Six Sigma DMAIC Project




                                            GEAE Account




                                    Project Leader/Green Belt: Mike Lisenby
                        Project Leader Title: Project Coordinator and Certified Green Belt
                                      Project Start Date: September 9, 2002

Master Black Belt: Steven Bonacorsi
Six Sigma in Action
                                                                             Dell Server Ordering
Customer Profile – Global design & production company for Aircraft Engines         Before Z_ST 1.4

Business Problem & Impact
Server replacements with Dell products had come to a halt, due to an
inability to correlate servers and components received with what was
ordered. The required cycle time of 10 days was not being met.                    Success          Defect
                                                                                    48%             52%
                                                                                 (29 Orders)
                                                                                                  (31 Orders)
Measure & Analyze
Data Collection: Cycle time was measured in days, from the date of order
to the date of delivery. The existing process sigma was negative 1.2. A
complete analysis of continuous data collected was performed. Upon
review, the customer elected to change their CTQ, causing a shift to
discrete data analysis.
                                                                                   After Z_ST 2.76
Root Causes: Lack of an identification methodology up-front in the
ordering process was identified as the root cause. Shipping distance was a                      Defect
contributor.                                                                                     10%
                                                                                                (3 Orders)

Improve & Control
Host name and/or project code of the parent server was used as a
reference on each server/component order. Orders for multiple servers
were separated into logical units.                                                 Success
                                                                                     90%
                                                                                  (26 Orders)
Results/Benefits
After the 2 month project, the customer saved US$258K, and ITS saved
$16K as a result of the improved process.


                 A Combined Savings of $275K Over 12 Months!

Mais conteúdo relacionado

Mais de Kevin Egan

Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case StudyKevin Egan
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case StudyKevin Egan
 
Operating System Six Sigma Case Study
Operating System Six Sigma Case StudyOperating System Six Sigma Case Study
Operating System Six Sigma Case StudyKevin Egan
 
Pc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case StudyPc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case StudyKevin Egan
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudyKevin Egan
 
Sms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudySms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudyKevin Egan
 
Ticket Accuracy Six Sigma Case Study
Ticket Accuracy   Six Sigma Case StudyTicket Accuracy   Six Sigma Case Study
Ticket Accuracy Six Sigma Case StudyKevin Egan
 
Qaa paul nelson
Qaa   paul nelsonQaa   paul nelson
Qaa paul nelsonKevin Egan
 
Pharma iq mediakit1
Pharma iq mediakit1Pharma iq mediakit1
Pharma iq mediakit1Kevin Egan
 
Jack Welch Speak - PEXN
Jack Welch Speak - PEXNJack Welch Speak - PEXN
Jack Welch Speak - PEXNKevin Egan
 
ISLSS Offerings
ISLSS OfferingsISLSS Offerings
ISLSS OfferingsKevin Egan
 

Mais de Kevin Egan (11)

Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case Study
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
Operating System Six Sigma Case Study
Operating System Six Sigma Case StudyOperating System Six Sigma Case Study
Operating System Six Sigma Case Study
 
Pc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case StudyPc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case Study
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case Study
 
Sms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudySms Integration Six Sigma Case Study
Sms Integration Six Sigma Case Study
 
Ticket Accuracy Six Sigma Case Study
Ticket Accuracy   Six Sigma Case StudyTicket Accuracy   Six Sigma Case Study
Ticket Accuracy Six Sigma Case Study
 
Qaa paul nelson
Qaa   paul nelsonQaa   paul nelson
Qaa paul nelson
 
Pharma iq mediakit1
Pharma iq mediakit1Pharma iq mediakit1
Pharma iq mediakit1
 
Jack Welch Speak - PEXN
Jack Welch Speak - PEXNJack Welch Speak - PEXN
Jack Welch Speak - PEXN
 
ISLSS Offerings
ISLSS OfferingsISLSS Offerings
ISLSS Offerings
 

Dell Server Ordering Six Sigma Case Study

  • 1. Six Sigma DMAIC Project GEAE Account Project Leader/Green Belt: Mike Lisenby Project Leader Title: Project Coordinator and Certified Green Belt Project Start Date: September 9, 2002 Master Black Belt: Steven Bonacorsi
  • 2. Six Sigma in Action Dell Server Ordering Customer Profile – Global design & production company for Aircraft Engines Before Z_ST 1.4 Business Problem & Impact Server replacements with Dell products had come to a halt, due to an inability to correlate servers and components received with what was ordered. The required cycle time of 10 days was not being met. Success Defect 48% 52% (29 Orders) (31 Orders) Measure & Analyze Data Collection: Cycle time was measured in days, from the date of order to the date of delivery. The existing process sigma was negative 1.2. A complete analysis of continuous data collected was performed. Upon review, the customer elected to change their CTQ, causing a shift to discrete data analysis. After Z_ST 2.76 Root Causes: Lack of an identification methodology up-front in the ordering process was identified as the root cause. Shipping distance was a Defect contributor. 10% (3 Orders) Improve & Control Host name and/or project code of the parent server was used as a reference on each server/component order. Orders for multiple servers were separated into logical units. Success 90% (26 Orders) Results/Benefits After the 2 month project, the customer saved US$258K, and ITS saved $16K as a result of the improved process. A Combined Savings of $275K Over 12 Months!