BUILDING TECHNOLOGY 1 [BLD6140/ ARC3514 /ARC3512]
SCHOOLOF ARCHITECTURE, BUILDING& DESIGN
Bachelor of Science (Honours)(Architecture)
C o n s t r u c t i o n S o l u t i o n s
Kennett Lim Roong Xiang
0325031
Mr. Rizal
Learning Centre for All
Klang
CONTENT TABLE
1.0 Introduction
1.1 Jalan Besar, Klang
1.2 Learning Centre for All
A. Project description
B. Plans
2.0 Precedent studies and analysis
2.1 Façade – M House, Grid timber louvres screen façade
- Cloverdale 749, Corrugated Metal Cladding Façade
2.2 Structural system - The Spring House, Steel System
2.3 Floor system - The Spring House, Composite Steel Floor
2.4 Roof - Nest We Grow Moment Connection,
3.0 Alternative design scheme
3.1 façade 1
3.2 façade 2
4.0 Sectional perspective
5.0 References
2
1.0 Introduction
The elaborated findings and analysis in the practicality of design through the means of the structural and the envelope systems of proposed Learning
Centre for All in Klang design. The analysis and documentation of construction methods and materials, evaluation of existing construction system and
detailing of the selectedproject, lastly to generate an alternative construction solutions via the interpretation of sketches and drawings.
Moreover, the thought process and consideration spans to ensure that the design implemented into the abstract of thinking integrates logical and
workable construction systems such as floor, roof, and façade of the proposed building project. The findings and conclusions drawn thereafter allows
understanding of the design scheme as an intention to tackle issues regarding to the site in Klang as well as to increase knowledge competency of the
design proposed.
This objective encourages analytical and critical study of the principles, practices and details of building technology in the abstract design of the Learning
Centre for All.Also, to be able to implement the alternative construction systems into the design of the building afterwards.
1.1 Jalan Besar
Primary circulatory access to cross through to the be redirected back south of Klang. Along
the wide road, it consists of the physical qualities like the intimate scale of the buildings,
oriented facades to the street sheltered with five foot walkways, spots and clumps of
vegetation, and the many parking amenities.
Diagram 1: The street of Jalan Besar spanning across Klang
intersectingat a junction in frontof KTM and nearsite A.
Scale 1; 2000
Figure 1: Jalan Besar street converging towards to
the site viewed from the bridge of Jalan Tengku
Kelana.
Figure 2: the famous “Chong Kok” that is well
perceived by many people local and far from Klang
flanked by shop lots of interest by along the wide
busy streetof Jalan Besar.
Introduction I 1.0 3
1.2 Learning Centre for All
A. Project description
Building function:
Learning and activity centre
Building type:
Infill of 3 shop lots
Building area:
5471.91m2 . (31 metres long and 16 metres wide)
Building storeys:
Existing building storey- 2 storeys,
Proposedlearning centre-4 storeys.
Location:
JY mart, trading gold smith shop lot and a wholesale shop lot opposite collectively
placed right in front of the KTM of Klang
Design Intention:
The learning centre is designed to aid in bringing livelihood and vibrancy to the rather
stagnant sector of Klang. It is also considered in the design as a strategy to be aware
and a new experience whilst travelling down the road of Jalan Besar, Klang. There is
much more things that can be discovered and to have community to intertwine with
the place a little longer as there are opportunities that can be taken and strengths to
be reinforced, weaknesses to be tackled and threats to be provideda solution to.
The design takes on the approach to the people by bringing introducing street life with
the building by the path-space relationship on the ground level as a connecting
circulation to the spaces above. Spaces whilst defined in relation to the presence of
the surrounding context.
Scale 1; 2000
Diagram 3: Buildings lots highlighted as the
proposed building of the learning centre for all. It
consists of 3 corner infill shop lots.
Diagram 2: site plan of Klang with the site indicated in relation with the
surrounding context.
4
5
B. Plans
1 :100
Ground floor
A B C D E F G
1
2
3
4
6
1 :100
First floor
A B C D E F G
1
2
3
4
1 :100
Second floor
7
A B C D E F G
1
2
3
4
8
1 :100
Third floor
A B C D E F G
1
2
3
4
Masonry screen façade I Precedentstudies and analysis I 2.0
2.1. Masonry facade
The building seeks to give an urban response by
understanding the boundary gable of the school as
a facade, not as a "blind" wall.
Edicion Juana Azurduy 1635 by
BAAG
Buenos Aires, Argentina
2011
Advantages
1. Resourceful, vernacular materials that can
be potentiallyfound locally .
2. Sufficient thermal mass to cool interior
spaces
3. Privacy to the inhabitants within the house.
4. Recyclable
5. Repeated intricate pattern allows ease of
constructability
6. Relatively low cost, in labour and material
usage
Disadvantages
1. Possibility for occurrence in corrosion
2. Expensive to be funded when needed
additional quantity
3. Weight- weight of a brick construction can
lead to premature and extensive sinking of
the foundation.
4. High cost in maintenance and labour
What can be learnt for the Learning
Centre for All .
The implementation of this pattern of façade
design stimulates play of transparency from in
the building to out. It makes perfect fit for the
intention into creating interest from street level
in Jalan Besar, Klang – the mix of classic and
new.
The modular arrangement and dimension eases
construction tension whilst economic factor
which compliments the interior spaces
effectively whereby spaces needed to be quiet;
yet open. Therefore, this fits in the learning
centrenicely.
9
10
Parasol strip
Brick screening
Belt edge
Doublewall | Brick screen
Modular schemes
Exploring the possibilities of the massive brick, horizontal "banners" of 90 cm
in height were designed that act as parapets, brises and screens. These bands
run along the four faces of the blocks forming the walls; balancing and
accentuating the visuals. Each balcony and terrace has expansions by brises&
screens that create privacy specific characteristics that favoursprivacy.
2.
Gridles -
Railings
3.
Expansions
4.
Core spaces
Brick locking
Brick screen
Soga Rigging
Simple brick
screen
Palomero
rigging
English brick
screen
Palomero
rigging with
tizon
1.
Gridles -
Parasols
Structure - Steel
Girdles- Parasol
+
=
4–faced - Continuously facet
every orientation of the house.
This motive initiates dialogue
among the suburban setting;
privacy & transparent
*Allimagescourtesy of BAAG
Perforated face-
The initiative was to design a
flexible wall in meeting the
terms of privacy as well as
local air movement
orientation.
CorrugatedMetalCladding Façade I 2.1 I Precedentstudies and analysis I 2.0
2.1. Corrugated Metal Cladding Façade
The contemporary effects of such a façade which
responds to the heaty seashore climate of the
country. The play of opacity and modern
materials usage which in
turn , provides ease of asse-
mblage & obtaining it.
CLOVERDALE 749 by Lorcan
O’Herlihy Architects
Los Angelos, CA, USA
2014
Advantages
1. Durable material against weather element
and age.
2. Strengthin material
3. Ductileand non-permeable
4. Ease in constructability of modular sizes
and fabricated offsite
5. Reusable and can be recycled
6. Low energy waste emission, & low in
construction waste
Disadvantages
1. Possible corrosion and rust
2. Possible and constant check-up of material
quality to ensurenot rust and dust free
3. Excess carbon emission during production
period
What can be learnt for the Learning
Centre for All .
By allowing the concept of transparency and the
varies of activities intensities within the learning
centre, this façade system creates the dialogue
of architectural poetic means whilst providing
the structuralfaçade system to the building.
The blend of opacity and openings formulated
with the modular dimension means in
construction provides ventilation and views to
the outside. Straightforward constructability
saves cost as well as labour skill required to
assemble such façade along the busy road of
Jalan Besar, Klang.
11
“face” of the
building.
Components
place on the
beam.
Horizontal and
vertical
members
which holds
the façade into
place.
Structural
integrity of the
“face” of the
house.
12
Primary structure:
Concrete structure
Secondary structure:
Steel beams and
columns
Primary structure:
Linen aluminium
panels (perforated
and opaque)
Installation method
1. Steel structures are bolted to the
concrete structure.
2. The corrugated panel is then added
later on to the steel beams at
intervals by securing it into place
using screws (fasteners).
Fastening patterns
Attaching to steel:
#12 – 14 XL SELF DRILLING SCREW
Trim Fastener
1/8” x 3/16”Pop Rivet
/1/4“ – 14 x 7/8” XL Stitch screw
Metal Sales panel colours
- ENERGY STAR® which
reduce heat load to
building.
- Durable
- Recyclable
- Low demand for cooling
technologies.
Linen white with
deep rib panel
(corrugated/opaque)
Structuralsteel system I Construction system I 2.2
2.2 Structural steel system
Steel is an inexpensive material and
can formulate the intricate in design.
Special connection and joint utilised
to mixes the structural members with
he masonry wall whilst providing
strength to the structure.
Spring House by Wu & Liu
Architects
Taipei, Taiwan
2015
Advantages
1. Fast modular components to be assembled
when reached to site
2. Flexible and resistiveagainst lateral forces
3. Strong and durable
4. Variety in dimensions as well as suitable
with cladding with other materials
5. Able to span great distances
Disadvantages
1. Lose strength at really high temperatures
and also that it can conduct heat and
electricity, numerous coatings adhered to
preventsuch accidental occurrence
2. Prone to natural corrosion in tropical and
humid environment
What can be learnt for the Learning
Centre for All .
Steel frame are available to longer and larger
structural spans whilst efficiency when laid out
along a regular grid layout.
Combined with masonry approach in
construction with the steel structure framework,
it produces an intricate architecture type along
the neighbouring shoplots. Thus appeal to the
generic sense of place in Jalan Besar. Masonry
also possess such insulation in acoustics
required in several spaces which need sound
proofing in the learning centre for all. Reused
bricks from existing damaged and abandoned
shoplots can be reusedin this building.
13
Column and masonry
connection details
(image courtesy of The
International Masonry
Institute)
14
THE PROCESS IN CONSTRUCTING THE STEEL FORMWORK
1. After the construction of pad footing foundation is set up, steel base plates are anchored and
attached to the pad footing foundation with anchor bolts.
2. Steel columns are lowered and welded to these base plates as these plates plays part into
transferring load to the ground.
3. Ground floor beams are connected to the columns via fin plates welded onto the web of the
steel I-Beams.
4. The ground floor is prepared through the floor system of composite flooring (refer to
Compositefloorsystem)as the infill walls are then placed later.
5. As the floor progresses, columns are erected and connected through splices where the
splices are bolted by the sides on the flanges surface of the I- Beams.
6. This process is applied to floors again to the second floor.
1 2 3 4
A light weight with a grid-like skeleton of vertical
and horizontal I- Beam steel members in which
sub structures are attached.
(image courtesyof SteelConstructionInfo)
Sectional constructional detail of
steelformwork.
CompositeSteelFlooring System I Floor I 2.2
2.3 Composite Steel Floor
Steel is an inexpensive material and
can formulate the intricate in design.
Special connection and joint utilised
to mixes the structural members with
he masonry wall whilst providing
strength to the structure.
Spring House by Wu & Liu
Architects
Taipei, Taiwan
2015
Advantages
1. Fast modular components to be assembled
when reached to site
2. Flexible and resistiveagainst lateral forces
3. Strong and durable
4. Variety in dimensions as well as suitable
with cladding with other materials
5. Able to span great distances
Disadvantages
1. Lose strength at really high temperatures
and also that it can conduct heat and
electricity, numerous coatings adhered to
preventsuch accidental occurrence
2. Prone to natural corrosion in tropical and
humid environment
What can be learnt for the Learning
Centre for All .
Steel frame are available to longer and larger
structural spans whilst efficiency when laid out
along a regular grid layout.
Combined with masonry approach in
construction with the steel structure framework,
it produces an intricate architecture type along
the neighbouring shoplots. Thus appeal to the
generic sense of place in Jalan Besar. Masonry
also possess such insulation in acoustics
required in several spaces which need sound
proofing in the learning centre for all. Reused
bricks from existing damaged and abandoned
shoplots can be reusedin this building.
15
Details of composite metal deck flooring.
(image courtesyof SteelConstructionInfo)
16
Composite steel flooring
components joint to the I-
Beam of the building
structure.
(image courtesy of
SteelConstructionInfo)
THE PROCESS IN CONSTRUCTING THE STEEL FORWORK
1. Trapezoidal steel decking is placed and spanned across the secondary floorbeams
2. The decking is rigidly placed to the primary and secondary beams by shear studs, connected
through deck-welding technique .
3. Mesh reinforcement , like rebars, are placed on top of the steel decking to provide bending
resistance and to reduce support cracking. The mesh aids in distributing effects of line and
point loads.
4. The profiledsteel decking acts as a formwork during construction & additional
reinforcement at the final stage of construction when R.C. (reinforced concrete)
is casted on top of it
1 2 3 4
Deck-welding technique of
the metal deck placed on the
I-Beam of the structure
(image courtesy of Arc Spot
Welding SteelDeck– A Primer)
Sectional perspective constructional
detail of composite steelflooring.
2.4 Transparent Plastic Corrugated
Sheets
Allowing light in for the plants, and heating the
space during colder months, extending the
usability of the Nest- This is the criteria
mentioned into one of the efforts into
maintaining energyefficiencyof the structure.
The simple construction deemedpractical
Whilst aestheticin a har-
monic appeal in its
setting and context.
Transparent Plastic CorrugatedSheets| Roof I 2.3
Nest We Grow Moment Connection
by Graduate students from the
University of California
Japan
2015
Advantages
1. Simple mechanism of longitudinal wood
truss allows simple construction
2. Lightweight members reduces load
imposed on structure
3. Resourceful material that is can be
obtained easily
4. Transparent corrugated material allows
play of light to enter the structure’s interior
thus exposed ceiling can be achieved
Disadvantages
1. Skilled labourer required to amend
construction details o be assembled
2. Possible degrade in wood over long period
of time
3. Traditional methods into securing could
compromise structuralintegrity
17
What can be learnt for the Learning
Centre for All .
Longitudinal wooden trusses are of a common
essence in the sense of place in Klang
shophouses. But, traditional methods could be of
failure and potentially be leading to the building’s
demise.
Efficiency in the modular assemblage with
proper integral pattern with much sturdier
material like steel, could prevent such
unfortunate event whilst providing visual appeal
to the structurewhen ceiling is exposed.
This effort allows light to be diffused into the
spaces while aestheticallypleasing.
18
Sectionalperspective
(Imagecourtesyof Archdaily)
Structural assemblage
1. Columns are amended into intended form of modularity.
2. Additional structural aids like steel plates are secured along with cross
bracing from one member to another.
3. Structural members have their end tip subtracted out to have ease in
assemblage horizontal members to be connected across it.
Columns
Vertical members in grid intervals as
structural membersto hold the form
of the structure
(image courtesyof Archdaily)
Sliding panels in the roof open to facilitate
air movement through the structure during
the summer and warmer parts of the day.
The tea platform sits to keep in warm air
created by the skin during the colder
months, and in a cross ventilated area
during the warm summer months.
(image courtesyof Archdaily)
Roof members assembly
Rafter and joists are
connected via the
hurricane strip and is
later attached with
the translucent roof.
The Nest takes advantage of the transparent plastic
corrugated sheets on the façade and roof, allowing
light in for the plants, and heating the space during
colder months, thus extending its usability.
(image courtesy of Archdaily)
3.1 Façade scheme 1 | Masonry facade scheme
Front elevation
Scale 1:100
19
3.0 Alternate Façade Scheme
Rear facing
Scale 1:100
2
0
3.2 Façade scheme 2 | Corrugated Metal Cladding Façade
Front elevation
Scale 1:100
21
Rear facing
Scale 1:100
2
2
23
Sectional perspectives
Ground floor
Dining space
1 ; 30
Reinforce concretepad footing
900mm x 900 mm
1200mm below ground level
Reinforce concretestump
400mm x 400 mm
Concreteslab steeldecking with
composite trapezoidal profile
Concreteslab mesh reinforcement30mm (thickness) timber oak flooring
embeddedinto concrete slab
Powder coated steelI- beam
200mm x 200mm
Low carbon shear studs
60mm composite
table counter
Self hydrated hangers
holding evergreencreepers
40mm (thickness)
Floor board decking
150mm Reinforce
concretefloor slab
250mm x 350mm
Reinforce concretefloor beam
Diningspace
Rehydrate and cook
station
196mm x 70mm
wooden floor joists
300 mm shared
concretewall to
neighbor shop lot
24
Highest floor
‘A space for me’ – breathing space
Wooden planks louvres
40mm x 150 mm
Tubular hollow purlin
60mm x 150 mm
Concreteslab steeldecking with
composite trapezoidal profile
50mm (thick) dampproof
membrane
Tubular hollow Rafter
300mm x 200 mm
Rectangular hollow truss
80mm x 200 mm
Lightweight concretecloser
300mm
Continuous
metalgutter
80mm (thick) oakwood
flooring decking
Fiber cementpanels
200mm(thick) x 2000mm x 1000mm
Milky white polycarbonate
corrugatedmetalsheeting
30mm (thickness)
Operable window
skylight
900mm pipe railing
150mm concrete
wall composite
Roof flashing
60mm concrete
wall build
Waterproofmembrane
Geotextile
Tree ball
(root)
Protection & drainage layer
5.0 References
Façade
Edicion Juana Azurduy1635
B. Julia, (2018) EdíficioJuana Azurduy1635 / BAAG.
Retrievedfrom:https://www.archdaily.com.br/br/894458/edificio-juana-azurduy-1635-baag?ad_medium=gallery
R. Sean, (n.d.) The Disadvantages of Masonry Construction.
Retrievedfrom:https://www.hunker.com/12465558/the-disadvantages-of-masonry-construction
BAAG,(2017) CasaBuho/ BAAG.
Retreivedfrom:https://www.plataformaarquitectura.cl/cl/office/baag
CLOVERDALE 749
G. Alyn, (2014). Cloverdale749apartmentsby LOHA featurebalconies screenedby perforatedmetal panels.
Retrievedform: https://www.dezeen.com/2014/05/28/cloverdale749-apartments-by-loha-feature-balconies-screened-by-perforated-metal-sheets/
G.John, (2013). Cloverdale749.
Retrievedfrom: https://www.architectmagazine.com/awards/annual-design-review/cloverdale749_o
O’Brien L. (2017). Metal Sales™ Adds Sleek Sustainabilityto Los Angeles’ Cloverdale749.
retrievedfrom: http://lopressroom.com/metalsales/cloverdale
Structural steel frame system
Spring House W L A
Images courtesyby Akira photography (2016), Spring HouseW L A, retrievedfrom:https://www.archdaily.com/photographer/akira-photography
(2016).
Spring Spring House.
Retrievedfrom:https://www.archdaily.com/789515/spring-house-w-l-a
WLA, (2015). The spring house/WLA.
Retrievedfrom:http://www.understandconstruction.com/steel-frame-structures.html
B. Dwight (n.d.). STEELFRAME STRUCTURES.
Retrievedfrom:https://www.whirlwindsteel.com/blog/bid/407580/7-advantages-of-structural-steel-frame-construction
Whirlwind Team (2015). 7ADVANTAGESOF STRUCTURALSTEELFRAME CONSTRUCTION.
Retrievedfrom:https://www.whirlwindsteel.com/blog/bid/407580/7-advantages-of-structural-steel-frame-construction
2
5
26
Floor
Spring House W L A
Images courtesyby Akira photography (2016), Spring HouseW L A, retrievedfrom:https://www.archdaily.com/photographer/akira-photography
J. W. Rackham, G. H. Couchman, & S. J. Hicks, (2009), Composite Slabs and Beams using Steel Decking: Best Practice for Design and Construction (Revised Edition). Britian, The Metal
Cladding & Roofing ManufacturersAssociation in partnershipwith The SteelConstructionInstitute
Retreivedfrom:https://www.steelconstruction.info/images/b/b8/SCI_P300.pdf
M. Crisinel, & D.C. O'Leary,(1996). STATE-OF-THE-ART REVIEW OF COMPOSITE FLOOR SLABDESIGNANDCONSTRUCTION.
Retrievedfrom:https://www.researchgate.net/publication/37455428_Composite_Floor_Slab_Design_and_Construction
Roof
Nest We Grow Moment Connection
J. Jenny, (2015). InnovativeDetail:NestWeGrowMomentConnection.
Retrievedfrom:https://www.architectmagazine.com/technology/detail/innovative-detail-nest-we-grow-moment-connection_o
S. Eduardo, (2015). NestWeGrow/ Faculdade de ProjetoAmbientalUCBerkeley+ Kengo Kuma& Associates
Retrievedfrom: https://www.archdaily.com.br/br/765181/nest-we-grow-college-of-environmental-design-uc-berkeley-plus-kengo-kuma-and-
associates/54c9b1dce58ece5c5e000219-section-aa
(2015). NestWeGrow/ Kengo Kuma & Associates+ Collegeof EnvironmentalDesign UCBerkeley.
Retrievedfrom:https://www.archdaily.com/592660/nest-we-grow-college-of-environmental-design-uc-berkeley-kengo-kuma-and-associates

Mais conteúdo relacionado

Mais procurados

Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Bachelor in quantity surveying 2
Bachelor in quantity surveying 2
Arthur Wilson
 
Architecture Culture & History 2_Project_02_Web book
Architecture Culture & History 2_Project_02_Web bookArchitecture Culture & History 2_Project_02_Web book
Architecture Culture & History 2_Project_02_Web book
Winnie Ang
 
Portfolio_Simple
Portfolio_SimplePortfolio_Simple
Portfolio_Simple
Chris Lee
 
CT Presentation (KLCC)
CT Presentation (KLCC)CT Presentation (KLCC)
CT Presentation (KLCC)
Yap Xin
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
Dominic Holder
 

Mais procurados (20)

Culture & History 2- Project 2
Culture & History 2- Project 2Culture & History 2- Project 2
Culture & History 2- Project 2
 
DEWAN TUNKU CANSELOR, UNIVERSITI MALAYA
DEWAN TUNKU CANSELOR, UNIVERSITI MALAYADEWAN TUNKU CANSELOR, UNIVERSITI MALAYA
DEWAN TUNKU CANSELOR, UNIVERSITI MALAYA
 
Architectural Culture and History 2: Project 2
Architectural Culture and History 2: Project 2Architectural Culture and History 2: Project 2
Architectural Culture and History 2: Project 2
 
PROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONSPROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONS
 
Btechfinal
BtechfinalBtechfinal
Btechfinal
 
Btech 1, 2
Btech 1, 2Btech 1, 2
Btech 1, 2
 
Designing a Super Tall Skyscraper
Designing a Super Tall Skyscraper Designing a Super Tall Skyscraper
Designing a Super Tall Skyscraper
 
Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Bachelor in quantity surveying 2
Bachelor in quantity surveying 2
 
high rise buildings case study
high rise buildings case studyhigh rise buildings case study
high rise buildings case study
 
Angkasapuri final report
Angkasapuri final reportAngkasapuri final report
Angkasapuri final report
 
High rise building
High rise buildingHigh rise building
High rise building
 
Architecture Culture & History 2_Project_02_Web book
Architecture Culture & History 2_Project_02_Web bookArchitecture Culture & History 2_Project_02_Web book
Architecture Culture & History 2_Project_02_Web book
 
Petronas Twin Towers
Petronas Twin TowersPetronas Twin Towers
Petronas Twin Towers
 
Commission on Chicago Landmarks Meet Agenda - May 13th, 2015
Commission on Chicago Landmarks Meet Agenda - May 13th, 2015Commission on Chicago Landmarks Meet Agenda - May 13th, 2015
Commission on Chicago Landmarks Meet Agenda - May 13th, 2015
 
Portfolio_Simple
Portfolio_SimplePortfolio_Simple
Portfolio_Simple
 
CHIN WOO STADIUM
CHIN WOO STADIUMCHIN WOO STADIUM
CHIN WOO STADIUM
 
Pegasus
PegasusPegasus
Pegasus
 
CT Presentation (KLCC)
CT Presentation (KLCC)CT Presentation (KLCC)
CT Presentation (KLCC)
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
Mies van der rohe
Mies van der roheMies van der rohe
Mies van der rohe
 

Semelhante a Construction solutions

Final wisma lee rubber compilation (new)
Final wisma lee rubber compilation (new)Final wisma lee rubber compilation (new)
Final wisma lee rubber compilation (new)
WC Yan
 
Mesiniaga final
Mesiniaga finalMesiniaga final
Mesiniaga final
Yq Chong
 

Semelhante a Construction solutions (20)

Btech
BtechBtech
Btech
 
Building Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsBuilding Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction Solutions
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
 
Construction Solutions
Construction SolutionsConstruction Solutions
Construction Solutions
 
B tech project 2
B tech project 2B tech project 2
B tech project 2
 
INTEGRATION
INTEGRATIONINTEGRATION
INTEGRATION
 
A3 report
A3 reportA3 report
A3 report
 
Building Technology 1 "Construction Solutions"
Building Technology 1 "Construction Solutions"Building Technology 1 "Construction Solutions"
Building Technology 1 "Construction Solutions"
 
Building tech Project 2
Building tech Project 2Building tech Project 2
Building tech Project 2
 
Building Technology project 02
Building Technology project 02Building Technology project 02
Building Technology project 02
 
Pm project `1 report
Pm project `1 reportPm project `1 report
Pm project `1 report
 
Final wisma lee rubber compilation (new)
Final wisma lee rubber compilation (new)Final wisma lee rubber compilation (new)
Final wisma lee rubber compilation (new)
 
Dewan Tunku Canselor
Dewan Tunku CanselorDewan Tunku Canselor
Dewan Tunku Canselor
 
Building Technology Design Solution
Building Technology Design SolutionBuilding Technology Design Solution
Building Technology Design Solution
 
Mod. 1.pptx
Mod. 1.pptxMod. 1.pptx
Mod. 1.pptx
 
Kew Xun Long's Portfolio (2010-2014)
Kew Xun Long's Portfolio (2010-2014)Kew Xun Long's Portfolio (2010-2014)
Kew Xun Long's Portfolio (2010-2014)
 
BE Compiled
BE Compiled BE Compiled
BE Compiled
 
Mesiniaga final
Mesiniaga finalMesiniaga final
Mesiniaga final
 
Mesiniaga final
Mesiniaga finalMesiniaga final
Mesiniaga final
 
2014 Portfolio C Cilio.compressed
2014 Portfolio C Cilio.compressed2014 Portfolio C Cilio.compressed
2014 Portfolio C Cilio.compressed
 

Último

Último (20)

Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 

Construction solutions

  • 1. BUILDING TECHNOLOGY 1 [BLD6140/ ARC3514 /ARC3512] SCHOOLOF ARCHITECTURE, BUILDING& DESIGN Bachelor of Science (Honours)(Architecture) C o n s t r u c t i o n S o l u t i o n s Kennett Lim Roong Xiang 0325031 Mr. Rizal Learning Centre for All Klang
  • 2. CONTENT TABLE 1.0 Introduction 1.1 Jalan Besar, Klang 1.2 Learning Centre for All A. Project description B. Plans 2.0 Precedent studies and analysis 2.1 Façade – M House, Grid timber louvres screen façade - Cloverdale 749, Corrugated Metal Cladding Façade 2.2 Structural system - The Spring House, Steel System 2.3 Floor system - The Spring House, Composite Steel Floor 2.4 Roof - Nest We Grow Moment Connection, 3.0 Alternative design scheme 3.1 façade 1 3.2 façade 2 4.0 Sectional perspective 5.0 References 2
  • 3. 1.0 Introduction The elaborated findings and analysis in the practicality of design through the means of the structural and the envelope systems of proposed Learning Centre for All in Klang design. The analysis and documentation of construction methods and materials, evaluation of existing construction system and detailing of the selectedproject, lastly to generate an alternative construction solutions via the interpretation of sketches and drawings. Moreover, the thought process and consideration spans to ensure that the design implemented into the abstract of thinking integrates logical and workable construction systems such as floor, roof, and façade of the proposed building project. The findings and conclusions drawn thereafter allows understanding of the design scheme as an intention to tackle issues regarding to the site in Klang as well as to increase knowledge competency of the design proposed. This objective encourages analytical and critical study of the principles, practices and details of building technology in the abstract design of the Learning Centre for All.Also, to be able to implement the alternative construction systems into the design of the building afterwards. 1.1 Jalan Besar Primary circulatory access to cross through to the be redirected back south of Klang. Along the wide road, it consists of the physical qualities like the intimate scale of the buildings, oriented facades to the street sheltered with five foot walkways, spots and clumps of vegetation, and the many parking amenities. Diagram 1: The street of Jalan Besar spanning across Klang intersectingat a junction in frontof KTM and nearsite A. Scale 1; 2000 Figure 1: Jalan Besar street converging towards to the site viewed from the bridge of Jalan Tengku Kelana. Figure 2: the famous “Chong Kok” that is well perceived by many people local and far from Klang flanked by shop lots of interest by along the wide busy streetof Jalan Besar. Introduction I 1.0 3
  • 4. 1.2 Learning Centre for All A. Project description Building function: Learning and activity centre Building type: Infill of 3 shop lots Building area: 5471.91m2 . (31 metres long and 16 metres wide) Building storeys: Existing building storey- 2 storeys, Proposedlearning centre-4 storeys. Location: JY mart, trading gold smith shop lot and a wholesale shop lot opposite collectively placed right in front of the KTM of Klang Design Intention: The learning centre is designed to aid in bringing livelihood and vibrancy to the rather stagnant sector of Klang. It is also considered in the design as a strategy to be aware and a new experience whilst travelling down the road of Jalan Besar, Klang. There is much more things that can be discovered and to have community to intertwine with the place a little longer as there are opportunities that can be taken and strengths to be reinforced, weaknesses to be tackled and threats to be provideda solution to. The design takes on the approach to the people by bringing introducing street life with the building by the path-space relationship on the ground level as a connecting circulation to the spaces above. Spaces whilst defined in relation to the presence of the surrounding context. Scale 1; 2000 Diagram 3: Buildings lots highlighted as the proposed building of the learning centre for all. It consists of 3 corner infill shop lots. Diagram 2: site plan of Klang with the site indicated in relation with the surrounding context. 4
  • 5. 5 B. Plans 1 :100 Ground floor A B C D E F G 1 2 3 4
  • 6. 6 1 :100 First floor A B C D E F G 1 2 3 4
  • 7. 1 :100 Second floor 7 A B C D E F G 1 2 3 4
  • 8. 8 1 :100 Third floor A B C D E F G 1 2 3 4
  • 9. Masonry screen façade I Precedentstudies and analysis I 2.0 2.1. Masonry facade The building seeks to give an urban response by understanding the boundary gable of the school as a facade, not as a "blind" wall. Edicion Juana Azurduy 1635 by BAAG Buenos Aires, Argentina 2011 Advantages 1. Resourceful, vernacular materials that can be potentiallyfound locally . 2. Sufficient thermal mass to cool interior spaces 3. Privacy to the inhabitants within the house. 4. Recyclable 5. Repeated intricate pattern allows ease of constructability 6. Relatively low cost, in labour and material usage Disadvantages 1. Possibility for occurrence in corrosion 2. Expensive to be funded when needed additional quantity 3. Weight- weight of a brick construction can lead to premature and extensive sinking of the foundation. 4. High cost in maintenance and labour What can be learnt for the Learning Centre for All . The implementation of this pattern of façade design stimulates play of transparency from in the building to out. It makes perfect fit for the intention into creating interest from street level in Jalan Besar, Klang – the mix of classic and new. The modular arrangement and dimension eases construction tension whilst economic factor which compliments the interior spaces effectively whereby spaces needed to be quiet; yet open. Therefore, this fits in the learning centrenicely. 9
  • 10. 10 Parasol strip Brick screening Belt edge Doublewall | Brick screen Modular schemes Exploring the possibilities of the massive brick, horizontal "banners" of 90 cm in height were designed that act as parapets, brises and screens. These bands run along the four faces of the blocks forming the walls; balancing and accentuating the visuals. Each balcony and terrace has expansions by brises& screens that create privacy specific characteristics that favoursprivacy. 2. Gridles - Railings 3. Expansions 4. Core spaces Brick locking Brick screen Soga Rigging Simple brick screen Palomero rigging English brick screen Palomero rigging with tizon 1. Gridles - Parasols Structure - Steel Girdles- Parasol + = 4–faced - Continuously facet every orientation of the house. This motive initiates dialogue among the suburban setting; privacy & transparent *Allimagescourtesy of BAAG Perforated face- The initiative was to design a flexible wall in meeting the terms of privacy as well as local air movement orientation.
  • 11. CorrugatedMetalCladding Façade I 2.1 I Precedentstudies and analysis I 2.0 2.1. Corrugated Metal Cladding Façade The contemporary effects of such a façade which responds to the heaty seashore climate of the country. The play of opacity and modern materials usage which in turn , provides ease of asse- mblage & obtaining it. CLOVERDALE 749 by Lorcan O’Herlihy Architects Los Angelos, CA, USA 2014 Advantages 1. Durable material against weather element and age. 2. Strengthin material 3. Ductileand non-permeable 4. Ease in constructability of modular sizes and fabricated offsite 5. Reusable and can be recycled 6. Low energy waste emission, & low in construction waste Disadvantages 1. Possible corrosion and rust 2. Possible and constant check-up of material quality to ensurenot rust and dust free 3. Excess carbon emission during production period What can be learnt for the Learning Centre for All . By allowing the concept of transparency and the varies of activities intensities within the learning centre, this façade system creates the dialogue of architectural poetic means whilst providing the structuralfaçade system to the building. The blend of opacity and openings formulated with the modular dimension means in construction provides ventilation and views to the outside. Straightforward constructability saves cost as well as labour skill required to assemble such façade along the busy road of Jalan Besar, Klang. 11
  • 12. “face” of the building. Components place on the beam. Horizontal and vertical members which holds the façade into place. Structural integrity of the “face” of the house. 12 Primary structure: Concrete structure Secondary structure: Steel beams and columns Primary structure: Linen aluminium panels (perforated and opaque) Installation method 1. Steel structures are bolted to the concrete structure. 2. The corrugated panel is then added later on to the steel beams at intervals by securing it into place using screws (fasteners). Fastening patterns Attaching to steel: #12 – 14 XL SELF DRILLING SCREW Trim Fastener 1/8” x 3/16”Pop Rivet /1/4“ – 14 x 7/8” XL Stitch screw Metal Sales panel colours - ENERGY STAR® which reduce heat load to building. - Durable - Recyclable - Low demand for cooling technologies. Linen white with deep rib panel (corrugated/opaque)
  • 13. Structuralsteel system I Construction system I 2.2 2.2 Structural steel system Steel is an inexpensive material and can formulate the intricate in design. Special connection and joint utilised to mixes the structural members with he masonry wall whilst providing strength to the structure. Spring House by Wu & Liu Architects Taipei, Taiwan 2015 Advantages 1. Fast modular components to be assembled when reached to site 2. Flexible and resistiveagainst lateral forces 3. Strong and durable 4. Variety in dimensions as well as suitable with cladding with other materials 5. Able to span great distances Disadvantages 1. Lose strength at really high temperatures and also that it can conduct heat and electricity, numerous coatings adhered to preventsuch accidental occurrence 2. Prone to natural corrosion in tropical and humid environment What can be learnt for the Learning Centre for All . Steel frame are available to longer and larger structural spans whilst efficiency when laid out along a regular grid layout. Combined with masonry approach in construction with the steel structure framework, it produces an intricate architecture type along the neighbouring shoplots. Thus appeal to the generic sense of place in Jalan Besar. Masonry also possess such insulation in acoustics required in several spaces which need sound proofing in the learning centre for all. Reused bricks from existing damaged and abandoned shoplots can be reusedin this building. 13
  • 14. Column and masonry connection details (image courtesy of The International Masonry Institute) 14 THE PROCESS IN CONSTRUCTING THE STEEL FORMWORK 1. After the construction of pad footing foundation is set up, steel base plates are anchored and attached to the pad footing foundation with anchor bolts. 2. Steel columns are lowered and welded to these base plates as these plates plays part into transferring load to the ground. 3. Ground floor beams are connected to the columns via fin plates welded onto the web of the steel I-Beams. 4. The ground floor is prepared through the floor system of composite flooring (refer to Compositefloorsystem)as the infill walls are then placed later. 5. As the floor progresses, columns are erected and connected through splices where the splices are bolted by the sides on the flanges surface of the I- Beams. 6. This process is applied to floors again to the second floor. 1 2 3 4 A light weight with a grid-like skeleton of vertical and horizontal I- Beam steel members in which sub structures are attached. (image courtesyof SteelConstructionInfo) Sectional constructional detail of steelformwork.
  • 15. CompositeSteelFlooring System I Floor I 2.2 2.3 Composite Steel Floor Steel is an inexpensive material and can formulate the intricate in design. Special connection and joint utilised to mixes the structural members with he masonry wall whilst providing strength to the structure. Spring House by Wu & Liu Architects Taipei, Taiwan 2015 Advantages 1. Fast modular components to be assembled when reached to site 2. Flexible and resistiveagainst lateral forces 3. Strong and durable 4. Variety in dimensions as well as suitable with cladding with other materials 5. Able to span great distances Disadvantages 1. Lose strength at really high temperatures and also that it can conduct heat and electricity, numerous coatings adhered to preventsuch accidental occurrence 2. Prone to natural corrosion in tropical and humid environment What can be learnt for the Learning Centre for All . Steel frame are available to longer and larger structural spans whilst efficiency when laid out along a regular grid layout. Combined with masonry approach in construction with the steel structure framework, it produces an intricate architecture type along the neighbouring shoplots. Thus appeal to the generic sense of place in Jalan Besar. Masonry also possess such insulation in acoustics required in several spaces which need sound proofing in the learning centre for all. Reused bricks from existing damaged and abandoned shoplots can be reusedin this building. 15
  • 16. Details of composite metal deck flooring. (image courtesyof SteelConstructionInfo) 16 Composite steel flooring components joint to the I- Beam of the building structure. (image courtesy of SteelConstructionInfo) THE PROCESS IN CONSTRUCTING THE STEEL FORWORK 1. Trapezoidal steel decking is placed and spanned across the secondary floorbeams 2. The decking is rigidly placed to the primary and secondary beams by shear studs, connected through deck-welding technique . 3. Mesh reinforcement , like rebars, are placed on top of the steel decking to provide bending resistance and to reduce support cracking. The mesh aids in distributing effects of line and point loads. 4. The profiledsteel decking acts as a formwork during construction & additional reinforcement at the final stage of construction when R.C. (reinforced concrete) is casted on top of it 1 2 3 4 Deck-welding technique of the metal deck placed on the I-Beam of the structure (image courtesy of Arc Spot Welding SteelDeck– A Primer) Sectional perspective constructional detail of composite steelflooring.
  • 17. 2.4 Transparent Plastic Corrugated Sheets Allowing light in for the plants, and heating the space during colder months, extending the usability of the Nest- This is the criteria mentioned into one of the efforts into maintaining energyefficiencyof the structure. The simple construction deemedpractical Whilst aestheticin a har- monic appeal in its setting and context. Transparent Plastic CorrugatedSheets| Roof I 2.3 Nest We Grow Moment Connection by Graduate students from the University of California Japan 2015 Advantages 1. Simple mechanism of longitudinal wood truss allows simple construction 2. Lightweight members reduces load imposed on structure 3. Resourceful material that is can be obtained easily 4. Transparent corrugated material allows play of light to enter the structure’s interior thus exposed ceiling can be achieved Disadvantages 1. Skilled labourer required to amend construction details o be assembled 2. Possible degrade in wood over long period of time 3. Traditional methods into securing could compromise structuralintegrity 17 What can be learnt for the Learning Centre for All . Longitudinal wooden trusses are of a common essence in the sense of place in Klang shophouses. But, traditional methods could be of failure and potentially be leading to the building’s demise. Efficiency in the modular assemblage with proper integral pattern with much sturdier material like steel, could prevent such unfortunate event whilst providing visual appeal to the structurewhen ceiling is exposed. This effort allows light to be diffused into the spaces while aestheticallypleasing.
  • 18. 18 Sectionalperspective (Imagecourtesyof Archdaily) Structural assemblage 1. Columns are amended into intended form of modularity. 2. Additional structural aids like steel plates are secured along with cross bracing from one member to another. 3. Structural members have their end tip subtracted out to have ease in assemblage horizontal members to be connected across it. Columns Vertical members in grid intervals as structural membersto hold the form of the structure (image courtesyof Archdaily) Sliding panels in the roof open to facilitate air movement through the structure during the summer and warmer parts of the day. The tea platform sits to keep in warm air created by the skin during the colder months, and in a cross ventilated area during the warm summer months. (image courtesyof Archdaily) Roof members assembly Rafter and joists are connected via the hurricane strip and is later attached with the translucent roof. The Nest takes advantage of the transparent plastic corrugated sheets on the façade and roof, allowing light in for the plants, and heating the space during colder months, thus extending its usability. (image courtesy of Archdaily)
  • 19. 3.1 Façade scheme 1 | Masonry facade scheme Front elevation Scale 1:100 19 3.0 Alternate Façade Scheme
  • 21. 3.2 Façade scheme 2 | Corrugated Metal Cladding Façade Front elevation Scale 1:100 21
  • 23. 23 Sectional perspectives Ground floor Dining space 1 ; 30 Reinforce concretepad footing 900mm x 900 mm 1200mm below ground level Reinforce concretestump 400mm x 400 mm Concreteslab steeldecking with composite trapezoidal profile Concreteslab mesh reinforcement30mm (thickness) timber oak flooring embeddedinto concrete slab Powder coated steelI- beam 200mm x 200mm Low carbon shear studs 60mm composite table counter Self hydrated hangers holding evergreencreepers 40mm (thickness) Floor board decking 150mm Reinforce concretefloor slab 250mm x 350mm Reinforce concretefloor beam Diningspace Rehydrate and cook station 196mm x 70mm wooden floor joists 300 mm shared concretewall to neighbor shop lot
  • 24. 24 Highest floor ‘A space for me’ – breathing space Wooden planks louvres 40mm x 150 mm Tubular hollow purlin 60mm x 150 mm Concreteslab steeldecking with composite trapezoidal profile 50mm (thick) dampproof membrane Tubular hollow Rafter 300mm x 200 mm Rectangular hollow truss 80mm x 200 mm Lightweight concretecloser 300mm Continuous metalgutter 80mm (thick) oakwood flooring decking Fiber cementpanels 200mm(thick) x 2000mm x 1000mm Milky white polycarbonate corrugatedmetalsheeting 30mm (thickness) Operable window skylight 900mm pipe railing 150mm concrete wall composite Roof flashing 60mm concrete wall build Waterproofmembrane Geotextile Tree ball (root) Protection & drainage layer
  • 25. 5.0 References Façade Edicion Juana Azurduy1635 B. Julia, (2018) EdíficioJuana Azurduy1635 / BAAG. Retrievedfrom:https://www.archdaily.com.br/br/894458/edificio-juana-azurduy-1635-baag?ad_medium=gallery R. Sean, (n.d.) The Disadvantages of Masonry Construction. Retrievedfrom:https://www.hunker.com/12465558/the-disadvantages-of-masonry-construction BAAG,(2017) CasaBuho/ BAAG. Retreivedfrom:https://www.plataformaarquitectura.cl/cl/office/baag CLOVERDALE 749 G. Alyn, (2014). Cloverdale749apartmentsby LOHA featurebalconies screenedby perforatedmetal panels. Retrievedform: https://www.dezeen.com/2014/05/28/cloverdale749-apartments-by-loha-feature-balconies-screened-by-perforated-metal-sheets/ G.John, (2013). Cloverdale749. Retrievedfrom: https://www.architectmagazine.com/awards/annual-design-review/cloverdale749_o O’Brien L. (2017). Metal Sales™ Adds Sleek Sustainabilityto Los Angeles’ Cloverdale749. retrievedfrom: http://lopressroom.com/metalsales/cloverdale Structural steel frame system Spring House W L A Images courtesyby Akira photography (2016), Spring HouseW L A, retrievedfrom:https://www.archdaily.com/photographer/akira-photography (2016). Spring Spring House. Retrievedfrom:https://www.archdaily.com/789515/spring-house-w-l-a WLA, (2015). The spring house/WLA. Retrievedfrom:http://www.understandconstruction.com/steel-frame-structures.html B. Dwight (n.d.). STEELFRAME STRUCTURES. Retrievedfrom:https://www.whirlwindsteel.com/blog/bid/407580/7-advantages-of-structural-steel-frame-construction Whirlwind Team (2015). 7ADVANTAGESOF STRUCTURALSTEELFRAME CONSTRUCTION. Retrievedfrom:https://www.whirlwindsteel.com/blog/bid/407580/7-advantages-of-structural-steel-frame-construction 2 5
  • 26. 26 Floor Spring House W L A Images courtesyby Akira photography (2016), Spring HouseW L A, retrievedfrom:https://www.archdaily.com/photographer/akira-photography J. W. Rackham, G. H. Couchman, & S. J. Hicks, (2009), Composite Slabs and Beams using Steel Decking: Best Practice for Design and Construction (Revised Edition). Britian, The Metal Cladding & Roofing ManufacturersAssociation in partnershipwith The SteelConstructionInstitute Retreivedfrom:https://www.steelconstruction.info/images/b/b8/SCI_P300.pdf M. Crisinel, & D.C. O'Leary,(1996). STATE-OF-THE-ART REVIEW OF COMPOSITE FLOOR SLABDESIGNANDCONSTRUCTION. Retrievedfrom:https://www.researchgate.net/publication/37455428_Composite_Floor_Slab_Design_and_Construction Roof Nest We Grow Moment Connection J. Jenny, (2015). InnovativeDetail:NestWeGrowMomentConnection. Retrievedfrom:https://www.architectmagazine.com/technology/detail/innovative-detail-nest-we-grow-moment-connection_o S. Eduardo, (2015). NestWeGrow/ Faculdade de ProjetoAmbientalUCBerkeley+ Kengo Kuma& Associates Retrievedfrom: https://www.archdaily.com.br/br/765181/nest-we-grow-college-of-environmental-design-uc-berkeley-plus-kengo-kuma-and- associates/54c9b1dce58ece5c5e000219-section-aa (2015). NestWeGrow/ Kengo Kuma & Associates+ Collegeof EnvironmentalDesign UCBerkeley. Retrievedfrom:https://www.archdaily.com/592660/nest-we-grow-college-of-environmental-design-uc-berkeley-kengo-kuma-and-associates