What is Construction ?
 
 
 
What is Construction ? As products “ Construction is a  UNIQUE PRODUCT produced by combining and organising people, materials, machine, money, technology and environment  Project Management CCM
 
 
 
 
From economics perspective Under the Standard Industrial Classification, construction is defined as   “the activity of erecting buildings and other structures, commercial, structural and residential work, including all demolition, repair and renovation works” Project Management CCM WHAT IS CONSTRUCTION ?
As a process It is  the process of organising and combining materials, plant and machinery, people (firms and companies), money, technology and the environment in systematic and logical sequential manner to produce construction products through the function of planning, organising, coordinating and controlling” Project Management CCM WHAT IS CONSTRUCTION ?
What is construction ? (as defined by the International Standard Industrial Classification under United Nations) The constructing, altering, repairing and demolishing buildings ;  constructing, altering and repairing of highways and streets and bridges; viaducts, culverts, sewers and water, gas, electricity mains; railway roadbeds, sub-ways and harbour and water ways;  piers; airport and parking areas, dams, drainage, irrigation, flood control and water power project and hydroelectric plants; pipelines; water wells; athletic fields, golf courses, swimming pools and tennis courts; communication systems such as telephone and telegraph lines;
What is construction ? (as defined by the International Standard Industrial Classification under United Nations) The constructing, altering, repairing and demolishing buildings ;  constructing, altering and repairing  of  marine constructions such as dredging and underwater rock removal; pile driving, land draining and reclamation; and other   types of heavy construction.....mining services such preparing and constructing mining sites and drilling crude oil and natrural gas wells… specialist trade contractors’ activities….”
What is construction ? (as defined by the International Standard Industrial Classification under United Nations)   “ the assembly and installation  on site of pre-fabricated, integral parts into bridges, water tanks, storage and warehouse facilities, railroad and elevated right of way, lift and escalators, plumbing, sprinkler, central heating, wiring etc. systems of building and all kinds of structure…..  Including the departments or other units of manufacturers of the pre-fabricated parts and equipment which specialise in this work and  which is feasible to treat as a separate establishments, as well as businesses primarily engaged in the activity, are classified in this group”
 
Building Project  Development Process  (see project procurement)
THE PROCESS OF CONSTRUCTION PROJECT DEVELOPMENT (Traditional system) Design and costing  Appoint consultants Prepare tender  Document Feasibility study Tendering  Evaluate  & Select  contractor Award tender  and  contracting   Construction  Completion  and handover  Client’s intention to build
Stage 1 Concept Stage 2  Brief Preparation Stage 3  Design Development Brief Wait  Design Studies Outline Cost Studies Master Cost Plan and Program Legal Arrangement Consult Authorities Design Development Cost Studies Detail  Brief Commercial advice Funding Wait  Activities Outline Planning Application Outline Planning Permission Detail Planning  Permission Detail Planning  Application Appoint Project Managers & Consultants
Design Sanction Tender Documents etc. Start Construction Mobilization Contract administration/Supervision Demolition Archaeological Dig Cost Review Tender Report Tender Period Possible Early Order Contractor’s Design Design Sanction Construction Period Stage 5 Construction Appoint Contractor Site Possession Out to Tender Stage 4  Tender Documentation & Tendering Soil investigation
Marketing building Final Account Stage 5 Construction Final Completion Pratical Completion Contract administration/Supervision Tenant  requirements Maintenance Handover Stage 4 Closing
DETAILED DESIGN SCHEMATIC DESIGN CONCEPT DESIGN FEASIBILITY STUDY INCEPTION & PRODUCTION OF PROJECT BRIEF TRADITIONAL APPROACH CONSTRUCTION SELECT CONTRACTOR & AWARD OF CONTRACT TENDER AND EVALUATION OF TENDER PREPARE TENDER DOCUMENT PREPARE BILL OF QUANTITIES
EVALUATE BIDDING INVITATION TO TENDER/  BIDDING PREPARE PROJECT BRIEF & CLIENT’S REQUIREMENTS FEASIBILITY STUDY INCEPTION & DEVELOP PROJECT OBJECTIVES DESIGN AND BUILD APPROACH SUBMIT BIDDING DOCUMENT TECHNICAL AND FINANCIAL PROPOSAL  PROJECT COST & PRICE SCHEDULE SCHEMATIC DRAWINGS & SPECIFICATION CLIENT’S RESPONSIBILITY CONTRACTOR’S  RESPONSIBILITY Project Management CCM
HANDING OVER CONTRACTOR’S  RESPONSIBILITY WORK PLANNING SELECTION OF CONTRACTOR & AWARD OF CONTRACT Project Management CCM DESIGN AND BUILD APPROACH DETAIL DRAWINGS & SHOP DRAWINGS CONSTRUTION
EVALUATE BIDDING INVITATION TO BID/ TENDER  PREPARE PROJECT BRIEF & CLIENT’S REQUIREMENTS FEASIBILITY STUDY INCEPTION & DEVELOP PROJECT OBJECTIVES BIDDING DOCUMENTATION TECHNICAL AND FINANCIAL PROPOSAL  PROJECT COST & PRICE SCHEDULE SCHEMATIC DRAWINGS & SPECIFICATION CLIENT’S RESPONSIBILITY CONTRACTOR’S  RESPONSIBILITY Project Management CCM TURNKEY APPROACH
GIVING THE KEYS & HAND OVER CONTRACTOR’S  RESPONSIBILITY WORK PLANNING SELECTION OF CONTRACTOR & AWARD OF CONTRACT SUPPLY AND INSTALL FURNITURE, FITTINGS, ACCESSORIES, DRAPERY ETC Project Management CCM CLIENT’S  RESPONSIBILITY TURNKEY APPROACH DETAIL DRAWINGS & SHOP DRAWINGS CONSTRUTION
STAGE 1 STAGE II STAGE III STAGE IV FEASIBILITY PLANNING  AND DESIGN PRODUCTION TURN OVER AND START UP TIME COST AND % COMPLETE Strategic phase Tactical phase
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],CONSTRUCTION MANAGEMENT TOTAL PROJECT MANAGEMENT DESIGN MANAGEMENT PRODUCTION DESIGN OCCUPANCY CONSTRUCTION PROJECT DEVELOPMENT PROCESS FACILITY MANAGEMENT
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],ASSEMBLY ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],CONSTRUCTION MANAGEMENT CONSTRUCTION PROJECT MANAGEMENT DESIGN MANAGEMENT PRODUCTION DESIGN OCCUPANCY CONSTRUCTION PROCESS FACILITY MANAGEMENT
Building Project Development Process – RIBA Plan of Work Briefing All client interests, consultants Set up client organization for briefing. Consider requirements To prepare general outline of requirements and plan future actions Inception A Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
Building Project Development Process – RIBA Plan of Work Briefing Client’s representative, architect, engineers, quantity surveyors and others according to the nature of the project  Carry out studies of user requirements, site conditions, planning, design, costs etc as necessary for client to make viable decisions To provide the client with an appraisal & recommendation in order that he may make decision on whether to proceed and in which form ensuring that it is feasible economically, functionally and technically Feasibility B Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
Building Project Development Process – RIBA Plan of Work Sketch plan All client interests, architect, engineers, quantity surveyors, specialists and all statutory and approving authority Further develop the brief. Carry out studies on user requirements, technical constraints and problems, planning, design, cost as necessary to reach decisions To determine the general approach to layout, design and construction in order to obtain authoritative approval of the client on the outline proposals and accompanying report OUTLINE PROPOSAL C Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
Building Project Development Process – RIBA Plan of Work Sketch plan All client interests, architect, engineers, quantity surveyors, specialists and all statutory and approving authority Final development of the brief, full design of the project by the architect, preliminary engineering design by engineers, preparation of cost plan by the QS and full technical report. Submission of proposal for approval by the client To complete the brief and decide on particular proposals, including planning arrangement, shape and appearance, constructional method, outline specification and cost plans and to obtain planning, building and all approvals SCHEMATIC DESIGN D Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
Building Project Development Process – RIBA Plan of Work Working drawings Architect, QS, Engineers and specialists, contractor (if already employed) Full design of every part and component on the building by  collaboration of all concerned. Complete cost checking of the design To obtain final decision on every matter related to design, specification, construction and project cost DETAIL DESIGN E Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
Building Project Development Process – RIBA Plan of Work Detail drawings Architect, QS, Engineers and specialists, contractor (if already employed) Preparation of final production information – drawings, specification, and schedules To prepare production information and make final detailed decisions to carry out work PRODUCTION OF INFORMATION F Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
Building Project Development Process – RIBA Plan of Work Working drawings Architect, QS, Engineers and specialists, contractor (if already employed) Preparation of bills of quantities and tender documents To prepare and complete all information and arrangements for obtaining tenders  PREPARE BILLS OF QUANTITIES G Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
Building Project Development Process – RIBA Plan of Work Architect, QS, Engineers and specialists. Action as recommended for open or selective tendering Action as recommended for open or selective tendering TENDER ACTION H Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
Building Project Development Process – RIBA Plan of Work Site operation Contractor and sub-contractors Action in accordance with paras 5-10 inclusive of project management. Contractor to submit work programme Action in accordance with paras 5-10 inclusive of project management PROJECT PLANNING J Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
Building Project Development Process – RIBA Plan of Work Site operation Architect, QS, Engineers, contractors and sub-contractors and client Action in accordance with paras 15-18 inclusive of project management Action in accordance with paras 15-18 inclusive of project management OPERATION ON SITE K Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
Building Project Development Process – RIBA Plan of Work Site operation Architect, QS, Engineers, contractors and client Action in accordance with paras 15-18 inclusive of project management Action in accordance with paras 15-18 inclusive of project management COMPLETION L Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
Building Project Development Process – RIBA Plan of Work Site operation Architect, QS, Engineers, contractor and client Analysis of job records, inspection of completed building. Study of building uses To analyse the management, construction and performance of the project FEED BACK M Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
Assessment and decision  of the need based on organisation aim, objective and policy by management  The need for new  construction arising from commercial, economic, technological and sociological factors Develop alternative concept,  programme,  organisation, prelim. cost and time  estimate Evaluate alternatives  concepts  against  cost, time and  company's  aim, objective and policy Develop project aim & objective,  outline brief,  development programme, set budget & identify  sites Decision to build  according to  the specified concept, cost and time contained in feasibility report DECISION INCEPTION FEASIBILITY CONCEPTION DECISION 1 2 3 4 1 2 3 4
Preliminary product design and engineering,  cost estimate & cost plan, specification resource planning  Preliminary process design & engineering, project program, outline of procurem't system; Project organisat’n Detailed process design (construct’n methods) and specification Final estimate and cost plan as basis for tender evaluation & tender decision Detailed project design and engineering, final estimate & cost plan; detailed specification Information Production  -sufficient document to procure builder, suppliers etc.  5 6 7 8 PRODUCT AND PROCESS  DESIGN AND INFORMATION PRODUCTION DECISION 9
Construction, including supervision, monitoring and evaluation Invite contractors to submit tenders Production ends at this point PROCUREMENT PRODUCTION 10 11 12 10 11 12 13 14 Evaluate tenders and select contractor and execute contract Site possession, mobilization and commence work Completion and handing over + defect liability period
finito

Mais conteúdo relacionado

Mais procurados

Stages In Construction
Stages In ConstructionStages In Construction
Stages In ConstructionAB MAKASANA
 
Tendering in construction introduction
Tendering in construction introductionTendering in construction introduction
Tendering in construction introductionDaniel Ross
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTShankar Ramasamy
 
Quantity surveying course
Quantity surveying courseQuantity surveying course
Quantity surveying courseJavid Hussain
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & EquipmentsGAURAV. H .TANDON
 
Construction management
Construction managementConstruction management
Construction managementUsama Khalid
 
Introduction to Civil engineering drawing
Introduction to Civil engineering drawingIntroduction to Civil engineering drawing
Introduction to Civil engineering drawingMuhammed Salim Manaladi
 
Construction Project Management ppt
Construction Project Management pptConstruction Project Management ppt
Construction Project Management pptRajeshPV12
 
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...AELC
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Managementsrinivas2036
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyorSyafiq Deen
 
Construction Quality & Safety Management
Construction Quality & Safety ManagementConstruction Quality & Safety Management
Construction Quality & Safety ManagementYahaya Hassan Labaran
 
Civil Engineering Materials and Construction Practices
Civil Engineering Materials and Construction PracticesCivil Engineering Materials and Construction Practices
Civil Engineering Materials and Construction PracticesAMIE(I) Study Circle
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYINGlizwi nyandu
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.NAVNEET KUMAR JHA
 

Mais procurados (20)

Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
Construction tender process
Construction tender processConstruction tender process
Construction tender process
 
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
 
Tendering in construction introduction
Tendering in construction introductionTendering in construction introduction
Tendering in construction introduction
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
 
Quantity surveying course
Quantity surveying courseQuantity surveying course
Quantity surveying course
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & Equipments
 
WORKS MANAGEMENT IN CPWD PART-I
WORKS MANAGEMENT IN CPWD PART-IWORKS MANAGEMENT IN CPWD PART-I
WORKS MANAGEMENT IN CPWD PART-I
 
Construction management
Construction managementConstruction management
Construction management
 
Introduction to Civil engineering drawing
Introduction to Civil engineering drawingIntroduction to Civil engineering drawing
Introduction to Civil engineering drawing
 
Construction Project Management ppt
Construction Project Management pptConstruction Project Management ppt
Construction Project Management ppt
 
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Management
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Construction Quality & Safety Management
Construction Quality & Safety ManagementConstruction Quality & Safety Management
Construction Quality & Safety Management
 
Civil Engineering Materials and Construction Practices
Civil Engineering Materials and Construction PracticesCivil Engineering Materials and Construction Practices
Civil Engineering Materials and Construction Practices
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
 
Construction process
Construction processConstruction process
Construction process
 
Tender procedure slide
Tender procedure slideTender procedure slide
Tender procedure slide
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 

Destaque

New trends in engineering contracts
New trends in engineering contractsNew trends in engineering contracts
New trends in engineering contractsMuhammad Aljalali
 
Construction Management (1st Lecture)
Construction Management (1st Lecture) Construction Management (1st Lecture)
Construction Management (1st Lecture) Muhammad Aljalali
 
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project managementKabilan Kabi
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & managementManit Agarwal
 
Tender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process
 

Destaque (7)

FIDIC Gap Analysis
FIDIC Gap AnalysisFIDIC Gap Analysis
FIDIC Gap Analysis
 
New trends in engineering contracts
New trends in engineering contractsNew trends in engineering contracts
New trends in engineering contracts
 
Construction Management (1st Lecture)
Construction Management (1st Lecture) Construction Management (1st Lecture)
Construction Management (1st Lecture)
 
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENTCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT
 
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project management
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & management
 
Tender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement Guide
 

Semelhante a Sxsw 2011 construction enviroment

MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) Mudassir Nazar Dabilkar
 
CONSTRUCTION PROJECT MANAGEMENT - INTRODUCTION
CONSTRUCTION PROJECT MANAGEMENT - INTRODUCTIONCONSTRUCTION PROJECT MANAGEMENT - INTRODUCTION
CONSTRUCTION PROJECT MANAGEMENT - INTRODUCTIONpraveenphalani
 
Advanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptxAdvanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptxSiharaGallage
 
FNBE 0315: ICI & ITD Project Integration (Project 1)
FNBE 0315: ICI & ITD Project Integration (Project 1)FNBE 0315: ICI & ITD Project Integration (Project 1)
FNBE 0315: ICI & ITD Project Integration (Project 1)haeykceb
 
07 It Application01 Intro
07 It Application01 Intro07 It Application01 Intro
07 It Application01 IntroFazie70
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Amir Mohammed
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020MTAF
 
Salem mohamed curriculum vitae
Salem mohamed curriculum vitaeSalem mohamed curriculum vitae
Salem mohamed curriculum vitaeSALEM MOHAMMED
 
Construction Management - Consultant Side
Construction Management - Consultant SideConstruction Management - Consultant Side
Construction Management - Consultant SideAhmed Helmy
 
Guc arct 702 legislations lecture 4 - project delivery process and business...
Guc arct 702 legislations   lecture 4 - project delivery process and business...Guc arct 702 legislations   lecture 4 - project delivery process and business...
Guc arct 702 legislations lecture 4 - project delivery process and business...Galala University
 
professional services and value engeneering
professional services and value engeneeringprofessional services and value engeneering
professional services and value engeneeringAbdo Jamous El Jamous
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008AYM1979
 

Semelhante a Sxsw 2011 construction enviroment (20)

The Architecture Profession
The Architecture ProfessionThe Architecture Profession
The Architecture Profession
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
 
CONSTRUCTION PROJECT MANAGEMENT - INTRODUCTION
CONSTRUCTION PROJECT MANAGEMENT - INTRODUCTIONCONSTRUCTION PROJECT MANAGEMENT - INTRODUCTION
CONSTRUCTION PROJECT MANAGEMENT - INTRODUCTION
 
Advanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptxAdvanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptx
 
Real estate investment
Real estate investmentReal estate investment
Real estate investment
 
FNBE 0315: ICI & ITD Project Integration (Project 1)
FNBE 0315: ICI & ITD Project Integration (Project 1)FNBE 0315: ICI & ITD Project Integration (Project 1)
FNBE 0315: ICI & ITD Project Integration (Project 1)
 
07 It Application01 Intro
07 It Application01 Intro07 It Application01 Intro
07 It Application01 Intro
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020
 
Salem mohamed curriculum vitae
Salem mohamed curriculum vitaeSalem mohamed curriculum vitae
Salem mohamed curriculum vitae
 
Construction Management - Consultant Side
Construction Management - Consultant SideConstruction Management - Consultant Side
Construction Management - Consultant Side
 
landscape
landscapelandscape
landscape
 
Amr Moneim CV March 2016
Amr Moneim CV March 2016Amr Moneim CV March 2016
Amr Moneim CV March 2016
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 
Guc arct 702 legislations lecture 4 - project delivery process and business...
Guc arct 702 legislations   lecture 4 - project delivery process and business...Guc arct 702 legislations   lecture 4 - project delivery process and business...
Guc arct 702 legislations lecture 4 - project delivery process and business...
 
CV-Kunwar Aftab Ahmad Khan-29Oct2015
CV-Kunwar Aftab Ahmad Khan-29Oct2015CV-Kunwar Aftab Ahmad Khan-29Oct2015
CV-Kunwar Aftab Ahmad Khan-29Oct2015
 
professional services and value engeneering
professional services and value engeneeringprofessional services and value engeneering
professional services and value engeneering
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 

Mais de juwes

Road
RoadRoad
Roadjuwes
 
Dw final (inside)
Dw final (inside)Dw final (inside)
Dw final (inside)juwes
 
Diaphragmwall test
Diaphragmwall testDiaphragmwall test
Diaphragmwall testjuwes
 
Cut and cover_sections
Cut and cover_sectionsCut and cover_sections
Cut and cover_sectionsjuwes
 
Wk 4 modular_lecture
Wk 4 modular_lectureWk 4 modular_lecture
Wk 4 modular_lecturejuwes
 
Cofferdam 02
Cofferdam 02Cofferdam 02
Cofferdam 02juwes
 
Coffer dams 01
Coffer dams 01Coffer dams 01
Coffer dams 01juwes
 
Wk 1 2_substructure_dewatering_bw
Wk 1 2_substructure_dewatering_bwWk 1 2_substructure_dewatering_bw
Wk 1 2_substructure_dewatering_bwjuwes
 
Wk 1 2_substructure_dewatering
Wk 1 2_substructure_dewateringWk 1 2_substructure_dewatering
Wk 1 2_substructure_dewateringjuwes
 
earth support
earth supportearth support
earth supportjuwes
 

Mais de juwes (10)

Road
RoadRoad
Road
 
Dw final (inside)
Dw final (inside)Dw final (inside)
Dw final (inside)
 
Diaphragmwall test
Diaphragmwall testDiaphragmwall test
Diaphragmwall test
 
Cut and cover_sections
Cut and cover_sectionsCut and cover_sections
Cut and cover_sections
 
Wk 4 modular_lecture
Wk 4 modular_lectureWk 4 modular_lecture
Wk 4 modular_lecture
 
Cofferdam 02
Cofferdam 02Cofferdam 02
Cofferdam 02
 
Coffer dams 01
Coffer dams 01Coffer dams 01
Coffer dams 01
 
Wk 1 2_substructure_dewatering_bw
Wk 1 2_substructure_dewatering_bwWk 1 2_substructure_dewatering_bw
Wk 1 2_substructure_dewatering_bw
 
Wk 1 2_substructure_dewatering
Wk 1 2_substructure_dewateringWk 1 2_substructure_dewatering
Wk 1 2_substructure_dewatering
 
earth support
earth supportearth support
earth support
 

Sxsw 2011 construction enviroment

  • 2.  
  • 3.  
  • 4.  
  • 5. What is Construction ? As products “ Construction is a UNIQUE PRODUCT produced by combining and organising people, materials, machine, money, technology and environment Project Management CCM
  • 6.  
  • 7.  
  • 8.  
  • 9.  
  • 10. From economics perspective Under the Standard Industrial Classification, construction is defined as “the activity of erecting buildings and other structures, commercial, structural and residential work, including all demolition, repair and renovation works” Project Management CCM WHAT IS CONSTRUCTION ?
  • 11. As a process It is the process of organising and combining materials, plant and machinery, people (firms and companies), money, technology and the environment in systematic and logical sequential manner to produce construction products through the function of planning, organising, coordinating and controlling” Project Management CCM WHAT IS CONSTRUCTION ?
  • 12. What is construction ? (as defined by the International Standard Industrial Classification under United Nations) The constructing, altering, repairing and demolishing buildings ; constructing, altering and repairing of highways and streets and bridges; viaducts, culverts, sewers and water, gas, electricity mains; railway roadbeds, sub-ways and harbour and water ways; piers; airport and parking areas, dams, drainage, irrigation, flood control and water power project and hydroelectric plants; pipelines; water wells; athletic fields, golf courses, swimming pools and tennis courts; communication systems such as telephone and telegraph lines;
  • 13. What is construction ? (as defined by the International Standard Industrial Classification under United Nations) The constructing, altering, repairing and demolishing buildings ; constructing, altering and repairing of marine constructions such as dredging and underwater rock removal; pile driving, land draining and reclamation; and other types of heavy construction.....mining services such preparing and constructing mining sites and drilling crude oil and natrural gas wells… specialist trade contractors’ activities….”
  • 14. What is construction ? (as defined by the International Standard Industrial Classification under United Nations) “ the assembly and installation on site of pre-fabricated, integral parts into bridges, water tanks, storage and warehouse facilities, railroad and elevated right of way, lift and escalators, plumbing, sprinkler, central heating, wiring etc. systems of building and all kinds of structure….. Including the departments or other units of manufacturers of the pre-fabricated parts and equipment which specialise in this work and which is feasible to treat as a separate establishments, as well as businesses primarily engaged in the activity, are classified in this group”
  • 15.  
  • 16. Building Project Development Process (see project procurement)
  • 17. THE PROCESS OF CONSTRUCTION PROJECT DEVELOPMENT (Traditional system) Design and costing Appoint consultants Prepare tender Document Feasibility study Tendering Evaluate & Select contractor Award tender and contracting Construction Completion and handover Client’s intention to build
  • 18. Stage 1 Concept Stage 2 Brief Preparation Stage 3 Design Development Brief Wait Design Studies Outline Cost Studies Master Cost Plan and Program Legal Arrangement Consult Authorities Design Development Cost Studies Detail Brief Commercial advice Funding Wait Activities Outline Planning Application Outline Planning Permission Detail Planning Permission Detail Planning Application Appoint Project Managers & Consultants
  • 19. Design Sanction Tender Documents etc. Start Construction Mobilization Contract administration/Supervision Demolition Archaeological Dig Cost Review Tender Report Tender Period Possible Early Order Contractor’s Design Design Sanction Construction Period Stage 5 Construction Appoint Contractor Site Possession Out to Tender Stage 4 Tender Documentation & Tendering Soil investigation
  • 20. Marketing building Final Account Stage 5 Construction Final Completion Pratical Completion Contract administration/Supervision Tenant requirements Maintenance Handover Stage 4 Closing
  • 21. DETAILED DESIGN SCHEMATIC DESIGN CONCEPT DESIGN FEASIBILITY STUDY INCEPTION & PRODUCTION OF PROJECT BRIEF TRADITIONAL APPROACH CONSTRUCTION SELECT CONTRACTOR & AWARD OF CONTRACT TENDER AND EVALUATION OF TENDER PREPARE TENDER DOCUMENT PREPARE BILL OF QUANTITIES
  • 22. EVALUATE BIDDING INVITATION TO TENDER/ BIDDING PREPARE PROJECT BRIEF & CLIENT’S REQUIREMENTS FEASIBILITY STUDY INCEPTION & DEVELOP PROJECT OBJECTIVES DESIGN AND BUILD APPROACH SUBMIT BIDDING DOCUMENT TECHNICAL AND FINANCIAL PROPOSAL PROJECT COST & PRICE SCHEDULE SCHEMATIC DRAWINGS & SPECIFICATION CLIENT’S RESPONSIBILITY CONTRACTOR’S RESPONSIBILITY Project Management CCM
  • 23. HANDING OVER CONTRACTOR’S RESPONSIBILITY WORK PLANNING SELECTION OF CONTRACTOR & AWARD OF CONTRACT Project Management CCM DESIGN AND BUILD APPROACH DETAIL DRAWINGS & SHOP DRAWINGS CONSTRUTION
  • 24. EVALUATE BIDDING INVITATION TO BID/ TENDER PREPARE PROJECT BRIEF & CLIENT’S REQUIREMENTS FEASIBILITY STUDY INCEPTION & DEVELOP PROJECT OBJECTIVES BIDDING DOCUMENTATION TECHNICAL AND FINANCIAL PROPOSAL PROJECT COST & PRICE SCHEDULE SCHEMATIC DRAWINGS & SPECIFICATION CLIENT’S RESPONSIBILITY CONTRACTOR’S RESPONSIBILITY Project Management CCM TURNKEY APPROACH
  • 25. GIVING THE KEYS & HAND OVER CONTRACTOR’S RESPONSIBILITY WORK PLANNING SELECTION OF CONTRACTOR & AWARD OF CONTRACT SUPPLY AND INSTALL FURNITURE, FITTINGS, ACCESSORIES, DRAPERY ETC Project Management CCM CLIENT’S RESPONSIBILITY TURNKEY APPROACH DETAIL DRAWINGS & SHOP DRAWINGS CONSTRUTION
  • 26. STAGE 1 STAGE II STAGE III STAGE IV FEASIBILITY PLANNING AND DESIGN PRODUCTION TURN OVER AND START UP TIME COST AND % COMPLETE Strategic phase Tactical phase
  • 27.
  • 28.
  • 29. Building Project Development Process – RIBA Plan of Work Briefing All client interests, consultants Set up client organization for briefing. Consider requirements To prepare general outline of requirements and plan future actions Inception A Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
  • 30. Building Project Development Process – RIBA Plan of Work Briefing Client’s representative, architect, engineers, quantity surveyors and others according to the nature of the project Carry out studies of user requirements, site conditions, planning, design, costs etc as necessary for client to make viable decisions To provide the client with an appraisal & recommendation in order that he may make decision on whether to proceed and in which form ensuring that it is feasible economically, functionally and technically Feasibility B Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
  • 31. Building Project Development Process – RIBA Plan of Work Sketch plan All client interests, architect, engineers, quantity surveyors, specialists and all statutory and approving authority Further develop the brief. Carry out studies on user requirements, technical constraints and problems, planning, design, cost as necessary to reach decisions To determine the general approach to layout, design and construction in order to obtain authoritative approval of the client on the outline proposals and accompanying report OUTLINE PROPOSAL C Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
  • 32. Building Project Development Process – RIBA Plan of Work Sketch plan All client interests, architect, engineers, quantity surveyors, specialists and all statutory and approving authority Final development of the brief, full design of the project by the architect, preliminary engineering design by engineers, preparation of cost plan by the QS and full technical report. Submission of proposal for approval by the client To complete the brief and decide on particular proposals, including planning arrangement, shape and appearance, constructional method, outline specification and cost plans and to obtain planning, building and all approvals SCHEMATIC DESIGN D Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
  • 33. Building Project Development Process – RIBA Plan of Work Working drawings Architect, QS, Engineers and specialists, contractor (if already employed) Full design of every part and component on the building by collaboration of all concerned. Complete cost checking of the design To obtain final decision on every matter related to design, specification, construction and project cost DETAIL DESIGN E Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
  • 34. Building Project Development Process – RIBA Plan of Work Detail drawings Architect, QS, Engineers and specialists, contractor (if already employed) Preparation of final production information – drawings, specification, and schedules To prepare production information and make final detailed decisions to carry out work PRODUCTION OF INFORMATION F Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
  • 35. Building Project Development Process – RIBA Plan of Work Working drawings Architect, QS, Engineers and specialists, contractor (if already employed) Preparation of bills of quantities and tender documents To prepare and complete all information and arrangements for obtaining tenders PREPARE BILLS OF QUANTITIES G Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
  • 36. Building Project Development Process – RIBA Plan of Work Architect, QS, Engineers and specialists. Action as recommended for open or selective tendering Action as recommended for open or selective tendering TENDER ACTION H Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
  • 37. Building Project Development Process – RIBA Plan of Work Site operation Contractor and sub-contractors Action in accordance with paras 5-10 inclusive of project management. Contractor to submit work programme Action in accordance with paras 5-10 inclusive of project management PROJECT PLANNING J Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
  • 38. Building Project Development Process – RIBA Plan of Work Site operation Architect, QS, Engineers, contractors and sub-contractors and client Action in accordance with paras 15-18 inclusive of project management Action in accordance with paras 15-18 inclusive of project management OPERATION ON SITE K Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
  • 39. Building Project Development Process – RIBA Plan of Work Site operation Architect, QS, Engineers, contractors and client Action in accordance with paras 15-18 inclusive of project management Action in accordance with paras 15-18 inclusive of project management COMPLETION L Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
  • 40. Building Project Development Process – RIBA Plan of Work Site operation Architect, QS, Engineers, contractor and client Analysis of job records, inspection of completed building. Study of building uses To analyse the management, construction and performance of the project FEED BACK M Usual terminology People directly involved Task to be done Purpose of work and decisions to be reached Stage No
  • 41. Assessment and decision of the need based on organisation aim, objective and policy by management The need for new construction arising from commercial, economic, technological and sociological factors Develop alternative concept, programme, organisation, prelim. cost and time estimate Evaluate alternatives concepts against cost, time and company's aim, objective and policy Develop project aim & objective, outline brief, development programme, set budget & identify sites Decision to build according to the specified concept, cost and time contained in feasibility report DECISION INCEPTION FEASIBILITY CONCEPTION DECISION 1 2 3 4 1 2 3 4
  • 42. Preliminary product design and engineering, cost estimate & cost plan, specification resource planning Preliminary process design & engineering, project program, outline of procurem't system; Project organisat’n Detailed process design (construct’n methods) and specification Final estimate and cost plan as basis for tender evaluation & tender decision Detailed project design and engineering, final estimate & cost plan; detailed specification Information Production -sufficient document to procure builder, suppliers etc. 5 6 7 8 PRODUCT AND PROCESS DESIGN AND INFORMATION PRODUCTION DECISION 9
  • 43. Construction, including supervision, monitoring and evaluation Invite contractors to submit tenders Production ends at this point PROCUREMENT PRODUCTION 10 11 12 10 11 12 13 14 Evaluate tenders and select contractor and execute contract Site possession, mobilization and commence work Completion and handing over + defect liability period