PROJECT PLANNING THE “REALITY CHECK” BUDGET

  When we are planning a project for a client we
  depend on you, our subcontractors and vendors
  to provide essential budget and technical
  information about what we are planning.

  This is an overview of the first phase of that
  process. We call it the “reality check” budget.

  Here is how it works…
         Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING THE “REALITY CHECK” BUDGET

  Our job together is to provide our client with the
         answer to two essential questions:

                                                       What it takes to
                                                      accomplish those
                                                           goals




            Everything they would
            like to achieve to make
           their good home better                            $
        What’s possible?                           At what cost?
         Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING THE “REALITY CHECK” BUDGET


                 CLIENT NAME &
                 ADDRESS
                                        We do this by
                                        outlining their goals.


Our Design
Agreement
lists the
project’s
goals




             Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING THE “REALITY CHECK” BUDGET
      And producing a preliminary plan that
        they agree achieves those goals


                                                                                         The
                                                                                         “schematic”
                                                                                         plan shows
                                                                                         what we
                                                                                         might
                                                                                         choose to do




         Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING THE “REALITY CHECK” BUDGET

We now have a picture of “what’s possible”.
Next we want to determine “at what cost?”

We want to do this at the right level of detail,
enough but not too much. Our goal is a low to
high budget range to serve as a “reality check.”

Our client can then determine whether the
project and its features are reasonable, and
react accordingly.

          Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING THE “REALITY CHECK” BUDGET
                                                       As we develop the project
                                                       we will move from the
                       Reality                         general to the specific as
        Review
         and
                       Check
                                                       we progress thru each
        Revise
                                                       phase of the design
                 Contract
                  Budget
                                                       process.

                                                       When we request your
                                                       input, be sure you
     Fixed Price Contract for a
        Clear Scope of Work                            understand where we are
                                                       in the process.
           Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING THE “REALITY CHECK” BUDGET

                                                                We start by breaking
                                                                the project into
CLIENT NAME



                                                                “Phases” so that we
                                                                understand their cost
                                                                and, if needed, can
                                                                choose to postpone or
                                                                eliminate some work .

    This is a screen from our
                                                                This helps you picture
    customized “Scope of
    Work” estimating system
                                                                the areas of the project.

                  Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING THE “REALITY CHECK” BUDGET




                        PHASE
                                                                          Next we describe




                                       TASK ITEM
      CATEGORY                                                            the tasks
                                                                          necessary, in
                                                                          general categories
                                                                          of work, to build
                                                                          what is designed in
                                                                          each phase.

                                                                          This is where your
                                                                          scope of work is
                                                                          described.
                 Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING THE “REALITY CHECK” BUDGET
For each task we determine what resources will be
required. At this stage we may choose general unit
costs to get close without taking your time.


                                  UNIT COST ITEM




                                                                     WHICH SUB?
                                                                                     This is where
                                                                                     we assign
                                                                                     work to you


         Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING THE “REALITY CHECK” BUDGET

Or we may identify the materials required and a
subcontractor that will perform the work.




                 We need an estimated cost
                 from this subcontractor                    Now we need you!	

         Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING THE “REALITY CHECK” BUDGET
                                                       We use these phases and
                                                       scope items to request a
                                                       preliminary “Budget
                                                       Proposal” from you for
                                                       each item that we have
                                                       assigned to you.

                                                       We create this form to
    TASK ITEMS




                                                       make responding clear
                                                       and easy.
                 Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING THE “REALITY CHECK” BUDGET
Clear instructions about the purpose                                     The project, who will
                                                                         do the work, the active
and use of the form are provided.                                        plans, and the date




                                                                             A review of what to do



                                                     A reminder about the need to
                                                     respond in a reasonable time

         Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING THE “REALITY CHECK” BUDGET
Then each item is listed with space for
you to provide cost, time, and comments                                          What is the
                                                                                 estimated cost for
                                                                                 each item and how
                                                                                 long might it take



                                                                                 Is this just an
                                                                                 estimated cost or
                                                                                 can it be used to go
                                                                                 to Contract


                                                                                 Comments about
                                                                                 this item that we
                                                                                 need to pay
                                                                                 attention to



         Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING THE “REALITY CHECK” BUDGET

If needed, we provide special notes about the task to
call attention to specific requirements or conditions.




                                                    We add special technical notes,
                                                    site conditions, or comments that
                                                    you have provided about this task

         Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING THE “REALITY CHECK” BUDGET

Those notes then appear in the proposal request, as
well as in the final work authorization




         Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING THE “REALITY CHECK” BUDGET




                                                                                                     HIGH
                                                                                      LOW
We enter cost information
provided by every sub, then
present our client with a
summary of budget ranges for
each category and phase. This
helps them understand the
budget and make a decision
about how to proceed.
            Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING THE “REALITY CHECK” BUDGET

Along with the budget,
the client receives the
written scope of work
that includes every
item in each phase and
category in the exact
same language that you
were provided, but
without the special
technical notes.

          Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING THE “REALITY CHECK” BUDGET

  With your help, we now have all the information
     necessary for our client to understand…

                                                       What it takes to
                                                      accomplish those
                                                           goals




            Everything they would
            like to achieve to make
           their good home better                            $
        What’s possible?                           At what cost?
         Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING THE “REALITY CHECK” BUDGET
                                                    We can now revise the project
                                                    in response to what we have
                                                    learned.
                       Reality
        Review         Check
         and
        Revise                                      In the next phase of the
                                                    process we will clarify the
                 Contract
                  Budget                            details necessary to produce a
                                                    clear scope of work for the
                                                    final fixed price contract. You
                                                    will have the chance to confirm
     Fixed Price Contract for a                     or revise the information you
        Clear Scope of Work
                                                    have provided in this phase.

           Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING THE “REALITY CHECK” BUDGET
We manage project information in this way so that we can easily
respond to the client’s changes in the scope of the project
    From “reality check” to final contract budget



                                               Perhaps the
                                               client
                                               chooses to
                                               do less work



                                               ELIMINATE

                                                                 For the final contract
                                                                 we go from low to high
                                               ELIMINATE         budget ranges to single
                                                                 fixed costs

                Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING THE “REALITY CHECK” BUDGET

                                                By managing information
                                                in this way we are striving
                                                to make the best use of
                                                everybody’s time.

                                                We value your attention
                                                and rely on your input to
                                                assure that the project is
                                                successful and satisfying
                                                for everyone.

         Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING THE “REALITY CHECK” BUDGET

                      What happens next?

                      Once our client responds to the project
                      budget we can refine the details and
                      produce accurate drawings and a
                      contract scope of work.

                      Then we will ask you to provide costs for
                      the actual project as shown and
                      described in those documents.

         Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
PROJECT PLANNING THE “REALITY CHECK” BUDGET




                         MAKE
                         SENSE

         Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants

Mais conteúdo relacionado

Semelhante a Reality Check Budget

iDesignX Presentation
iDesignX PresentationiDesignX Presentation
iDesignX PresentationiDesignX
 
The Digital Creative Process
The Digital Creative ProcessThe Digital Creative Process
The Digital Creative Processstorybridge
 
Project network scheduling and S-curve
Project network scheduling and S-curve Project network scheduling and S-curve
Project network scheduling and S-curve Satish Yadavalli
 
Advanced Projects(tm) Brochure Oct09
Advanced Projects(tm)   Brochure   Oct09Advanced Projects(tm)   Brochure   Oct09
Advanced Projects(tm) Brochure Oct09dbevort
 
Conceptual estimating, design-build_and_the_steel_fabricator
Conceptual estimating, design-build_and_the_steel_fabricatorConceptual estimating, design-build_and_the_steel_fabricator
Conceptual estimating, design-build_and_the_steel_fabricatorPT.DYKA Sarana Teknikatama
 
Agile project planning
Agile project planningAgile project planning
Agile project planningTroy Bitter
 
Pace Brochusre Part 2
Pace Brochusre Part 2Pace Brochusre Part 2
Pace Brochusre Part 2guestdcb540a
 
Project design and management
Project design and managementProject design and management
Project design and managementAndrew Zolnai
 
Project Iniation And Setup
Project Iniation And SetupProject Iniation And Setup
Project Iniation And SetupSpinnaker_Group
 
David Chan Profile And Experience
David Chan Profile And ExperienceDavid Chan Profile And Experience
David Chan Profile And ExperienceDavid Chan
 
Building Results Oriented Websites: The Method That Ends the Madness
Building Results Oriented Websites: The Method That Ends the MadnessBuilding Results Oriented Websites: The Method That Ends the Madness
Building Results Oriented Websites: The Method That Ends the MadnessTom McCracken
 
Areen Commercial Design
Areen Commercial DesignAreen Commercial Design
Areen Commercial DesignAreen Design
 
092811 updated contech brochure
092811 updated contech brochure092811 updated contech brochure
092811 updated contech brochurePaul Smith
 
092811 updated contech brochure
092811 updated contech brochure092811 updated contech brochure
092811 updated contech brochurePaul Smith
 
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...Ed Kozak
 
010212 updated contech brochure cta
010212 updated contech brochure cta010212 updated contech brochure cta
010212 updated contech brochure ctaPaul Smith
 
010212 updated contech brochure cta
010212 updated contech brochure cta010212 updated contech brochure cta
010212 updated contech brochure ctaPaul Smith
 

Semelhante a Reality Check Budget (20)

iDesignX Presentation
iDesignX PresentationiDesignX Presentation
iDesignX Presentation
 
The Digital Creative Process
The Digital Creative ProcessThe Digital Creative Process
The Digital Creative Process
 
Methodology
MethodologyMethodology
Methodology
 
Project network scheduling and S-curve
Project network scheduling and S-curve Project network scheduling and S-curve
Project network scheduling and S-curve
 
Advanced Projects(tm) Brochure Oct09
Advanced Projects(tm)   Brochure   Oct09Advanced Projects(tm)   Brochure   Oct09
Advanced Projects(tm) Brochure Oct09
 
Conceptual estimating, design-build_and_the_steel_fabricator
Conceptual estimating, design-build_and_the_steel_fabricatorConceptual estimating, design-build_and_the_steel_fabricator
Conceptual estimating, design-build_and_the_steel_fabricator
 
Agile project planning
Agile project planningAgile project planning
Agile project planning
 
Pace Brochusre Part 2
Pace Brochusre Part 2Pace Brochusre Part 2
Pace Brochusre Part 2
 
Project design and management
Project design and managementProject design and management
Project design and management
 
Project Iniation And Setup
Project Iniation And SetupProject Iniation And Setup
Project Iniation And Setup
 
David Chan Profile And Experience
David Chan Profile And ExperienceDavid Chan Profile And Experience
David Chan Profile And Experience
 
Building Results Oriented Websites: The Method That Ends the Madness
Building Results Oriented Websites: The Method That Ends the MadnessBuilding Results Oriented Websites: The Method That Ends the Madness
Building Results Oriented Websites: The Method That Ends the Madness
 
Lean UX
Lean UXLean UX
Lean UX
 
Primera Reunión del SGLC. Daria Zimina
Primera Reunión del SGLC. Daria ZiminaPrimera Reunión del SGLC. Daria Zimina
Primera Reunión del SGLC. Daria Zimina
 
Areen Commercial Design
Areen Commercial DesignAreen Commercial Design
Areen Commercial Design
 
092811 updated contech brochure
092811 updated contech brochure092811 updated contech brochure
092811 updated contech brochure
 
092811 updated contech brochure
092811 updated contech brochure092811 updated contech brochure
092811 updated contech brochure
 
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
 
010212 updated contech brochure cta
010212 updated contech brochure cta010212 updated contech brochure cta
010212 updated contech brochure cta
 
010212 updated contech brochure cta
010212 updated contech brochure cta010212 updated contech brochure cta
010212 updated contech brochure cta
 

Mais de Jamie Wolf

Wolfpack at Emerald Builders Orientation
Wolfpack at Emerald Builders OrientationWolfpack at Emerald Builders Orientation
Wolfpack at Emerald Builders OrientationJamie Wolf
 
Wolfpack at building shelter orientation
Wolfpack at building shelter orientationWolfpack at building shelter orientation
Wolfpack at building shelter orientationJamie Wolf
 
Wolfpack at lewis creek orientation
Wolfpack at lewis creek orientationWolfpack at lewis creek orientation
Wolfpack at lewis creek orientationJamie Wolf
 
Up and to the right!
Up and to the right!Up and to the right!
Up and to the right!Jamie Wolf
 
Board leadership
Board leadershipBoard leadership
Board leadershipJamie Wolf
 
Thinking about the BE365 System
Thinking about the BE365 SystemThinking about the BE365 System
Thinking about the BE365 SystemJamie Wolf
 
Ph coffee cup metaphor
Ph coffee cup metaphorPh coffee cup metaphor
Ph coffee cup metaphorJamie Wolf
 
Collaboration workgroup
Collaboration workgroupCollaboration workgroup
Collaboration workgroupJamie Wolf
 
Systems primer intro 10.24.11
Systems primer intro 10.24.11Systems primer intro 10.24.11
Systems primer intro 10.24.11Jamie Wolf
 
Thermal Comfort
Thermal ComfortThermal Comfort
Thermal ComfortJamie Wolf
 
BE10 Meta Patterns of Sustainability
BE10 Meta Patterns of SustainabilityBE10 Meta Patterns of Sustainability
BE10 Meta Patterns of SustainabilityJamie Wolf
 
Open Source Practice Intro
Open Source Practice IntroOpen Source Practice Intro
Open Source Practice IntroJamie Wolf
 
Wolfworks Cambium 2010
Wolfworks Cambium 2010Wolfworks Cambium 2010
Wolfworks Cambium 2010Jamie Wolf
 
Remodeling Budget Think
Remodeling Budget ThinkRemodeling Budget Think
Remodeling Budget ThinkJamie Wolf
 

Mais de Jamie Wolf (16)

Wolfpack at Emerald Builders Orientation
Wolfpack at Emerald Builders OrientationWolfpack at Emerald Builders Orientation
Wolfpack at Emerald Builders Orientation
 
Wolfpack at building shelter orientation
Wolfpack at building shelter orientationWolfpack at building shelter orientation
Wolfpack at building shelter orientation
 
Wolfpack at lewis creek orientation
Wolfpack at lewis creek orientationWolfpack at lewis creek orientation
Wolfpack at lewis creek orientation
 
Up and to the right!
Up and to the right!Up and to the right!
Up and to the right!
 
Board leadership
Board leadershipBoard leadership
Board leadership
 
Thinking about the BE365 System
Thinking about the BE365 SystemThinking about the BE365 System
Thinking about the BE365 System
 
Be365
Be365Be365
Be365
 
Ph coffee cup metaphor
Ph coffee cup metaphorPh coffee cup metaphor
Ph coffee cup metaphor
 
Collaboration workgroup
Collaboration workgroupCollaboration workgroup
Collaboration workgroup
 
Systems primer intro 10.24.11
Systems primer intro 10.24.11Systems primer intro 10.24.11
Systems primer intro 10.24.11
 
Thermal Comfort
Thermal ComfortThermal Comfort
Thermal Comfort
 
BE10 Meta Patterns of Sustainability
BE10 Meta Patterns of SustainabilityBE10 Meta Patterns of Sustainability
BE10 Meta Patterns of Sustainability
 
Be10 Awards
Be10 AwardsBe10 Awards
Be10 Awards
 
Open Source Practice Intro
Open Source Practice IntroOpen Source Practice Intro
Open Source Practice Intro
 
Wolfworks Cambium 2010
Wolfworks Cambium 2010Wolfworks Cambium 2010
Wolfworks Cambium 2010
 
Remodeling Budget Think
Remodeling Budget ThinkRemodeling Budget Think
Remodeling Budget Think
 

Reality Check Budget

  • 1. PROJECT PLANNING THE “REALITY CHECK” BUDGET When we are planning a project for a client we depend on you, our subcontractors and vendors to provide essential budget and technical information about what we are planning. This is an overview of the first phase of that process. We call it the “reality check” budget. Here is how it works… Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 2. PROJECT PLANNING THE “REALITY CHECK” BUDGET Our job together is to provide our client with the answer to two essential questions: What it takes to accomplish those goals Everything they would like to achieve to make their good home better $ What’s possible? At what cost? Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 3. PROJECT PLANNING THE “REALITY CHECK” BUDGET CLIENT NAME & ADDRESS We do this by outlining their goals. Our Design Agreement lists the project’s goals Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 4. PROJECT PLANNING THE “REALITY CHECK” BUDGET And producing a preliminary plan that they agree achieves those goals The “schematic” plan shows what we might choose to do Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 5. PROJECT PLANNING THE “REALITY CHECK” BUDGET We now have a picture of “what’s possible”. Next we want to determine “at what cost?” We want to do this at the right level of detail, enough but not too much. Our goal is a low to high budget range to serve as a “reality check.” Our client can then determine whether the project and its features are reasonable, and react accordingly. Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 6. PROJECT PLANNING THE “REALITY CHECK” BUDGET As we develop the project we will move from the Reality general to the specific as Review and Check we progress thru each Revise phase of the design Contract Budget process. When we request your input, be sure you Fixed Price Contract for a Clear Scope of Work understand where we are in the process. Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 7. PROJECT PLANNING THE “REALITY CHECK” BUDGET We start by breaking the project into CLIENT NAME “Phases” so that we understand their cost and, if needed, can choose to postpone or eliminate some work . This is a screen from our This helps you picture customized “Scope of Work” estimating system the areas of the project. Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 8. PROJECT PLANNING THE “REALITY CHECK” BUDGET PHASE Next we describe TASK ITEM CATEGORY the tasks necessary, in general categories of work, to build what is designed in each phase. This is where your scope of work is described. Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 9. PROJECT PLANNING THE “REALITY CHECK” BUDGET For each task we determine what resources will be required. At this stage we may choose general unit costs to get close without taking your time. UNIT COST ITEM WHICH SUB? This is where we assign work to you Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 10. PROJECT PLANNING THE “REALITY CHECK” BUDGET Or we may identify the materials required and a subcontractor that will perform the work. We need an estimated cost from this subcontractor Now we need you! Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 11. PROJECT PLANNING THE “REALITY CHECK” BUDGET We use these phases and scope items to request a preliminary “Budget Proposal” from you for each item that we have assigned to you. We create this form to TASK ITEMS make responding clear and easy. Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 12. PROJECT PLANNING THE “REALITY CHECK” BUDGET Clear instructions about the purpose The project, who will do the work, the active and use of the form are provided. plans, and the date A review of what to do A reminder about the need to respond in a reasonable time Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 13. PROJECT PLANNING THE “REALITY CHECK” BUDGET Then each item is listed with space for you to provide cost, time, and comments What is the estimated cost for each item and how long might it take Is this just an estimated cost or can it be used to go to Contract Comments about this item that we need to pay attention to Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 14. PROJECT PLANNING THE “REALITY CHECK” BUDGET If needed, we provide special notes about the task to call attention to specific requirements or conditions. We add special technical notes, site conditions, or comments that you have provided about this task Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 15. PROJECT PLANNING THE “REALITY CHECK” BUDGET Those notes then appear in the proposal request, as well as in the final work authorization Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 16. PROJECT PLANNING THE “REALITY CHECK” BUDGET HIGH LOW We enter cost information provided by every sub, then present our client with a summary of budget ranges for each category and phase. This helps them understand the budget and make a decision about how to proceed. Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 17. PROJECT PLANNING THE “REALITY CHECK” BUDGET Along with the budget, the client receives the written scope of work that includes every item in each phase and category in the exact same language that you were provided, but without the special technical notes. Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 18. PROJECT PLANNING THE “REALITY CHECK” BUDGET With your help, we now have all the information necessary for our client to understand… What it takes to accomplish those goals Everything they would like to achieve to make their good home better $ What’s possible? At what cost? Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 19. PROJECT PLANNING THE “REALITY CHECK” BUDGET We can now revise the project in response to what we have learned. Reality Review Check and Revise In the next phase of the process we will clarify the Contract Budget details necessary to produce a clear scope of work for the final fixed price contract. You will have the chance to confirm Fixed Price Contract for a or revise the information you Clear Scope of Work have provided in this phase. Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 20. PROJECT PLANNING THE “REALITY CHECK” BUDGET We manage project information in this way so that we can easily respond to the client’s changes in the scope of the project From “reality check” to final contract budget Perhaps the client chooses to do less work ELIMINATE For the final contract we go from low to high ELIMINATE budget ranges to single fixed costs Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 21. PROJECT PLANNING THE “REALITY CHECK” BUDGET By managing information in this way we are striving to make the best use of everybody’s time. We value your attention and rely on your input to assure that the project is successful and satisfying for everyone. Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 22. PROJECT PLANNING THE “REALITY CHECK” BUDGET What happens next? Once our client responds to the project budget we can refine the details and produce accurate drawings and a contract scope of work. Then we will ask you to provide costs for the actual project as shown and described in those documents. Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants
  • 23. PROJECT PLANNING THE “REALITY CHECK” BUDGET MAKE SENSE Designers & Builders of FUTURE FRIENDLY HOMES • Certified Passive House Consultants