CONTENTS
 Introduction
 Site Analysis
 Concept
 Master Plan
 Planting Plan
 Costing
 Construction Details
 Maintenance Plan
INTRODUCTION
In this project, we are assigned to conduct a landscape project in the campus. The campus
is in need of green spaces to balance the concrete and the greens.
The site need not to be more than 10m X 10m. We have selected the site in front of the
library which is near the stairs. It is a walkway to Block D. Researches and analyses were
conducted to understand the site and the needs of it. We are to show a master plan and also
propose a planting plan for the site. The costing and maintenance are also taken into
consideration. Sketches and elevations were drawn for a better understanding of the reason
we proposed site.
The site is named ‘90 DEGREES’ due to the fact that our site is located on the walls and
columns and not on the ground, forming a right angle with the corridor. The implementation
of our site will form vertical landscapes that provides greenery to the place.
SITE ANALYSIS
The site is located on the walls of the stairs and library in Block C of Taylor’s University
Lakeside Campus. It spans the 2nd
and 3rd
Floors of Block C. It is also adjacent to the
Tiffin café and right in front of the library entrance and is easily accessed by the walkway
in Level 2.
The library wall: The wall in front of the library entrance:
A.Site Specification
1. Original condition of the site
The left section of the site faces
the walkway from Block C all the
way to block E therefore there
will be many passers-by.
The wall, which is part of the
site faces the entrance of the
Library. There are some Plotted
trees to provide shades from
the sunlight during the evening.
A walkway can be seen when
facing south from the site. The
walkway connects from Block C
to Block E. Students and
lecturers pass by this area on a
frequent basis.
When facing North beneath one of the sections in our
site (The library windows), the Experimental Studio
can be seen. Students and lecturers walk through this
place to go to the Grand Hall and the Commercial
Block.
Photos taken from the site:
2. Circulation Patterns On Site
Second Floor
Third Floor
HUMAN CIRCULATION: People can access the site easily from anywhere
WIND CIRCULATION: The wind blows from every direction as our site is locate in an open
area
SUN CIRCULATION: The sun shone from the East to West with more sunlight directed to
our site during the evening but most of the time will be covered by concrete roof
3. Shading on site
The site is comparatively not as sunny and hot as open spaces as there is a concrete
ceiling covered as shown in one of the pictures above. However, during the evening
hours, approximately 5pm to 6.30 pm, where the sun strikes at the side, the site gets
sunny and hot, causing the front section to get a little bit of sunlight. The side section
and the back section does not get much sunlight and it is covered by a concrete wall.
Therefore, more non-sun-tolerant plants should be planted throughout this area as
they could survive in a more shady setting.
This small tree provide shade
during from the evening
Our site does not get much sunlight as
it is covered by the concrete ceiling
CONCEPT:
CLASH of CONTEMPORARY and
VERTICAL GARDENS
Contemporary gardens have become a trend nowadays. It focuses on simple yet elegant
design which enhances the space given.
Contemporary gardens emphasizes on the rawness of the materials without the use of fancy
pottery and hardscape. In addition, the urban spaces are getting limited day by day, people
have found a new way to bring in greenery to the city. This can be done by developing
vertical gardens.
Vertical gardens is a method of planting greenery vertically instead of planting it on the
ground. In this case, creepers and planter boxes are used widely.
Taylor's University has a very modern structure which will fit well with the two concepts
above. Thus, provides the ideal garden for the campus.
MASTER PLAN
When people think about landscaping, they usually think about horizontal landscapes. This
project takes a different approach by doing vertical landscapes. The site is given the
name ’90 DEGREES’ as the two vertical sections in the site are at vertical angles with one
another. The walls are also placed at a 90 degree angle wih the floor.
The section on the left consists of multiple library windows. A concrete platform will be built
using reinforced concrete. It will serve as a flat surface to place three planter boxes. The
plants planted in the planter boxes are desert roses (adenium obesum) and devil’s ivy
(epipremnum aureum). The section on the right consists of a stairway that spans the first to
third floor of Block C in Taylor’s University. Two brick walls, two vertical gardens, eight
vertical metal wires and a bench made of metal net and aggregates are located in this
section.
Bubble Diagram of The Site
PLANTING PLAN
Elevation 1
Elevation 2
Planting List
Scientific Name Common Name
1 Adenium Obesum Desert Roses
2 Epipremnum Aureum Golden Queen
3 Adiantum Pedatum Five-Fingered Fern
4 Loropetalum Chinense Chinese Fringe Flower
5 Drynaria Quercifolia Oak Leaf Fern
6 Bryophya Moss
7 Tristellatia Australasae Shower of Gold Climber
Adenium Obesum Epipremnum Aureum Adiantum Pedatum
Loropetalum Chinense Adiantum Pedatum Loropetalum Chinense
Tristellateia Australasae
These plants listed above are suitable for our site as they grow well in humid tropical climates.
As the site receives little amount of sunlight and is shaded from rainfall, plants with low sunlight
and water requirements are chosen. The types of plants we have included in our site include
creeper plants (or better known as vines), ferns, and flowering plants. Three different species
of ferns are planted on the walls to produce a vertical garden. Loam soil is used as a growing
medium due to its rich nutrient content. This type of soil is easy for roots and water to penetrate
through. Moss grows naturally on the brick walls due to the damp condition of our site.
COSTING
ITEM DESCRIPTION UNIT QUANTITY RATE(RM) TOTAL(RM)
1 PRELIMINARIES
1.1 General site clearance of areas free from m² 100 6 600.00
major obstructions
1.2 Insurance premiums for Public Liability/
Contractor All Risks(CAR),SOCSO etc L.Sum 2000.00
1.3 Provide all costs incurred by complying with
all Safety,Health and Welfare Regulations,
pertaining to all workpeople employed on site L.Sum 2000.00
1.4 Fee/Premium for Performance Bond
(Insurance Guarantee or Bank Guarantee) L.Sum 2500.00
1.5 Mobilization L.Sum 1000.00
2 PIPE WORKS
2.1 Bed and haunching of concrete to pipe L.Sum 100.00
2.2 Poly pipe (W25mm H25mm L50000mm) L.Sum 173.50
3 HARDSCAPES
3.1 External walls-common bricks in gauged mortar
half brick thick m² 7.2 320 2304.00
3.2 Bricks and concrete platform m² 1.5 308 462.00
3.3 Steel bars(0.1m Hx 0.8m Lx 0.2m W) No 32 450 14400.00
3.4 Aggregate concrete wired bench L.Sum 1000
3.5 Planter box(0.3m Wx2.2m Lx 0.3m H) No 3 1500 4500.00
3.6 Strechable wire cable L.Sum 300.00
3.7 Pocket Vertical Garden Kit (0.3m Wx1.5m H) No 16 640 10240.00
3.8 30pockets in a set,8sets for each wall
3.9 Metal Net(7.3m L) L.Sum 12.00
SUB TOTAL 41591.50
ITEM DESCRIPTION UNIT QUANTITY RATE(RM) TOTAL(RM)
4 SOIL
4.1 Imported topsoilfillingandcompost to fill
planter boxes to height 24'' m³ 10 60 600.00
5 SOFTSCAPES
5.1 Plants
a Adenium Obesum(Desert Rose) m² 11 35 385.00
b Trollius Chinensis(Golden Queen) m² 11 15 165.00
c Tristellateia Australasiae(Galphimia Vine) m² 7 13 91.00
d Adiantum Pedatum m² 2.18 22 47.96
e Loropetalum Chinense m² 2.18 40 87.20
f Drynaria Quercifolia m² 2.18 50 109.00
6 ELECTRICAL WORKS
6.1 Spotlight No 2 80 160.00
6.2 Electricalwire L.Sum 170.00
7 MAINTENANCE PLANFOR ONE YEAR
7.1 To provide alllabours,equipment,tools,etc
andcarry out maintenance for allplants
(fertilisers,replacingdead plants,etc)
for 12 months month 12 1000 12000.00
SUB TOTAL 13815.16
7 CONTINGENCIES % 5% 2770.33
GRAND TOTAL 58176.99
CONSTRUCTION DETAILS
Vertical Garden Planter Pockets
Semi permeable pockets will
be used to grow 3 m x 1.2 m
living walls on both columns
in the site. The pockets are
made of polyethylene
terephthalate (PET), a
synthetic plastic polyester
that has excellent wear
resistance and low
coefficient of friction, making
it easy to clean. The PET is
also an amazing material
that provides a safe growing
medium that is pH neutral
and non-reactive, making it
safe for plants to grow in it.
It also had low maintenance
cost and high quality.
These pockets are hooked onto nails on the columns
in our site using strong nylon tabs. The pockets will
be filled with loam soil, which provides sufficient
nutirents for the ferns to grow. As the pockets are
semi-permeable, water can flow through the pockets
to other plants below it while soil remains contained
in it.
Dimensioning of a set of pockets:
Dimensioning for a single pocket:
Three different types of plants will be planted in
the pockets, namely adiantum pedatum,
loropetalum chinense and drynaria quercifolia.
900 cubic cm / 890 g of loam soil fills up each
pocket, providing a medium for the plants to go.
Poly pipes that carry water from a water source
and excess water from the planter box will be
used to irrigate the plants from the top.
Diagram of two Vertical Garden Planter Pockets:
The Concrete Platform for the Planter Box
A 7.2 m x 0.4 m x 0.2 m concrete platform with an internal inclined plane is built below the
windows. To put it in place, 14 steel bars will be drilled into the wall to keep the concrete
platform in place. Reinforced concrete is selected as a material to build the platform as it
is strong enough.
Dimensioning of the concrete platform:
The metal net serves as a flat surface to place three planter boxes with dimensions of 2.2
m x 0.3 m x 0.3 m. Excess water from the soil in the planter boxes move through the
metal net to prevent ponding. The inclined plane directs water to a hole. The water is then
transported via a poly pipe to the vertical garden.
To make the concrete platform in tact with the wall and not pose a threat to passers-by
below, 14 pairs of steel bars are drilled into the wall below the library windows to make
the attachment firm. Bricks and concrete will cover the steel bars, completing the
platform.
Materials used for constructing the concrete platform:
Metal net Steel bars Bricks Concrete
The colour of the three planter boxes placed on top of the metal net is black so that it
does not look filthy after a long period of time. The material is plastic as it is light, cheap,
easy to maintain, gets cleaned easily and has high tensile strength.
Desert roses (Adenium Obosum) and Golden
Queen plants (Epipremnum Aureum) will be
planted in the rich loam soil that fills the planter
box.
Diagram of how the planter box is placed and how the plants are watered:
Diagram of water movement in the site:
The excess water from the planter box is used to water the plants in the vertical gardens.
The water hydrates the plants in the Vertical Garden Planter Pockets. Hence, water is
recycled and there will be less wastage of resources during the irrigation process.
Poly pipes will be used to irrigate and drain water in our
site. These pipes are selected due to their high quality,
strong durability and their characteristic of not rusting.
MAINTENANCE PLAN
Maintenance Specifications:
Integrated Pest Management
Fertilizers shall be used to maintain the health of plants. For all year, existing plants and
new plantings shall be monitored at weekly intervals for pest infestations and symptoms
of stress, and bi-weekly thereafter.
A. Irrigation system
1. Automated systems shall operate only in the morning or evening hours, namely 7
am and 5 pm as these times tend to be cool, so the amount of water lost through
evaporation is much less than other time of the day. Plants shall not be watered
at night as if they stay damp, they are more likely to be damaged by fungal and
bacterial diseases.
2. Automated systems shall not over-spray onto surrounding pavement. Each
sprinkler in the planter box will be set to spray only 50 ml each sprinkling session.
3. The dripping mechanisms in the vertical garden will only drip 40 ml each session
into the soil of the plants as excess water from the planter box is transported to
the planter pockets.
4. The irrigation system shall be maintained to insure that all areas receive sufficient
water. Damaged or vandalized pipes shall be replaced as soon as possible.
5. Routinely inspect all water lines, valves and pumps for leaks. Hired workers of
Taylor’s University Lakeside Campus will check the irrigation mechanisms in the
site once every three days.
B. Hand watering specifications:
1. The roots of plants will be irrigated every day as the site is under the roof and does
not receive natural rainfall.
2. All plantings shall be monitored. If showing signs of stress related to lack of water,
the plants will be deeply hand watered as needed.
C. Pesticide requirements:
1. Pests shall be managed in accordance with the bio-rational (non-toxic)
pesticides when necessary to prevent damage to plantings.
D. Fertilization requirements:
1. Soil and plant tissue shall be tested and slow-release fertilizer applied as
needed to maintain healthy growing conditions for shrubs, trees and grass.
E. Pruning requirements:
1. Shrubs will be monitored and pruned
once every two days to remove weak,
diseased or damaged limbs/branches in
order to avoid the need for pesticide
applications and to maintain the plants in
proper form.
Weekly Timetable For Maintenance Before Noon
Day/Time 7:00
am
7:30 am 8:00
am
9:00 am 10:00 am
Monday Sprinkling
and
drippling
Hand
removal
of weeds
Adding
fertilizer
to loam
soil
- Hand
watering
by workers
Tuesday Sprinkling
and
drippling
Pruning - - Hand
watering
by workers
Wednesday Sprinkling
and
drippling
Hand
removal
of weeds
- - Hand
watering
by workers
Thursday Sprinkling
and
drippling
Pruning Adding
fertilizer
to loam
soil
- Hand
watering
by workers
Friday Sprinkling
and
drippling
Hand
removal
of weeds
- - Hand
watering
by workers
Saturday Sprinkling
and
drippling
Pruning - Inspection
of
pesticides
Hand
watering
by workers
Sunday Sprinkling
and
drippling
Hand
removal
of weeds
- Applying
pesticides
(Only for
month)
Hand
watering
by workers
Weekly Timetable For Maintenance After Noon
Day/Time 4:30 pm 5:00 pm 8:30 pm 9:00 pm
Monday Hand
watering
by
workers
Sprinkling
and
drippling
Sweeping of
concourse
-
Tuesday Hand
watering
by
workers
Sprinkling
and
drippling
Sweeping of
concourse
Inspection of
plumbing and
lights
Wednesday Hand
watering
by
workers
Sprinkling
and
drippling
Sweeping of
concourse
-
Thursday Hand
watering
by
workers
Sprinkling
and
drippling
Sweeping of
concourse
Inspection of
plumbing and
lights
Friday Hand
watering
by
workers
Sprinkling
and
drippling
Sweeping of
concourse
-
Saturday Hand
watering
by
workers
Sprinkling
and
drippling
Sweeping of
concourse
Inspection of
plumbing and
lights
Sunday Hand
watering
by
workers
Sprinkling
and
drippling
Sweeping of
concourse
-

Mais conteúdo relacionado

Mais procurados

Assignment mixed land use
Assignment mixed land useAssignment mixed land use
Assignment mixed land use
arpriyank
 

Mais procurados (20)

Design of spaces by william whyte
Design of spaces by william whyte  Design of spaces by william whyte
Design of spaces by william whyte
 
IFC
IFCIFC
IFC
 
Gift, Gujarat
Gift, GujaratGift, Gujarat
Gift, Gujarat
 
Gandhi nagar
Gandhi nagarGandhi nagar
Gandhi nagar
 
High rise building study & report
High rise building study & reportHigh rise building study & report
High rise building study & report
 
yamuna appartment case study.pptx
yamuna appartment case study.pptxyamuna appartment case study.pptx
yamuna appartment case study.pptx
 
city of paris.ppt
city of paris.pptcity of paris.ppt
city of paris.ppt
 
Gandhinagar,Gujarat,India- Urban Design for Student Architects.
Gandhinagar,Gujarat,India- Urban Design for Student Architects.Gandhinagar,Gujarat,India- Urban Design for Student Architects.
Gandhinagar,Gujarat,India- Urban Design for Student Architects.
 
Lec- 13a GARDEN CITY CONCEPT OF TOWN PLANNING.pptx
Lec- 13a GARDEN CITY CONCEPT OF TOWN PLANNING.pptxLec- 13a GARDEN CITY CONCEPT OF TOWN PLANNING.pptx
Lec- 13a GARDEN CITY CONCEPT OF TOWN PLANNING.pptx
 
Thee Urban Vision's Placemaking Program
Thee Urban Vision's Placemaking ProgramThee Urban Vision's Placemaking Program
Thee Urban Vision's Placemaking Program
 
Assignment mixed land use
Assignment mixed land useAssignment mixed land use
Assignment mixed land use
 
Charleschorrea
CharleschorreaCharleschorrea
Charleschorrea
 
Type of high rise building
Type of high rise buildingType of high rise building
Type of high rise building
 
Connaught place
Connaught placeConnaught place
Connaught place
 
Space frame
Space frameSpace frame
Space frame
 
Urban Design Project 2
Urban Design Project 2Urban Design Project 2
Urban Design Project 2
 
Urban Street Edge
Urban Street EdgeUrban Street Edge
Urban Street Edge
 
Copenhagen 1
Copenhagen 1Copenhagen 1
Copenhagen 1
 
case study of INFOSYS MIHAN
case study of INFOSYS MIHANcase study of INFOSYS MIHAN
case study of INFOSYS MIHAN
 
Sangath- An Architect's Office
Sangath- An Architect's OfficeSangath- An Architect's Office
Sangath- An Architect's Office
 

Destaque (16)

Final site analysis
Final site analysisFinal site analysis
Final site analysis
 
ICI 4. site analysis pdf
ICI 4. site analysis pdfICI 4. site analysis pdf
ICI 4. site analysis pdf
 
Final project(2)
Final project(2)Final project(2)
Final project(2)
 
Site analysis at Kuala Selangor-Lake
Site analysis at Kuala Selangor-LakeSite analysis at Kuala Selangor-Lake
Site analysis at Kuala Selangor-Lake
 
Photobook small
Photobook smallPhotobook small
Photobook small
 
Group b site analysis (1)
Group b   site analysis  (1)Group b   site analysis  (1)
Group b site analysis (1)
 
Final presentation studio site analysis
Final presentation studio site analysisFinal presentation studio site analysis
Final presentation studio site analysis
 
SITE ANALYSIS
SITE ANALYSISSITE ANALYSIS
SITE ANALYSIS
 
Site B site analysis
Site B site analysisSite B site analysis
Site B site analysis
 
Site Analysis
Site AnalysisSite Analysis
Site Analysis
 
Dv site analysis report
Dv site analysis reportDv site analysis report
Dv site analysis report
 
lecture 4 : types of planting design
 lecture 4 : types of planting design  lecture 4 : types of planting design
lecture 4 : types of planting design
 
Site Analysis
Site AnalysisSite Analysis
Site Analysis
 
Site analysis presentation
Site analysis presentationSite analysis presentation
Site analysis presentation
 
Site planning kevin lynch
Site planning kevin lynchSite planning kevin lynch
Site planning kevin lynch
 
Site analysis-example
Site analysis-exampleSite analysis-example
Site analysis-example
 

Semelhante a Constructed landscape final project (final)

Constructedlandscapefinalprojectfinal 140822034343-phpapp02
Constructedlandscapefinalprojectfinal 140822034343-phpapp02Constructedlandscapefinalprojectfinal 140822034343-phpapp02
Constructedlandscapefinalprojectfinal 140822034343-phpapp02
Christina Ng Sue Li
 
Constructed landscape final project (final)
Constructed landscape final project (final)Constructed landscape final project (final)
Constructed landscape final project (final)
Muhammad Naim
 
Chong yu xuan cl-report
Chong yu xuan cl-reportChong yu xuan cl-report
Chong yu xuan cl-report
Yong Sy
 
CL final assignment report
CL final assignment reportCL final assignment report
CL final assignment report
kongzc
 
Chong yu xuan cl-report
Chong yu xuan cl-reportChong yu xuan cl-report
Chong yu xuan cl-report
Chong Yu Xuan
 
Chong yu xuan cl-report
Chong yu xuan cl-reportChong yu xuan cl-report
Chong yu xuan cl-report
Lwj Welson
 
FNBE0214_CL_Final Project_Report
FNBE0214_CL_Final Project_ReportFNBE0214_CL_Final Project_Report
FNBE0214_CL_Final Project_Report
Winnie Ang
 
Constructed landscape report for final project
Constructed landscape report for  final projectConstructed landscape report for  final project
Constructed landscape report for final project
Lee Jian Ru
 
CL FINAL PROJECT REPORT
CL FINAL PROJECT REPORTCL FINAL PROJECT REPORT
CL FINAL PROJECT REPORT
Jıa Yıı
 
Foundation in natural and built environment
Foundation in natural and built environmentFoundation in natural and built environment
Foundation in natural and built environment
Jaclyn Hwang
 
Ici final group
Ici final groupIci final group
Ici final group
Kailyn Lee
 

Semelhante a Constructed landscape final project (final) (20)

Constructedlandscapefinalprojectfinal 140822034343-phpapp02
Constructedlandscapefinalprojectfinal 140822034343-phpapp02Constructedlandscapefinalprojectfinal 140822034343-phpapp02
Constructedlandscapefinalprojectfinal 140822034343-phpapp02
 
Constructed landscape final project (final)
Constructed landscape final project (final)Constructed landscape final project (final)
Constructed landscape final project (final)
 
Chong yu xuan cl-report
Chong yu xuan cl-reportChong yu xuan cl-report
Chong yu xuan cl-report
 
CL final assignment report
CL final assignment reportCL final assignment report
CL final assignment report
 
Chong yu xuan cl-report
Chong yu xuan cl-reportChong yu xuan cl-report
Chong yu xuan cl-report
 
Chong yu xuan cl-report
Chong yu xuan cl-reportChong yu xuan cl-report
Chong yu xuan cl-report
 
CL - Final Project Report
CL - Final Project ReportCL - Final Project Report
CL - Final Project Report
 
FNBE0214_CL_Final Project_Report
FNBE0214_CL_Final Project_ReportFNBE0214_CL_Final Project_Report
FNBE0214_CL_Final Project_Report
 
Cl
ClCl
Cl
 
CL Report
CL ReportCL Report
CL Report
 
Cl report
Cl reportCl report
Cl report
 
Part 1 group 5 report (includies photobook)
Part 1 group 5 report (includies photobook)Part 1 group 5 report (includies photobook)
Part 1 group 5 report (includies photobook)
 
CL - Project 3 ( Final Project ) ~ The Landscape Project
CL - Project 3 ( Final Project ) ~ The Landscape Project CL - Project 3 ( Final Project ) ~ The Landscape Project
CL - Project 3 ( Final Project ) ~ The Landscape Project
 
Constructed landscape report for final project
Constructed landscape report for  final projectConstructed landscape report for  final project
Constructed landscape report for final project
 
CL FINAL PROJECT REPORT
CL FINAL PROJECT REPORTCL FINAL PROJECT REPORT
CL FINAL PROJECT REPORT
 
CL Final Report
CL Final ReportCL Final Report
CL Final Report
 
Foundation in natural and built environment
Foundation in natural and built environmentFoundation in natural and built environment
Foundation in natural and built environment
 
Constructed Landscape
Constructed LandscapeConstructed Landscape
Constructed Landscape
 
Cl
ClCl
Cl
 
Ici final group
Ici final groupIci final group
Ici final group
 

Mais de jygwen (17)

Epc 2
Epc 2Epc 2
Epc 2
 
Psy final
Psy finalPsy final
Psy final
 
Full 2
Full 2Full 2
Full 2
 
Epc tra.house
Epc tra.houseEpc tra.house
Epc tra.house
 
Mathematics
MathematicsMathematics
Mathematics
 
Acc
AccAcc
Acc
 
Psy2nd journ
Psy2nd journPsy2nd journ
Psy2nd journ
 
Circles&sphere
Circles&sphereCircles&sphere
Circles&sphere
 
Eng presentation
Eng presentationEng presentation
Eng presentation
 
eng research report
eng research reporteng research report
eng research report
 
Psycho
PsychoPsycho
Psycho
 
Compare&contrast
Compare&contrastCompare&contrast
Compare&contrast
 
Ici final project report
Ici final project reportIci final project report
Ici final project report
 
Fp part a - report template
Fp   part a - report templateFp   part a - report template
Fp part a - report template
 
Magazine ici
Magazine iciMagazine ici
Magazine ici
 
Eng oral presentation
Eng oral presentationEng oral presentation
Eng oral presentation
 
English essay
English essayEnglish essay
English essay
 

Último

Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 

Último (20)

Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 

Constructed landscape final project (final)

  • 1. CONSTRUCTED LANDSCAPE FINAL PROJECT LANDSCAPE PROJECT Intake: FNBE 0414 Lecturer: Mr Lee Cherng Yih Group Members: Christina Ng Sue Li Karolina Bondarenko Lim Joe Onn Naim Ariffin Ong Eu Xuan Sonia Mancxia Tan Jia Yi 90 DEGREES
  • 2. CONTENTS  Introduction  Site Analysis  Concept  Master Plan  Planting Plan  Costing  Construction Details  Maintenance Plan
  • 3. INTRODUCTION In this project, we are assigned to conduct a landscape project in the campus. The campus is in need of green spaces to balance the concrete and the greens. The site need not to be more than 10m X 10m. We have selected the site in front of the library which is near the stairs. It is a walkway to Block D. Researches and analyses were conducted to understand the site and the needs of it. We are to show a master plan and also propose a planting plan for the site. The costing and maintenance are also taken into consideration. Sketches and elevations were drawn for a better understanding of the reason we proposed site. The site is named ‘90 DEGREES’ due to the fact that our site is located on the walls and columns and not on the ground, forming a right angle with the corridor. The implementation of our site will form vertical landscapes that provides greenery to the place.
  • 4. SITE ANALYSIS The site is located on the walls of the stairs and library in Block C of Taylor’s University Lakeside Campus. It spans the 2nd and 3rd Floors of Block C. It is also adjacent to the Tiffin café and right in front of the library entrance and is easily accessed by the walkway in Level 2. The library wall: The wall in front of the library entrance:
  • 5. A.Site Specification 1. Original condition of the site The left section of the site faces the walkway from Block C all the way to block E therefore there will be many passers-by. The wall, which is part of the site faces the entrance of the Library. There are some Plotted trees to provide shades from the sunlight during the evening. A walkway can be seen when facing south from the site. The walkway connects from Block C to Block E. Students and lecturers pass by this area on a frequent basis. When facing North beneath one of the sections in our site (The library windows), the Experimental Studio can be seen. Students and lecturers walk through this place to go to the Grand Hall and the Commercial Block.
  • 6. Photos taken from the site: 2. Circulation Patterns On Site Second Floor
  • 7. Third Floor HUMAN CIRCULATION: People can access the site easily from anywhere WIND CIRCULATION: The wind blows from every direction as our site is locate in an open area SUN CIRCULATION: The sun shone from the East to West with more sunlight directed to our site during the evening but most of the time will be covered by concrete roof
  • 8. 3. Shading on site The site is comparatively not as sunny and hot as open spaces as there is a concrete ceiling covered as shown in one of the pictures above. However, during the evening hours, approximately 5pm to 6.30 pm, where the sun strikes at the side, the site gets sunny and hot, causing the front section to get a little bit of sunlight. The side section and the back section does not get much sunlight and it is covered by a concrete wall. Therefore, more non-sun-tolerant plants should be planted throughout this area as they could survive in a more shady setting. This small tree provide shade during from the evening Our site does not get much sunlight as it is covered by the concrete ceiling
  • 9. CONCEPT: CLASH of CONTEMPORARY and VERTICAL GARDENS Contemporary gardens have become a trend nowadays. It focuses on simple yet elegant design which enhances the space given. Contemporary gardens emphasizes on the rawness of the materials without the use of fancy pottery and hardscape. In addition, the urban spaces are getting limited day by day, people have found a new way to bring in greenery to the city. This can be done by developing vertical gardens.
  • 10. Vertical gardens is a method of planting greenery vertically instead of planting it on the ground. In this case, creepers and planter boxes are used widely. Taylor's University has a very modern structure which will fit well with the two concepts above. Thus, provides the ideal garden for the campus.
  • 11. MASTER PLAN When people think about landscaping, they usually think about horizontal landscapes. This project takes a different approach by doing vertical landscapes. The site is given the name ’90 DEGREES’ as the two vertical sections in the site are at vertical angles with one another. The walls are also placed at a 90 degree angle wih the floor. The section on the left consists of multiple library windows. A concrete platform will be built using reinforced concrete. It will serve as a flat surface to place three planter boxes. The plants planted in the planter boxes are desert roses (adenium obesum) and devil’s ivy (epipremnum aureum). The section on the right consists of a stairway that spans the first to third floor of Block C in Taylor’s University. Two brick walls, two vertical gardens, eight vertical metal wires and a bench made of metal net and aggregates are located in this section. Bubble Diagram of The Site
  • 13. Planting List Scientific Name Common Name 1 Adenium Obesum Desert Roses 2 Epipremnum Aureum Golden Queen 3 Adiantum Pedatum Five-Fingered Fern 4 Loropetalum Chinense Chinese Fringe Flower 5 Drynaria Quercifolia Oak Leaf Fern 6 Bryophya Moss 7 Tristellatia Australasae Shower of Gold Climber Adenium Obesum Epipremnum Aureum Adiantum Pedatum Loropetalum Chinense Adiantum Pedatum Loropetalum Chinense Tristellateia Australasae These plants listed above are suitable for our site as they grow well in humid tropical climates. As the site receives little amount of sunlight and is shaded from rainfall, plants with low sunlight and water requirements are chosen. The types of plants we have included in our site include creeper plants (or better known as vines), ferns, and flowering plants. Three different species of ferns are planted on the walls to produce a vertical garden. Loam soil is used as a growing medium due to its rich nutrient content. This type of soil is easy for roots and water to penetrate through. Moss grows naturally on the brick walls due to the damp condition of our site.
  • 14. COSTING ITEM DESCRIPTION UNIT QUANTITY RATE(RM) TOTAL(RM) 1 PRELIMINARIES 1.1 General site clearance of areas free from m² 100 6 600.00 major obstructions 1.2 Insurance premiums for Public Liability/ Contractor All Risks(CAR),SOCSO etc L.Sum 2000.00 1.3 Provide all costs incurred by complying with all Safety,Health and Welfare Regulations, pertaining to all workpeople employed on site L.Sum 2000.00 1.4 Fee/Premium for Performance Bond (Insurance Guarantee or Bank Guarantee) L.Sum 2500.00 1.5 Mobilization L.Sum 1000.00 2 PIPE WORKS 2.1 Bed and haunching of concrete to pipe L.Sum 100.00 2.2 Poly pipe (W25mm H25mm L50000mm) L.Sum 173.50 3 HARDSCAPES 3.1 External walls-common bricks in gauged mortar half brick thick m² 7.2 320 2304.00 3.2 Bricks and concrete platform m² 1.5 308 462.00 3.3 Steel bars(0.1m Hx 0.8m Lx 0.2m W) No 32 450 14400.00 3.4 Aggregate concrete wired bench L.Sum 1000 3.5 Planter box(0.3m Wx2.2m Lx 0.3m H) No 3 1500 4500.00 3.6 Strechable wire cable L.Sum 300.00 3.7 Pocket Vertical Garden Kit (0.3m Wx1.5m H) No 16 640 10240.00 3.8 30pockets in a set,8sets for each wall 3.9 Metal Net(7.3m L) L.Sum 12.00 SUB TOTAL 41591.50
  • 15. ITEM DESCRIPTION UNIT QUANTITY RATE(RM) TOTAL(RM) 4 SOIL 4.1 Imported topsoilfillingandcompost to fill planter boxes to height 24'' m³ 10 60 600.00 5 SOFTSCAPES 5.1 Plants a Adenium Obesum(Desert Rose) m² 11 35 385.00 b Trollius Chinensis(Golden Queen) m² 11 15 165.00 c Tristellateia Australasiae(Galphimia Vine) m² 7 13 91.00 d Adiantum Pedatum m² 2.18 22 47.96 e Loropetalum Chinense m² 2.18 40 87.20 f Drynaria Quercifolia m² 2.18 50 109.00 6 ELECTRICAL WORKS 6.1 Spotlight No 2 80 160.00 6.2 Electricalwire L.Sum 170.00 7 MAINTENANCE PLANFOR ONE YEAR 7.1 To provide alllabours,equipment,tools,etc andcarry out maintenance for allplants (fertilisers,replacingdead plants,etc) for 12 months month 12 1000 12000.00 SUB TOTAL 13815.16 7 CONTINGENCIES % 5% 2770.33 GRAND TOTAL 58176.99
  • 16. CONSTRUCTION DETAILS Vertical Garden Planter Pockets Semi permeable pockets will be used to grow 3 m x 1.2 m living walls on both columns in the site. The pockets are made of polyethylene terephthalate (PET), a synthetic plastic polyester that has excellent wear resistance and low coefficient of friction, making it easy to clean. The PET is also an amazing material that provides a safe growing medium that is pH neutral and non-reactive, making it safe for plants to grow in it. It also had low maintenance cost and high quality. These pockets are hooked onto nails on the columns in our site using strong nylon tabs. The pockets will be filled with loam soil, which provides sufficient nutirents for the ferns to grow. As the pockets are semi-permeable, water can flow through the pockets to other plants below it while soil remains contained in it.
  • 17. Dimensioning of a set of pockets: Dimensioning for a single pocket: Three different types of plants will be planted in the pockets, namely adiantum pedatum, loropetalum chinense and drynaria quercifolia. 900 cubic cm / 890 g of loam soil fills up each pocket, providing a medium for the plants to go. Poly pipes that carry water from a water source and excess water from the planter box will be used to irrigate the plants from the top.
  • 18. Diagram of two Vertical Garden Planter Pockets:
  • 19. The Concrete Platform for the Planter Box A 7.2 m x 0.4 m x 0.2 m concrete platform with an internal inclined plane is built below the windows. To put it in place, 14 steel bars will be drilled into the wall to keep the concrete platform in place. Reinforced concrete is selected as a material to build the platform as it is strong enough. Dimensioning of the concrete platform: The metal net serves as a flat surface to place three planter boxes with dimensions of 2.2 m x 0.3 m x 0.3 m. Excess water from the soil in the planter boxes move through the metal net to prevent ponding. The inclined plane directs water to a hole. The water is then transported via a poly pipe to the vertical garden. To make the concrete platform in tact with the wall and not pose a threat to passers-by below, 14 pairs of steel bars are drilled into the wall below the library windows to make the attachment firm. Bricks and concrete will cover the steel bars, completing the platform. Materials used for constructing the concrete platform: Metal net Steel bars Bricks Concrete
  • 20. The colour of the three planter boxes placed on top of the metal net is black so that it does not look filthy after a long period of time. The material is plastic as it is light, cheap, easy to maintain, gets cleaned easily and has high tensile strength. Desert roses (Adenium Obosum) and Golden Queen plants (Epipremnum Aureum) will be planted in the rich loam soil that fills the planter box. Diagram of how the planter box is placed and how the plants are watered:
  • 21. Diagram of water movement in the site: The excess water from the planter box is used to water the plants in the vertical gardens. The water hydrates the plants in the Vertical Garden Planter Pockets. Hence, water is recycled and there will be less wastage of resources during the irrigation process. Poly pipes will be used to irrigate and drain water in our site. These pipes are selected due to their high quality, strong durability and their characteristic of not rusting.
  • 22. MAINTENANCE PLAN Maintenance Specifications: Integrated Pest Management Fertilizers shall be used to maintain the health of plants. For all year, existing plants and new plantings shall be monitored at weekly intervals for pest infestations and symptoms of stress, and bi-weekly thereafter. A. Irrigation system 1. Automated systems shall operate only in the morning or evening hours, namely 7 am and 5 pm as these times tend to be cool, so the amount of water lost through evaporation is much less than other time of the day. Plants shall not be watered at night as if they stay damp, they are more likely to be damaged by fungal and bacterial diseases. 2. Automated systems shall not over-spray onto surrounding pavement. Each sprinkler in the planter box will be set to spray only 50 ml each sprinkling session. 3. The dripping mechanisms in the vertical garden will only drip 40 ml each session into the soil of the plants as excess water from the planter box is transported to the planter pockets.
  • 23. 4. The irrigation system shall be maintained to insure that all areas receive sufficient water. Damaged or vandalized pipes shall be replaced as soon as possible. 5. Routinely inspect all water lines, valves and pumps for leaks. Hired workers of Taylor’s University Lakeside Campus will check the irrigation mechanisms in the site once every three days. B. Hand watering specifications: 1. The roots of plants will be irrigated every day as the site is under the roof and does not receive natural rainfall. 2. All plantings shall be monitored. If showing signs of stress related to lack of water, the plants will be deeply hand watered as needed. C. Pesticide requirements: 1. Pests shall be managed in accordance with the bio-rational (non-toxic) pesticides when necessary to prevent damage to plantings. D. Fertilization requirements: 1. Soil and plant tissue shall be tested and slow-release fertilizer applied as needed to maintain healthy growing conditions for shrubs, trees and grass. E. Pruning requirements: 1. Shrubs will be monitored and pruned once every two days to remove weak, diseased or damaged limbs/branches in order to avoid the need for pesticide applications and to maintain the plants in proper form.
  • 24. Weekly Timetable For Maintenance Before Noon Day/Time 7:00 am 7:30 am 8:00 am 9:00 am 10:00 am Monday Sprinkling and drippling Hand removal of weeds Adding fertilizer to loam soil - Hand watering by workers Tuesday Sprinkling and drippling Pruning - - Hand watering by workers Wednesday Sprinkling and drippling Hand removal of weeds - - Hand watering by workers Thursday Sprinkling and drippling Pruning Adding fertilizer to loam soil - Hand watering by workers Friday Sprinkling and drippling Hand removal of weeds - - Hand watering by workers Saturday Sprinkling and drippling Pruning - Inspection of pesticides Hand watering by workers Sunday Sprinkling and drippling Hand removal of weeds - Applying pesticides (Only for month) Hand watering by workers
  • 25. Weekly Timetable For Maintenance After Noon Day/Time 4:30 pm 5:00 pm 8:30 pm 9:00 pm Monday Hand watering by workers Sprinkling and drippling Sweeping of concourse - Tuesday Hand watering by workers Sprinkling and drippling Sweeping of concourse Inspection of plumbing and lights Wednesday Hand watering by workers Sprinkling and drippling Sweeping of concourse - Thursday Hand watering by workers Sprinkling and drippling Sweeping of concourse Inspection of plumbing and lights Friday Hand watering by workers Sprinkling and drippling Sweeping of concourse - Saturday Hand watering by workers Sprinkling and drippling Sweeping of concourse Inspection of plumbing and lights Sunday Hand watering by workers Sprinkling and drippling Sweeping of concourse -