TRIP REPORT
Customer Khalda RIG EDC Rig - 82
Well name/Slot No Khebry Installation #
Job No
Start Date June 27, 2004 END DATE 2 July 2004
Engineer Khaled Abdel Fattah Technician
Engineer Foad abdel mmonem Technician
Engineer Technician
Date Time Operation
27-June 7:00 Arrive RFZ, prepare for the job & take all tools and materials needed.
Sunday 9:30 Departed RFZ to Khalda.
20:30 Arrived khalda
Report to the field mgr. Hamed.A.Elfotoh
28 June 7:30 Move from Khlada to Sampetco, (99 km, )
Monday 8:45 Arrived Smptoc.
Report to the field manger Dony Herz.
9:00 Got the work permit.
9:30 Arrived Khebry
Work at cutting the old studs, removing about 10 cm. From the tope layer of the concrete
21:00 Adjust the position of the new studs, as per the drawing received from Khalda .
Work at the first base.
Work at the second base cutting the studs and removing the 10 cm of the top layer of the concrete.
Departed Khebry to Salam base.
29-July 7:00 Moved from Salam base to Sampetco
Tuesday 8:00 Arrived Sampetco
9:00 Got the signature for the extension of the work permit.
9:30 Arrive Khebry
Continue working at second and third base cutting the studs and removing the 10 cm of the top layer of the
concrete.
Finish the first base(cutting the old studs , making new studs)
Moved from Khebry to Salam base
30 June
Wednesda
y
7:00
9:00 pm.
Move from Salam base to Sampetco then to Khebry .
Got the signature from the production and safety.
Meet the project engineer Ali Hassan , he confirmed that every thing is ready and he wait on the concrete
preparation
Finished the second base new studs welding and adjusting.
Work at the concrete top layer of the first base.
Work at the third base new studs adjusting for the dimensions, and welding the studs.
Moved from Khebry to Salam base
1 Juny
Thursday
7:00
11:00 pm.
Move from Salam base to Sampetco then to Khebry.
Finish the concrete of the second base.
Finish the new studs welding of the third base
Finish the concrete work of the third base.
Departed Khebry
2 July 7:30 Move from Salam base to meet Field manager Dony Herz
Checked the dim. And concrete by Donny Herz & found the dim. OK.
Got the paper work signature & travel to Cairo.
Reda Rep. Qarun Rep.
Field Service Engineer Maintenance Dept.
Ihab Magdy Eng. Mohamed El-Araby
Schlumberger REDA Production ServicesHelen Padua Confidential Page 1 13/06/2016

Mais conteúdo relacionado

Destaque

Khalda Petroleum company
Khalda Petroleum companyKhalda Petroleum company
Khalda Petroleum companyMahmoud Hamdy
 
Belzona Oil Presentation
Belzona Oil PresentationBelzona Oil Presentation
Belzona Oil Presentationguest6e90fd7
 
Gasco Presentation Final
Gasco Presentation FinalGasco Presentation Final
Gasco Presentation FinalMahin Rahman
 
NPCIL Mechanical Engineering Interview Experience
NPCIL Mechanical Engineering Interview ExperienceNPCIL Mechanical Engineering Interview Experience
NPCIL Mechanical Engineering Interview ExperienceParesh Gujarati
 
Gasco erp book final03102011_pdf1
Gasco erp book final03102011_pdf1Gasco erp book final03102011_pdf1
Gasco erp book final03102011_pdf1Chrysi Theodoridou
 
Mechanical interview questions
Mechanical interview questionsMechanical interview questions
Mechanical interview questionsPrashant Kumar
 
Interview Questions for Mechanical Engineering Students
Interview Questions for Mechanical Engineering StudentsInterview Questions for Mechanical Engineering Students
Interview Questions for Mechanical Engineering StudentsMoredhvaj giri
 
Top 7 mechanical engineer interview questions answers
Top 7 mechanical engineer interview questions answersTop 7 mechanical engineer interview questions answers
Top 7 mechanical engineer interview questions answersjob-interview-questions
 
19 comptency questions and answers
19 comptency questions and answers19 comptency questions and answers
19 comptency questions and answersNikhil367
 
200 top most steam boilers, engines, nozzles and turbines mechanical engine...
200 top most steam boilers, engines, nozzles and turbines   mechanical engine...200 top most steam boilers, engines, nozzles and turbines   mechanical engine...
200 top most steam boilers, engines, nozzles and turbines mechanical engine...Dr. Qaisar Nadeem
 
Curriculum Studies Assignment
Curriculum Studies AssignmentCurriculum Studies Assignment
Curriculum Studies AssignmentStephen Taylor
 
Interview questions with answers on mechanical design
Interview questions with answers on mechanical designInterview questions with answers on mechanical design
Interview questions with answers on mechanical designkifayat ullah
 

Destaque (18)

Khalda Petroleum company
Khalda Petroleum companyKhalda Petroleum company
Khalda Petroleum company
 
New PetroSavers Presentation
New PetroSavers PresentationNew PetroSavers Presentation
New PetroSavers Presentation
 
Belzona Oil Presentation
Belzona Oil PresentationBelzona Oil Presentation
Belzona Oil Presentation
 
November 20
November  20November  20
November 20
 
2761abdulla
2761abdulla2761abdulla
2761abdulla
 
Bookgasco 06draft2
Bookgasco 06draft2Bookgasco 06draft2
Bookgasco 06draft2
 
Gasco Presentation Final
Gasco Presentation FinalGasco Presentation Final
Gasco Presentation Final
 
NPCIL Mechanical Engineering Interview Experience
NPCIL Mechanical Engineering Interview ExperienceNPCIL Mechanical Engineering Interview Experience
NPCIL Mechanical Engineering Interview Experience
 
Gasco erp book final03102011_pdf1
Gasco erp book final03102011_pdf1Gasco erp book final03102011_pdf1
Gasco erp book final03102011_pdf1
 
Mechanical interview questions
Mechanical interview questionsMechanical interview questions
Mechanical interview questions
 
Interview Questions for Mechanical Engineering Students
Interview Questions for Mechanical Engineering StudentsInterview Questions for Mechanical Engineering Students
Interview Questions for Mechanical Engineering Students
 
Top 7 mechanical engineer interview questions answers
Top 7 mechanical engineer interview questions answersTop 7 mechanical engineer interview questions answers
Top 7 mechanical engineer interview questions answers
 
19 comptency questions and answers
19 comptency questions and answers19 comptency questions and answers
19 comptency questions and answers
 
Smart Answers in Interview
Smart Answers in InterviewSmart Answers in Interview
Smart Answers in Interview
 
200 top most steam boilers, engines, nozzles and turbines mechanical engine...
200 top most steam boilers, engines, nozzles and turbines   mechanical engine...200 top most steam boilers, engines, nozzles and turbines   mechanical engine...
200 top most steam boilers, engines, nozzles and turbines mechanical engine...
 
Curriculum Studies Assignment
Curriculum Studies AssignmentCurriculum Studies Assignment
Curriculum Studies Assignment
 
PMP Preparation - 02 FAQ
PMP Preparation - 02 FAQPMP Preparation - 02 FAQ
PMP Preparation - 02 FAQ
 
Interview questions with answers on mechanical design
Interview questions with answers on mechanical designInterview questions with answers on mechanical design
Interview questions with answers on mechanical design
 

Mais de Khaled AbdelFattah

KHALED A.Fattah QHSE MGR CV 22 Jan 2017
KHALED A.Fattah QHSE  MGR CV 22 Jan  2017KHALED A.Fattah QHSE  MGR CV 22 Jan  2017
KHALED A.Fattah QHSE MGR CV 22 Jan 2017Khaled AbdelFattah
 
khaled ticket and rick evaluation
khaled ticket and rick evaluationkhaled ticket and rick evaluation
khaled ticket and rick evaluationKhaled AbdelFattah
 
راي المتدربين احمد سليمان احمد
راي المتدربين    احمد سليمان احمد راي المتدربين    احمد سليمان احمد
راي المتدربين احمد سليمان احمد Khaled AbdelFattah
 
CEW South Sudan experience certificate March 2015
CEW South Sudan experience certificate March 2015CEW South Sudan experience certificate March 2015
CEW South Sudan experience certificate March 2015Khaled AbdelFattah
 
Electric safety السلامه والكهرباء المنزليه
Electric safety السلامه والكهرباء المنزليه  Electric safety السلامه والكهرباء المنزليه
Electric safety السلامه والكهرباء المنزليه Khaled AbdelFattah
 

Mais de Khaled AbdelFattah (7)

KHALED A.Fattah QHSE MGR CV 22 Jan 2017
KHALED A.Fattah QHSE  MGR CV 22 Jan  2017KHALED A.Fattah QHSE  MGR CV 22 Jan  2017
KHALED A.Fattah QHSE MGR CV 22 Jan 2017
 
khaled ticket and rick evaluation
khaled ticket and rick evaluationkhaled ticket and rick evaluation
khaled ticket and rick evaluation
 
راي المتدربين احمد سليمان احمد
راي المتدربين    احمد سليمان احمد راي المتدربين    احمد سليمان احمد
راي المتدربين احمد سليمان احمد
 
ESP DST succes story tharjath
ESP DST succes story tharjathESP DST succes story tharjath
ESP DST succes story tharjath
 
TOT Cert
TOT CertTOT Cert
TOT Cert
 
CEW South Sudan experience certificate March 2015
CEW South Sudan experience certificate March 2015CEW South Sudan experience certificate March 2015
CEW South Sudan experience certificate March 2015
 
Electric safety السلامه والكهرباء المنزليه
Electric safety السلامه والكهرباء المنزليه  Electric safety السلامه والكهرباء المنزليه
Electric safety السلامه والكهرباء المنزليه
 

Khalda - HPS June-2004 - SOE

  • 1. REDA Production Services TRIP REPORT Customer Khalda RIG EDC Rig - 82 Well name/Slot No Khebry Installation # Job No Start Date June 27, 2004 END DATE 2 July 2004 Engineer Khaled Abdel Fattah Technician Engineer Foad abdel mmonem Technician Engineer Technician Date Time Operation 27-June 7:00 Arrive RFZ, prepare for the job & take all tools and materials needed. Sunday 9:30 Departed RFZ to Khalda. 20:30 Arrived khalda Report to the field mgr. Hamed.A.Elfotoh 28 June 7:30 Move from Khlada to Sampetco, (99 km, ) Monday 8:45 Arrived Smptoc. Report to the field manger Dony Herz. 9:00 Got the work permit. 9:30 Arrived Khebry Work at cutting the old studs, removing about 10 cm. From the tope layer of the concrete 21:00 Adjust the position of the new studs, as per the drawing received from Khalda . Work at the first base. Work at the second base cutting the studs and removing the 10 cm of the top layer of the concrete. Departed Khebry to Salam base. 29-July 7:00 Moved from Salam base to Sampetco Tuesday 8:00 Arrived Sampetco 9:00 Got the signature for the extension of the work permit. 9:30 Arrive Khebry Continue working at second and third base cutting the studs and removing the 10 cm of the top layer of the concrete. Finish the first base(cutting the old studs , making new studs) Moved from Khebry to Salam base 30 June Wednesda y 7:00 9:00 pm. Move from Salam base to Sampetco then to Khebry . Got the signature from the production and safety. Meet the project engineer Ali Hassan , he confirmed that every thing is ready and he wait on the concrete preparation Finished the second base new studs welding and adjusting. Work at the concrete top layer of the first base. Work at the third base new studs adjusting for the dimensions, and welding the studs. Moved from Khebry to Salam base 1 Juny Thursday 7:00 11:00 pm. Move from Salam base to Sampetco then to Khebry. Finish the concrete of the second base. Finish the new studs welding of the third base Finish the concrete work of the third base. Departed Khebry 2 July 7:30 Move from Salam base to meet Field manager Dony Herz Checked the dim. And concrete by Donny Herz & found the dim. OK. Got the paper work signature & travel to Cairo. Reda Rep. Qarun Rep. Field Service Engineer Maintenance Dept. Ihab Magdy Eng. Mohamed El-Araby Schlumberger REDA Production ServicesHelen Padua Confidential Page 1 13/06/2016