipal Resource Mobilisation
Municipal Resource Mobilisation
 
Analytical comparision of BOT,BOOT and PPP models
 Analytical comparision of BOT,BOOT and PPP models Analytical comparision of BOT,BOOT and PPP models
Analytical comparision of BOT,BOOT and PPP models
 
Private public partnership (ppp)
Private public partnership (ppp)Private public partnership (ppp)
Private public partnership (ppp)
 
Case studies ppp
Case studies pppCase studies ppp
Case studies ppp
 
Public Private Partnerships Deloitte
Public Private Partnerships DeloittePublic Private Partnerships Deloitte
Public Private Partnerships Deloitte
 
Public Private Patnership
Public Private Patnership Public Private Patnership
Public Private Patnership
 
PPP for Infrastructure Projects
PPP for Infrastructure ProjectsPPP for Infrastructure Projects
PPP for Infrastructure Projects
 
Smart Cities (India)
Smart Cities (India)Smart Cities (India)
Smart Cities (India)
 
Policy & Strategy for PPP in Bangladesh
Policy & Strategy for PPP in BangladeshPolicy & Strategy for PPP in Bangladesh
Policy & Strategy for PPP in Bangladesh
 
Public private partnership in infrastructure
Public private partnership in infrastructurePublic private partnership in infrastructure
Public private partnership in infrastructure
 
Municipal finance
Municipal financeMunicipal finance
Municipal finance
 
Infrastructure and Transportation Planning Study Notes
Infrastructure and Transportation Planning Study NotesInfrastructure and Transportation Planning Study Notes
Infrastructure and Transportation Planning Study Notes
 
Analytical Comparison between BOT,BOOT and PPP Projects
Analytical Comparison between BOT,BOOT and PPP ProjectsAnalytical Comparison between BOT,BOOT and PPP Projects
Analytical Comparison between BOT,BOOT and PPP Projects
 
National Urban Transport Policy
National Urban Transport PolicyNational Urban Transport Policy
National Urban Transport Policy
 
Public investment plan_management
Public investment plan_managementPublic investment plan_management
Public investment plan_management
 
Public Private Partnership
Public Private PartnershipPublic Private Partnership
Public Private Partnership
 
Infrastructure financing-india
Infrastructure financing-indiaInfrastructure financing-india
Infrastructure financing-india
 
Project finance ppt final
Project finance ppt finalProject finance ppt final
Project finance ppt final
 
Berlin smart city
Berlin smart cityBerlin smart city
Berlin smart city
 

Semelhante a Presentation Public Private Partnership (PPP)

Public private partnership_(sanitation)[1]
Public private partnership_(sanitation)[1]Public private partnership_(sanitation)[1]
Public private partnership_(sanitation)[1]Shraddha Kulkarni
 
Presentation 4.1b Regulator led initiatives
Presentation 4.1b Regulator led initiativesPresentation 4.1b Regulator led initiatives
Presentation 4.1b Regulator led initiativesjohnabutterworth
 
The Water Dialogue II Report
The Water Dialogue II ReportThe Water Dialogue II Report
The Water Dialogue II ReportWaterCap
 
Financing water in_the_arab_countries_beirut89_3_2010
Financing water in_the_arab_countries_beirut89_3_2010Financing water in_the_arab_countries_beirut89_3_2010
Financing water in_the_arab_countries_beirut89_3_2010Parti Djibouti
 
Session Governance - Principles for ppp april 2010
Session Governance - Principles for ppp april 2010Session Governance - Principles for ppp april 2010
Session Governance - Principles for ppp april 2010IRC
 
Hydro Priyank jain
Hydro Priyank jain Hydro Priyank jain
Hydro Priyank jain PRIYANK JAIN
 
Challenges & Lessons from water sector reforms and devolution
Challenges & Lessons from water sector reforms and devolutionChallenges & Lessons from water sector reforms and devolution
Challenges & Lessons from water sector reforms and devolutionWaterCap
 
2015-Canadian-Municipal-Water-Consortium-Report-web
2015-Canadian-Municipal-Water-Consortium-Report-web2015-Canadian-Municipal-Water-Consortium-Report-web
2015-Canadian-Municipal-Water-Consortium-Report-webJennifer Dingman, PhD
 
COMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITY
COMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITYCOMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITY
COMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITYwle-ss
 
P3 presentation - CCA.PPTX
P3 presentation - CCA.PPTXP3 presentation - CCA.PPTX
P3 presentation - CCA.PPTXMatt Meaker
 
Indian Hydro Power - A new regulatory effort
Indian Hydro Power - A new regulatory effort Indian Hydro Power - A new regulatory effort
Indian Hydro Power - A new regulatory effort Priyank Jain
 
Urban development investing in the business potential
Urban development   investing in the business potentialUrban development   investing in the business potential
Urban development investing in the business potentialLijitha Kallimakula
 
Making blended finance work for water and sanitation green talks webinar
Making blended finance work for water and sanitation green talks webinarMaking blended finance work for water and sanitation green talks webinar
Making blended finance work for water and sanitation green talks webinarOECD Environment
 
Build Operate Transfer and private sector led hydropower development
Build Operate Transfer and private sector led hydropower developmentBuild Operate Transfer and private sector led hydropower development
Build Operate Transfer and private sector led hydropower developmentWater, Land and Ecosystems (WLE)
 
Current Green Energy Financing Programs - Noli Cruz, DBP
Current Green Energy Financing Programs - Noli Cruz, DBPCurrent Green Energy Financing Programs - Noli Cruz, DBP
Current Green Energy Financing Programs - Noli Cruz, DBPOECD Environment
 
A IFC e o setor de saneamento - Evento lançamento Manual de Perdas_RJ_2013
A IFC e o setor de saneamento - Evento lançamento Manual de Perdas_RJ_2013A IFC e o setor de saneamento - Evento lançamento Manual de Perdas_RJ_2013
A IFC e o setor de saneamento - Evento lançamento Manual de Perdas_RJ_2013FIA Business School
 

Semelhante a Presentation Public Private Partnership (PPP) (20)

Public private partnership_(sanitation)[1]
Public private partnership_(sanitation)[1]Public private partnership_(sanitation)[1]
Public private partnership_(sanitation)[1]
 
Presentation 4.1b Regulator led initiatives
Presentation 4.1b Regulator led initiativesPresentation 4.1b Regulator led initiatives
Presentation 4.1b Regulator led initiatives
 
The Water Dialogue II Report
The Water Dialogue II ReportThe Water Dialogue II Report
The Water Dialogue II Report
 
Financing water in_the_arab_countries_beirut89_3_2010
Financing water in_the_arab_countries_beirut89_3_2010Financing water in_the_arab_countries_beirut89_3_2010
Financing water in_the_arab_countries_beirut89_3_2010
 
Ppp
PppPpp
Ppp
 
Session Governance - Principles for ppp april 2010
Session Governance - Principles for ppp april 2010Session Governance - Principles for ppp april 2010
Session Governance - Principles for ppp april 2010
 
Hydro Priyank jain
Hydro Priyank jain Hydro Priyank jain
Hydro Priyank jain
 
Challenges & Lessons from water sector reforms and devolution
Challenges & Lessons from water sector reforms and devolutionChallenges & Lessons from water sector reforms and devolution
Challenges & Lessons from water sector reforms and devolution
 
Session4
Session4Session4
Session4
 
2015-Canadian-Municipal-Water-Consortium-Report-web
2015-Canadian-Municipal-Water-Consortium-Report-web2015-Canadian-Municipal-Water-Consortium-Report-web
2015-Canadian-Municipal-Water-Consortium-Report-web
 
COMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITY
COMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITYCOMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITY
COMMERCIAL AND FINANCIAL OUTSOURCING OF A UTILITY
 
P3 presentation - CCA.PPTX
P3 presentation - CCA.PPTXP3 presentation - CCA.PPTX
P3 presentation - CCA.PPTX
 
public private partnership
 public private partnership public private partnership
public private partnership
 
Drishti
DrishtiDrishti
Drishti
 
Indian Hydro Power - A new regulatory effort
Indian Hydro Power - A new regulatory effort Indian Hydro Power - A new regulatory effort
Indian Hydro Power - A new regulatory effort
 
Urban development investing in the business potential
Urban development   investing in the business potentialUrban development   investing in the business potential
Urban development investing in the business potential
 
Making blended finance work for water and sanitation green talks webinar
Making blended finance work for water and sanitation green talks webinarMaking blended finance work for water and sanitation green talks webinar
Making blended finance work for water and sanitation green talks webinar
 
Build Operate Transfer and private sector led hydropower development
Build Operate Transfer and private sector led hydropower developmentBuild Operate Transfer and private sector led hydropower development
Build Operate Transfer and private sector led hydropower development
 
Current Green Energy Financing Programs - Noli Cruz, DBP
Current Green Energy Financing Programs - Noli Cruz, DBPCurrent Green Energy Financing Programs - Noli Cruz, DBP
Current Green Energy Financing Programs - Noli Cruz, DBP
 
A IFC e o setor de saneamento - Evento lançamento Manual de Perdas_RJ_2013
A IFC e o setor de saneamento - Evento lançamento Manual de Perdas_RJ_2013A IFC e o setor de saneamento - Evento lançamento Manual de Perdas_RJ_2013
A IFC e o setor de saneamento - Evento lançamento Manual de Perdas_RJ_2013
 

Último

VIP Model Call Girls Baramati ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Baramati ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Baramati ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Baramati ( Pune ) Call ON 8005736733 Starting From 5K to...SUHANI PANDEY
 
Call Girls in Sarita Vihar Delhi Just Call 👉👉9873777170 Independent Female ...
Call Girls in  Sarita Vihar Delhi Just Call 👉👉9873777170  Independent Female ...Call Girls in  Sarita Vihar Delhi Just Call 👉👉9873777170  Independent Female ...
Call Girls in Sarita Vihar Delhi Just Call 👉👉9873777170 Independent Female ...adilkhan87451
 
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...tanu pandey
 
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...SUHANI PANDEY
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCNAP Global Network
 
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
celebrity 💋 Patna Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Patna Escorts Just Dail 8250092165 service available anytime 24 hourcelebrity 💋 Patna Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Patna Escorts Just Dail 8250092165 service available anytime 24 hourCall Girls in Nagpur High Profile
 
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...SUHANI PANDEY
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)Congressional Budget Office
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterChristina Parmionova
 
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...SUHANI PANDEY
 
1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLSarandianics
 
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...nehasharma67844
 
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...SUHANI PANDEY
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processNAP Global Network
 

Último (20)

VIP Model Call Girls Baramati ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Baramati ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Baramati ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Baramati ( Pune ) Call ON 8005736733 Starting From 5K to...
 
Call Girls in Sarita Vihar Delhi Just Call 👉👉9873777170 Independent Female ...
Call Girls in  Sarita Vihar Delhi Just Call 👉👉9873777170  Independent Female ...Call Girls in  Sarita Vihar Delhi Just Call 👉👉9873777170  Independent Female ...
Call Girls in Sarita Vihar Delhi Just Call 👉👉9873777170 Independent Female ...
 
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCC
 
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
 
celebrity 💋 Patna Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Patna Escorts Just Dail 8250092165 service available anytime 24 hourcelebrity 💋 Patna Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Patna Escorts Just Dail 8250092165 service available anytime 24 hour
 
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
 
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
 
call girls in Raghubir Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service ...
call girls in Raghubir Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service ...call girls in Raghubir Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service ...
call girls in Raghubir Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service ...
 
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - Poster
 
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...
 
1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS
 
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
 
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP process
 

Presentation Public Private Partnership (PPP)

  • 1. Public Private Partnership in Urban Water Sector in India Ankit Tulsyan Ipshita Das Khalid Rahman TERI University 20th October 2014
  • 2. Public Private Partnership: Definition • A Public Private Partnership project means a project based on a contract or concession agreement, between a government or statutory entity on the one side and a private sector company on the other side, for delivering contractual service on payment of user charges. • The concept of PPP should not be confused with other concepts such as Public service(full state responsibility), Privatization(includes sale of assets) and Outsourcing(short term contracts, ex: hiring a security).
  • 3. Need for a Public Private Partnership • The increasing trend of population pressures in a country alongside various developmental projects taking place for the welfare of state has severally constrained the government’s ability to address public needs through the traditional means. • Other considerations too, like  Increased efficiency in project delivery  Improved operation and management  Access to advanced technology  Need to bring in commercial viability considerations in the provision of urban infrastructure
  • 4. Types of PPP Supply and Management Contract Manage part or whole of Infra/Service Ownership - State Management Fees in lieu 3 – 5 Years Turnkey Traditional Model/Less Complex Bidding Process of Selection Design & Builds at a Fixed Fee Low Risk and Low Pvt. Investment Lease/Affermage Public Investment with private efficiency Operator run, collect revenue, 8-15 Yr period Lease – fixed fee to the Owner Affermage – fixed fee to the operator Greater commercial risk to the Private operator Concessions Public authority grants the right to build and operate Revenue is linked to performance, 5 to 50 year period High Pvt. InvestmentSeveral Forms – JV/BOOT/BOT. Govt. may do VGF Asset ownership of Govt
  • 5. Genesis of Public Private Partnership • Public Private Partnerships (PPPs) were introduced in 1992 in the UK by the Conservative government and subsequently expanded across the world. • This was the basis for the first PPP Policy developed in the state of Victoria, Australia. • In India, PPP Model was first followed in the power sector and thereafter expanded to other sector • In case of Urban water supply, the trend was primarily Build Operate Transfer (BOT) with 100 percent private financing but post 2010, the operational contracts are a mix of concession agreements, BOT projects, and management contracts
  • 6. Overview of PPP in Indian Urban water Sector Source: Trends in Private Sector Participation in the Indian Water Sector: A Critical Review
  • 7. Reasons for Failure of the Projects Source: Trends in Private Sector Participation in the Indian Water Sector: A Critical Review
  • 8. Analysis of factors for Success of the Projects Source: Trends in Private Sector Participation in the Indian Water Sector: A Critical Review
  • 9. International Case Studies Senegal • In early 1990’s only 54% of Senegal’s urban population had access to safe water. • In 1994 Gov created steering committee of the ministers of each Gov agency concerned with WSS • The committee created a state asset-holding company to retain the asset and the right to extract water, and operating company would produce and distribute water. • Considering the need and constraint of the sector the committee decided to give it on a affermage contract • A 10 years affermage contract was signed between Government and Senegalaise des eaus which was formed specially for this purpose with specified term and condition
  • 10. How PPP Helped Foster Efficient Public Investment in Senegal  Between 1996 and 2003, water production has increased by 18 percent with 81,000 new household connections and 400 standpipes according to the World Bank.  The financial equilibrium achieved in 2003, with average tariff increases not exceeding 3% per year  Water cuts are rare and more of Dakar is connected to a clean water supply than ever before, with careful measures to make sure that poor areas of town are not overlooked.  Service to the poor: Social connections programs (SCPs) have significantly helped expend access of service to the poor  Thus, the key outcomes of the PPP are: 1. More water to more people 2. Better financial heath 3. Positive change in tariff
  • 11. Key factors for successful implementation • The choice of affermage contact was an innovation. A performance contract has never been used before like this and initially there was a lot of skepticism, but it has proved to be very effective • The contract addressed the need of the Gov and kept the asset in hand • Strong political will and good leadership from the relevant ministry was present. • The operations and maintenance function were clearly defined. • Tariff Adjustments has introduced progressively as improvements are made in coverage and service quality.
  • 12. International Case Studies Manila (the Philippines) –Past Scenario, before 1997 • Before 1997, the capital’s water supply and distribution was in disarray. • Communal water sources were shared by hundreds of families who had to line up for hours just to get a few pails for the day’s use. • Two-thirds of the water produced was being lost to leaks, poor metering, and illegal connections • Clean and potable water was a luxury which poor families simply did not have, and that others had to acquire at a steep price
  • 13. International Case Studies Manila (the Philippines) - Post a PPP arrangement in 1997 • Two concessions were awarded in 1997 to cover two contrasting areas • The Ayala-led Manila Water Company took over the East Zone of Metro Manila & the Western concession by the Maynilad, operated by Benpres-Suez under a concession agreement. Winners invested $7 billion to expand and improve the facility • In the Western concession (Maynilad), coverage expanded from 67% to 86 percent. In the Eastern zone (Manila Water), coverage jumped from 26% to 99%. • An estimated 4 million people gained access to piped water in Manila during the period 1997–2006. • Water for poor programme at 1.5$ per month • With the contract the Price has been decreased by 74% in the east zone and 43% in the west zone.
  • 14. International Case Studies Manila (the Philippines) Source: Public-Private Partnerships for Urban Water Utilities, Marin 2009
  • 15. Way Forward – for strengthening PPP in Urban Water Sector  Establish sector trend approach rather than current project specific approach  States should follow well established and accepted principles to increase the chance of success for PPPs in water sector  Bureaucracy should be a facilitator and not an impediment  Develop sector regulation for long-term measure:  Develop states implementation and monitoring capacity  Tariff Structure Reforms for full cost recovery approach

Notas do Editor

  1. Unlike outsourcing (such as hiring a security or cleaning company to do a job), a PPP entails the private party taking very substantial risk for financing a project's capital and operating costs, designing and building a facility, and managing its operations to specified standards, normally over a significant period of time.   In a PPP, the land typically belongs to the public institution, not to the private party, and the fixed assets developed in terms of the PPP are thus state property.   Privatisation entails the sale/disposal of state property and functions - including all the assets and liabilities associated with that property and functions.